Loading...
ST9905-CS070726 (8/21/2009) Keith Marvin - RE: Bethel Road - Storm Sewer AdjustmentPage 1 From: Keith Marvin To:dpluu@transystems.com Date: 7/26/2007 2:23 PM Subject: RE: Bethel Road - Storm Sewer Adjustment Ok. Keep us posted on the progress. I was still with the city I just went to work for a different department for a while. The family is doing well. I do remember those guys from CP&Y. I hope they are all doing well. How is everything with you? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> <dpluu@transystems.com> 7/26/2007 2:01 PM >>> Keith, That's right...we can eliminate the two waterline lowering and save some piping too...Just FYI, we are still working on some of the language in the contract with the developer.....you would think for a small job like this it should be no problem right....well, not when you have the attorneys on both side looking at it....anyway.....welcome back.....I've heard you've left the City of Coppell awhile back.....how are the family?....Do you remember Lee Halichek, Tom Cochill, and Jeff Frison back in the days with CPY?....I ran into them at the TSPE meeting and Jeff is with HDR, Lee is with Bowman Construction, and Tom is with Jones and Carter which is right across the hall from us. Danny Luu, P.E. Project Manager TranSystems Main 972-280-9300 Direct 972-888-2531 -----Original Message----- From: Keith Marvin [mailto:KMARVIN@ci.coppell.tx.us] Sent: Thursday, July 26, 2007 1:50 PM To: DL-Danny Luu Subject: Re: Bethel Road - Storm Sewer Adjustment Thanks, Danny. I guess we don't need to lower that existing water line either. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> <dpluu@transystems.com> 7/26/2007 1:23 PM >>> Keith, (8/21/2009) Keith Marvin - RE: Bethel Road - Storm Sewer AdjustmentPage 2 I am sending you a pdf of a sketch showing the proposed adjustment to S.D. Line "B". Let me know if you have any questions. Danny Luu, P.E. Project Manager TranSystems Main 972-280-9300 Direct 972-888-2531