Loading...
The Garland Group - Re-roof Columbarium at Rolling OaksCity of Coppell Public Works Department Routing Sheet for Approval of Contracts and Agreements Vendor Name: The Garland Group Date: 8/13/2021 Contracted Work/Project: Quote 25 -TX -201562 in the amount of $96,941.00 Explanation: Re -roof of Columbarium at 400 Freeport Parkwa 0✓ = F71 0 Council Approved: Yes / No If yes, Date: 8/10/2021 Budget Approved: Yes / No Ethics Certificate Required: Yes / No If Yes, Copy is Attached: Yes / No 1?.611 war., S lrm "i ® New Vendor ® Existing Vendor ® Renewing Contract Routing Sequence: 1. Employee initiating contract/agreement: Steve Shore (Include W-9 & CIQ form if vendor is not in system I 2. Supervisor Authorization: Initials Date SCS 8/13L'! 3. Purchasing Manager/Technician: Jamie Brierton JB 8/13 (Signature needed only if vendor is new to system or contract has been changed since last time used) 4. Director of Public Works Authorization: Kent Collins i'� s6` L a 5. Deputy City Manager Authorization Comments: 6. City Manager: Comments: Traci Leach/Vicki Chiavetta yG Aa.S/, Mike Land 7. Originals back to Administrative Manager: Kyra Jansen 8. Copy of contract/agreement to Jennifer Miller: =YES / NO= Garland/DBS, Inc. 3800 East 91St Street Cleveland, OH 44105 Phone: (800) 762-8225 Fax: (216) 883-2055 ROOFING MATERIAL AND SERVICES PROPOSAL City of Coppell Rolling Hills Cemetery - Columbarium 400 Freeport Parkway Coppell, TX 75019 Date Submitted: 06/22/2021 Proposal #: 25 -TX -210562 MICPA # PW1925 Purchase orders to be made out to: Garland/DBS, Inc. Please Note: The following budget/estimate is being provided according to the pricing established under the Master Intergovernmental Cooperative Purchasing Agreement (MICPA) with Racine County, WI and OMNIA Partners, Public Sector (U.S. Communities). The line item pricing breakdown from Attachment C: Bid Form should be viewed as the maximum price an agency will be charged under the agreement. Garland/DBS, Inc. administered an informal competitive process for obtaining quotes for the project with the hopes of providing a lower market -adjusted price whenever possible. Scope of Work: Metal Roof Replacement 1. Remove existing roof down to wood deck 2. Inspect wood deck for water damage and provide price per sq/ft to replace as needed 3. Reset atrium assembly from roof system. 4. Install framing members including rafters, fire retardant wood decking. 5. Install vapor control layer for air barrier with breathable qualities 6. Install vapor control underlayment 6" up vertical substrate walls including dormer, head walls and side walls adjoining metal roof system 7. Install metal roof system and components per engineered installation drawings provided by Manufacturer. 8. Install Clips per Wind Uplift calculations and fastening pattern 9. Install new flashing on side walls and head walls 10. Install all perimeter termination flashing per Engineered Drawings 11. Fasteners to be specified in engineered shop drawings by Manufacturer 12. Install gutter system per shop drawings provided by Manufacturer 13. Install pop rivets per shop drawings provided by Manufacturer 14. Install sealant per shop drawings provided by Manufacturer 15. Install foam in valley and perimeter locations per shop drawings provided by Manufacturer Page 1 of 4 16. General Contractor responsible for provided dumpsters General Contractor responsible for scheduling and dropping dumpster at designated areas on campus provided during pre -construction meeting conducted by manufacturer rep 17. General Contractor required to have full time supervisor onsite during any and all work is being performed. General Contractor will be required to be present for weekly progress meetings 18. General Contractor is responsible for providing schedule from staging metal to completion of installation of roof system with dates weather permitting 19. General Contractor responsible for ensuring exposed roof deck is water tight every day before installation technicians leave job site 20. General Contractor is responsible for maintaining a clean environment on roof deck, sidewalks, grounds and any other locations on campus work is be performed 21. General Contractor is responsible for 5 Year Workmanship Warranty 22. General Contractor is responsible for 1 st Year of Maintenance of Roof System from date of approved completion by all parties including Manufacturer, City of Coppell and General Contractor 23. Contractor to provide 5 year workmanship and 2 year material warranty. 24. Manufacturer to provide 30 Year Warranty Attachment C: Bid Form - Line Item Pricing Breakdown Item # Item Description Unit Price Quantity Unit Extended Price Tear -off & Dispose of Debris: SYSTEM TYPE 2.26 Metal Roofing System - Wood / Tectum Deck $ 2.40 3,500 SF $ 8,400 METAL ROOFING SYSTEMS - LOW SLOPE & STEEP SLOPE (2): INSULATION OPTIONS FOR ARCHITECTURAL STANDING SEAM ROOF 14.01.02 INSTALLATION OVER SUBSTRATE: INSULATION OPTION: Architectural Application - No Insulation - WOOD DECK: Class A Fire -Retardant Underlayment $ 4.09 3,500 SF $ 14,315 METAL ROOFING SYSTEMS - LOW SLOPE & STEEP SLOPE (2): ROOF CONFIGURATION Architectural or Structural Standing Seam Roof 14.03.05 System; Seam Height At or Above 1" Below 2"; Aluminum Panels: THICKNESS OPTION: Bare Galvalume Coated Steel or Equal Panel Price - 24 Ga, 18" Wide Panels $ 4.36 3,500 SF $ 15,260 METAL ROOFING SYSTEMS - LOW SLOPE & STEEP SLOPE (2): ROOF CONFIGURATION Architectural or Structural Standing Seam Roof 14.03.08 System; Seam Height At or Above 1" Below 2'; Aluminum Panels: PANEL WIDTH OPTION: Add for 16" Panel Width - Galvalume Coated Steel or Equal $ 0.32 3,500 SF $ 1,120 Page 2 of 4 Base Bid Total Maximum Price of Line Items under the MICPA: $ 122,036 Page 3 of 4 METAL ROOFING SYSTEMS - LOW SLOPE & STEEP SLOPE (2): ROOF CONFIGURATION Architectural or Structural Standing Seam Roof 14.03.09 System; Seam Height At or Above 1" Below 2"; Aluminum Panels: COLOR OPTION: Add for Standard Colors - Fluorocarbon Paint System Over Aluminum or Galvalume Coated Steel Or Equal $ 1.00 3,500 SF $ 3,500 METAL ROOFING SYSTEMS - LOW SLOPE & STEEP SLOPE (2): ROOF CONFIGURATION Architectural or Structural Standing Seam Roof 14.03.24 System; Seam Height At or Above 1" Below 2"; Aluminum Panels: PANEL INSTALLATION OPTION: Architectural Application - Installed Over Substrate At or Above 3:12 Slope $ 6.90 3,500 SF $ 24,150 Metal Stretch-Out: 24 Gauge Drip Edge with Four (4) Bends $ 12.42 240 LF $ 2,981 Metal Stretch-Out: 24 Gauge Ridge with Three (3) Bends $ 15.42 20 LF $ 308 Metal Stretch-Out: 24 Gauge Hip with Three (3) Bends $ 15.42 170 LF $ 2,621 Metal Stretch-Out: 24 Gauge Zee Closure with Two (2) Bends $ 10.78 380 LF $ 4,096 Sub Total Prior to Multipliers $ 76,752 MULTIPLIER - MULTIPLE MATERIAL STAGINGS Multiplier is applied when labor production is effected by the time it takes to stage a roof multiple times. Situations include, but are not limited to staging 22.03 materials to perform work on multiple roof levels, planned shutdowns and restarts, portion of the job is over sensitive work areas requiring staging from more than one point, etc. 20 $ 76,752 % $ 15,350 MULTIPLIER - ROOF HAS GREATER THAN 4/12 SLOPE 22.13 Multiplier is applied when Roof Area has a Greater than 4/12 Slope, Steeper slope reduces overall labor production and requires additional safety precautions. 22 $ 76,752 % $ 16,885 MULTIPLIER - ROOF SIZE IS GREATER THAN 3,000 SF, BUT LESS THAN 5,000 SF Multiplier is applied when Roof Size is greater than 3,000 SF, but less than 5,000 SF. Situation creates 22.19 the fixed costs: equipment, mobilization, demobilization, disposal, & set-up labor to be allocated across a smaller roof area resulting in fixed costs being a larger portion of the overall job costs 17 $ 76,752 % $ 13,048 Total After Multipliers I $ 122,036 Base Bid Total Maximum Price of Line Items under the MICPA: $ 122,036 Page 3 of 4 and/DBS Price Based CMR Construction and Roofing Tri -Lam Roofing and Waterproofing Crawford Roofing Inc. $ 128,672 $ 155,686 $ 197,047 Please Note — The construction industry is experiencing unprecedented global pricing and availability pressures for many key building components. Specifically, the roofing industry is currently experiencing long lead times and significant price increases with roofing insulation and roofing fasteners. Therefore, this proposal can only be held for 30 days. DBS greatly values your business, and we are working diligently with our long-term suppliers to minimize price increases and project delays which could effect your project. Thank you for your understanding and cooperation. Clarifications/Exclusions: 1. Permits are excluded. 2. Bonds are included. 3. Plumbing, Mechanical, Electrical work is excluded. 4. Masonry work is excluded. 5. Interior Temporary protection is excluded. 6. Any work not exclusively described in the above proposal scope of work is excluded. If you have any questions regarding this proposal, please do not hesitate to call me at my number listed below. Respectfully Submitted, Sy" Matt Egan Garland/DBS, Inc. (216) 430-3662 Page 4 of 4