Loading...
ST0003-CS080626Page 1 of 2 Keith Marvin - Re: Coppell Road Move 6/19/08 meeting summary From: <richard.ll .trevino@verizon.com> To: <tammie.dean@verizon.com> Date: 6/26/20081:28 PM Subject: Re: Coppell Road Move 6/19/08 meeting summary CC: <danny.fortune@verizon.com>, <stephens.clifford@verizon.com>, <darin.e.box@verizon.com>, <jenny.j.ruppert@verizon.com>, <mat307@SBCglobal.net>, <michael.brown@verizon.com>, <olen.cl.steele@verizon.com>, <stefani.wilkinson@verizon.com>, <tammie.dean@verizon.com>, <carl.x.shipman@verizon.com>, <keith.e.jones(cwerizon.com>, <rodell@ci.coppell.tx.us>, <kmarvin(c~ci.coppell.tx.us> Attachments: Coppell Road Move MEETING #1 SUMMARY 6-19-08.doc Tammie, We will be needing to set up a face to face meeting with Engineering (ASAP) to discuss dates and the necessary changes that need to be made out in the field and to the narratives to these two work orders. I have given my large set of prints to Mid America so that we can continue to work until the Gadded prints are received. There is also a section of Aerial cable on the far South side that needs to be moved by the end of next week so that we are out of the way of the new water line that is being installed, which will involve pulling of poles, transferring cables and placing new IPIDs to allow cables to be moved back 12ft of the new poles. these pages are not on the set prints that are presently in the field. It would also be in the best interest of all involved parties to attend Thursday Meetings @ 9:OOAM to discuss and answerthe City of Coppells questions to upcoming and unforeseen changes aswe progress. Regards Thanks, Richard Trevino Coordinator FTTP OSP Construction Lewisville 972-318-3247 office 214-437-6452 cellular Tammie M. Dean1EMPLITXNerizon Richard L. TrevinolEMPLITXIVerizon@VZNotes, Cliff E. StephenslEMPLITXIVerizon@VZNotes, Charles D. Fortune/EMPLlTXIVerizon@VZNotes, Olen C. 06/20/2008 02:24 PM SteelelVENDITXIVerizon@VZNotes, Darin E. To Box/EMPLlTXIVerizon@VZNotes, Michael W. BrownIEMPLITXIVerizon@VZNotes, Stefani R. WilkinsonlEMPL1TX1Verizon@VZNotes, Jenny J. RuppertlEMPLITXIVerizon@VZNotes, Tammie M. DeanIEMPLITXIVerizon@VZNotes, mat307@SBCglobal.net cc Subject Coppell Road Move 6/19/08 meeting summary file://C:1Documents and SettingslradloolLocal SettingslTemplXPgrpwise148639971 City_o... 8/18/2009 Page 2 of 2 Attached below is the Coppell Road Move meeting summary from the conference call that was held on Thursday June 19th. The next meeting is scheduled for: Date: Thursday July 10, 2007 Time: 2:00 p.m Conference Bridge: (866) 766-3409 passcode: 5457470# If you have any questions or updates prior to the next call please feel free to contact me at 972-318-3505. Thanks, Tammie Dean Project Specialist- Project Management Texas NE&P Office :9721318-3505 Fax :9721318-1150 tammie.dean@verizon.com file://C:1Documents and SettingslradloolLocal SettingslTemplXPgrpwise148639971 City_o... 8/18/2009 Coppell Road Move 6/20/2008 VERIZON PROJECT MANAGEMENT MEETING SUMMARY T0: Attendees PROJECT: Coppell Road Move ,Coppell TX PROJECT ISD: September 15, 2008 MEETING DATE: Thursday June 19, 2008 -Meeting # 1 PROJECT DESCRIPTION: 5647.005-3POAOPK PROVIDE LABOR AND MATERIAL TO REPLACE ALL THE AERIAL CABLE ALONG COPPELL ROAD. THREE 4" CONDUITS ARE TO BE PLACED ALONG THE WEST R.O.W. WITH A 1200 PAIR CABLE AND A 600 PAIR CABLE IN TWO DUCTS. A VACANT CONDUIT IS BEING PLACED FOR FUTURE GROWTH ALONG BETHEL ROAD AT THE SOUTH END OF THE PROJECT. ALL POLES AND AERIAL CABLES ARE TO BE REMOVED. WHEN: IN SERVICE JUNE 15, 2008 WHERE: COPPELL ROAD FROM SANDY LAKE ROAD SOUTH TO COPPELL STREET. WHY: COPPELL ROAD IS BEING WIDENED. STORM DRAIN AND NEW WATER LINES ARE BEING PLACED. REVISION 2 (5/8/2008)ISSUED TO CHANGE ROUTING OF COPPER CABLE PER CITY OF COPPELL. COPPER CABLE IS BEING CHANGED FROM UNDERGROUND TO BURIED. 5647-005-3PFAOHY PROVIDE LABOR AND MATERIAL TO REPLACE SEVERAL SECTIONS OF FIBER OPTIC CABLE ALONG COPPELL ROAD. COPPELL ROAD IS BEING CUT DOWN AND A NEW STORM DRAIN AND WATER LINE IS BEING PLACED. FIBER CABLE NEEDS TO BE LOWERED SO CITY LINES CAN BE PLACED. WHEN: IN-SERVICE JUNE 15, 2008. WHERE: COPPELL ROAD FROM SANDY LAKE ROAD SOUTH TO COOPER STREET. WHY: COPPELL ROAD IS BEING WIDENED. STORM DRAIN AND NEW WATER LINES ARE BEING PLACED. PURPOSE OF MEETING: The purpose of this meeting was to discuss the major milestones, and identify any issues that will affect the successful completion of these projects. NEXT MEETING: MEETING DATE: Thursday, July 10, 2008 MEETING TIME: 2:OOPM CDT ACCESS #: 866-766-3409 passcode 5457470# If you have any questions regarding this meeting or project, please contact me at (972) 318-3505 Tammie Dean Project Manager 1 Coppell Road Move 6/20/2008 ATTENDEE LIST The following individual with an (X) before their names were in attendance at this meeting. Please ensure that each of the attendees receive a copy of this meeting summary. Coppell Road Move TEAM ATTENDEE LIST: Name Department X CliffStephens Network Eng/Ping-Texas Danny Fortune Construction -Texas Y Darin Box Network Eng/Ping-Texas X Jenny Ruppert Network Eng/Ping- Texas Olan Steele Network Eng/Ping- Texas a Mike Richard Mike Brown Network Eng/Ping- Texas Y Rick Trevino Network Ops West -Texas Stefani Wilkinson NetworkEng/Ping-Texas X Tammie Dean Network Eng/Ping -Texas PROJECT WORK ORDERS Coppell Road Move Work Orders Phone # Role Email Address 972-318-1554 Network Engineer stephens.clifford@verizon.coi 972-318-5132 Mgr-Construction danny.fortune@.verizon.com 972-318-5184 SEC MGR-NETWORK ENGINEERING Dazin.box@verizon.com 325-944-6034 SPEC-NETWORK ENGINEERING Jenny Ruppet@verizon.com 972-318-5284 Olan.steele@verizon.com 817-577-2772 Mid-America Mat307rSBC~loobal.net 972-578-3354 OSP Network Engineering michael.brown@verizon.com 972-318-3247 Coord Network Ops- Construction richazd.l l.trevino@.verizon.a 903-885-1742 SPEC-NETWORK ENGINEERING stefani.wilkinson@verizon.co 972-318-3505 Project Specialist tammie.dean@verizon.com Work Order ACTIVITY I TASK CMS Schell Detail En 'r CMS Actual Detail Eng'r CMS WO Approval CMS Schell Mat. Ship CMS Actual Mat. Ship CMS Schell Const. Start CMS Actual Const. Start CMS Schell In-Serv CMS Actual In-Sere 5647-005- Aerial 03-11-OS 03-11-08 03-12-OS 03-12-08 06-20-OS 10-15-08 3POAOPK Copper Re lacment 5647-005- Fiber 03-11-OS 03-11-08 03-12-08 06-05-08 06-05-OS 06-20-08 09-15-08 i 3PFOHY re lacement I. PREVIOUS ACTION ITEMS None II. CURRENT BUSINESS ITEMS 1.01 Permits - Olan Steele /Rick Trevino -Closed All City of Coppell permits where picked upon Thursday June 19tH 2 Coppell Road Move 6/20/2008 1.02 Material Status -Jenny Reppert /Rick Trevino -Open WO 3PFOHY all material on hand to start job WO 3POAOPK - 600 pr on hand, will be using 1200 pr from IF work order, Email sent to AI Dill to cancel the 1200 pr cable from this order. Jenny to order 900, 300 & 400 pr cable needed. VZ to provide all class 2 material, Mid-America to supply remaining class 1 material. 1.03 Daily Reporting -Mike Richard /Jenny Repper - On-Going Since Mid-America does not have access to V-Build yet, they will be reporting the placing statis Jenny via email at ~nny.repper(cr)verizon.com. Jenny to follow up with in need to get Mid- America access to V-Build. 1,04 Job Prints - Olan Steele -Open Olan to meet with Rick and Mid-America on Friday 6/20 at 10am to delivery a new set of job prints. Olan to mark a new pole setting on Mid-America current prints. 1.05 Work start / Completions -Mid America Mid America has called in locates for all work orders. They are scheduled to to start on next week and are schedule to complete all placing by the end of August. III. OPEN DISCUSSION 1.06 Weekly Meetings- Ricky -Mid America - On-Going Will attend weekly meetings on Thursday mornings at 9AM with Road Move construction company trailer which is located near Bass Pro shop. IV. PENDING ACTION ITEMS 1.02 Material Updates Jenny Reppert /Rick Trevino -Open 1.03 Daily Reporting -Mike Richard /Jenny Repper - On-Going 1.04 Job Prints - Olan Steele -Open 1.05 Bi-Weekly Updates -Rick Trenvo /Mike Richard - MidAmerica 3