Loading...
RE 2009-0609.4 ) A RESOLUTION OF THE CITY OF COPPELL, TEXAS RESOLUTION NO. '2009- tJb 0<1.4- A RESOLUTION OF THE CITY OF COPPELL, TEXAS, AUTHORIZING THE CITY ENGINEER, IN CONJUNCTION WITH THE CONTRACTOR, TO CLOSE BETHEL ROAD FROM ARMSTRONG BOULEVARD TO PENFOLDS LANE FOR A PERIOD OF UP TO FIVE MONTHS FOR THE CONSTRUCTION OF THE BRIDGE OVER GRAPEVINE CREEK AS PART OF THE BETHEL ROAD II PHASE A PROJECT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, Bethel Road I1 Phase A, from Denton Tap Road to Penfolds Lane including the bridge over Grapevine Creek, is planned to undergo reconstruction in the near future; and WHEREAS, during the period of said reconstruction, traffic on the street and bridge will be severely impaired; and WHEREAS, reconstruction of the bridge within the existing right-of-way requires closure of the portion of Bethel Road to be affected during the period of reconstruction; and WHEREAS, after consideration the City Council has determined that it would be in the best interest of the City and its citizens to provide for a safer reconstruction process by permitting the temporary closure of this portion of Bethel Road during the period of reconstruction; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF COPPELL, TEXAS: SECTION 1. That the City Engineer, in conjunction with the Contractor for the Bethel Road II Phase A project, is hereby authorized to undertake the necessary steps to close the street and bridge to through traffic during the period of reconstruction. SECTION 2. That the Contractor is authorized and directed to cause the erection of signs and official traffic control devices as is necessary and to give notice of alternate routes of travel as provided herein. ) SECTION 3. That this Resolution shall take effect immediately from and after its passage as the law and charter in such cases provide. DULY PASSED by the City Council of the City ofCoppell, Texas, this the ~day of ~-' ,2009. ........ APPROVED: ~ ~ JA ~s, MAYOR ATTEST: ~'gc;./J / BALL, C SECRETARY 2