Loading...
ST0702-MP071207 1701 N Market Street, Suite 500 CPL07392 Dallas, Texas 75202 South Coppell Infrastructure www.freese.com Improvements One Page Status Report December 7, 2007 Ken Griffin, P.E. To: Caleb Thornhill, FNI Project Manager From: Keith Marvin (Coppell); Trish Hatley (FNI), Austin Gunter (FNI), Aaron Litteken (FNI), Lane cc: Wheetley (FNI), Pat Atkins (C&P), File Project Updates: ? Sent files to C&P Engineering. Need to coordinate storm drain systems. ? Delineated drainage areas of vacant field west of project limits based on contours and as-builts. ? Contacted DART and Fort Worth Western Rail Road regarding grade crossing. Currently working on construction timeline affect to improve crossing. Tasks and deliverables: ? City to provide schematic plans for development west of project limits when available. Upcoming Submittals and Meetings: Submittal/Meeting DATE ? 60% Design Submittal 12/20/07 Additional Information: ? We need to determine construction timeline of C&P’s Engineering development and Coppell Road. Current storm drain system outfalls to future system of C&P Engineering. If C&P Engineering system is not in place, a graded ditch will be required. Page 1 of 1