Loading...
ST0003-CS080915 (2) Page 1 of 3 Keith Marvin - Re: Coppell Road Project From:   <stephens.clifford@verizon.com> To:   "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date:   9/15/2008 3:37 PM Subject:   Re: Coppell Road Project   It has but, we are still trying to assest the damage before we start sending technicians. Right now Rick Trrevino is the only one going from my group. CLIFF STEPHENS LOCAL MANAGER CONSTRUCTION LEWISVILLE, TX (972)318-1554 "Keith Marvin" <kmarvin@ci.coppell.tx.us> To Cliff E. Stephens/EMPL/TX/Verizon@VZNotes cc 09/15/2008 03:12 PM SubjectRe: Coppell Road Project That's great.  I though for sure this storm would have had an impact on the schedule. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> <stephens.clifford@verizon.com> 9/15/2008 1:23 PM >>> As of 9/15/08 everything is on target for splicing completion by 9/22/08. If anything changes I will send you an e-mail. CLIFF STEPHENS LOCAL MANAGER CONSTRUCTION LEWISVILLE, TX (972)318-1554 "Keith Marvin" <kmarvin@ci.coppell.tx.us> 09/15/2008 01:13 PM To Cliff E. Stephens/EMPL/TX/Verizon@VZNotes file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48CE814BCity_...8/18/2009 Page 2 of 3 cc "Robert Caudill" <rcaudill@TiseoPaving.com>, Charles D. Fortune/EMPL/TX/Verizon@VZNotes, Kelly K. Baumann/EMPL/TX/Verizon@VZNotes, Richard L. Trevino/EMPL/TX/Verizon@VZNotes, Steve M. Olinsky/EMPL/TX/Verizon@VZNotes Subject Re: Coppell Road Project Cliff, I'm guessing that most of your manpower is being sent elsewhere to work on storm damage.  Any idea how this may impact the completion of this project? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> <stephens.clifford@verizon.com> 9/12/2008 7:17 AM >>> The splicing on the Coppell rd. move is at 90% completion as of 9/12/08. We are still on target to complete splicing by 9/22/08. CLIFF STEPHENS LOCAL MANAGER CONSTRUCTION LEWISVILLE, TX (972)318-1554 "Keith Marvin" <kmarvin@ci.coppell.tx.us> 09/11/2008 04:40 PM To Charles D. Fortune/EMPL/TX/Verizon@VZNotes, Cliff E. Stephens/EMPL/TX/Verizon@VZNotes cc "Robert Caudill" <rcaudill@TiseoPaving.com>, Kelly K. Baumann/EMPL/TX/Verizon@VZNotes, Richard L. Trevino/EMPL/TX/Verizon@VZNotes, Steve M. Olinsky/EMPL/TX/Verizon@VZNotes Subject Coppell Road Project Gentlemen, We met this morning as we have been doing for the past several weeks to discuss the status of utility relocations on the Coppell Road project.  We appreciate the fact that Kelly was able to represent Verizon and give us some information on the conflict with the 1800 pair cable at the north end of the project. Kelly shared his understanding of where we are in the splicing process. Unfortunately his knowledge is based on a field visit last week.  We would appreciate it if someone with first hand knowledge of the splicing activity could attend the meeting next week at 9:00am on Thursday. file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48CE814BCity_...8/18/2009 Page 3 of 3 Our contractor will begin the excavation on the west side of the roadway either Friday or Monday depending on the weather.  + Keith Marvin, P.E. Project Engineer (972) 304-3681 file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\48CE814BCity_...8/18/2009