ST0003-CS081222
(8/20/2009) Keith Marvin - Re: Coppell RoadPage 1
From: Keith Marvin
To:Caudill, Robert
Date: 12/22/2008 11:01 AM
Subject: Re: Coppell Road
Robert,
Would you still want to be paid for the lime and subgrade prep in addition to this?
Have you decided to lime the school lot, or are you asking for this additional there as well?
Call me if you want.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> "Robert Caudill" <rcaudill@TiseoPaving.com> 12/22/2008 8:44 AM >>>
Keith;
The cost for additional 2" of concrete is $9.00/SY ($4.50/inch). Let me
know on this.
Robert Caudill
Vice President
Tiseo Paving Company
(972) 289-0723