Vista Ridge Retail, L5-CS081229
DEVELOPMENT REVIEW COMMITTEE
ENGINEERING COMMENTS
ITEM:
Coppell Office Village, Lot 1, Block A, Replat,
a replat of the U-Haul Addition,
Lot 1, Block 1, to relocate and revise easements to allow the development of an
office building on 2.02 acres of land located along the south side of S.H. 121,
approximately 400 feet east of Denton Tap Road, at the request of L. Lynn
Kadleck, Kadleck & Associates.
STAFF REP.: Marcie Diamond PROJECT ID# RP-08-0049
DRC DATE:
December 29, 2008 and January 2, 2009
CONTACT:
Kenneth M. Griffin, P.E., Dir.of Engineering/Public Works 972/304-3686
COMMENT STATUS: PRELIMINARY FINAL REVISED
AFTER P&Z
1. Remove “utility easement” from the fire lane.
2. Include a 20’ utility easement for the sanitary sewer main.
3. Include a 5’ drainage easement on the east side of the property.