Loading...
RE 09-23-86.3 RESOLUTION NO. 092386.3 A RESOLUTION OF THE CITY COUNCIL OF COPPELL, TEXAS, APPROVING THE ENGINEER'S REPORT ON THE ROAD IMPROVEMENTS ON BELT LINE ROAD NORTH AND SOUTH FROM INTERSTATE 635 TO BELT LINE EAST/WEST, AND CALLING THE PUBLIC HEARING ON THE PROPERTY ASSESSMENTS. WHEREAS, The City Council of the City of Coppell is of the opinion that it is necessary to levy an assessment against the property and the owners thereof abutting upon the following: Belt Line Road North and South from Interstate 635 to Belt Line Road East/West. and against railway companies whose tracks occupy said street if any, for a part of the cost of improving said street, fixing a time for the hearing of the owners of said property, and said railway companies, concerning the same, and directing SVB Real Property Services in conjunction with the City Secretary to give notice of said hearing, as required by law; and, WHEREAS, The City Council has heretofore, by resolution, ordered the improvement of the street enumerated above, by paving said street from curb to curb with 9-inch thickness reinforced 3000-pounds per square inch concrete pavement; with 12-inch cement stabilized base; with 6-inch height integral curbs; with 6-inch thickness reinforced concrete drive approaches; with 4-inch thickness reinforced concrete sidewalks where specified; so that there shall be two roadways each 34 feet in width separated by a variable width median with left turn lanes where specified, and improvements shall include the construction of all necessary storm drainage for the completion of this project, and, WHEREAS, An Engineer's Report has been filed, in accordance with the law, with the City Council, setting forth the participation by the abutting property owners, in the cost thereof, together with the names of the owners and the description of said property, and the work to be done adjacent thereto, and the amounts proposed to be assessed against each lot or parcel and its owners and all other matters required by the applicable law; Now, Therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COPPELL: SECTION 1: That the report or statement filed by Ginn, Inc. having been duly examined is hereby approved. SECTION 2: That it is hereby found and determined that the cost of improvements on the hereinafter described street, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting property and the owners thereof, are as follows, to-wit: Beginning 600 feet North of Interstate 635, approximately 9750 LF of six-lane divided thoroughfare shall be paved consisting of two - 34' b-b 9" thick concrete pavement sections on 12" cement stabilized subgrade, 24' wide median, left turn lanes, curb and gutter, brick pavers, asphalt transitions, rock fill and geotextile fabric along approximately 1600 LF of lake frontage. Major storm sewer and culvert construction consisting of approximately 5500 LF RCP (21" to 12"), 10,700 LF RCBC (3'x2' to 12'xl2')comb. precast and cast-in-place, also includes headwalls, wingwalls, and 300 LF retaining wall. a. The estimated cost of the improvements is $6.275 million including contingencies. b. The estimated rate per front foot to be assessed against abutting property and the owners thereof is $130.56. All assessments, however, are to be made and levied by the City Council as it may deem just and equitable, having in view the special benefits in enhanced value to be received by such parcels of property and owners thereof, the equities of such owners, and the adjustment of the apportionment of the cost of improvements so as to produce a substantial equality of benefits received and burdens imposed. SECTION 3: That a hearing shall be given to said owners of abutting property, and of railways and of street railways,if any, or their agents or attorneys and all persons interested in said matter, as to the amount to be assessed against each owner and his abutting property and railways and street railways, and as to the benefits to said property by reason of said improvement, or any other matter or thing in connection therewith, which hearing shall be held in the Council Chamber of the City Hall of the City of Coppell, County of Dallas, on the 21st day of October, A.D. 1986, at __ p.m., at which time all the said owners, their agents or attorneys or other interested persons are notified to appear and be heard, and at said hearing said owners and other persons may appear, by counsel or in person, and may offer evidence, and said hearing shall be adjourned from day to day until fully accomplished. SVB Real Property Servives in conjunction with the City S~creta~y is.h~reby direqte~ tg. give notice qf~th~ time and place or SUCh nearing ana or other matter ana rac~s in accordance with the terms or provisions of the Act passed at the First called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said session, together with any amendments thereto, now shown as Article 1105b of Vernon's Texas Civil Statutes, which said law, as an alternative method for the construction of street improvements is used by the City of Coppell, Texas. Said notice shall be by advertisement inserted at least three times in a newspaper published in the City of Coppell, Texas the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act. SVB Real Property Services in conjunction with the City Secretary, is hereby further directed to give additional written notice of said hearing by mailing to said owners and to said railway companies and street railway companies, if any, a copy of said notice deposited in the Post Office at Coppell, Texas, at least fourteen (14) days prior to the date of said hearing, provided however, that any failure of the property owners to receive said notice, shall not invalidate these proceedings. SECTION 4: That this resolution shall take effect immediately from and after its adoption. PASSED AND APPROVED this ~/c~_ day of ~ , 1986~. Mayor, ~ity o~ Coppell, Texas ATTEST: ~ppell, Texas GINN, INC. CONSULTING ENGINEERS September 8, 1986 Honorable Mayor Duggan & City Council P.O. Tox 478 Coppell, TX 75019 Re: Engineers Report Belt Line Road Street Assessment Program Dear Mayor and Council Members: The 1984 Bond Program by the City of Coppell allowed for the improvements to Belt Line Road from IH635 to Denton Tap Road. Planned improvements to this section of roadway include the following: Approximately 9750 LF of six-lane divided thoroughfare consisting of two - 34' b-b 9" thick concrete pavement sections on 12" cement stabilized subgrade, 24' wide median, left turn lanes, curb and gutter, brick pavers, asphalt transitions, rock fill and geotextile fabric along approximately 1600 LF of lake frontage. Major storm sewer and culvert construction consisting of approximately 5500 LF RCP (21" to 66"), 10,700 LF RCBC (3'x2' to 12'x12') comb. precast and cast-in-place, also includes headwalls, wingwalls, and 300 LF retaining wall. Bids were received by the City of Coppell on July 31, 1986, at 10:00 a.m. Eleven bidders participated and submitted bids for both a six-lane and an alternate four-lane project. The lowest bidder was Ed Bell Construction Company, P.O. Box 20777, Dallas, Texas 75220. The low bid for a six-lane project was $5,540,642.41 and for a four-lane project was $5,368,326.28. The difference between the six-lane and the alternate four-lane was $172,316.13. Due to the close difference in cost between the six-lane and four-lane projects, it is recommended that the City construct the six lanes at this time for the low bid submitted. The assessments shall be calculated for the four-lane project with the City paying the difference between the six and four-lane bids. The table on the following page shows the method used in calculating the assessment per front foot in accordance with the Street Assessment Ordinance: ASSESSMENT CALCULATION BASED ON 4-LANE Total Bid Construction Cost and Engineering Fees = $5,921,699.28 Less Non-Assessible Items = $ -553,347.54 Less Dallas County Participation = $ -700,000.00 Net Total Project Cost Assessible $4,668,351.74 1. Paving and Engineering Portion (Assessed @ 90%) $2,482,629.46 x (0.90) = $2,234,366.51 2. Drainage, Curb and Sidewalk Portion (Assessed @ 100%) $2,185,722.28 x (1.00) = $2,185,722.28 *** TOTAL 1 & 2 = $4,420,088.79 $ For Assessments Assessment/Front Foot Allowable by State Law $4.420,088.79 = $258.48/LF 17,100 LF It is recommended that the City of Coppell levy an assessment in the maximum amount of $130.00/LF which will fund the shortfall in funding for the amount exceeding the 1984 bond program budget for a four-lane roadway. The City of Coppell, as a result, will fund the original $3.66M allocated in the 1984 bond program and in addition will cover the cost difference between the six lanes vs. four lanes, which is $172,316.13. Respectfully submitted, GINN, INC. B. Wayne Ginn, P.E. /ss