Loading...
ST0003-CS080818 (8/18/2009) Keith Marvin - Re: FW: Delete Bores & Add Open Cut CrossingsPage 1 From: Keith Marvin To: lsmith@TiseoPaving.com Date: 8/18/2008 5:44 PM Subject: Re: FW: Delete Bores & Add Open Cut Crossings Thanks Lance. We need these wakways in place by Monday. Let's get a price ASAP. Keith -----Original Message----- From: "Lance Smith" <lsmith@TiseoPaving.com> To: Keith Marvin <KMARVIN@ci.coppell.tx.us> Sent: 8/18/2008 5:08:19 PM Subject: RE: FW: Delete Bores & Add Open Cut Crossings Keith, When we met last Friday with North Texas they understood the importance of maintaining a clean project and said that they would have everything in good shape by this Friday. We addressed the tree limbs and they will be gone this week also. They are going to send us a quote for the temp walkways and according to Robert you were willing to add by change order the cost to provide temp walkways, I expected a price from North Texas today but they didn't send one. I will hound them tomorrow so we can get a price agreed before the end of the week. Thanks Lance -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Monday, August 18, 2008 3:52 PM To: Lance Smith Cc: Albert Samaniego; Robert Caudill Subject: Re: FW: Delete Bores & Add Open Cut Crossings Lance, Thanks for the additional information. This issue should not affect our working relationship. I understand your position as it relates to a proposed change from one of your sub-contractors. I hope you understand our position as it relates to having two different costs for the same pay item depending on which sub is doing the work. We have gone ahead and processed the pay estimate. I would like to not that we have agreed to the 25% for ROW Preparation, and that I would like to see the tree trimming removed from the ROW. With this email I want to reiterate that we need to have the traffic control refreshed, the roadway cleaned, and some safe pedestrian routes established before school starts next Monday. I have been talking about this for a couple of weeks now, and I am getting a little concerned. (8/18/2009) Keith Marvin - Re: FW: Delete Bores & Add Open Cut CrossingsPage 2 Please reassure me that you will get this taken care of. Thanks, Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Lance Smith" <lsmith@TiseoPaving.com> 8/15/2008 10:57 AM >>> Keith, Please see the e-mail and attachments from North Texas Contracting. This is not a request from Tiseo for a change order I just wanted you to see what I was telling you over the phone, after we hung up it seemed to me that you felt like I was trying to pocket some kind of windfall profit from work not performed. I apologize for not consulting you when I was told that this was the agreement made in the field. I should have taken time to follow up on what I was told. North Texas Contracting Tiseo Paving 6" PVC Crossing w/Temp Paving - 42.0 @ 166.00 = 6,972.00 Concrete Removal - 260.0 SY @ 5.55 = 1,443..00 8" PVC Crossing w/Temp Paving - 193.0 @ 199.00 = 38,407.00 HMAC Removal - 220.0 SY @ 3.40 = 748.00 12" PVC Crossing w/Temp Paving - 69.0 @ 212.00 = 14,628.00 Temp HMAC - 480.0 SY @ 16.00 = 7,680.00 $ 60,007.00 6" PVC - 42.0 LF @ 31.50 = 1,323.00 8" PVC - 193.0 LF @ 42.00 = 8,106.00 12" PVC - 69.0 LF @ 57.75 = 3,984.75 $ 23,284.75 - (8/18/2009) Keith Marvin - Re: FW: Delete Bores & Add Open Cut CrossingsPage 3 60,007.00 - 36,722.25 loss North Texas Contracting Tiseo Paving 6" PVC Bore - 42.0 @ 180.00 = 7,560.00 6" PVC Bore - 42.0 @ 189.00 = 7,938.00 8" PVC Bore - 193.0 @ 210.00 = 40,530.00 8" PVC Bore - 193.0 @ 220.50 = 42,556.50 12" PVC Bore - 69.0 @ 230.00 = 15,870.00 12" PVC Bore - 69.0 @ 241.50 =16,663.50 $63,960.00 $ 67,158.00 - 63,960.00 3,198.00 profit We have always had a good working relationship with the City of Coppell and I do not want a misunderstanding over this to change that. Thanks Lance ________________________________ (8/18/2009) Keith Marvin - Re: FW: Delete Bores & Add Open Cut CrossingsPage 4 From: Zach Fusilier [mailto:zfusilier@ntexcon.com] Sent: Tuesday, July 01, 2008 10:24 AM To: Lance Smith Cc: Mike George; 'Craig Benckendorf'; mbradford@ntexcon.com; 'Natalie Gregory'; bfusilier21@hotmail.com Subject: Delete Bores & Add Open Cut Crossings Lance & Mike, Please see the attached change order proposal for the deletion of the bores and the addition of crossings with temporary paving. This has already been allowed onsite by the inspector so please see if the city can process the paperwork so we can invoice for the work performed. Thanks again. Zach Fusilier North Texas Contracting 4999 Keller Haslet Road Keller, Texas 76248 Office - 817-430-9500 Mobile - 817-819-6691 Fax - 817-430-9207