ST0003-CS090421
(8/20/2009) Keith Marvin - Re: S. Coppell Rd.Page 1
From: Keith Marvin
To:Mail, Leach
CC:Samaniego, Albert
Date: 4/21/2009 4:16 PM
Subject: Re: S. Coppell Rd.
It is starting to come together. They will move the mailboxes back before they are done. I'll talk to them about it this
week and try to get a schedule from them.
The 8' hike and bike trail will be built on the back side of the curb along the west side of the street. They should start that
work soon.
Keith
>>> "Leach Mail" <leachmail@verizon.net> 4/21/2009 4:08 PM >>>
Keith,
It looks like they are making great progress on the road and I was just
going to remind you that we will need to have our mailboxes moved back. You
may or may not remember but ours was destroyed in the excavation, so we will
also need a new one.
Now that the crew is working on the curbing on the west side of the road,
was just wondering what happened to the bike trail that was on the plans for
the west side of the road? What is the plan?
Thanks.
JoAnn Leach
408 S. Coppell Rd.
Coppell, TX 75019