Loading...
BGE, Inc.: Village Parkway Pump StationCity of Coppell Engineering Department Routing Sheet for Approval of Contracts and Agreements Vendor Name: BGE Inc. Date: 7/27/2022 -~--------------- Contracted Work/Project: Village Parkway Pump Station Redundancy Project Exp la nation: ASR #2 for finalized s stem desi n Council Approved: Yes / No If yes , Date: 7/26/2022 Budget Approved: Yes / No GL Account: ------- Ethics Certificate Required: Yes / No If Yes, Copy is Attached: Yes / No 0 New Vendor 0 Existing Vendor Routing Sequence : 1. Employee initiating contract/agreement: {Include W-9 & CIQ form if vendor is not in system.) 2. Supervisor Authorization: 3. Purchasing Manager/Technician: 0 Renewing Contract Initials Date Digitally s1gnea by Jamie Brierton • • DN: C=US , E=jbrierton@coppelltx .gov , Jam I e 8 r1 e rto n O=City of Coppell , OU =Publ ic Works , CN2Jam1e Brierton Date : ~022 07 25 10·"6·06 05 '00' (Signature needed only if vendor is new to system or contract has been changed since last time used) 4. Director of Engineering Authorization: __ Kent Collins□ 5 . Deputy City Manager Authorization: Comments: ____________________________ _ 6. City Manager: Mike Land Comments: ----------------------------- 7 . Copy of contract/agreement to Kim Tiehen: YES / NO ----- July 20 , 2022 Ms . Jamie Brierton Re : Addit ional Services Request -Water System Redundancy Improvements -Village Parkway Pump Station Improvements. Dear Ms . Brierton : BGE , Inc . prev iously entered into an agreement dated August 27 , 2020 (the "Original Agreemen t"), in the amount of $244 ,300.00. for the design and construction administration , for • Project 1: Village Parkway Pump Station Redundancy Improvements , This additional services request shall serve as an amendment to the design and construction adm inistration services fees to provide services and deliverables as detailed in Attachment A .1. The basis of compensation for the additional services of this project will be based on combination of lump sum and time & materials fees as summarized in Attachment B. This Additiona l Services Request is subject to the Terms and Conditions attached with the Original Agreement. A detailed schedule of the work will be provided upon execution of this request , but the intent is to bring the refenced projects to bid this fall for a construction contract award by the end of the year. Please ind icate acceptance of this Additional Services Request by signing below and returning a signed copy for our files. If you have any questions regarding this proposal, please do not hesitate to contact us. We appreciate the opportunity to perform this assignment and look forward to its comp letion . Sincerely , Bryant Caswe ll, P.E. Director, Pub li c Works Agreed and AcceP. d by : CITY OF COPB L Name : Title : ------------ Da t e: Serving. Leading. Solvi ng .™ BGE , Inc. · 2595 Dallas Parkway, Suite 101 · Frisco, Texas 75034 · 972-464-4800 · www.bgeinc.com Coppell Water System Redundancy Projects Attachment A.1-Additional Services Request ATTACHMENT A.1 -Additional Services Request Project 1-Village Parkway Pump Station (VPPS) Redundancy Professional Services and support for the City of Coppell (Coppell} for the design of redundancy measures for the Village Parkway Pump Station : The additional effort due to additional scope· for necessary project improvements and unforeseen site conditions, and incorporation of these elements into detailed design, bidding phase support and construction phase services for the following : • VPPS emergency bypass pumping system , o Discharge pipeline reroutes to 30 " water main in Kimbel Kt. to avoid underground conflicts , o Additional system connections of the 30 " water main in Kimbel Kt. including water system modeling to determine allowable shutdown windows, o Additional structural, electrical and civil engineering for design of discharge header valve vault due to added complexity of underground conditions, • Additional 48" yard piping valve in need of replacement, including incorporation of line stops to accommodate the work , • Additional permanent water meter station including electrical and SCADA, • Additional special services including Subsurface Utility Engineering (SUE) and Geotechnical investigation. ARTICLE I SCOPE OF SERVICES The ENGINEER agrees to furnish the OWNER the above specific services on a lump sum basis and incorporated into the original project scope deliverables. 7P Basic Services Task 1 Task 2 Task 3 Task 4 Task 5 Task 6 Attachment B City of Coppell Water System Redundancy Projects Engineering Fee Summary 7/20/2022 Village Parkway Pump s d tation Redundancy Improvements-Amen ment Project Management $ - Preliminary Engineering Report (30%) $ - Preliminary Design (60%) $ - Final Design (90% and Final) $ - Final Design (100% and Final) $ 131,659 Bid Phase services $ 5 ,605 Basic Services Total $ 137,264 Special Services (Time & Materials) Task 7 Construction Phase Services $ 33,491 Task 8 Geotechnical Engineering $ 1,800 Task 9 Subsurface Utility Engineering (Lvl A) $ - Special Services Total $ 35,291 Sub-Total $ 172,555