Byrne Construction Services contract for construction of Fire Station 5 2024-05-16EXHIBIT "H" CONSTRUCTION ON PUBLIC PROPERTY STATEMENT OF OWNERSHIP AND FUNDING JOB NO. 1685 COPPELL FIRE STATION NO. 5 1. The name, address, and primary business telephone number of the primary obligee: Coppell Fire Station No. 5 157 S. Moore Road Coppell, TX 75019 2. The name and address of the surety on the payment bond provided by the primary obligor to which any notice of claim should be sent: Liberty Mutual Insurance 450 Plymouth Rd., Suite 400 Plymouth Meeting, PA 79462 -8284 3. A statement from the primary obligee that funds are available and have been authorized for the full contract amount for the construction of the improvements. The following funds are available and have been authorized for the construction of the improvements. lnit. i AIA Document A133 ® -2019 Exhibit A Guaranteed Maximum Price Amendment This revised Amendment, which now includes the early procurement items and construction costs , dated the 6th day of May in the year 2024 , is incorporated into the accompanying AIA Document Al3JBL2019, Standard Form of Agreement Between Owner and Construction Manager as Constructor where the basis of payment is the Cost of the Work Plus a Fee with a Guaranteed Max imum Price dated the 24th day of January in the year 2024 (the "Agreement") (In words, indicate day, month, and y ear.) for the following PROJECT: (Name and address or location) Coppell Fire Station No. 5 157 S. Moore Road Coppell , Texas 75019 THE OWNER: (Nam e, legal status, and address) City of Coppell 255 Parkway Blvd. Coppell , Texas 75019 THE CONSTRUCTION MANAGER: (Name , legal status, and address) Thos . S. Byrne, Inc. dba Byrne Construction Services 551 E. Berry Street Fort Wotih , Texas 76110 TABLE OF ARTICLES A.1 GUARANTEED MAXIMUM PRICE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION A.3 INFORMATION UPON WHICH AMENDMENT IS BASED A.4 CONSTRUCTION MANAGER'S CONSULTANTS, CONTRACTORS, DESIGN PROFESSIONALS, AND SUPPLIERS ARTICLE A.1 GUARANTEED MAXIMUM PRICE § A.1.1 Guaranteed Maximum Price Pursuant to Section 3 .2 .6 of the Agreement, the Owner and Construction Manager hereby amend the Agreement to establish a Guaranteed Maximum Price. As agreed by the Owner and Construction Manager, the Guaranteed Maximum Price is an amount that the Contract Sum shall not exceed. The Contract Sum consists of the Construction Manager's Fee plus the Cost of the Work, as that term is defined in Article 6 of the Agreement. § A.1.1.1 The Contract Sum is guaranteed by the Construction Manager not to exceed Eleven Million One Hundred inety Four Thousand Six Hundred inety Dollars ($ ADDITIONS AND DELETIONS : The author of this document has added information needed for its completion. The author may also have revised the text of the original AIA standard form . An Additions and Deletions Report that notes added information as well as revisions to the standard form text is available from the author and should be reviewed. A vertical line in the left margin of this document indicates where the author has added necessary information and where the author has added to or deleted from the original AIA text. This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. AIA Document A201 ™-2017, General Conditions of the Contract for Construction, is adopted in this document by reference. Do not use with other general conditions unles s this document is modified . AIA Document A 133 -2019 Exhibit A Copyright © 1991 , 2003 , 2009 , and 2019 . All rights reserved . "The American Institute of Architects ," "American Institute of Architects ,"" AIA," the AIA Logo , and "AIA Contract Documents " are trademarks of The American Institute of Architects . This document was produced at 15:44:43 1 ET on 05/08/2024 under Order No.410424 7118 which exp ires on 11/26/2024, is not for resale, is licensed for one-time use only , and may only be used in accordance with the AIA Contract Documents® Terms of Service . To report copyright violations, e-mail docinfo@aiacontracts.com . User Notes: (926173305) lnit. 11,194,690 ), s ubje ct to addition s and deduction s by Change Order as pro v ided in the Contract Documents. § A.1.1.2 Itemized Statement of the Guaranteed Maximum Price . Provided below is an itemized statement of the Guaranteed Max imum Price organized by trade categorie s, including allowances ; the Construction Manager's contingency; alternates ; the Construction Manager's Fee; and other items that comprise the Guaranteed Max imum Price as defined in Section 3 .2.1 of the Agreement. (Provide itemized stateme nt be lo w or reference an attachment.) See Exhibit A. I -Cost Summary Sh eet § A.1.1.3 The Construction Manager's Fee is set forth in Section 6.1.2 of the Agreement. § A.1.1.4 The method of adjustm ent of th e Construction Manager's Fee for changes in the Work is set forth in Section 6.1.3 of the Agreement. • § A.1.1.5 Alternates § A.1.1.5.1 Alternates, if any, included in the Guaranteed Maximum Price: Item Price See Exhibit A.2 -Alternates . § A.1 .1.5.2 Subject to the conditions noted below, the following alternates may be accepted by the Owner following execution of this Exhibit A. Upon acceptance, the Owner shall issue a Modification to the Agreem ent. (Insert below eac h alternate and the co nditions that mu st be met for the Owner to accept th e alternate.) Item Price Conditions for Acceptance See Exhibit A.2 -Alternates § A.1.1.6 Unit prices, if any: (Ident ify th e item and state th e unit price and quantity limitations, if any, to w hich the unit price will be applicable.) Item Units and Limitations Price per Unit ($0.00) See Exhibit A.3 -Unit Costs ARTICLE A.2 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION § A.2.1 The date of commencement of the Work sha ll be: (Check one of th e following boxes.) [ ] The date of execution of this A mendment. [ X ] Estab li sh ed as fo ll ows: (Insert a dat e or a means to determine the date of co mm enceme nt of th e Work.) Date of Commencement shall be determin ed when a Notice to Proceed has been issued and a building demolition permit is available for issuance. If a date of commencement of the Work is not se lected, then the date of commencement shall be the date of execution of this Amendment. § A.2.2 Unless otherwise provided , the Contract Time is the period of time, including authorized adjustments , allotted in the Contract Documents for Substantial Comp letion of the Work. The Contract Time s hall be measured from the date of commencement of the Work. § A.2 .3 Substantial Completion § A.2.3 .1 Subject to adjustments of the Contract Time as provided in the Contract Documents, the Construction Manager shall achieve Substantial Completion of the entire Work : (Check one of th e following boxes and co mplete th e necessary information.) AIA Document A 133 -2019 Exhi bit A. Copyright © 1991 , 2003, 2009 , and 2019 . All rights reserved. "The American Institute of Architects ," "America n Institute of Architects ," "AIA," the AIA Logo , and "AIA Contract Do cume nts " are trademarks of The American Institute of Architects . This do cumen t was produced at 15:44:43 2 ET on 05/08 /2 024 under Order No.410424 7118 which expires on 11/26/2024, is not for resale , is licensed for one-time use only , and may only be used in accordance with the AIA Contract Documents® Terms of Service. To report co pyright violations , e-mail docinfo@aiacontracts.com . User Notes: (926173305) lnit. Not later than ) calendar days from the date of commencement of the Work. [ X ] By the following date: See Exhib it A.4 -Project Schedule § A.2.3.2 Subject to adjustments of the Contract Time as provided in the Contract Documents , if port ions of the Wo rk are to be completed prior to Substantial Completion of the entire Work , the Construction Manager s hall ach ieve Substantial Completion of such portions by the following dates: Portion of Work Substantial Completion Date See Exhibit A.4 -Project Schedule § A.2 .3.3 If the Construction Manager fails to achieve Substantial Completion as provi ded in th is Section A.2 .3, liq u idated damages, if any, shall be assessed as set forth in Section 6 .1.6 of the Agreement. ARTICLE A.3 INFORMATION UPON WHICH AMENDMENT IS BASED § A.3.1 The Guaranteed Maximum Price and Contract T ime set forth in this Amendment are based on the Contract Documents and the fo ll owing: § A.3.1 .1 The following Supp lementary and other Conditions of the Contract: Document See Exhibit A.5 - Contract Documents Title § A.3 .1.2 The fo ll owing Specifications: Date (Either list the Specificatio ns here, or refer to an exhibit attached to this Amendment.) See Exhibit A.5 -Contract Documents List Section Title Date § A.3.1 .3 The fo ll owing Drawings : (Either list the Drawings here, or refer to an exhibit attached to this Amendment.) See Exhibit A.5 -Contract Documents List Number Title Date § A.3.1 .4 The Sustainability P lan, if any: Pages Pages (If the Owner identified a Sustainable Objective in the Owner's Criteria, identify the document or documents th at comprise the Sustainability Plan by Litle, dat e and number of pages, and include other identifying iriformation. The Sustainability Plan identifies and describes the Sustainable Objective ; the targeted Sustainable Measures; implementation strategies selected to achieve the Sustainable Measures ; the Owner 's and Construction Manager's roles and responsibilities associated with achieving the Sustainable Measures ; the specific details about design reviews, testing or metrics to verify achievement of each Sustainable Measure; and the Sustainability Documentation required for the Project, as those terms are defined in Exhibit C to the Agreement.) Title Date Not App licab le Other identifying information: § A.3.1 .5 Allowances , if any, included in the Guaranteed Max imum Price: (Identify each allowance.) Pages AIA Document A 133 -2019 Exhibit A. Copyright© 1991 , 2003 , 2009, and 2019. All rights reseNed. "The American Institute of Architects ,"" American Institute of Architects ," "AIA ," the AIA Logo , and "AIA Contract Documents" are trademarks of The American Institute of Arch itects . T his document was pro du ce d at 15:44:43 3 ET on 05/08/2024 und er Order No.4 104247118 wh ic h exp ires on 11/26/2024, is not for resa le, is licensed for one-time use onl y, an d may on ly be use d in accordance with the AIA Contract Documents® Terms of SeNice. To report cop y rig ht violations, e-mai l docinfo@a iacontracts .com . User Notes: (926173305) It em Price See Exhibit A.6 -Allowances § A.3.1.6 Assumptions and clarifications , if any, upon which the Guaranteed Maximum Price is base d : (Identify eac h assumption and clarification.) See Exhibit A. 7 -Qualifications and Assumptions § A.3.1.7 The Guaranteed Max imum Price is based upon the fo ll owing other documents and information: (List any other do cu me nts or information here, or refer to an exhibit attached to this Amendment.) I. Not Applicab le lnit. ARTI CLE A.4 CONSTRU CTI ON MANA GE R'S CON SULTANT S, CONTRACTORS , DESIGN PROFE SSIONALS , AND SUPPLI ERS § A.4.1 The Construction Manage r shall retain the consu ltants , contractors, desi g n professionals , and suppliers, identified below: (List name, disciplin e, address, and other information.) ntered into as of the day and year first written above. ~ER (Signature) Mike Land , City Manager City of Coppell Matthew A vi i a, CEO Byrne Construction Services (Printed nam e and title) (Printed name and title) AIA Document A 133 -2019 Exhibit A. Copyright© 1991 , 2003, 2009 , and 2019. All rights reserved. "The American Institute of Architects ," "American Institute of Architects ," "AIA ," the AIA Logo , a nd "A IA Contract Documents" are trademarks of The American Institute of Archi t ects . This document was produced at 15:44:43 4 ET on 05/08/2024 under Order No .4 104247118 which expires on 11/26/2024, is no t f or resale , is lice nsed for one-time use on ly , and may on ly be used in accordance with the AIA Contract Documents® Terms of Service. To report copyrig ht violations, e-mai l docinfo@aiacontracts.com . User Notes: (926173305) Byrne Construction Services Coppell Fire Station No. 5 -Total GMP (ERP & Construction) Exhibit "A.1" Cost Summary See attached Cost Summary dated May 6, 2024. BYRM CONSTRUCTIO N SERVICES Cost Estimate Summary Sheet Date : May 6, 2024 : :. ., ... 010020 Temporary Cons truction 023000 Demolition 033000 Concrete 036500 Po lished & Stained Concrete 044000 Masonry 051000 Structura l Stee l 061000 RouQh Carpentry 062000 Arch itectural Woodwork 071000 Waterproofing & Sealants 074100 Roofing 081000 Doors , Frames & Hardware 083300 Overhead Doors 084000 Glass & GlazinQ 092100 Drywa ll & Acous tical 093000 Ti le 096200 Rubber Athletic Floorinq 096500 Resi lient Floorinq & Base 099100 Paintinq 100000 Specia lties 101000 Flagpo les 101400 Signage 105300 Canop ie s & Awnings 110000 Specia lty Equipment!Turnout Gear 114300 Residential Equipment 114300 Food Service Eq uipm ent 115200 AV Equipment 116500 Ath letic Equipment 122 000 Window Treatment 210000 Fire Protection 220000 Plumbing 230000 HVAC 236000 Test & Ba lance 237000 Comm issioninQ of HVA C 260000 Electrical 265000 Generator & Swi tchqear 270000 Communications 274000 Audio / Video Systems 280000 Security & Access Control 285000 Station Alert Sys tem 310000 Earthwork 310001 Enabling 313116 Termite Treatment 316600 AuQer Cast Pi les 32 1720 Pa veme nt Markinq s 32 1410 Fen cing & Gates 323000 Site Improvements 329000 Landscape & Irrigation 330000 Site Uti lities Cost of Work Subtotal Design Co mpl etio n Factor Market Vo latility Conti ng ency Owner's Conting ency Con tractor ContinQ ency Bui ld ing Permi t Construction Costs Subtotal CGL & Umbrella In surance Bui lder's Risk Payment & Performance Bond Construction Costs & Insurance Subtotal General Conditio ns & General Requirements Subtotal Preconstruction Fee Fee Project SubTotal 0.00% 2.00 % 0.00 % 3.00% 3.25% $ $ $ $ $ $ $ $ Coppell Fire Station #5 GMP01 -· 53 ,244 160,700 234 ,258 448 ,2 02 0.00 % 8,964 1.00 % 3.00% 13 ,446 3.00 % EXCLUDED $ 470 ,6 12 $ 5,920 $ 88 1 $ 9,757 $ 487 ,170 $ 109,421 $ 596,591 w/Base $ 19,389 3.25% $ 615,980 Page 1 of 1 $ 236,220 $ $ 822 ,514 $ 123,816 $ 855 ,001 $ 488,629 $ 53 ,550 $ 345,708 $ 127,642 $ 229,704 $ 138,175 $ 179,9 16 $ 193,635 $ 369,240 $ 54,960 w/BP-096500 $ 12,096 $ 92,359 $ 25,975 $ 16 ,000 $ 64 ,212 $ 72 ,565 $ 20,587 $ 79,162 w/BP -11 4300 w/BP-274000 $ 63 ,396 $ 5,875 $ 65,450 w/BP-230000 $ 1,919,534 $ 15,000 $ 22,500 $ 661 ,534 $ $ 107,203 $ 70,500 $ 102 ,000 $ 143,312 $ 58 ,000 $ 74,964 $ 2 ,034 $ 34 4 ,753 $ 9,004 $ 90 ,715 EXCLUD ED $ 136,552 $ 402,055 $ 8,896,047 $ $ 88 ,960 $ 280,327 $ 266,881 EXCLUD ED $ 9,532,216 $ 101 ,661 $ 15,128 $ 85,610 $ 9,734,615 $ 486 ,896 $ 10,22 1,511 $ 25,000 $ 332,199 $ 10,578,710 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ A CEN TURY OF EXCELLENCE 551 E. Berry Street Fort Worth, Texas 76110 (817) 335-3394 Fax (8 17) 877-5507 12 080 sqft .. 289,464 $ 23.96 160,700 $ 13.30 822 ,5 14 $ 68.09 Wrangler Concrete 123 ,816 $ 10.25 Johnson & Sons 855 ,001 $ 70.78 Shi rl ey Maso nry 488,629 $ 40.45 Plyler Fabrication 53 ,5 50 $ 4.43 Byrne 345 ,708 $ 28.62 Anton Cabinetry 127,642 $ 10.57 Mobile Enterpri ses 229,704 $ 19.02 An chor Roofing 138,175 $ 11.44 Ace Door 179,916 $ 14.89 TX Overhea d Door 193,635 $ 16.03 Su nbelt or Advanced 369,240 $ 30 .57 G MI 54 ,960 $ 4.55 Busine ss Flooring $ 12,096 $ 1.00 Business Flooring 92 ,359 $ 7.65 Carrea Pa inting 25,975 $ 2.15 Specialties Direct 16 ,000 $ 1.32 Betsy Ross Flagpoles 64 ,212 $ 5.32 TBD 72,565 $ 6.01 Canopy So lutions 20 ,587 $ 1.70 Gear Grid 79,162 $ 6.55 Amundsen $ $ 63,396 $ 5.25 Marathon Fitness 5,875 $ 0.49 Barb er 65,4 50 $ 5.42 TBD $ SkiHi 1,9 19 ,534 $158 .90 SkiHi 15,000 $ 1.24 De lta-T 22,500 $ 1.86 Cam pos 661 ,534 $ 54.76 TBD 234,2 58 $ 19.39 Groves Electric 107 ,203 $ 8.87 TBD 70,500 $ 5.84 TBD 102,000 $ 8.44 TBD 143,312 $ 11.86 US Digital Designs 58 ,000 $ 4.80 Melville Excavatin g 74,964 $ 6.21 Byrne 2,034 $ 0.17 TBD 344 ,7 53 $ 28.54 Wrangler Conc rete 9,004 $ 0.75 Semper Fi 90,715 $ 7.5 1 Triple C Fence $ 136,552 $ 11 .30 TBD 402 ,055 $ 33.28 Maverick Utilities 9,344,249 $773.53 97,925 Cale per Cost of Work 280,327 Cale per Cost of Work 280,327 Cale per Cost of Work 10,002,828 $ 828.05 107,5 81 16,009 95,367 10,221 ,78 5 $846.17 596 ,3 17 10,818,102 $895.54 25,000 351 ,588 11,194,690 $926.7 1 Cost Br eak down by Bid Pa ckage Byrne Construction Services Coppell Fire Station No. 5 -Total GMP (ERP & Construction) Exhibit "A.2" Alternates No Alternates are included in this GMP. Byrne Construction Services Coppell Fire Station No. 5 -Total GMP (ERP & Construction) Exhibit "A.3" Unit Costs The following Unit Costs are included in this GMP. Auger Cast Pile Deduct P1 -18" $77.91 $13. P2 -24" $124.40 $24.0 These unit costs are subcontractor costs and do not include Byrne markups for insurances, bonds , fee, etc. Byrne Construction Services Coppell Fire Station No. 5 -Total GMP (ERP & Construction) Exhibit "A.4" Project Schedule See attached Project Schedule dated May 7 , 2024. A1040 A1055 A1050 Public Advertisement# 2 (Eady Package) Bid Day (Early Package) Subcontractor Bids Scope Review(Earty Package) Early ProaJremen t Package Approved by Counci l (Early) Issue LOrs I Sub Buyout & Purchasing (Earty) Generator ProaJrement 0 14-Feb-24 A 0 15 0 28-Feb-24 A 240 240 07-May-24 2024 Q2 Q3 Q 4 Q1 rPricing ·:·· ate to mdve to Construction DoaJments arty ackage) : , do Bids Scope ; Review(Earty Pack~ge) QJ ment Pack~ge Approved by ¼Jrcil (Earty) • Lo ; is~b i:i~~~i i Pu~~sin-9 -~a-rtyJ ••••••• A2730 A2820 A2830 A2840 A2850 A2740 A2790 A2800 A2810 Electrica l Gear ProaJrement 120 Electri ca l G ar Procurement A1120 A1070 A2135 A2140 A26 70 A2720 A1090 A1100 A1110 A1138 A1140 A1170 A1270 A1285 100% For Constru ction Drawngs Deve lopment 15 100% For Construction D.lgs Issued for Pricing (Design Tean O Finalize Traoo Package DoaJments for Bidding Public Advertisement# 1 Public Advertisemen t # 2 Issue DoaJments for Subcontractor Bidding PreBid & Outreach Meeting Bid Day Subcontractor Bids Scope Review FGMP Draft Reviewwth Owler/Design Team Qty of Coppell-FG MP Approved by Council .. issue LOrs / Sub ·Buyout-& Purcilasing······--• -·-• ·-·-··· .... Mobilization 10 30 10 BYRN ---~lMldElbl --- CONSTRUC TI ON SERV ICES O 29-Mar-24 A 0 10-Apr-24 A 15-Apr-24 A 0 19-Apr-24 A 0 03-May-24 A 1 14-May-24 20 19-May-25 30 15-May-24 10 16-May-24 2~un-24 30-May-24 g~~~ _ o'. ~ns\~;~(~~ -~":A_l:Q~ .C?<:~hri:~~! 00% Fo r Constru,ction D.lgs Issued f~r Pricing (Design T m) ' ' ' ' Permit ~ Review by Qty of ~ppell (4 Wks) ' ' Fin lize Traoo ~ackage Document~ for Bidding -~bli Ad~~~~;,~~itii ·--··---·-··: ---------··· - Pub cAdvertiseinent # 2 : ue DoaJm~nts for Subcontractbr Bidding I P Bid & Out~ach Meeting : B Day : --·s~-b~nt~~~r-Bids Scope Revi~~ FG MP Chft Reviewwth Owler/Design Team I Qty of Coppell-FGMP Appr6ved by Council I NTP ls ~ued for Constructio~ __ -~ j _ l:5_s_u_~ L_(_)r~ j _S~_b_ ~~~'!~t _& ~ur:cJ-i~~in_ D Mobilization : Coppell F ire Station # 5 GMP Schedu le 5.7.24 Project Start Date: 17-Aug-23 Project Finish Date: 16-Jun-25 Da ta Date: 07-May-24 Page 1 of 4 2025 Q2 Generator ProaJrement Constn.jction -~roject aoseo Activity ID Activity OD A13 10 Project/ Sa fety Ki ck-0..!!_ Meeting_: C>.vler I Design Team t A1290 SWPPP -Erosion Control 2 A1320 Site Survey & Dimension Control 2 A1305 Foundatio n Rein She D.l.gs -A/E Re view 10 A1315 's;j; UtilitySubmittals-A/E Revew 10 -1 A1295 ~M Shop D.l.g Coard ~ Bldg & Site Ge nerate 15 A1355 ~ctural Ste el Sh op ~s -Generate 15 A1345 BIM Shop D.l.g Coard -UG Bldg & Site NE Review 10 +--------- A1365 Structural Steel ~hop ~s -NE Re~ 10 - A1325 ~M S~p D.l.g Coo ~ -Overhead MEP -Generate 15 A1385 Structural Steel Fabrication 15 ----- A1335 ~hop D.l.g Coard -Overhead MEP -NE Review 10 A1395 Overhead MEP ProOJrement (Ductv.or1<, li ghting , etc) 1 15 A1405 Structural Steel Delivery Existing Building Demo A2780 Asbestos Inspection Report (no abateme.!1!) 0 A2770 SWPPP fo r Demo 4 A1300 Temporary Site Fencing 2 ~o Exi ~g Building 10 Ground Brea ki ng Event Tree Protection lnstalation A1710 Site S~ /Cut/ Tree ~moval/ Demoliion A1330 ~ and Bu ilding Pad Grading A1 72 0 Install Construction Entrances A1730 ~nitary Sev..e ~Sand _91 Sepa~r Oncer Primary Pov.er & Xmfr / Conduit A1780 ,..I_ransformer & GeneratorJ'ad Construction A1750 ~rm Dra in A2020 Wate r +--A1790 Se t Tra nsfame rfor Permanent Pov.er Paving & Site StruchEes A2040 D.Jmp ~er Foundation & Slab A1360 Site Paving 15 ~v.elks 5 Site Perimeter Fencing T 10 lniQ<!lion & L..andscaJ!!!lQ A2030 Import and Spread To p~I A 1430 Irrigation 10 ~ng 10 Hardscape Amenities 5 BYRN ----A.-rwirgl.Mdfb -----c:::=:J -- CONSTRUCTION SERVICES -Q .. __ RD Start Finish 1 22-May-~ 22-May-24 2 22-May-24 23-May-24 2 24-May-24 28-May-24 10 22-May-24 05-Jun-24 10 22-May-~ 05-Jun-24 15 30-May-24 19-Jun-24 15 O~un-24 2~un-24 10 20-Jun-24 03-Ju l-24 10 27.Jun-2 4 11.Jul-2 4 15 05-Ju l-24 25-Ju l-24 15 12.Jul-24 01-Aug-24 10 2~ul-24 08-Aug-24 15 09-~g-24 29-Aug-2 4 0 11-0d-24 24-0ct-23 A 4 07-May-24 10-May-24 ~ 07-May-24 08-May-24 10 13-May-24 24-May-2 4 2 28-May-24 29-~ay-24 5 2 8-~y-2 4 03-Jun-24 5 04.Jun -24 10-Jun-24 1 04.Jun -24 04.Jun-24 -------8 17.Jan-25 28.Jan-25 11 .Jun-24 11.Jun-24 17.Jun-24 18.Jun-24 24.Jun-24 19-J un-24 27-Jun-2 4 5 28.Jun-24 05-Jul-24 1 10-J ul-24 10-Jul-24 8 21-Aug-24 30-Aug-24 15 29-Jan-25 18-Fet>-25 -5 19-Fet>-25 25-Fet>-25 1 O 03-Mar-25 14-Mar-25 3 26-Fet>-25 28-Fet>-25 1 O 03-Mar-25 14-Mar-25 10 17-Mar-25 28-Mar-25 5 24-Mar-25 28-Mar-25 2024 Q2 Q3 Q4 Q1 I Projeq / Safety Kick-Off Meeting -C>.vler I De ign Team SWPPP -Erosion Co ntro l: D Site ~urvey & Dimension!Control , 202 5 Q2 : : : : Q3 .. ·--··□-·F~~~.ci~1i~~·R~·i~-si,;p~~·~·A £·R~~~ •••• ····--· •• --·-·:·-•·. ·-··· ·-··-··-:--··--·-·-•• D Si te Uti lity Submittals -:A/E Revew : c::::J BIM Shop D.l.g Cootd UG Bldg & Site G nerate ' c::::J : Structural Stee l S~op D.l.gs -General Cl BIM Shop D.l.g Cbord -UG Bldg & s· e NE Review : ----------. ---i;:f -StNd~-raiSt~-~{Sh~-p-~~-:NE-R -vi~------• -----·(-. ---------• ----·--------• ---- : c:::::J BIM Shop D\\Q Coard -Ove rh ea MEP -Ge nera te : : c::::J Struct ura l Steel Fabricatio n : D BIM She~ D.l.g Coard -Ove ead MEP -NE Re~ew ···--·········j·····•··g ··~·~!!.~~-~.~~.~~~~ .~~!S~.~r!<,.li~.~\!~9 !!!.t~l .......... : ........... . : : ~ Struct ural Slee Delivery : : ' ' ' ' ' ' ' ' ~m nQ : : ·• ·-·~~"'.~~j ~~r.~.'!1-° .......... l.......... • • Tempora(YSite Fencing ; -----------······~·········---·•··?·•··-------- • Demo Existing Building : I Gro f d Breaking Eve nt : ' ' ' ' I Tree Protection lnstalati6n , , ....... i .. s iitstrip i ·~ii·+~~ R~~~~i i ·0e;,:-,:;,;~~ ••••••••••••••••• ·:· ••••••••• ·-•• -• • t ......... . I Siie and Building Pad :Grading : : I n~II Construction Ent~nces □ Remo bilize!fo r Site Paving Gra~ing & Prep -- - ----------J ----------------• ~ ------------------• --•• -□ ~anitary Sev..er & S~nd Oi l Separa tor -------:---···--·-·----·--:--------·--- □ Oncer Primary Pov.er & Xmfr / Conduij □ : Transformer & Ge~erator Pad Constru lion □: Storm Drain ' .............. ~ .. ~~!~~ ......... ~ ................. --·-. -. -.......... : .................. :. ·-. -·· .. ·--. ! I Set Tra nsforme t or Permanent Po r ! ! : □ D.J nipster Fo unda tion & lab : : : : c::::J Site P~ving : : : □ Side~lks : · -· · ·-· · · · · · · · ;· -· · · · · · · · · · · -· · · · ;-· -· · · · · · · · · · · · ·· · · · · · · · ·····□-·sf e ·P~ri~~ie r r="e"~ci ~g • • • • ·-• ••• • : I mpdrt and Spread Top sdl : □ rrlgation : ···-......... L .............. , ................. ··•· ··········g _l.~!l.f!~~~P!~L .. : .... ·-·····-: □ ! Hard scape Ame n i\ies Coppell Fire Statio n # 5 GMP Schedul e 5.7.24 Project Start Date: 17-Aug-23 Proj ect Fi nish Date: 16-Jun-25 Data Date : 07-May-24 Page 2 of 4 Activity ID A1375 A1380 A1660 A1680 A1800 A1670 A1550 A2010 A2000 A1390 A1400 A1690 A1650 A1830 A1410 A1370 A1570 A1560 A1420 A1810 A1580 A1850 A1820 A1590 A1840 A1860 A1870 A1880 A1890 A1940 A1620 A1610 A1900 A1910 A1950 A1540 A1630 A1920 A1530 A1930 A1960 A1600 A1450 Activity Perform Test Auger Cast Pile Dilled Auger Cast Pi es Grade Beams Underground MEP (Plumb Void) Slab on Void(Pour1) Slab on Void (Pou r 2) Foundation C.Ure Tirre Grind Pol Concrete Areas (k,nial Grind 10 Days Post Poui, Install Floor Protection In all Exposed Conditions Structural CMU Walls Stee l Structure , Pan Stairs & Roofing Supports Form Rein Pour Structural Leve l 2 Slab Roof Decking & Stee l Trimout Exterior Wall Framing / Sheathing / WP Roofing (Less Cap Sheet) Stone Vene er & Si:Jing On dudes Scaff Setup & RemovaQ Roofing Died-In Final Roof Cap Sheet Glass & Glazing Overhead Exterior Doors/ 4-Fo ld Doors Building Died-In Delivery of Exteri.or & Interior HM Door Frames Interior Partnion Layout Overhead MEP Rough-In Frame lnteriorWall s In Wall MEP/Secu ri ty/AV & Data Rough-In One Side Interior Partitions In-Wall Inspection Oose Walls Hard Ceilings and Interior Soffits Tape, Bed, Float and Paint (First Coat) Ce iling Systems Ceramic Tile Ceiling Grid IT I Data OH Wire Pull Milv-ork Toilet Accessories ~Spe cialties Dup Ceiling T ie & Linear 1/1/ood Cei lings Flooring -Fina l Grind Polished Concrete Paint (Fina l Coat) Rubber Flooring Fitness Room MEPTrimOut Permanent PolMlr BYRN ---Aln'S1flllMdEl:Jl ----c===i -- CONSTRUC TION SERVICES -Q kd Rmclnrg \Ao\'Jk OD 12 15 12 5 5 4 20 20 15 15 40 10 10 0 1 20 10 10 10 7 15 15 12 10 10 10 2 15 RD Start 2 17.Jun-24 12 19.Jun-24 15 08.Jul-24 12 24.Jul-24 5 07-Aug-24 5 14-Aug-24 5 21-Aug-24 5 05-Sep-24 4 12-Sep-24 20 16-Sep-24 20 11-0ct-24 5 08-Nov-24 5 08-Nov-24 . -·-·····-· -·----- 15 01-Nov-24 15 13-Nov-24 40 15-Nov-24 0 3 06-Dec-24 10 10.Jan-25 10 10.Jan-25 0 1 09-Sep-24 1 27-Nov-24 20 02-Dec-24 10 16-Dec-24 1 0 2 3-Dec-2 4 10 09.Jan-25 1 23.Jan-25 7 24.Jan-25 7 24.Jan-25 15 30.Jan-25 15 13-Feb-25 12 20-Feb-25 7 20-Feb-25 7 03-Mar-25 1 0 06-Mar-25 10-Mar-25 10-Mar-25 10 20-Mar-25 10 03-Apr-25 2 03-Apr-25 15 14-Apr-25 Fi nish 18.Jun-24 0~ul-24 26.Jul-24 08-Aug-24 13-Aug-24 20-Aug-24 27-Aug-24 11-Sep-24 17-Sep-24 11-0ct-24 07-Nov-24 14-Nov-24 14-Nov-2 4 -··· 21-Nov-24 05-Dec-24 16.Jan-25 05-Dec-24 10-Dec-24 23-Jan-25 23-Jan-25 23-Jan-25 09-Sep-24 27-Nov-24 31-Dec-24 31-Dec-24 08.Ja n-25 22.Jan-25 23-Jan-25 03-Feb-25 03-Feb-25 19-Feb-25 05-Mar-25 07 -Mar-25 28-Feb-25 11-Mar-25 19-Mar-25 14-Mar-25 18-Mar-25 02-Apr-25 16-Apr-25 04-Apr-25 02-May--25 . --·· -.. - 03-Feb-25 ---- --·· Coppe ll Fire Station # 5 GMP Sc hedu le 5.7.24 Q2 .. 2024 2025 Q3 Q4 Q1 Q2 Q3 I Perform Test Auger Cast Pile ~ DiDed Auger Ca ~! Piles : -Grade Beams -r----u~d~-rg~~~-dME·P-<P·1~~b -Vi id) _____ ---······~----· -----------·------------ : II Slab on ;Void (Pour 1) : II Slab on Void (Pou r2) ' I Foundation C.Ure Tirre I Glind Pol Concre te A as ~nial Grind 10 Days Post Pou Q ••••• ii • (~~i~i1 .Fkl"a°r. P~i~~,; n. h-~i1 -E~~~~-ei ~nciiti~n~------ -Structural CM Wais : : -Stee l St cture , Pan Stairs &:Roofing Supports ' D Form R in Pour Structura l ~eve l 2 Slab ---~--~<:?( __ ~!1_Q~~t_e_1:1_i:-!~~J __ _ c::J Exteri rWall Framing/ S~eathing / WP -Ro fing (Less Cap Sheet) Stone Venee ~& Si:Jing On d udes $caff Setup & _ ; _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~ _ _ _ _ _ _ _ Ro fing Died-In : : : • --ri -ii ~-1-R~~t -~p-st;~~( -· ' ' D Glass & Gla ~ng D Ove rh ead Eicterior Doors/ 4-Fold Doors Building Di~d-ln : ~live·ry -~i ~~ri~-r & • t~ri~~ HM ci;~~ F~~es· lnteri r Partnion Layout : Overhead MEP Rough-In Frame Interior Walls : In Wall M EP/S~curity/AV & Data Rough-In •• ---• -- ---•• -;-•• ------• --------On~-Sjd~-ln ~~,;~~ P~rtiti~ri;--. --:--•• ---• ----- 1 In-Wa ll lnsp~ction ■ Oosewahs , □ Hard Ce ilings and Interior Soffrts -Tape , Bed, Roat and Pairit (First Coat) --------~~~-gsi,~-~~-------:------------ □ CeiamicTile □ Ceili~g Grid □ rr :, Data OH W ire Puli ' -Millv.ork : --~---------------------------□--fbii~i.t1~~~~-r1~;&~p~cia1ti~~---- □ l;)rop Ceiling T ie & Li near 1/1/ood Iii Flooring -Fina l Grind Po lished :. Paint (Fina l Coat) -------·-· _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ __________ ( -~ub~_~r-~-~~~~~_f~~~_s_s_ ~~~~ : -MEPTrim ;O ut Project Start Date: 17-Au g-23 Proj ect Fini sh Da te: 16-J un -25 Da ta Da te: 07-May-24 Pa ge 3 of 4 : : Activity ID Activity OD A1440 Cond~io ned Ar A1740 ~ and Balance 10 A1760 Comm issio nin g 5 A1460 ~yme Punch ~ 10 A1480 OMierTrani ng A14 70 Arch~ect Punch li st 10 1-- A1510 Finalk'lspect~ 5 A1500 ~bstan tial Completion A1640 Fina l Completion 20 A1490 'o..-.o erFF&E 15 t- A15 20 Grand Opening/ Station Active 0 BYRN ---,.,......,I.MdEb ----c:::==i -- CONSTRUCTION SERVICES -o .. __ RD Start Finish 2024 2025 02 Q3 Q4 Q1 02 Q3 06-Feb-25 Conditioned Ar : 10 02-Apr-2 5 15-Apr-25 ............. ··--·----·--···--· -·-·····-····· ................... 9 .. "!"~~!.a_~~ ~~!~b~ .... . 5 1~Apr-25 22-Apr-25 10 1:?±pr-25 30-Apr-25 5 01-May-25 07-May-2 5 10 01-May-25 14-May-25 5 05-May-25 09-May-25 D Commissioning D Byrne Pun ~list D OMierTriini ng D Arch itec;t Punchlist , I Final In spections 5 12-May-25 16-May-25 ------------------------------------------------------------·:-·-----■--s-~b;t-~hti~i ~~P~t.- : -~nal Completi 20 15 0 19-May-25 16-Jun-25 19-May-25 09-Jun-25 09-Jun-25 Coppell F ire Station # 5 GMP Schedule 5.7.2 4 Project Start Date : 17-Aug-23 Proj ect Fin ish Date : 16-Jun-25 Data Date : 07-May-24 Page 4 of 4 : c=J o;vier FF&E : Giand Opening Byrne Construction Services Coppell Fire Station No. 5 -Total GMP (ERP & Construction) Exhibit "A.5" Contract Documents See attached Contract Documents List dated May 6 , 2024. BYRN CONSTRUCTION SERV ICES Date: 5/6/2024 Sheet Bid Package Manual Bid Package Manual Bid Package Manual Bid Package Manual 03/27/24 Bid Package Manual 03/27/24 Bid Package Manual 03/27/24 Bid Package Manual 03/27 /24 Bid Package Manual 03/27/24 Bid Package Manual 03/27 /24 Bid Package Manual 03/27/24 Bid Package Manua l 03/27/24 Bid Package Manual 03/27/24 Bid Package Manual 03/27 /24 Bid Package Manua l 03/27/24 Bid Package Manual 03/27/24 Bid Package Manua l 03/27/24 Bid Package Manual 03/27/24 Bid Package Manua l 03/27 /24 Bid Package Manual 03/27/24 Bid Package Manua l 03/27/24 Bid Package Manua l 03/27/24 00 01 01 03/27/24 00 01 07 03/27/24 00 01 10 03/27/24 00 26 00 03/27/24 00 31 32 03/27/24 00 80 04 03/27/24 00 80 05 03/27/24 00 80 06 03/27/24 00 80 07 03/27/24 00 80 08 03/27/24 00 80 09 03/27/24 01 10 00 03/27/24 01 25 00 03/27/24 01 26 00 03/27/24 01 29 00 03/27/24 01 31 00 03/27/24 01 32 00 03/27/24 01 32 33 03/27/24 01 33 00 03/27/24 01 35 13 .55 03/27/24 01 40 00 03/27/24 01 42 00 03/27/24 01 42 19 03/27 /24 01 43 39 03/27/24 01 50 00 03/27 /24 01 56 39 03/27/24 01 57 13 03/27/24 01 60 00 03/27/24 01 73 00 03/27/24 01 77 00 03/27/24 01 78 23 03/27/24 01 78 39 03/27/24 01 79 00 03/27/24 Contract Documents L is t Copp ell Fire St ation #5 157 S Mo ore Road , Coppell, Texas 7501 9 100% Construct io n Documents For Bid Instructions to Bidders Summary of Work Bid Package List Sample Subcontract Agreement Supplemental Subcontract Conditions Exhibit A -Contract Documents Exhibit B -Subcontractor Safety Res onsibilities A CE NTU RY OF EXCELLE NCE 55 1 E Berry St. Fort W orth , TX 76 110 81 7/335/3394 FAX 8 17/877-5507 Exhibit C -Safety Po licy for Drugs, Alcohol , and Other Prohibited Articles Exhibit D -Project Schedule Exhibit E -Bid Package Forms (for each trade) Subcontractor's Payment Bond Form Subcontractor's Performance Bond Form App lications & Certificate for Payment Form Schedule of Values Form Fina l Pa yment Re lease Subcontractor Dai ly Report Form Job Hazard Analysis (JHA) Form Warranty Form TWCC Form 83 Samp le ACORD Certifi cate of Insurance SPECIFICATIONS Title Page Sea ls Page Table of Contents Procurement Substitution Procedures -Procurement Substitution Request Form Geotechnical Data -Geotechnical Report Implementation of House Bill 1925 House Bi ll 89 Verification Form Company Information Form Conflict of Interest Questionnaire Boycott Energy Companies Form Prohibition of Discrimination Against Firearm Entities and -Firearm Trade Associations Form Summary Substitution Procedures -Substitution Request Form Contract Modification Procedures Payment Procedures Project Management and Coordination Construction Progress Documentation Photographic Documentation Submittal Procedures Special Project Proced ures for Storm She lters Quality Requirements References Reference Standards (C) Mockups Temporary Faci lities and Contro ls Temporary Tree and Plant Protection Erosion and Sedimentation Contro l Product Requirements Execution Closeout Procedures Operation and Maintenance Data Project Record Documents Demonstration and Trai ning Page 1 of 7 Contract Documents List BYRM CONSTRUCTION SERVICES Date: 5/6/2 0 24 S heet Original 02 41 13 03/27/24 03 10 00 03/27/24 03 20 00 03/27/24 03 30 00 03/27/24 03 30 35 03/27/24 03 35 43 03/27/24 04 20 05 03/27/24 04 42 00 03/27/24 05 10 00 03/27/24 05 21 00 03/27/24 05 30 00 03/27/24 05 40 00 03/27/24 05 50 00 03/27/24 05 51 13 03/27/24 05 52 13 03/27/24 06 10 53 03/27/24 06 16 43 03/27/24 06 41 13 03/27/24 06 64 00 03/27/24 07 21 00 03/27/24 07 27 26 03/27/24 07 42 10.11 03/27/24 07 52 16 03/27/24 07 62 00 03/27/24 07 62 10 03/27/24 07 72 00 03/27/24 07 84 13 03/27/24 07 84 43 03/27/24 07 91 00 03/27/24 07 92 00 03/27/24 07 92 19 03/27/24 08 11 13 03/27/24 08 11 69 03/27/24 08 14 16 03/27/24 08 31 13 03/27/24 08 33 23 03/27/24 08 33 26 03/27/24 08 35 13.39 03/27/24 08 41 13 03/27/24 08 51 13 03/27/24 08 71 00 03/27/24 08 80 00 03/27/24 08 83 00 03/27/24 08 91 19 03/27/24 09 22 16 03/27/24 09 29 00 03/27/24 09 30 13 03/27/24 09 51 13 03/27/24 09 54 26 03/27/24 09 61 16 03/27/24 09 65 13 03/27/24 09 81 16 03/27/24 09 91 13 03/27/24 09 91 23 03/27/24 09 93 00 03/27/24 09 96 00 03/27/24 10 11 00 03/27/24 Contra ct Docum ents List Cop pell Fire Stat ion #5 157 S Moore Road, Coppe ll , Texas 75019 100 % Constructi on Docume nts For Bid S heet Name Se lective Site Demo lition (C) Concrete Forming and Accessories (S) Concrete Reinforcing (S) Cast-In-Place Concrete (S) Under Slab Sheet Vapor Retarder Po lished Concre te Finishing Unit Masonry Exterior Stone Cladding Structura l Stee l Framing (S) Stee l Joist and Joist Girders (S) Meta l Decking (S) Co ld-Formed Meta l Framing (S) Meta l Fa brications Meta l Pan Stairs Pipe and Tube Rai li ngs Misce ll aneous Rough Carpentry Gypsum Sheath in g Wood-Veneer-Faced Architectural Cabinets Plastic Pane ling Therma l Insu lation Fluid-App li ed Membrane Air Barriers Composite Meta l Hybrid Subfram ing System A CENTURY OF EXCELLENCE 551 E B erry St. Fort W orth , TX 76 110 8 17 /335/3394 FAX 81 7 /877 -5507 Styrene-Butadiene-Styrene (SBS) Modified Bitum inous Membrane Roofing Sheet Meta l Flas hi ng and Trim Flexible Flashing Roof Accessories Penet ration Firestoppi ng Jo int Fires t opping Preformed Joint Sea ls Joint Sea lants Acoustica l Joint Sea lants Ho ll ow Meta l Doors and Frames Meta l Storm Doors and Frames Flu s h Wood Doors Access Doors and Frames Overhead Coiling Doors Overhead Coi ling Gri ll es Fo ur-Fo ld Doors A lu minum-Framed Entrances and Storefronts Alumin um Windows Doo r Hardware -Door Hardware Schedu le Glazing Mirrors Fixed Louvers Non -St ructura l Metal Framing Gyps um Boa rd Ceram ic Tiling Aco ustica l Pa nel Cei li ngs Linear Wood Cei li ng Panels Concrete Floor Sea ling Res ili ent Base and Accessories Aco ustica l Blanket Insu lat ion Exterior Painting Interior Painting Staini ng and Tra nsparent Finishing High-Performance Coatings Visua l Display Units Page 2 of 7 Contract Documents List BYRN CONSTRUCTION SERVICES Date: 5/6/2024 Sheet Original 10 14 00 03/27/24 10 14 16 03/27/24 101419 03/27/24 10 14 24 03/27/24 10 21 13.14 03/27/24 10 28 00 03/27/24 10 41 00 03/27 /24 10 43 17 03/27/24 10 44 13 03/27/24 10 44 16 03/27/24 10 73 17 03/27/24 10 75 16 03/27/24 10 99 00 03/27/24 11 30 13 03/27 /24 11 52 24 03/27/24 12 24 13 03/27/24 12 36 61 .16 03/27/24 00 01 01 03/27/24 00 01 07 03/27/24 00 01 10 03/27/24 21 00 00 03/27/24 21 05 00 03/27/24 21 13 13 03/27/24 22 00 00 03/27/24 22 05 00 03/27/24 22 05 53 03/27/24 22 07 00 03/27/24 22 11 16 03/27/24 22 11 23 03/27/24 22 13 16 03/27/24 22 14 00 03/27/24 22 21 13 03/27/24 22 30 00 03/27/24 22 42 00 03/27/24 23 00 00 03/27/24 23 05 00 03/27/24 23 05 13 03/27/24 23 05 14 03/27/24 23 05 48 03/27/24 23 05 53 03/27/24 23 05 93 03/27/24 23 07 00 03/27/24 23 08 00 03/27/24 23 09 00 03/27/24 23 21 13 03/27/24 23 23 00 03/27/24 23 30 00 03/27/24 23 34 00 03/27/24 23 35 16 03/27/24 23 55 33 03/27/24 23 72 23 03/27/24 23 81 26 03/27/24 23 81 27 03/27/24 23 82 39 03/27/24 26 00 00 03/27/24 26 05 19 03/27/24 26 05 20 03/27/24 Contract Documents List Coppell Fire Station #5 157 S Moore Road, Coppell, Texas 75019 100% Construction Documents For Bid Sheet Name Signage Plaques Dimensional Letter Signage Storm She lter Signage Stainless-Steel Toilet Compartments Toilet , Bath , and Laundry Accessories Fire Department Access Lock and Vault First Aid Kits Fire Protection Cabinets Fire Extinguishers Prefabricated Metal Canopies Ground-Set Flagpoles Miscellaneous Specia lties Residential Appliances Flat Screen TV Mounts Roller Window Shades Solid Surfacing Countertops Title Page Seals Page Table of Contents Fire Suppression Common Work Results for Fire Suppression Wet Pipe Fire Sprinkler Systems Plumbing Common Work Results for Plumbing Identification for Plumbing Equipment and Piping Plumbing Insulation Domestic Water Piping System Natural Gas Piping System Sanitary Waste and Vent System Storm Drainage System Plumbing Piping Systems Domestic Water Heating Equipment and Accessories Plumbing Fixtures Heating , Ventilating , and Air Conditioning (HVAC) Work Common Work Resu lts for HVAC Common Motor Requirements for HVAC Common Motor Starter Requirements for HVAC Equipment Vibration and Seismic Controls for HVAC Piping and Equipment Identification for HVAC Ductwork, Equipment and Piping Mechanical Systems Testing , Adjusting , and Balancing (TAB) Insulation Mechanica l Systems Commissioning Controls and Instrumentation Condensate Piping Refrigerant Piping HVAC Air Distribution Exhaust and Supply Air Fans Multi-Gas Detection and Control System Heat Generation -Gas Fired App liances Roof Mounted Packaged Dedicated Outside Air Units (Gas) Variable Refrigerant Flow (VRF) Air Conditioning Units Duct-Free Split Systems Heat Generation -Electric Electrical Low Voltage Electrica l Power Conductors and Cables Cable Connections Page 3 of 7 A CENTURY OF EXCELLENCE 55 1 E Berry St. Fort W orth , TX 76 110 8 17 /335/3394 FAX 8 17/877-5507 Contract Documents List BYRM CONSTRUC T ION SERV ICES Date: 5/6/2024 Sheet Orig inal 26 05 23 03/27/24 26 05 26 03/27/24 26 05 29 03/27/24 26 05 32 03/27/24 26 05 43 03/27/24 26 05 53 03/27/24 26 05 73 03/27/24 26 09 13 03/27/24 26 24 16 03/27/24 26 27 16 03/27/24 26 27 26 03/27/24 26 28 13 03/27/24 26 28 16 03/27/24 26 32 14 03/27/24 26 36 23 03/27/24 26 36 25 03/27 /24 26 43 13 03/27/24 26 51 01 03/27/24 26 51 02 03/27/24 26 51 05 03/27/24 26 51 07 03/27/24 27 00 00 03/27/24 27 05 26 03/27/24 27 05 28 03/27/24 27 11 00 03/27/24 27 15 00 03/27/24 28 00 00 03/27/24 28 09 00 03/27/24 28 10 00 03/27/24 28 23 00 03/27/24 28 31 00 03/27/24 31 22 00 03/27/24 31 25 00 03/27/24 31 31 16 03/27/24 313213.13 03/27/24 31 63 16 03/27/24 32 13 16 03/27/24 32 17 13 03/27/24 32 17 23 03/27/24 32 31 19 03/27/24 32 31 30 03/27/24 32 84 00 03/27/24 32 92 23 03/27/24 32 93 00 03/27/24 33 10 00 03/27/24 33 30 00 03/27/24 33 40 00 03/27/24 G0 .00 03/27/24 G0.01 03/27/24 G0 .02 03/27/24 G0 .10 03/27/24 G0 .11 03/27/24 G0.12 03/27/24 G0.56 03/27/24 C01 .01 03/27/24 Co n tract Documents List Coppell Fire Station #5 157 S Moore Road, Coppell, Texas 75019 100% Construction Documents For Bid Sheet Name Control -Voltage Electrical Power Cables Grounding and Bonding for Electrical Systems Hangers and Supports for Electrica l Systems Raceways Underground Ducts and Raceways for Electrical Systems Identification for Electrical Systems Electric Power System Analysis Electrical Power Monitoring and Control Pane lboard Electrical Cabinets and Enclosures Wiring Devices Fuses Enclosed Switches and Circuit Breakers Diesel Engine Driven Generator Sets Automatic Transfer Switches Generator Quick Connect Switches Surge Suppression Devices Interior Lighting Exterior Lighting Networked Lighting Controls Emergency Inverters Communications (LV) Grounding and Bonding for Communications Systems (LV) Pathways for Communications Systems (LV) Communications Room Fittings (LV) Communications Horizontal Cab ling (L V) Electronic Security (LV) Electrical Systems Monitoring by Building Management System Access Control and Intrusion Detection (LV) Video Surveillance (LV) Fire Alarm Multiplex System (Performance Specification) Grading (C) Erosion and Sedimentation Controls (C) Termite Control Lime Stabilization (C) Auger Cast Grout Piles (S) Decorative Concrete Paving Parking Bumpers Pavement Markings Decorative Metal Fences and Gates We lded Metal Gates Planting Irrigation Sod Trees , Shrubs, and Groundcovers Water Utilities (C) Sanitary Sewerage Utilities (C) Storm Drainage Utilities (C) Drawings COVER SHEET GENERAL PROJECT INFORMATION &SHEET INDEX PROJECT CODE SHEET LIFE SAFETY CODE ANALYSIS ADA STANDARDS ADA STANDARDS STORM SHELTER INFORMATION SITE PLAN Page 4 of 7 A CENTURY OF EXCELLENCE 55 1 E Berry St. Fort W orth , T X 76 11 0 8 17/335/3394 FAX 817/877-5507 Contract Documents List BYRN CONSTRUCTION SERVICES Date: 5/6/2024 Sheet Original C02 .01 03/27/24 C02.02 03/27/24 C03 .01 03/27/24 C04 .01 03/27/24 C05.01 03/27/24 C05 .02 03/27/24 C05 .03 03/27/24 C06 .01 04/15/24 C07 .01 03/27/24 C07 .02 03/27/24 C07 .03 03/27/24 C07.04 03/27/24 C08.01 04/15/24 C09 .01 04/15/24 C10 .01 03/27/24 C10 .02 03/27/24 L 1.01 03/27/24 L 1.02 03/27/24 L 1.03 03/27/24 TP1 .01 03/27/24 IR1 .01 03/27/24 IR1 .02 03/27/24 IR1.03 03/27/24 IR1 .04 03/27/24 S1.00 03/27/24 S1 .01 03/27/24 S1.02 03/27/24 S1.03 03/27/24 S1 .04 03/27/24 S2.01 04/15/24 S2.01R 03/27/24 S2.02 03/27/24 S2.03 03/27/24 S3.01 03/27/24 S3.02 04/15/24 S3.03 03/27/24 S3.04 03/27/24 S3.05 03/27/24 S3.06 03/27/24 S3 .07 03/27/24 S3 .08 03/27/24 S4 .01 03/27/24 S4.02 04/15/24 S5 .01 04/15/24 S5 .02 03/27 /24 S5 .10 03/27/24 S5 .11 03/27/24 S5.12 03/27/24 S6 .01 03/27/24 A0.01 03/27/24 A0.10 03/27/24 A0.20 04/30/24 A0.30 04/15/24 A0 .35 03/27/24 A0.36 03/27/24 A0.40 03/27/24 A0.45 03/27/24 Contract Documents List Coppell Fire Station #5 157 S Moore Road, Coppell, Texas 75019 100% Construction Documents For Bid Sheet Name GENERAL NOTES GENERAL NOTES DEMOLIT ION PLAN DIMENSION CONTROL PLAN PAVING PLAN PRIVATE PAVING DETAILS PUBLIC PAVING DETAILS GRADING PLAN PRE-DEVELOPED DRAINAGE AREA MAP POST-DEVELOPED DRAINAGE AREA MAP REFERENCE DRAINAGE MAPS REFERENCE DRAINAGE MAPS STORM SEWER PLAN UTIL ITY PLAN EROS ION CONTROL PLAN EROSION CONTROL DETAILS LANDSCAPE PLAN -COLOR LANDSCAPE PLAN LANDSCAPE DETAILS TREE PRESERVATION PLAN IRRIGATION PLAN TREE IRRIGATION PLAN IRRIGATION SCHEDULE AND NOTES IRRIGATION DETAILS STRUCTURAL ABBREVIATIONS AND LEGEND GENERAL NOTES GENERAL NOTES (CONTINUED) SPEC IAL IN SPECTIO NS SPEC IAL INSPECTION (CONTINUED) FOUNDATION PLAN FOUNDATION PLAN SLAB REINFORCING LEVEL 2 / LOW ROOF FRAM IN G PLAN ROOF FRAMING PLA N TYPICAL DETAILS -FOUNDATION AND SLAB-ON-VO ID TYPICAL DETAILS -FOUNDATION AND SLAB-ON-VOID TYP ICAL DETAILS -STEEL FRAM IN G TYP ICAL DETAILS -STEEL FRAM IN G TYPICAL DETAILS -COMPOSITE SLAB TYPICAL DETAILS -COMPOSITE SLAB SLAB SCHEDULES AND DETAIL TYPICAL NON-LOAD BEARING CMU WALL DETAILS FOUNDAT ION DETAILS FOUNDAT ION DETAILS STEEL FRAMING DETAILS STEEL FRAM IN G DETAILS CMU WALL ELEVATIO NS STORM SHELTER CMU WALL ELEVAT IONS LOAD BEARING CMU WALL DETAILS BRACED FRAME ELEVAT ION S TYPICAL MOUN TING HEIGHTS PART ITIO N TYPES MATERIAL LEGEND & FINISH SCHEDULE DOOR SCHEDULE DOOR DETA ILS DOOR DETAILS WINDOW & LOUVER TYPES WINDOW DETAILS Page 5 of 7 A CENTURY OF EXCELLENCE 551 E Berry St. Fort Worth , TX 761 10 817/335/3394 FAX 81 7/8 77-5507 Contract Documents List BYRM CONSTRUCTION SERVICES Date: 5/6/2024 Sheet Or igina l A0.46 03/27/24 A0.50 04/15/24 A1 .01 03/27/24 A2 .10 03/27/24 A2 .15 03/27/24 A2 .20 03/27/24 A2 .30 03/27/24 A3.10 04/15/24 A3.20 04/15/24 A4 .01 04/15/24 A4 .02 04/15/24 A4 .10 04/15/24 A5 .01 03/27/24 A5 .05 03/27/24 A5.11 03/27/24 A6.01 03/27/24 A6.02 03/27/24 A6 .10 03/27/24 A7.01 03/27/24 A7.02 03/27/24 A7 .50 03/27/24 A7 .51 03/27/24 A7.52 03/27/24 A7.53 03/27/24 A7 .70 03/27 /24 A7 .75 03/27/24 A7.81 03/27/24 A8 .01 04/15/24 AB .02 03/27/24 A8 .03 04/15/24 A8.04 04/15/24 AB.05 04/15/24 AB .65 03/27/24 A8 .66 03/27/24 A8.67 04/15/24 A8.68 03/27/24 A9.00 03/27/24 A9.01 03/27/24 A9.20 03/27/24 A9 .21 03/27/24 AD1 .00 03/27/24 MEPE1 .01 04/15/24 MEPE2.01 04/15/24 MEPE2 .02 04/15/24 M0.01 04/15/24 M2 .11 04/15/24 M2.21 04/15/24 M3 .11 04/15/24 M3 .12 03/27/24 M4 .01 04/15/24 M4.02 04/15/24 M5.01 03/27/24 M5.02 03/27/24 M5 .03 03/27/24 M6 .01 04/15/24 M8.01 04/15/24 M8 .02 04/15/24 Co n tract Documents List Coppe ll Fire Station #5 157 S M oore Road, Coppell, Texas 75019 100% Construction Documents For Bid Sheet Name WINDOW & LOUVER DETAILS SIGNAGE DRAWINGS SITE PLAN OVERALL FLOOR PLAN -FIRST FLOOR OVERALL FLOOR PLAN -SECOND FLOOR FURNITURE PLAN OVERALL ROOF PLAN OVERALL REFLECTED CE ILING PLAN -FIRST FLOOR OVERALL REFLECTED CE ILING PLAN -SECOND FLOOR ENLARGED FLOOR PLAN ENLARGED FLOOR PLAN ENLARGED REFLECTED CEILING PLAN PLAN DETAILS ROOF DETAILS INTERIOR DETAILS EXTER IOR BU ILDING ELEVATIONS EXTERIOR BUILDING ELEVATIONS -COLOR ENLARGED BUILD ING ELEVATIONS BU ILDING SECTIONS BU ILD ING SECT IONS WALL SECTIONS WALL SECTIONS WALL SECTIONS WALL SECTIONS WALL SECTION DETAILS VERTICAL CIRCULATION SECTIONS ST AIR DETAILS INTER IOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS CASEWORK DETAILS CASEWORK DETAILS CASEWORK DETAILS CASEWORK DETAILS WALL SYSTEMS PROJECT OVERVIEW PLAN CUTAWAY MOCK UP DEMOLITION S ITE PLAN SITE PLAN -MPE ROOF PLAN -MPE STORM SHELTER REQU IREMENTS GENERAL NOTES & LEGEND -MECHANICAL FLOOR PLANS -LEVEL 1 -HVAC FLOOR PLANS -LEVEL 2 -HVAC FLOOR PLANS -LEVEL 1 -HVAC PIP ING FLOOR PLANS -LEVEL 2 -HVAC PIPING ENLARGED FLOOR PLANS SECT IONS & ENLARGED FLOOR PLANS DETAILS -MECHANICAL DETAILS -MECHAN ICAL DETAILS -MECHAN ICAL SCHEDULES -MECHANICAL HOOD INFORMATION 1 HOOD INFORMATION 2 Page 6 of 7 A CENTURY OF EXCELLENCE 55 1 E Berry St. Fort W orth , TX 76110 817 /335/3394 FAX 817/877-5507 Contract Documents List BYRN CONSTRUCTION SERVICES Date: 5/6/2024 Sheet Original M8 .03 04/15/24 MZ1 .01 03/27/24 P0 .01 03/27 /24 P2.01 04/30/24 P2 .11 04/30/24 P2 .21 04/15/24 P3.01 04/15/24 P3 .02 04/15/24 P4 .01 03/27/24 P4 .02 03/27/24 P4 .03 03/27/24 P5 .01 04/15/24 FP0 .01 03/27 /24 FP2 .10 03/27 /24 FP2 .21 03/27/24 E0 .01 03/27/24 E1 .11 04/15/24 E1 .21 04/15/24 E2 .11 04/15 /24 E2 .21 04/15/24 E3 .11 03/27/24 E3 .21 03/27/24 E4 .01 04/15/24 E5.01 04/15/24 E5 .02 03/27/24 E6 .01 03/27/24 E7.01 04/15/24 AV0 .01 03/27/24 AV2 .10 03/27/24 AV5 .01 03/27/24 T0.01 03/27/24 T1 .01 03/27/24 T2 .10 03/27/24 T2 .20 03/27/24 T2.30 03/27/24 T4 .01 03/27/24 T5 .01 03/27/24 SC0 .01 03/27/24 SC1.01 03/27/24 SC2.10 03/27/24 SC2 .20 03/27/24 SC2.30 03/27/24 Addendum 1 04/15/24 Addendum 2 04/30/24 Contract Documents List Coppell Fire Station #5 157 S Moore Road, Coppell, Texas 75019 100% Construction Documents For Bid Sheet Name HOOD INFORMATION 3 FIRST FLOOR PLAN -OVERALL -HVAC ZON IN G GENERAL NOTES , LEGENDS , & SCHEDULES -PLUMBING UNDERFLOOR PLANS -PLUMB IN G FLOOR PLANS -LEVEL 1 -PLUMBING FLOOR PLANS -LEVEL 2 -PLUMBING ENLARGED UNDERFLOOR PLANS -PLUMBING ENLARGED UNDERFLOOR PLANS -PLUMBING DETAILS -PLUMB IN G DETAILS -PLUMB IN G DETAILS -PLUMB IN G RISER DIAGRAMS -PLUMBING DETAILS AND SECT IONS -FIRE PROTECTION FLOOR PLANS -LEVEL 1 -FIRE PROTECTION FLOOR PLANS -LEVEL2 -FIRE PROTECT ION GENERAL NOTES & LEGENDS -ELECTR ICAL FLOOR PLANS -LE V EL 1 -POWER FLOOR PLANS -LEVEL 2 -POWER FLOOR PLANS -LEVEL 1 - LIGHT IN G FLOOR PLANS -LEVEL 2 -LIGHTING FLOOR PLANS -LEVEL 1 -FIRE ALARM FLOOR PLANS -LEVEL 2 - FIRE ALARM ENLARGED FLOOR PLANS -ELECTRICAL DETAILS -ELECTRICAL DETAILS -ELECTR ICAL ONE-LINE DIAGRAM -ELECTRICAL SCHEDULES -ELECTRICAL LEGEND AND NOTES -AUDIOVISUAL . OVERALL FLOOR PLANS -AUDIOVISUAL GENERAL DETA ILS -AUDIOVISUAL LEGEND AND NOTES -COMMU NI CAT IONS SITE PLAN -COMMUNICATIONS OVERALL GROUND LEVEL FLOOR PLAN -CO MMUNI CAT IONS OVERALL SECOND LEVEL FLOOR PLAN -COM MUNI CAT IONS OVERALL ROOF PLA N -COMMUN ICAT IONS TELECOM ROOM DETA ILS -COMMUNICATIO NS GENERAL DETAILS -COMMUNICATIONS LEGEND AND NOTES -SECUR ITY SITE PLAN -SECURITY OVERALL GROUND LEVEL FLOOR PLAN -SEC URITY OVERALL SECOND LEVEL FLOOR PLAN -SECUR ITY OVERALL ROOF PLA N -SECURITY Addenda Addendum 1 Addendum 2 A CENTURY OF EXCELLENCE 55 1 E Berry St. Fort Worth, TX 761 10 81 7 /335/3394 FAX 817/877-5507 Page 7 of 7 Contract Documents List Byrne Construction Services Coppell Fire Station No. 5 -Total GMP (ERP & Construction) Exhibit "A.6" Allowances The allowances indicated below are included in this GMP. 1. Coordination with Atmos for Gas Meter $25 ,000 Byrne Construction Services Coppell Fire Station No. 5 -Total GMP (ERP & Construction) Exhibit "A.7" Qualifications & Clarifications See attached Qualifications & Clarifications dated May 6 , 2024. BYRN: CONSTRUCTION SERVICES A CENTURY OF EXCELLENCE 551 E . Berry Stree t Fort Worth , Texa s 76110 (8 17) 335-3394 Fax (81 7) 877 -550 7 Qualifications & Clarifications Date: May 6 , 2024 Coppell Fire Station #5 GMP01 ------~ - General Conditions: --~ 1 Various Construction Contingencies are included in this estimate , and is intended for construction use only . -Design Completion Factor is excluded. -Market Volatility is included at 1 % of Cost of Work. -Contractor Contingency is included at 3% of Cost of Work . -Owner contingency is included at 3%. 2 A construction fee of 3.25% is included on the cost summary, and is based upon the total construction cost. 3 Builders Risk Insurance is included , and based upon the total cost. 4 CGL & Umbrella Insurance is included , and based upon the total cost. 5 Payment and Performance bonds for Byrne have been included on the cost summary, and are based upon the total cost. 6 The CM pre-construction services fee is included in this estimate. 7 All costs associated with approvals , easements , assessments, fees, deposits, charges , permits , studies , impact fees , tap fees , services fees , or similar, required by any governing agency to include County, City, State , or Federal entities , in addition to any and all utility entities are specifically excluded . An allowance for gas service has been included within Site Utilities , as noted. 8 Building permit cost is excluded , and to be paid By Owner if applicable. 9 Testing Lab services for materials , mock-ups , or delegated engineering components are to be provided by the Owner, and are excluded. 10 Testing of building components for water or air intrusion is not included and is to be provided by the Owner. 11 12 The General Conditions included in this estimate are based upon approximately 12 months to substantial completion. Overall project completion is 13 months . 13 Design Fees or services are not included . Where required in the specifications , the Construction Manager will provide design calculations and information provided by the Trade Contractors to the Architect and Engineer for approval and acceptance of the design . 14 The CM does not warrant of guarantee functionality of the design with the Owner's requirements. The CM relies upon the designers to provide and implement the Owner's requirements into the design documents. 15 All initial and final survey's and plats required by the City are by the Owner. 16 All electrical costs associated with construction is included . 17 All water costs associated with construction is included . 18 This estimate is to be reviewed as a whole ; not as individual line items. Temporary Construction Cost of Work Items: ________ ~--~------------ 1 Sales tax is excluded . 2 This estimate is based upon electronic design document files and models being available to all subcontractors at no additional cost. 3 All furnishings , fixtures , and equipment are excluded from this estimate , unless specifically noted in the estimate deta il. 4 All hazardous or contaminated material and soil testing, remediation , investigation , and abatement is excluded . 5 Site is assumed to be free of any contaminates , unencumbered, and ready to begin excavation work . 6 CM excludes responsibility for compliance and/or viability of point selections with regard to the design components or specifications. Page 1 of 3 Qualifications & Clarification s BYRN CONSTRUCTION SERVICES Date: May 6 , 2024 A CENTURY OF EXCELLENCE 551 E. Berry Street Fort Worth , Texas 76110 (817) 335 -3394 Fax (817) 877-5507 Qualifications & Clarifications Coppell Fire Station #5 GMP01 7 Initial design models shall be provided by the design team to Byrne. BIM coordination and clash detection is included for structure and M/E/P during construction. 8 All costs associated with temporary fencing and gates is included . ---~~--------------------- General Comment: --~~ ---- ---------~------------~ --~~----- 1 This estimate is based upon the information made available. Quantities and selections of materials and components are gathered or assumed per interpretation of the availab le documents. 2 Material and Labor Shortages -If serious or unusual price escalation , or material and/or labor shortages are experienced due to causes beyond the Contractor's control following the execution of this Contract, and to the extent such escalation and/or shortages increase the cost of construction or cause the Contractor to incur delays to the critical path that cannot be avoided despite the exercise of reasonable professional diligence, Contractor shall provide Owner with notice of such shortages and their potential cost and/or schedule impact and a change order shall issue to adjust the Contract Sum and Contract Time accordingly. 3 We cannot guarantee lifability of existing trees to remain due to utility work within root zone. Page 2 of 3 Qualific ations & Clarifications BYRN CONSTRUCTION SERVICES A CENTURY OF EXCELLENCE 551 E. Berry Street Fort Worth , Texas 76110 (817) 335 -3394 Fax (817) 877-5507 Qualifications & Clarifications Date: May 6, 2024 Division 11 -Equipment: Coppell Fire Station #5 GMP01 ------------------------------------- 1 Included per the availab le documents. 2 Installation of Owner Furnished Gear Extractor and Drying Cabinet are included. 3 Floor scrubber Clarke MASO 15B is included. 4 Athletic equipment is included per Owner directed vendor Marathon Fitness. 3 Compressed air piping is included as copper pipe due to no spec provided. -------------------------- Division 23 -Heating, Ventilating and Air Conditioning: 1 Included per the availab le documents. Commissioning of mechanical equipment is included. Page 3 of 3 Qualifications & Clarifications BYRM CONSTRUCTION SERVICES Byrne Construction Services 55 1 E. Berry Fort Worth, TX 76 11 0 City of Coppell Fire Station #5 157 S. Moore Road . Cop pell, Te xas ISSUE 05/0 1/2024 Site Log istics Plan SL.01 LEGEND _ Construction Traffic Ro ute -Temp Water Route ... Temp Power Route BYRM CONSTRUCT ION SERVICE S Byrne Construction Services 55 1 E. Berry Fort Worth, TX 761 10 City of Coppell Fire Station #5 157 S. Moore Road . Coppell, Texas ISSUE 05/0 1/2024 Site Logistics Plan SL .02 Bond No. 022231272 STATUTORY PERFORMANCE BOND PURSUANT TO CHAPTER 2253 OFTHETEXASGOVERNMENTCODEASAMENDED BY THE 73RD TEXAS LEGISLATURE, 1993 (PUBLIC WORKS) KNOW ALL MEN BY THESE PRESENTS: That, Thos. S. Byrne, Inc. dba Byrne Construction Services, (hereinafter called the Principal), as Principal , and Liberty Mutual Insurance Company. a corporation organized and existing under the laws of the State of Massachusetts, with its principal office in the City of Boston, MA (hereinafter called the Surety), as Surety, are held and firmly bound unto the City of Coppell, Texas (hereinafter called the Obligee), in the amount of Eleven million one hundred ninety four thousand six hundred ninety and no/100 ($11,194,690.00), for the payment whereof, the said Principal and Surety bind themselves, and their heirs, administrators , executors, successors and assigns , jointly and severally, firmly by these presents. WHEREAS , the Principal has entered into a certain written contract with the Obligee, dated the 24th day of January. 2024, for City of Coppell Fire Station #5 , which contract is hereby referred to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully perform the work in accordance with the plans , specifications and contract documents, then this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of Texas Govemment Code as amended by Acts of the 73rd Legislature, 1993 , and all liabilities on this bond to all such claimants shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein . IN WI1NESS WHEREOF , the said Principal and Surety have signed and sealed this instrument this 7th day of May, 2024 . Attest: (I f Corpo ration ) Wi tness: Liberty Mutual Insurance Company Bond No. 022231272 STATUTORY PAYMENT BOND PURSUANT TO CHAPTER 2253 OFTHETEXASGOVERNMENTCODEASAMENDED BY THE 73RD TEXAS LEGISLATURE, 1993 (PUBLIC WORKS) KNOW ALL MEN BY THESE PRESENTS: That, Thos. S. Byrne, Inc. dba Byrne Construction Services , (hereinafter called the Principal), as Principal, and Liberty Mutual Insurance Company. a corporation organized and existing under the laws of the State of Massachusetts , with its principal office in the City of Boston, MA (hereinafter called the Surety), as Surety, are held and firmly bound unto the City of Coppell, Texas, (hereinafter called the Obligee ), in the amount Eleven million one hundred ninety four thousand six hundred ninety and no/100 ($11,194,690.00), for the payment whereof, the said Principal and Surety bind themselves , and their heirs, administrators, executors, successors and assigns, jointly and severally, firmly by these presents. WHEREAS , the Principal has entered into a certain written contract with the Obligee , dated the 24th day of January, 2024, for City of Coppell Fire Station #5 , which contract is hereby refeITed to and made a part hereof as fully and to the same extent as if copied at length herein. NOW THEREFORE, THE CONDITION OF TI-IlS OBLIGATION IS SUCH, that if the said Principal shall pay all claimants supplying labor and material to him or a subcontractor in the prosecution of the work provided for in said contract, then , this obligation shall be void; otherwise to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to the provisions of Chapter 2253 of Texas Government Code as amended by Acts of the 73rd Legislature, 1993 , and all liabilities on this bond to all such claimants shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. IN WJTNESS WHEREOF , the said Principal and Surety have signed and sealed this instrument this 7th day of May 2024. Att est: Witn ess : Liberty Mutual Insurance Company ~Liberry, ~ Mutual. SURETY This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Liberty Mutual Insurance Company The Ohio Casualty Insurance Company West American Insurance Company POWER OF ATTORNEY Certificate No: 8205229-975271 KNOWN ALL PERSONS BY THESE PRESENTS : That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampsh ire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (here in collectively ca ll ed the "Companies "), pursuant to and by authority herein set forth , does hereby name, constitute and appoint, Bennett Brown, Kev in J. Dunn, Robert a Er b, Steven Tucke r, Tanner L angston, Tr acy Tucke r, W. L awrence Brown all of the city of Fort Worth state of TX each Individually if there be more than one named, its true and lawful attorney-In-fact to make, execute , seal, acknow ledge and delive r, for and on its behalf as surety and as its act and deed , any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Compan ies as ff they have been duly signed by the pres ident and attested by the secretary of the Companies in their own proper perso ns. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized office r or official of the Companies and the corporate seals of the Compan ies have been affixed • thereto th is~ day of April , ~- Liberty Mutua l Insurance Company The Ohio Casualty Insurance Company ~ By: ddfrmpany :~-~ c ------J.=--------------1~ro :t:f ~ David M. Carey, Assistant Secretary _5 .a::, ,u State of PENNSYLVANIA ss ~ :::i Cou nty of MONTGOMERY § E ~~ ~~ .!:: ~ On th is 7th day of April , 20 21 befo re me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of Liberty Mutual Insurance ~ (I) ~ rn Company, The Ohio Casualty Compa ny, and West American Insurance Company, and that he, as such , being authorized so to do, execute the foregoing instrument for the purposes ~ ~, :fil _:: therein contained by signing on behalf of the corporations by himself as a duly authorized officer. ~ ~ ~-~ IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial sea l at King of Prussia, Pennsylvania , on the day and year first above written . <50 <I) ffi 0 in a..O ..Q ~ Commonwealth of Pennsylv an ia -Notary Sea l ';2: af O Tere sa Pastella , Notary Public ~ d (l)E 'ro _._, Mon tg omery Co unty f// ~ ; . , . \ fl -I-II J E 0 2 ~ _ My commission expi res March 28 , 2026 By:-1~'-------~--------------i~ ~ c: ~ ~~ ~ ..... ,$1 · comm is sion numbe r 11 26044 i'eresa Pastella, Notary Publ lc ~ o of 1n ~Vb ·"" Member, Pe nnsylvania Assocla tlon or Notaries ~ g>~ '411V ~~ .g> 2 This Power of Attorney is made and executed pursuant to and by autho ri ty of the following By-laws and Author izat ions of The Ohio Casualty Insurance Company, Liberty Mutual ~ ~ OE .!: Insurance Company, and West American Insurance Company wh ich resolutions are now in full force and effect reading as follows: ~ ~ -co ~ 2 ARTICLE IV-OFFICERS: Section 12. Power of Attorney . o 0 E ~ Arly officer or othe r official of the Corporation authori zed for that purpose in writing by the Chairman or the President, and subject to such limitation as the Cha irman or the ::a..-~ ~ President may prescribe, shall appo int such attorneys -In -fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety ffi ~ ~ ffi any and all undertakings, bonds , recognizances and other surety obligations. Such attorneys-in-fact , subject to the limitations set forth in their respective powers of attorney, shall -c, ~ 0 t:: ha ve full power to bind the Corporation by the ir signature and execution of any such instruments and to attach thereto the seal of the Corporation . When so executed , such § (I) z ~ instruments shall be as binding as if signed by the Pres ident and attested to by the Secretary . Any power or authority granted to any representative or attorney-in -fact under the ~ m provisions of th is article may be revoked at any time by the Board , the Chairman, the President or by the office r or officers granting such power or authority . ~ c.. ARTICLE XIII -Execution of Contracts: Section 5. Surety Bonds and Undertakings . Any officer of the Company authorized for that pu rpose in wct ting by the chairman or the president , and subject to such limitations as the chairman or the president may prescribe, sha ll appoint such attorneys -in-fact, as may be necessa·ry to act in behalf of the Company to make , execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys -In -fact subject to the limitations set forth in their respective powers of attorney, shall have full power to blnd the Company by their signatu re and execu ti on of any su ch instruments and to attach there to the seal of the Company. When so executed such instruments shall be as binding as If signed by the pres ident and attested by the secretary . Certificate of Designation -The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such attorneys -in• fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recogn izances and other surety obligatio ns. Authorization -By unanimous consent of the Company's Board of Directors , \he Company consents that facsimile or mechanically reproduced signature of any ass istant secretary of the Company, wherever appearing upon a certified copy of any powe r of attorney Issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed . I, Renee C. Llewellyn , the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original power of attorney of which the foregoing is a full , true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked . IN TESTIMONY WHEREOF , I have hereunto set my hand and affixed the seals of said Companies this~ day of May , 2024 . 4/~ By:=-'~-=--.,..,..-=-,,-~---:-:--c--=----:---------Renee C. Llewellyn, Assistant Secretary LMS -12873 LM IC OCI C WAI C Multi Co 02121 ~Ubertx ~Mutual Important Notice TO OBTAIN INFORMATION OR TO MAKE A COMPLAINT: You may write to Liberty Mutual Surety at: Liberty Mutual Surety Interchange Corporate Center 450 Plymouth Road, Suite 400 Plymouth Meeting, PA 19462-8284 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. 0. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state. tx. us Premium or Claim Disputes Should you have a dispute concerning a premium, you should contact the agent first. If you have a dispute concerning a claim, you should contact the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. Attach This Notice To Your Policy: This notice is for information only and does not become a part or condition of the attached document. LMIC-3500 Page 1 of 2 Rev . 7 .1.07 ~u · ertx ~ Mutual. NOTIFICACION IMPORTANTE PARA OBTENER INFORMACION O REALIZAR UNA QUEJA: Usted puede escribir la notificaci6n y dirigirla a Liberty Mutual Surety en la siguiente direcci6n: Liberty Mutual Surety Interchange Corporate Center 450 Plym·outh Road, Suite 400 Plymouth Meeting, PA 19462-8284 Usted puede contactar al Departamento de Seguros de Texas para obtener informacion acerca de las companfas, coberturas, derechos o quejas: 1-800-252-3439 Usted puede escribir al Departamento de Seguros de Texas a la siguiente direcci6n: P. 0. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us • Disputas acerca de primas o re~lamos En caso de que usted quiera elevar una disputa concerniente al tema de primas, par favor contacte en primer lugar a su agente. Si el tema de la disputa es relativo a un reclamo, por favor contacte a la companfa de seguros en primer termino. Si usted considera que la disputa no es apropiadamente resuelta en estas instancias, entonces usted puede contactar al Departamento de Seguros de Texas .. Adjunte esta notificacion a su p61iza: Esta notificaci6n es a los solos fines de su informaci6n y la misma no forma parte o condiciona de manera alguna el documento adjunto . LMIC -3500 Page 2 of 2 Rev. 7 .1.07