Loading...
ST0003-CS071213 (8/18/2009) Keith Marvin - Re: Coppell RoadPage 1 From: Keith Marvin To: kar@Huitt-Zollars.com Date: 12/13/2007 1:19 PM Subject: Re: Coppell Road Ken, I am out of the office until Monday. I agree that we can not lay an 8" at 0.23%. If a 10" keeps is within TCEQ guidelines then we should use it. I forwarded your email to our engineering technician to look at the layout. If I get some comments from him I'll pass them on, if not I'll call you on Monday. Keith -----Original Message----- From: "Roberts, Ken" <kar@Huitt-Zollars.com> To: Keith Marvin <KMARVIN@ci.coppell.tx.us> Cc: Theressa Smith <Theressa@Huitt-Zollars.com> Sent: 12/13/2007 11:51:41 AM Subject: Coppell Road Keith, In looking at the section of sanitary sewer to replace the existing 8" main is on a 0.23% grade. Because of the flat grade, we are proposing to replace the 8" main with a 10" main on a 0.22% grade. I have attached a sketch showing our proposed design for your review and comment. Let us know. Thanks, Kenneth Roberts, PE Huitt-Zollars, Inc.