ST9905-CS070726
(8/21/2009) Keith Marvin - RE: Bethel Road - Storm Sewer AdjustmentPage 1
From: Keith Marvin
To:dpluu@transystems.com
Date: 7/26/2007 2:23 PM
Subject: RE: Bethel Road - Storm Sewer Adjustment
Ok. Keep us posted on the progress.
I was still with the city I just went to work for a different department for a while. The family is doing well. I do remember
those guys from CP&Y. I hope they are all doing well.
How is everything with you?
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> <dpluu@transystems.com> 7/26/2007 2:01 PM >>>
Keith,
That's right...we can eliminate the two waterline lowering and save some piping too...Just FYI, we are still working on
some of the language in the contract with the developer.....you would think for a small job like this it should be no problem
right....well, not when you have the attorneys on both side looking at it....anyway.....welcome back.....I've heard you've left
the City of Coppell awhile back.....how are the family?....Do you remember Lee Halichek, Tom Cochill, and Jeff Frison back
in the days with CPY?....I ran into them at the TSPE meeting and Jeff is with HDR, Lee is with Bowman Construction, and
Tom is with Jones and Carter which is right across the hall from us.
Danny Luu, P.E.
Project Manager
TranSystems
Main 972-280-9300
Direct 972-888-2531
-----Original Message-----
From: Keith Marvin [mailto:KMARVIN@ci.coppell.tx.us]
Sent: Thursday, July 26, 2007 1:50 PM
To: DL-Danny Luu
Subject: Re: Bethel Road - Storm Sewer Adjustment
Thanks, Danny. I guess we don't need to lower that existing water line either.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> <dpluu@transystems.com> 7/26/2007 1:23 PM >>>
Keith,
(8/21/2009) Keith Marvin - RE: Bethel Road - Storm Sewer AdjustmentPage 2
I am sending you a pdf of a sketch showing the proposed adjustment to
S.D. Line "B". Let me know if you have any questions.
Danny Luu, P.E.
Project Manager
TranSystems
Main 972-280-9300
Direct 972-888-2531