Loading...
Kimley-Horn Denton Tap-CN 2021-02-24AMENDMENT NUMBER 1 TO THE AGREEMENT BETWEEN CLIENT AND KIMLEY-HORN AND ASSOCIATES, INC. This is Amendment number 1 dated February 8, 2021 to the agreement between City of Coppell ("Client") and Kimley-Horn and Associates, Inc. ("Consultant') dated June 18, 2019 ("the Agreement") concerning Denton Tap Road Intersection Improvements (the 'Project'). The Consultant has entered into the Agreement with Client for the furnishing of professional services, and the parties now desire to amend the Agreement. The Agreement is amended to include services to be performed by Consultant for compensation as set forth below in accordance with the terms of the Agreement, which are incorporated by reference. CLIENT: CIT' By: CONSULTANT: KIMLEY-HORN AND ASSOCIATES, INC. By: Tyler Henrichs Title: Title: Contract Specialist \ 02-08-2021 Date: Date: 972 770 1300 kimley-horn.com 13455 Noel Road Two Galleria Office Tower, Suite 700, Dallas, TX 75240 Kimley * Horn Page 1 February 8, 2021 Contract Amendment No. 1 Professional Services Agreement Denton Tap Road Intersection improvements Amendment Understanding Coppell, Texas has requested a proposal for providing the following professional The City of ispecifications, and opinions of probable construction cost engineering services for construction plans, for the following: 1. Design of an eight (8) foot wide pedestrian trail along the westbound (WB) parkway of Parkway Boulevard from Denton Tap to Heartz Road (app rox. 1,300 linear feet). This design will luderulldatingdthe Project design design alk/ramp sheet t improvements the improvements e services also i p ell, and the additional outlined above. The Project is currently under construction by the City of Copp intersection improvements are anticipated to be Change Ordered into the current construction contract, administered by City of Coppell. Scope of Services Basic Services Task 7 —Project Engineering (Amendment 1) Consultant will provide the 1 13 of the Agreement. folio ntg locations in accordance with Task 1.2, 1.3, 1.4, 1.5, 1.7, 1.8, 1.9, 1.1 , 1. Denton Tap Road and Parkway Boulevard a. Design of approximately 1,300 linear feet of an eight (8) foot wide pedestrian trail. In addition, consultant will provide the services specifically set forth below. 2. Consultant will participate in up to one (1) additional meeting with City staff onal siteg regarding project status, coordination, design, and review. Perform up to one (1) add t Subconsultant coordination will be included. 3. Consultant will prepare construction plans (22"x24" plan sheets at a scale of 1"=20" horizontal). Design submittal shall include the following plan sheets: a. Quantity Summary b. Project Control c. Paving Plan d. Erosion Control 4. Consultant will modify current construction plans for the Project to accommodate design improvements listed above. a. Sheet Index (Sheet 3) b. Quantities (Sheet 4-5) c. Typical Sections (Sheet 8) d. Project Control (Sheet 12) kimley-horn.com 1 13455 Noel Road Two Galleria Office Tower, Suite 700, Dallas, TX 75240 1 972 770 1300 Kimley * Horn Page 2 e. Paving (Sheet 18, 20, and 22) f. Erosion Control (Sheet 109) 5. Consultant will respond to one (1) round of 90% City comments. 6. Deliverables will include two design submittals: Pre -final design (90%) and Final (100%) documents. The final design and final document deliverables will consist of modifications to the Project contract documents modified as appropriate for the project. An Opinion of Probable Construction cost will be provided to Client for each deliverable submittal. Each submittal will include two (2) hard copies and a PDF copy. Final documents will include electronic files. 7. Development of project bidding documents, if necessary, will be considered Additional Services. Task 8 — Project Coordination Consultant will provide the following coordination tasks as outlined in this section. The budgeted fee for this task is based upon 10 hours of labor. We will not proceed with performance of services beyond the hours budgeted without written authorization by the Client. Specific tasks under this scope may include: 1. Prepare for and attend meetings as requested by the City. 2. Additional site visits not outlined in the task above. 3. Coordinate project specific items for traffic signal and intersection design modifications_ 4. Review and respond to additional construction plan reviews not outlined in the task above. Task 9 — Construction Administration Consultant will provide additional Construction Phase Administration services for the following locations in accordance with Task 3 of the Agreement. The budgeted fee for this task is based upon 10 hours of labor. We will not proceed with performance of services beyond the hours budgeted without written authorization by the Client. 1. Denton Tap Road and Parkway Boulevard (WB pedestrian trail) Special Services Task 10 — Survey Consultant will provide data collection (topographic survey) for the following locations in accordance with Task 4 of the Agreement. 1. Denton Tap Road and Parkway Boulevard (WB pedestrian trail) a. Along Parkway Boulevard: L A 25 -foot wide swath for a length of approximately 1,300 linear feet along the location of the proposed Parkway Boulevard Trail improvements. ii. NE, NW corners of Stonemeade Way intersection, including an area of 15' behind face of curb. 10' past each curb return on the major road and cross street. iii. NW corner of Heartz Road intersection, including an area of 15' behind face of curb. 10' past each curb return on the major road and cross street. Dallas, TX 75240 972 770 1300 kimley-horn.com 13455 Noel Road Two Galleria Office Tower, Suite 700, Kimley>))Horn Page 3 Task 11 — Subsurface Utility Engineering (provided by sub -consultant) Consultant will provide SUE data collection (up to 3,000 linear feet of quality level B) for the following locations in accordance with Task 5 of the Agreement. 1. Denton Tap Road and Parkway Boulevard (WB pedestrian trail) Task 12 - Right -of -Way / Easement Instruments of Conveyance Consultant will provide Instruments of Conveyance (up to one (1) right-of-way instrument or easement instrument) for the following locations in accordance with Task 6 of the Agreement. 1. Denton Tap Road and Parkway Boulevard (WB pedestrian trail) Additional Services' Any services not specifically provided for in the above scope will be billed as additional services and performed at our then current hourly rates. Additional services we can provide include, but are not limited to, include the following: 1. Construction staking. 2. Title Research. nts beyond the improvements identified in the 3. Design of any offsite drainage improveme scope. 4. Storm Drainage Design other than tasks specifically described above to verify existing system. 5. Design of any traffic signal improvements beyond the improvements identified in the scope. 6. Preparation for and attendance at additional public meetings. 7. Furnish additional copies of review documents and/or bid documents more than the number of the same identified above. 8. Assist the City as an expert witness in litigation about the project or in hearings before approving and regulatory agencies. 9. Redesign to reflect project scope changes requested by the City, required to address changed conditions or change in direction previously approved by the City, mandated by changing governmental laws, or necessitated by the City's acceptance of substitutions proposed by the contractor. 10. Traffic studies. 11. Street lighting design. 12. Design for street signs, way -finding or other special signs. 13. Franchise utility coordination. 14. Construction phase services that exceed the specific description of services identified above. 15. Landscape design. 16. Design of retaining walls in excess of three (3) feet in height. 17. Temporary Signals. 18. Irrigation design. kimley-horn.com 1 13455 Noel Road Two Galleria Office Tower, Suite 700, Dallas, TX 75240 972 770 1300 KimleyA Horn Information Provided By Client Page 4 We shall be entitled to rely on the completeness and accuracy of all information provided by the Client or the Client's consultants or representatives. The Client shall provide all information requested by Kimley-Horn during the project, including but not limited to the following: 1. Record drawings. 2. GIS Information. Schedule Kimley-Horn will provide our services as expeditiously as practicable with the goal of meeting a mutually agreed upon schedule. Due to the everchanging circumstances surrounding the COVID-19 Virus, situations may arise during the performance of this Agreement that affect availability of resources and staff of Kimley-Horn, the client, other consultants, and public agencies. There could be changes in anticipated delivery times, jurisdictional approvals, and project costs. Kimley-Horn will exercise reasonable efforts to overcome the challenges presented by current circumstances, but Kimley-Horn will not be liable to Client for any delays, expenses, losses, or damages of any kind arising out of the impact of the COVID-19 Virus. 1 [This space intentionally left blank] 13455 Noel Road Two Galleria Office Tower, Suite 700, Dallas, TX 75240 Kim ey>>> Horn Page 5 Fee and Expenses Kimley-Horn will perform the services described above on either a Lump Sum or Reimbursable/Hourly basis in accordance with the following tasks: Lump Sum Task 7 Project Engineering (Amendment 1)............................................................. $17,500 Task10 Survey......................................................................................................... $5,500 Total Lump Sum Project Fee $23,000 Reimbursable/Hourl Task 8 Project Coordination ................................................. ...................................... $2,500 Task 9 Construction Administration............................................................................ $2,500 Task 11 Subsurface Utility Engineering...................................................................... $5,000 Task 12 Instruments of Conveyance.......................................................................... $2,500 Total Reimbursable/Hourly Project Fee $12,500 Total Project Fee $35,500 13455 Noel Road Two Galleria Office Tower, Suite 700, Dallas, TX 75240