Loading...
ST0003-CS081104 (8/19/2009) Keith Marvin - Tracking # THGE-153037Page 1 From: Keith Marvin To:theivycottage@theivycottage-coppell.com Date: 11/4/2008 4:51 PM Subject: Tracking # THGE-153037 The Ivy Cottage, Thank you for contacting the city about the Coppell Road reconstruction project currently under way. The City Inspector for this project is Albert Samaniego. He can be reached on his cell phone at 469-576-1458. At this time he should have already made contact with you concerning moving signs and barricades to allow better access to your business. The scope of this project has always been from south of Cooper Lane to Sandy Lake. We apologize for the inconvenience this construction is causing. If you continue to experience a problem, please feel free to contact Albert or I and let us know. Keith Marvin, P.E. Project Engineer (972) 304-3681 (8/26/2009) Rhonda Adloo - 520 South Coppell Rd - The Ivy CottagePage 1 From: Rhonda Adloo To:Keith Marvin Date: 11/4/2008 8:13 AM Subject: 520 South Coppell Rd - The Ivy Cottage from a C2 request - The road construction on South Coppell Road was supposed to be north of Cooper Street on the west side of Coppell Road allowing for north bound traffic according to all accounts we have read. However, construction is now proceeded south of Cooper Street. Plus there is now a road construction sign directly in front of our business blocking customers from entering our driveway from the south. In addition, the garbage was not picked on Saturday morning because of this. This situation is having a direct and significant adverse impact on our business and on the sales taxes that we generate for Coppell. (8/26/2009) Rhonda Adloo - Re: Urgent -- Road Construction Sign Blocking Driveway to The Ivy Cottage @ 520South Coppell RoadPage 1 From: Rhonda Adloo To:The Ivy Cottage in Coppell Date: 11/4/2008 8:36 AM Subject: Re: Urgent -- Road Construction Sign Blocking Driveway to The Ivy Cottage @ 520South Coppell Road I sent your online request to Keith Marvin, our Project Engineer for the Coppell Rd project. He is aware of the problem and will handle the movement of signage and barricades belonging to the contractor. Rhonda Adloo Engineering Department Administrative Support Supervisor 972/304-3686 radloo@ci.coppell.tx.us