McMahon Contracting - Airline Drive CO #1-CN 2020-09-22T 11 E 1 9 T Y C_OPPELL e ,�. sr �,✓'`e A e Change Order No. 1 Date of Issuance: 8 -Sep -20 Effective Date: September,8 2020 Owner: City of Coppell Contract No.: Tax 2016B Contractor: McMahon Contracting, LP Engineer: Kimley Horn Project: Airline Drive The Contract is modified as follows upon execution of this Change Order: Description: 1) Delete 12" lime stabilized subgrade at 40#/SY including flex base. 2) Add 8" lime stabilized subgrade section at 51#/Sy including flex base. Total CO #1 of $31,661.35 with no time impact. Attachments: McMahon Pricing Change Order #1 CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIMES (note changes in Milestones if applicable) Original Contract Price: Original Contract time in days: $4,454,084.65 400 Total from previously approved Change Orders Total from previously approved Change Orders No. N/A to No. N/A No. N/A to No. N/A $0.00 Days: 0 Contract price prior to this Change Order: Contract Times Prior to this Change Order: $4,454,084.65 Days: 400 (Increase) due to this Change Order (Increase) of this Change Order: $31,661.35 Days: 0 Contract price incorporating this Change Order Contract Times with all approved Change Orders 1 $4,485,746.00 Days: 400 RECOMMENDED By: City Engineer Title: Kent Collins, Director ACC D By: Owne Title: Mike Land, Citv Mgr Date: && Date: ACCEPTED By: i Contractor Title: William Mee. McMahon Date: MCMAHON CONTRACTING L.F. CHANGE ORDER REQUEST 01 REVISED FROM: McMahon Contracting L.P. 3019 Roy Orr Blvd. Grand Prairie, TX 75050 Phone: 972-263.6907 Fax: 972-264-0008 DATE: September 2, 2020 TO: CITY OF COPPELL PROJECT: AIRLINE DRIVE We hereby propose the following changes and/or additions to the original contract. ITEM DESCRIPTION UNIT OF MEASURE QUANTITY UNIT PRICE NET COST CHANGE 63 12" LIME STABILIZED SUBGRADE SY -28720.00 $3.47 ($99,658.40) 64 LIME FOR STABILIZED SUBGRADE (40/SY) TON -570.00 $200.00 ($114,000.00) 64A FLEXBASE 121N SECTION SY -935.00 $19.06 ($17,821.10 6300#1 8" LIME STABILIZED SUBGRADE SY 28720.00 $3.47 $99,656.40 64CO#1 LIME FOR STABILIZED SUBGRADE (51/SY) TON 732.00 $200.00 $146,400.00 64ACO#1 FLEXBASE 81N SECTION SY 935.00 $18.27 $17,082.45 ALL PAYMENTS BASED ON Notes: FINAL MEASURED QUANTITIES Additional calendar days requested: TOTAL $31,661.35 Signed: Dale: / I� 'z e— Accepted: Printed Name: Date: Page 1 of 1