Loading...
Park West CC(02-2)-CS090715 THE.CITY.OF corrELL .5 MEMORANDUM FROM THE DEPARTMENT OF ENGINEERING To: Lee Stone, Commercial Building Inspector From: Larry Davis, Construction Inspector Date: July 15, 2009 RE: QT Kitchen on NW corner of Belt Line & Airline As of this date, a maintenance bond to cover water line installation work has not been provided to this office. Our files show no test paperwork has been received for the double-check either. Let me know if you have other questions or concerns. "CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"