Loading...
ST0003-CS080717 (8/18/2009) Keith Marvin - Coppell RoadPage 1 From: Keith Marvin To:Caudill, Robert; lsmith@tiseopaving.com CC:Griffin, Ken; Samaniego, Albert Date: 7/17/2008 2:41 PM Subject: Coppell Road Gentlemen, Albert Samaniego and I have discussed extending the temporary storm drain pipe approximately 20 feet south of the plan location at the outfall. Albert is concerned about the steep drop from the edge of Coppell Road where the pipe currently ends. The utility sub-contractor installing this pipe requested written authorization prior to proceeding with this work. The City of Coppell hereby requests that Tiseo install such additional pipe as the city inspector may direct in the field. All work associated with this will be paid at the contract unit price. In the event we over-run the quantity on this item we will reconcile that at the end of the project. Please feel free to contact me to discuss this matter. Keith Marvin, P.E. Project Engineer (972) 304-3681