ST0003-CS071024 (8/18/2009) Keith Marvin - Fwd: RE: S. Coppell Rd.Page 1 From: Keith Marvin To:leachs4@verizon.net CC:Griffin, Ken Date: 10/24/2007 4:58 PM Subject: Fwd: RE: S. Coppell Rd. Ms. Leach, The city is working with our consultant to finalize the construction plans for the portion of Coppell Road from Sandy Lake to Cooper. We have been acquiring right of way at the intersections to construct ADA accessible ramps. We are still working with three property owners to complete this acquisition. We have requested that the franchise utility companies (Verizon, Atmos, Oncor, etc.) relocate their utilities where they are in conflict with the proposed street improvements. We are hopeful that they will begin relocation by the end of the year. If things stay on schedule we should be under construction around the time school lets out in May 2008. You are welcome to come by and get copies of the plans for your use. Please feel free to call me if I can be of any assistance. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Leach's" <leachs4@verizon.net> 10/22/2007 12:11 PM >>> I originally sent this message in June and got a return message that you were on vacation. Has there been any more design plans drawn or any details you can share with me on the progress of S. Coppell Rd? Thanks. JoAnn Leach From: Leach's [mailto:leachs4@verizon.net] Sent: Friday, June 08, 2007 10:08 AM To: 'kgriffin@ci.coppell.tx.us' Subject: S. Coppell Rd. Ken, We live at 408 S. Coppell Rd., (between Kaye and Plantation). We have put off having a circular drive installed in part due to the many delays in the reconstruction and also due to the elevation change proposed in the reconstruction of Coppell Rd. We now have a son who is about to turn 16 and for safety reasons we now want to push ahead with our plans. To put in a circular drive over the drainage ditch is cost prohibitive. I noticed in the newspaper recently that a new design firm had been hired, the way it read was for the other half of Coppell Rd and Bethel, but not sure if our end will be affected. I am wondering if you can give me any details on the elevation proposed, timetable of when we will be able to see the plans and when construction is now due to begin on our section of Coppell Rd. Will the Bethel Rd./Coppell Rd portion be completed before construction begins on the north part of S. Coppell Rd.? Any help you can provide would be appreciated. Thanks. JoAnn Leach 408 S. Coppell Rd. Coppell, TX 75019 972-393-7234 leachs4@verizon.net