Change Order No. 1
Date of Issuance: 8 -Sep -20 Effective Date: September,8 2020
Owner: City of Coppell Contract No.: Tax 2016B
Contractor: McMahon Contracting, LP
Engineer: Kimley Horn
Project: Airline Drive
The Contract is modified as follows upon execution of this Change Order:
Description: 1) Delete 12" lime stabilized subgrade at 40#/SY including flex base. 2) Add 8" lime stabilized
subgrade section at 51#/Sy including flex base. Total CO #1 of $31,661.35 with no time impact.
Attachments: McMahon Pricing Change Order #1
CHANGE IN CONTRACT PRICE
CHANGE IN CONTRACT TIMES
(note changes in Milestones if applicable)
Original Contract Price:
Original Contract time in days:
$4,454,084.65
400
Total from previously approved Change Orders
Total from previously approved Change Orders
No. N/A to No. N/A
No. N/A to No. N/A
$0.00
Days: 0
Contract price prior to this Change Order:
Contract Times Prior to this Change Order:
$4,454,084.65
Days: 400
(Increase) due to this Change Order
(Increase) of this Change Order:
$31,661.35
Days: 0
Contract price incorporating this Change Order
Contract Times with all approved Change Orders
1
$4,485,746.00
Days: 400
RECOMMENDED
By:
City Engineer
Title: Kent Collins, Director
ACC D
By:
Owne
Title: Mike Land, Citv Mgr
Date: && Date:
ACCEPTED
By: i
Contractor
Title: William Mee. McMahon
Date:
MCMAHON CONTRACTING L.F. CHANGE ORDER REQUEST 01 REVISED
FROM: McMahon Contracting L.P.
3019 Roy Orr Blvd.
Grand Prairie, TX 75050
Phone: 972-263.6907
Fax: 972-264-0008
DATE: September 2, 2020
TO: CITY OF COPPELL PROJECT:
AIRLINE DRIVE
We hereby propose the following changes and/or additions to the original contract.
ITEM
DESCRIPTION
UNIT OF
MEASURE
QUANTITY
UNIT
PRICE
NET COST
CHANGE
63
12" LIME STABILIZED
SUBGRADE
SY
-28720.00
$3.47
($99,658.40)
64
LIME FOR STABILIZED
SUBGRADE (40/SY)
TON
-570.00
$200.00
($114,000.00)
64A
FLEXBASE 121N SECTION
SY
-935.00
$19.06
($17,821.10
6300#1
8" LIME STABILIZED
SUBGRADE
SY
28720.00
$3.47
$99,656.40
64CO#1
LIME FOR STABILIZED
SUBGRADE (51/SY)
TON
732.00
$200.00
$146,400.00
64ACO#1 FLEXBASE 81N SECTION
SY
935.00
$18.27
$17,082.45
ALL PAYMENTS BASED ON
Notes: FINAL MEASURED QUANTITIES
Additional calendar days requested:
TOTAL $31,661.35
Signed:
Dale: / I� 'z e—
Accepted:
Printed Name:
Date:
Page 1 of 1