Loading...
ST9905-CS090223 (3/8/2010) Keith Marvin - Re: Fwd: FW: Bethel Road ElectricPage 1 From: John Elias To: Keith Marvin Date: 2/23/2009 5:44 PM Subject: Re: Fwd: FW: Bethel Road Electric Sheri confirmed to me that the meter's were set. I don't know anything about Tiseo's scope. John -----Original Message----- From: Keith Marvin Cc: John Elias <JELIAS@ci.coppell.tx.us> To: Richard Odell <RODELL@ci.coppell.tx.us> Sent: 2/23/2009 4:55:11 PM Subject: Fwd: FW: Bethel Road Electric Rick, Do we know the status of the power to the irrigation controllers? What does Bill mean that it was removed from Tiseo's scope? Keith >>> "Robert Caudill" < rcaudill@TiseoPaving.com > 2/23/2009 4:51 PM >>> Keith; Can you help me on this. It's my understanding is that we are waiting on OnCor. Robert Caudill Vice President Tiseo Paving Company (972) 289-0723 ________________________________ From: Donnie Wolverton [mailto:dlw@americanlandscapesystems.com] Sent: Monday, February 23, 2009 8:27 AM To: Robert Caudill Cc: John Elias; Joe E Davila Subject: Bethel Road Electric Robert, (3/8/2010) Keith Marvin - Re: Fwd: FW: Bethel Road ElectricPage 2 I spoke with Bill Barsota on Friday about the electricity for the Irrigation Controllers at Bethel Road. Bill told me that setting the electrical pedestals and running the electrical wire for the power was taken out of Tiseo's scope of work at the beginning of the job. He said there was no pay item for power to the irrigation controllers, only conduit under the pavement which has been installed. We are currently sending someone by periodically to manually turn on the valves and water the landscape material. My question is who is responsible for the power to the controllers and when could we expect permanent power so the systems can be walked and signed off from the City of Coppell. Thanks for your help with this, Donnie Wolverton American Landscape Systems, Inc 1780 Midway Road Lewisville, Texas 75056 Office: 469-521-2200 Fax: 469-521-2206