Loading...
ST0003-CS090514 (8/18/2009) Keith Marvin - Re: Time tablePage 1 From: Keith Marvin To:Abraham, Tom Date: 5/14/2009 11:06 AM Subject: Re: Time table Tom, The last correspondence I had was about a week ago, and they were ordering the blocks. They indicated it would take two weeks for the materials to arrive. I suspect they are making preparations to build the wall. They will need to remove some material in order to properly construct the wall. I'll have Albert get with them and get a better idea of the work schedule. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> Tom Abraham <tmedayil@yahoo.com> 5/14/2009 10:55 AM >>> Keith, The workers have removed some earth from my yard (about 3 or 4 ft. on left side) and it lowered the height of the yard on that side. I don't know if they did it by mistake or not. I hope the retaining wall will be of the same height through out the front (not lowered to the street level on the left side). Do you have any idea when they will start the work? I will not be here on some week-ends. Thanks, Tom Abraham.