Loading...
ST9905-CS080922 (8/21/2009) Keith Marvin - FW: Draft Deed RestrictionPage 1 From: "Mokry, Loretta" <lmokry@apaienv.com> To: <kmarvin@ci.coppell.tx.us> Date: 9/22/2008 12:04 PM Subject: FW: Draft Deed Restriction Attachments: sample deed restrict for NWP_Trib G-1 Mit Area.doc; sample deed restrict fo r NWP.doc Keith, Sent the following message previously on 9/10/08 from the hotel where I was staying that night. It might not have gone through properly. I had attached both the original generic deed restriction from the USACE and then one with my suggested text filled into the blanks. I had also back calculated the numbers of trees and shrubs and determined the spacing for each I had used. See note below. Let me know if you have any questions. Loretta Loretta Mokry Alan Plummer Associates, Inc. 10060 N Dowling Rd College Station, TX 77845 979.694.7619 home office 817.806.1700 Fort Worth Office 817.845.3280 cell www.apaienv.com <blocked::http://www.apaienv.om/> _____ From: Mokry, Loretta Sent: Wednesday, September 10, 2008 7:19 PM To: 'kmarvin@ci.coppell.tx.us' Cc: Voight, Jason Subject: Draft Deed Restriction Keith, (8/21/2009) Keith Marvin - FW: Draft Deed RestrictionPage 2 Attached is the USACE's draft deed restriction with the blanks filled in with what I think are appropriate titles. Have also attached the original document from the USACE. The deed restriction document really needs to be processed ASAP as according to the last modification Ken Laterza did for us, the draft deed restriction was to be submitted to the USACE for review and approval and then filed with the County Clerk prior to commencement of any ground-disturbing activity within the jurisdictional reach of the creek (i.e., the reach north of Bethel Road). At the present time, the City is out of compliance, but I think if we can get it to them with the Oct. 1 report there won't be any comment from the USACE. At the very latest, we need to have the draft deed restriction to the USACE by the time we submit the addendum report re: the completion of the plantings. I was also able to reconstruct my calculations re: the mitigation plantings. First, the numbers in the text on page 21 that indicated 178 canopy trees and 340 understory trees and shrubs are incorrect. These were the numbers in the original mitigation plan dated 5/25/2004 when the channel reach upstream of Bethel Road was still considered jurisdictional. They somehow got missed when we did all the revisions through the plan based on the revised jurisdictional review. The correct numbers are what is shown in the revised tables, 118 canopy trees and 236 understory trees and shrubs. (If you can't find the copy of the revised mitigation plan dated February 14, 2005 that I sent Suzan, let me know and we will get you another copy.) Based on the engineering design data in the mitigation plan, the channel bottom was to be 35 foot wide and the top of channel was to be 50 foot wide within the 60 foot wide right-of-way. That leaves 5 feet on each side of the channel for the plantings. The additional gabion layer you showed me may have decreased this. Let me know what you determine after you stake the boundaries of the right-of-way. There was approximately 830 linear feet (LF) of non-jurisdictional drainage channel and 350 LF of jurisdictional tributary channel for a total of 1180 LF. The canopy trees were to be spaced approximately every 20 feet along each side of the channel ((1180 x 2)/20) = 118 canopy trees. The understory trees and shrubs were to be spaced approximately every 10 feet along each side of the channel ((1180 x 2)/10) = 236). Usually we strive to a random spacing of trees and shrubs, but within the constraints of the drainage right-of-way, the canopy trees will need to be evenly spaced so that they have sufficient room to spread. The understory trees and shrubs can be more randomly spaced between the canopy trees based on the sizes of the individual species. Let me know if you have any further questions. Loretta Mokry Alan Plummer Associates, Inc. (8/21/2009) Keith Marvin - FW: Draft Deed RestrictionPage 3 10060 N Dowling Rd College Station, TX 77845 979.694.7619 home office 817.806.1700 Fort Worth Office 817.845.3280 cell www.apaienv.com <blocked::http://www.apaienv.om/> __________ Information from ESET NOD32 Antivirus, version of virus signature database 3433 (20080910) __________ The message was checked by ESET NOD32 Antivirus. http://www.eset.com __________ Information from ESET NOD32 Antivirus, version of virus signature database 3460 (20080922) __________ The message was checked by ESET NOD32 Antivirus. http://www.eset.com NOTICE OF RESTRICTION STATE OF TEXAS } KNOW ALL MEN BY THESE PRESENTS THAT: COUNTY OF } is the owner of that real property more particularly described and shown in Exhibit "A" (hereinafter the "Property") attached hereto and made a part hereof. The Property is subject to special conditions of U. S. Army Corps of Engineers (USACE) Nationwide Permit for Project Number , dated , or a revision thereof. One of the special conditions of the referenced permit requires restrictions be placed on the deed for the Property for the purpose of providing compensation for adverse impacts to waters of the United States. Any purchaser of all or any part of the Property or any person having an interest in or proposing to acquire an interest in all or part of the property, or any person proposing to develop or improve all or any part of the Property, is hereby notified that development restrictions affecting the Property are as follows: 1) The Property, or a portion of the Property, is hereby dedicated in perpetuity as {insert "a wetland mitigation area" and/or other mitigation area description} associated with the construction of . The Property shall not be disturbed except by those USACE-approved activities that would not adversely affect the intended extent, condition, and function of the mitigation area. Any other change, modification, or disturbance of the dedicated property shall require prior written approval by the District Engineer, USACE, Fort Worth District, or his/her duly authorized representative. 2) This restriction shall not be removed or revised without obtaining a modification of the aforementioned USACE authorization and/or prior written approval of the USACE. Permit modifications may be granted only by the USACE. This notice of restriction does not grant any property rights or exclusive privileges. EXECUTED THIS day of , 200 BY: SUBSCRIBED AND SWORN TO BEFORE ME by , on this the day of , 200 , to certify which witness my hand and seal of office. Notary Public in and for the State of Texas My commission expires: Printed Name of Notary: Page 1 of 4 (Acknowledgement) STATE OF TEXAS } COUNTY OF __________} This instrument was acknowledged before me on the day of , 200 by . Notary Public, State of Texas Notary's name (printed): Notary's Commission Expires: Page 2 of 4 Exhibit "A" FIELD NOTES AND MAP FOR A ACRE TRACT seal of RPS Page 3 of 4 Exhibit "B" MAP FOR A ACRE TRACT Page 4 of 4 NOTICE OF RESTRICTION STATE OF TEXAS} KNOW ALL MEN BY THESE PRESENTS THAT: COUNTY OF DALLAS} The City of Coppell, Texas is the owner of that real property more particularly described and shown in Exhibit "A" (hereinafter the "Property") attached hereto and made a part hereof. The Property is subject to special conditions of U. S. Army Corps of Engineers (USACE) Nationwide Permit 39 for Project Number 200400181, dated May 4, 2005, or a revision thereof. One of the special conditions of the referenced permit requires restrictions be placed on the deed for the Property for the purpose of providing compensation for adverse impacts to waters of the United States. Any purchaser of all or any part of the Property or any person having an interest in or proposing to acquire an interest in all or part of the property, or any person proposing to develop or improve all or any part of the Property, is hereby notified that development restrictions affecting the Property are as follows: 1) The Property, or a portion of the Property, is hereby dedicated in perpetuity as Tributary G-1 Mitigation Area {insert "a wetland mitigation area" and/or other mitigation area description} associated with the construction of Modification of Tributary G-1 in conjunction with the Bethel Road West Project. The Property shall not be disturbed except by those USACE-approved activities that would not adversely affect the intended extent, condition, and function of the mitigation area. Any other change, modification, or disturbance of the dedicated property shall require prior written approval by the District Engineer, USACE, Fort Worth District, or his/her duly authorized representative. 2) This restriction shall not be removed or revised without obtaining a modification of the aforementioned USACE authorization and/or prior written approval of the USACE. Permit modifications may be granted only by the USACE. This notice of restriction does not grant any property rights or exclusive privileges. EXECUTED THIS day of , 200 BY: SUBSCRIBED AND SWORN TO BEFORE ME by , on this the day of , 200 , to certify which witness my hand and seal of office. Notary Public in and for the State of Texas My commission expires: Printed Name of Notary: Page 1 of 4 (Acknowledgement) STATE OF TEXAS } COUNTY OF __________} This instrument was acknowledged before me on the day of , 200 by . Notary Public, State of Texas Notary's name (printed): Notary's Commission Expires: Page 2 of 4 Exhibit "A" FIELD NOTES AND MAP FOR TRIBUTARY G-1 MITIGATION AREA A 0.48-ACRE TRACT seal of RPS Page 3 of 4 Exhibit "B" MAP FOR TRIBUTARY G-1 MITIGATION AREA A 0.48-ACRE TRACT Page 4 of 4