Loading...
CM 1980-09-23 Minutes of September 23, 1980 The City Council of the City of Coppell met in regular session on September 23, 1980 at 7:30 p.m. in the Coppell High School Cafeteria. The following members were present: Andrew Brown, Jr., Mayor David Phillips, Mayor Pro Tem Roy Brock, Councilman Orville Mayo, Councilman Dale Ware, Councilman Councilman Glen White was not present. Also present were City Administrator James Elium, City Secretary Dorothy Timmons, and City Attorney Larry Jackson. The meeting was called to order and everyone asked to stand while Mayor Pro Tem ~hillips gave the invocation. Following the invocation, Councilman Mayo moved that the reading of the minutes be waived; Councilman Brock seconded and motion carried 4-0. Councilman Brock then moved that the minutes be approved as submitted; Councilman Mayo seconded and motion carried 4-0. The first item to be considered by the Council was a Citizens Appearance by Dr. Royce Lively to request an extension of one year on his temporary Mobile home permit. Dr. Lively stated that because of the economy and other unfore- seen items, he is not prepared at this time to take out a building permit for a permanent structure. Following discussion, Councilman Brock moved that the temporary permit be extended for a period of one vear with the understanding that a buildinq permit would be taken out before the exoiration of that year. This permit would be extended from September ll, 1980; ~ouncilman Ware second- ed and motion carried 4-0. The next item to be considered was a replat of Lot l-A, Shadydale Acres. Hr. Bill Campbell was present to request this replat. His house is presently on one acre, and he wants to sell the back portion of the lot. Following dis- cussion by the Council, r~ayor Pro Tem Phillips moved that the replat be ap- proved; Councilman Brock seconded and motion carried 4-0. Approval of the final plat on Woodridge No. 1 was then discussed by the Council. Mr. David Ruehlman made the presentation. He stated that this portion of the final plat would consist of 42 lots of which 20 are Townhomes and 22 are Single Family Lots. Phase 2 of the final plat would consist of all of that area west and north of the drainage ditch and would include improvements on the drainage ditch. Mr. Ruehlman stated that the back portion of the lots which front on Sandy Lake Road are extra deep in order to provide for berms as had been pre- viously agreed to. He also stated that the lots in the Townhouse area are 45 feet wide rather than 40 feet as previously submitted in the preliminary plat. Mr. Ruehlman also deposited with the City $6,300 for Park Fund money. A credit of $3,152 or 42 lots would be given to the Woodridge Addition since the payment was $150 per lot rather than the specified $75 per lot. Follow- ing discussion on this item, Mayor Pro Tem Phillips moved that the final plat be accepted as recommended by the Planning and Zoning Commission; Councilman Brock seconded and motion carried 4-0. Consideration of awarding a bid for construction of a 16" water line was then discussed by the Council and also of awardina a bid for construction of a ground storage tank. Mr. Bob Hogan was present to discuss this item with the Council. He stated that a total of 21 bids had been received on the 16 inch water line and that 3 bids had been received on the oround storage tank. It is their recommendation that the low bid in each case be awarded. Following discussion on this item, Councilman Brock moved that the bid on the 16" water line be awarded to Lightning Construction Company in the amount of $150,733.10. Councilman Ware seconded and motion carried 4-0. Councilman Ware then moved that the bid for construction of the qround storage tank and high service pumping station be awarded to Contract Builders in the amount of $489,998; Councilman Brock seconded and motion carried 4-0. Bid tabulations and a letter of recommendation from Hogan and Rasor are attached as a permanent part of these minutes. HOGAN & RASOR, INC. Engineers . Planners . Consultants 2730 Republic National Bank Tower Dallas, Texas 75201 CITY OF COPPELL, TEXAS 500,000 - GALLON GROUND STORAGE TANK AND HIGH SERVICE PUMPING STATION Bids Opened September 18, 1980 2:00 pom. CDST Base Bid Alternate Bid 1. .Contract Builders 814 W. Shady Grove Rd. Grand Prairie, Texas 75050~8.~ $505,885.00 2. Blakney Construction, Inc. P.O. Box 345 Granbury, Texas 76048 $518,000.00 $516,000.00 3. Onyx Construction Co., Inc. P.O. Box 18765 Fort Worth, Texas 76118 $579,1p9.00 $582,159.00 HOGAN & RASOR, INC. Engineers . Planners . Consultants 2730 Republic National Bank Tower Dallas, Texas 75201 CITY OF COPPELL, TEXAS ADDITIONS TO WATER DISTRIBUTION SYSTEM Bids Opened September 18, 1980 2:00 p.m. CDST Base Bid Alternate Bid 1. Lightning Construction Co., Inc. $125,458.10 $125,839.50 P.O, Box 176 Plus Add. Alt. #1 130,733.10 131,114.50 Seagoville, Texas 75159 Plus Add. Alt. #2 145,4~8.10 145,839.50 Plus Add. Alt. #1&2 ~0,733~ 151,114.50 2. Regional Utilities Co., Inc. $143,211.50 $143,194.00 P.O. Box 3186 Plus Add. Alt. #1 149,361.50 149,344.00 Irving, Texas 75061 Plus Add. Alt. #2 158,211.50 158,194.00 Plus Add. Alt. #1&2 164,361.50 164,344.00 3. Crookham & Vessels, Inc. $144,459.89 $154,811.09 P.O. Box 1088 Plus Add. Alt. #1 151,089.49 161,440.69 Sherman, Texas 75090 Plus Add. Alt. #2 163,209.89 173,561.09 ~Plus Add. Alt. #1&2 169,839.49 180,190.69 i 4. Leonard Hazel, Inc. $145,737.95 $146,223.85 P.O. Box 48098 Plus Add. Alt. #1 152,3~5.45 152,831.31 Watauga, Texas 76148 Plus Add. Alt. #2 174,487.95 174,973.85 Plus Add. Alt. #1&2 181,095.45 181,581.35 5. Circle "C" Construction Co. $153,808.00 $151,768.00 P.O. Box 40328 Plus Add. Alt. #1 159,908.00 157,868.00 Fort Worth, Texas 76140 Plus Add. Alt. #2 172,558.00 170,518.00 Plus Add. Alt. #1&2 178,658.00 176,618.00 6. Mid-Cities Construction Co. $154,103.00 $168,196.00 1011 Cresthaven Plus Add. Alt. #t 161,103.00 175,196.00 Euless, Texas 76039 Plus Add. Alt. #2 169,103.00 183,196.00 Plus Add. Alt. #1&2 176,103.00 190,196.00 Base Bid Alternate Bid 7. Conlee Construction $154,176.20 $174,667.70 P.O. Box 2683 Plus Add. Alt. #1 159,526.20 180,017.70 Richardson, Tx. 75080 Plus Add. Alt. #2 169,926.20 190,417.70 Plus Add. Alt. #1&2 175,276.20 195,767.70 8. Crawford Utility Contractor $154,614.23 $151,823.94 4732 Industrial Plus Add. Alt. #1 162,075.53 159,285.24 Rowlett, Texas 75088 Plus Add. Alt. #2 173,114.23 170,323.94 Plus Add. Alt. #1&2 180,575.53 177,785.24 Gamey Companies, Inc. $158,970.00 $ No Bid 1331 NW. Vivion Rd. Plus Add. Alt. #1 166,470.00 No Bid Kansas City, Mo. 64118 Plus Add. Alt. #2 183,970.00 No Bid Plus Add. Alt. #1&2 191,470.00 No Bid 10. Oscar Renda Contracting, Inc. $159,137.50 $157,957.00 Route 21, Box l14-A Plus Add. Alt. #1 165,837..50 164~657~00r.. Roanoke, Texas Plus Add. Alt. #2 199,137.50 197,957.00 Plus Add. Alt. #1&2 205,837.50 204,657.00 11. C & W Utility Contracting Co. $160,200.50 $164,212.80 P.O. Box 626 Plus Add. Alt. #1 166,680.50 170,692.80 DeSoto, Texas 75115 Plus Add. Alt. #2 176,450.50 180,462.80 Plus Add. Alt. #1&2 182,930.50 186,942.80 12. C. R. Feazell Contractor $162,498.50 $166,744.50 3644 Garner Plus Add. Alt. #1 172,298.50 176,544.50 Arlington, Texas 76013 Plus Add. Alt. #2 182,248.50 186,494.50 Plus Add. Alt. #1&2 192,048.50 196,294.00 Tex-Con Utility Contractors, Inc. $165,669.00 $169,874.00 3925 Forest Lane Plus Add. Alt. #1 171,554.00 175,759.00 Garland, Texas 75042 Plus Add. Alt. #2 240,669.00 244,874.00 Plus Add. Alt. #1&2 246,554.00 250,759.00 14. Cullum Construction Co. $166,433.00 $173,711.50 715 N. Central Exp. Plus Add. Alt. #1 173,113.00 180,391.50 Richardson, Texas 75080 Plus Add. Alt. #2 183,433.00 190,711.50 Plus Add. Alt. #1&2 190,113.00 197,391.50 15. Stolaruk Corporation $168,293.00 $177,186.50 19300 W. Eight Mi. Rd. Plus Add. Alt. #1 175,573.00 184,466.50 Southfield, Mi. 48075 Plus Add. Alt. #2 181,293.00 190,186.50 Plus Add. Alt. #1&2 188,573~00 ' 197,466.50 -2- Base Bid Alternate Bid 16. Beh Sira 6 Company $174,292.00 $183,697.50 1720 John West Road Plus Add. ~Alt. #1 180,157.00 189,562.50 P.O. Box 18045 Plus Add. Alt. #2 198,792.00 211,197.50 Dallas, Texas 25218 Plus Add. Alt. #162 207,657.00 217,062.50 17. Atkins Brothers Equip. Co., Inc. $175,484.25 $172,500.25 918 W. Marshall Plus Add. Alt. #1 180,595.25 176,611.25 Grand Prairie, Tx 75051 Plus Add. Alt. #2 199,234.25 196,250.25 Plus Add. Alt. #162 204,235.25 201,361.25 Eagle Ford Construction Co., Inc. $184,686.20 $181,759.20 8700 King George Drive Plus Add. Alt. #1 190,496.20 186,869.20 Dallas, Texas 75235 Plus Add. Alt. #2 203,436.20 200,509.20 Plus Add. Alt. #162 208,546.20 205,619.20 19. Cole Williams, Inc. $198,382.00 $201,402.00 5526 Dyer St. Plus Add. Alt. #1 208,482.00 211,502.00 Dallas, Texas 75206 Plus Add. Alt.*#2 218,382.00 221,402.00 Plus Add. Alt. #162 228,482.00 231,502.00 20. Wright Construction Co. $207,661.25 $214,056.25 601 W. Wall Plus Addl Alt. #1 215,516.25 226,911.25 Grapevine, Texas 76051 Plus Add. Alt. #2 240,161.25 246,556.25 Plus Add. Alt. #162 248,016.25 254,411.25 21. Ruff Construction Co., Inc. $ No Bid $141,158.00 P.O. Box 340449 Plus Add. Alt. #1 No Bid 146,148.00 Dallas, Texas 75234 Plus Add. Alt. #2 No Bid No Bid Plug Add. Alt. #162 No Bid No Bid -3- HOGAN & RASOR, ,.c. Engineers · Planners · Consultants September 23, 1980 Honorable Mayor and City Aldermen P.O. Box 478 Coppell, Texas 75019 Attention: Mr. James R. Elium, III, City Administrator ADDITIONS TO WATER DISTRIBUTIQN SYSTEM AND 500,000-GALLON GROUND STORAGE TANK AND HIGH SERVICE PUMPING STATION Gentlemen: On September 18, 1980, sealed bids were received and publicly opened at 2:00 p.m., at the Fire Station adjacent to City Hall for the con- struction of the two above referenced projects. A total of twenty-one (21) bids were received for the Additions to the Water Distribution System, ranging from a low of $150,733.10 to a high of $248,016.25. ~. Three bids were received on the 500,000-Gallon Ground Storage Tank ~ and High Service Pumping Station, ranging in price from $489,998.00 to $574,159.00. .During the process of the bid opening, each proposal was generally checked to note any irregularities in the preparation of the bids. The bid bonds, included with each proposal as required, were re- viewed and found to be acceptable, and each bidder had acknowledged receipt of the addenda. The low bidders on the two projects are as follows: ADDITIONS TO WATER DISTRIBUTION SYSTEM Lightning Construction Co., Inc. P.O. Box 176 Seagoville, Texas 75159 Amount Bid: $150,733.10 2730 I~lepublic Bank Tower Callas, Texas 75201 Honorable Mayor and City Aldermen Page Two September 23, 1980 500,000-GALLON GROUND STORAGE TANK AND HIGH SERVICE PUMPING STATION Contract Builders 814 W. Shady Grove Road Grand Prairie, Texas 75050 Amount Bid: $489,998.00 Separate lists of the contractors who bid on the two projects, as well as their total amounts bid, are enclosed. A detailed Bid Tabulation Sheet indicating the amount bid for each item by each contractor is being prepared and will be forthcoming. The proposals submitted by the two above contracting firms have been thoroughly reviewed in our office, and the extensions and additions of each bid item have been checked to verify their correctness. No errors were found in either proposal. On September 23, 1980, we met with Mr. Jerry C. Daniels, Vice President of Lightning Construction Co., Inc., and Mr. Jeff Nolen, Vice President of Contract Builders, to generally discuss their proposals and the two projects. Each contractor indicated satis- faction with his bid and looks forward to working for the City. In review of the qualification information received from each contractor, it appears that they have experienced personnel, sufficient equipment and financial stability to handle their pro- jects as specified. The bonding and insurance agency for each contractor indicated their firms would have no hesitancy in furnish- ing the required performance and payment bonds and the certificate of insurance. From our favorable review of the information received and from comments of references contacted pertaining to the experience and capability of the low bidders, it is recommended that the City of Coppell award the contract for construction of the Additions to ~he Water Distribution System to Lightning Construction Co., Inc., mn the amount of their low base bid of $125,458.10. It is further recommended that construction of Additive Alternates Nos. 1 and 2 be included, making the total amount of the contract $150,733.10. Additive Alternate No. 1 is the installation of fire hydrants on the existing 16-inch water main located in Bethel Road from Coppell Road westward to Esters Road and in Esters Road from Bethel Road to the existing elevated storage tank. Additive Al- ternate No. 2 will include a l%-inch asphaltic concrete pavement surface along Bethel Road from Coppell Road eastward to a point approximately 125 feet west of Harris Street. Honorable Mayor and City Aldermen Page Three September 23, 1980 Secondly, it is recommended that the City of Coppell award the contract for the 500,000-Gallon Ground Storage Tank and High Service Pumping Station to Contract Builders in the amount of their low base bid of $489,998.00. If you concur in these recommendations, please advise the suc- cessful contractors and our firm of the awards and instruct us to proceed with the preparation of formal contract documents and as to when you would like the notices issued to proceed with the construction. Yours very truly, HOGAN & RASOR, INC. RObert E. H . President REH:jc 0 TO: City Council, City of Coppell FROM: Guy Smith, 541 Shadowcrest, Coppell, Texas SUBJECT: Recommendation of Citizens to serve on the Park Board On behalf of several komeowners living in the willowood addition of the City of Coppell, I would like to suhnit the following names for consideration by the City Council as candidates for appointment to the City of Coppell Park Board. Fred Ferraro 537 Shadowcrest Coppell, TX 462-0725 ~ Sandy Marks 400 Woodhill Coppell, TX 462-1149 Joe Nave 550 Shadowcrest Coppell, TX 462-1872 ~. ,,~,~ The Willowood addition has over 850 adult homeowners, many of whom have children. These homeowners are concerned about the welfare of their children, and being able to have areas where the children can play without having to resort to the streets as playgrounds. Many adults would also enjoy having areas where they could go to have picnics - or where it could be restful and relaxing just to walk and jog. In recent weeks the greenbelt area in the Willowood subdivision has been suggested as an area that playground equipment could be located for the benefit of many children as well as adults living in this and other areas nearby. Since the willowood Subdivision is now a viable part of the City of Coppell, in which live many children as well as adults who enjoys parks and recreational areas, I feel that the Willowood area should be represented in any planning, development, and beautification undertaken by the City of Coppe 11. I feel that any or all of the above named individuals would be a definite asset to the City of Coppell Park Board, and would actively work to represent and help beautify the City of Coppell. Respectfu~yz.~ukmitted, Guy S. Smith 541 Shadowcrest Coppell, Texas 159 The next item to be considered by the Council was awardino of a bid for construction of a 6" water line on Howell and Bullock Street. Following discussion on this item concerning the use of PVC pipe vs. ductile iron, Councilman Brock moved that the bid be awarded to Turner Construction Co. in the amount of $33,060 with PVC pipe beino used for construction; Council- man Mayo seconded and motion~rried 4-0. A copy of the bid tabulations are attached as a permanent part of these minutes. ~Ir. Joe Bob Fikes was then present to discuss with the Council a recommendation from the Park Board for purchase of Playground Equipment for the greenbelt area in the Willowood Subdivision. Mr. Fikes stated that it is the recommend- ation of the Park Board that nine pieces of Playoround Equipment along with three picnic tables and grills be purchased for installation along Moore Road, along the cul-de-sac on the east end of Woodhurst, and at some point around the lake area. The anticipated cost on the equipment only is $5,296. In addition to this cost would be approximat61y $500 to $600 for freight. It is anticipated that volunteer labor would install the equipment. It was the consensus of the Council that this item be tabled until the next meetin9 in order for the Council to study the items more carefully. Next, the Council considered approval of an ordinance creating the office of Fire Marshal. Following discussion on this item, Councilman Mayo moved that this ordinance No. 225 be approved; Councilman Brock seconded and motion car- ried 4-0. Approval of a contract with Dallas County for fire protection services in the unincorporated areas of Dallas County was then considered by the Council. Following discussion, Councilman Ware moved that this item be approved; Council- man Mayo seconded and motion carried 4-0. Approval of a contract with Dallas County for ambulance service in the un- incorporated areas of Dallas County was then discussed by the Council. Councilman Brock moved that this contract be approved; Councilman Ware second- ed and motion carried 4-0. The City Administrator's Report was the next item on the agenda. City Ad- ministrator James Elium stated that the monthly Chamber of Commerce meeting would be held the next day with Coppell being recoqnized at the V.I.P. table. Mr. Elium urged all Council members to attend if possible. Approval of the bills was then considered by the Council. Mayor Pro Tem Phillips moved that the bills be approved for payment; Councilman Ware seconded and motion carried 4-0. The meeting was then c~osed for an Executive Session allowed under Article 6252-17, Section 2 (g) discussion concerning personnel. Following the Executive Session, the meeting was adjourned. Andrew Brown, Jr., ~ayor ~ ATTEST: Dorothy Tin, ns, City Secretary