Park West CC(02-2)-CS090715
THE.CITY.OF
corrELL
.5
MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To:
Lee Stone, Commercial Building Inspector
From:
Larry Davis, Construction Inspector
Date:
July 15, 2009
RE:
QT Kitchen on NW corner of Belt Line & Airline
As of this date, a maintenance bond to cover water line installation work has not been
provided to this office. Our files show no test paperwork has been received for the
double-check either.
Let me know if you have other questions or concerns.
"CITY OF COPPELL ENGINEERING - EXCELLENCE BY DESIGN"