SS9402-BD 9509073id RIVER VALLEY ENTER. LARRY JACKSON CONSTR. WRIGHT CONSTRUCTION ARCHITECTURAL UTIL ATKINS BROS. EQUIP
item Description Qb/ Unit Unit Pdce Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Pnce Amount
1-4 NOT USED ' N/A N/A
5 For furnishing and placing 8" PVC sewer (15'-20' depth) 166 LF $43.85 $7,279.10 $118.00 $19,588.00 $89.00 $14,774.00 $47.90 $7,951.40 $61.00 $10,126.00
3-13 NOT USED N/A N/A
14 For furnishing and placing 5" SDR-35 PVC sewer (0'-10' depth) 200 LF $27.50 $5,500.00 $40.00 $8,000.00 $61.00 $12,200.00 $51.30 $10,260.00 $50.00 $10,000.00
15 For furnishing and placing 5" SDR-35 PVC sewer (10'-15' depth) 2,570 LF $34.05 $93,637.50 $65.00 $167,050.00 $67.00 $172,190.00 $53.65 $137,880.50 $60.00 $154,200.00
16 For fumishing and placing 5" SDR-35 PVC sewer (15'-20' depth) 1,094 LF $48.45 $53,004.30 $80.00 $87,520.00 $95.00 $103,930.00 $57.15 $62,522.10 $75.00 $82,050.00
17 For fumishing and placing 5' SDR-35 PVC sewer (20'-25' depth) 230 LF $66.50 $15,295.00 $136.00 $31,280.00 $137.00 $31,510.00 $71.10 $16,353.00 $94.00 $21,620.00
18 NOT USED N/A N/A
19 For furnishing and placing 4 FT diameter standard manhole 5 EA $2,515.00 $12,575.00 $2,000.00 $10,000.00 $1,900.00 $9,500.00 $3,000.00 $15,000.00 $2,410.00 $12,050.00
Z0 For furnishing and placing 5 FT diameter standard manhole 8 EA $2,780.00 $22,240.00 $4,800.00 $38,400.00 $3,100.00 $24,800.00 $3,800.00 $30,400.00 $4,260.00 $34,080.00
21 For furnishing and @lacing 6 FT diameter standard manhole I EA $2,880.00 I $2,880.00 $5,000.00 $5,000.00 $4,500.00 $4,500.00 $5,300.00 $5,300.00 $5,810.00 $5,810.00
22 NOT USED N/A N/A
23 For furnishing and placing 5 FT diameter drop inlet manhole I EA $3,890.00 $3,890.00 $6,500.00 $6,500.00 $5,300.00 $5,300.00 $6,000.00 $6,000.00 $12,190.00 $12,190.00
24-26 NOT USED N/A N/A
27 For furnishing and placin(j 20" diameter dry bore 718 LF $62.00 $44,516.00 $260.00 $186,680.00 $290.00 $208,220.00 $201.00 $144,318.00 $197.50 $141,805.00
28 For furnishing and placing 20" diameter casing p~pe 718 LF $20.00 $14,360.00 $65.00 $46,670.00! $25.00 $17,950.00 $36.70 $26,350.60 $12.00 $8,616.00
29 For abandonment of standard sewer manhole 9 EA $1,200.00 $10,800.00 $500.00 $4,500.00 $700.00 $6,300.00 $440.00 $3,960.00 $200.00 $180.00
30-31 NOT USED N/A N/A
32 iFor removal and replacement of 8" reinforced concrete pavement 12 SY $42.00 $504.00 $90.00 $1,080.00 $100.00 $1,200.00 $76.00 $912.00 $68.00 $816.00
33 For removal and replacement of reinforced concrete driveway 188 SY $35.00 $6,580.00 $60.00 $11,280.00 $39.00 $7,332.00 $69.00 $12,972.00 $40.00 $7,520.00
34 For removal and replacement of reii,;'u,~ed concrete 4 FT wide sidewalk 835 LF $12.00 $10,020.00 $16.00 $13,360.00 $34.00 $28,390.00 $11.30 $9,435.50 $15.00 $12,525.00
36-36 NOT USED N/A N/A
37 For furnishing and placing landscaping I LS $8,500.00 $8,500.00 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $20,000.00 $20,000.00 $9,000.00 $9,000.00
38 ForTrench ExCavation Safety and Support 3,555 LF $2.90 $10,309.50 $2.00 $7,110.00 $1.00 $3,555.00 $3.40 $12,087.00 $0.25 $888.75
For furnishing and maintaining Traffic Control signage, ban~icading, etc.
39 :ludng and threucjh completion of construction I LS $5,960.00 $5,960.00 $15,000.00 $15,000.00 $9,000.00 $9,000.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00
40 For furnishing and placin~l 4" PVC sewer services 8 EA $840.00 $6,720.00 ~;750.00 $6,000.00 $900.00 $7,200.00 $460.00 $3,680.00 $350.00 $2,800.00
41 For furnishing and placing 24" ASTM F-497 PVC sewer (25'-30' depth) 102 LF $121.00 $12,342.00 $144.00 $14,688.00 $105.00 $10,710.00 $157.00 $16,014.00 $154.00 $15,708.00
SECTION I -GRAPEVINE Ill SUBTOTAL $346,912.40 $689,706.00 $689,561.00 $546,396.10 $563,604.75
1 For furnishing and placin,q 6" Cl. 50 Ductile Iren Pipe 215 LF $48.00 $10,320.00 ~;55.00 $11,825.00 $62.00 $13,330.00 $60.60 $13,029.00 $63.00 $13,545.00
2 For furnishing and placing 8" Cl. 50 Ductile Iren Pipe 215 LF $55.00 $11,825.00 -~0.00 $12,900.00 $65.00 $13,975.00 $65.00 $13,975.00 $67.00 $14,405.00
3 NOT USED N/A NIA
4 For furnishing and placing 8" SDR-35, PVC sewer (10'-15' depth) 13 LF $32.00 $416.00 $141.00 $1,833.00 $89.00 $1,157.00 $51.00 $663.00 $54.00 $702.00
5-9 NOT USED N/A N/A
10 For furnishing and placing 12" SDR-35, PVC sewer (10'-15' depth) 557 LF $25.10 $13,980.70 = $43.00 $23,951.00 $59.00, $32,863.00 $47.25 $26,318.25 $42.00 $23,394.00
11 For furnishir~rand placing 12" SDR-35, PVC sewer (10'-15' depth) 1,565 LF $31.20 $48,828.00 $66.00 $103,290.00 $64.00 I $100,160.00 $54.00 $84,510.00 $53,00 $82,945.00
12 For furnishing and placing 12" SDR-35, PVC sewer (15'-20' depth) 580 LF $45.60 $26,488.00 $105.00 $60,900.00 $92.00 $53,360.00 $58.30 $33,814.00 $65.00 $37,700.00
13-18 i NOT USED N/A N/A
19 For furnishing and placing 4 FT diameter standard manhole 8 EA $2,515.00 $20,120.00 $2,000.00 $16,000.00 $2,000.00 $16,000.00 $2,500.00 $20,000.00 $2,410.00 $19,280.00
20-23 NOT USED N/A N/A
24 For fumishing and placincj 4 FT diameter T),PO 'S" manhole 3 EA $2,725.00 $8,175.00 $2,200.00 $6,600.00 $3,200.00 $9,600.00 $2,800.00 $8,400.00 $2,470.00 $7,410.00
25 For furnishing and placing 5 FT diameter Type "S" manhole I EA $2,780.00 $2,780.00 $5,000.00 $5,000.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00 $3,450.00 $3,450.00
For furnishing all labor, rnatedals and incidentals required to complete Siphon
26 structure per contract requirements I EA $21,500.00 $21,500.00 $23,000.00 $23,000.00 $21,000.00 $21,000.00 $13,600.00 $13,600.00 $19,000.00 $19,000.00
27 For furnishing and placing 20" diameter dry bore 316 LF $62.00 $19,592.00 $265.00 $83,740.00 $290.00 $91,640.00 $205.00 $64,780.00 $175.00 $55,300.00
28 For furnishing and placing 20' diameter casing pipe 316 LF $20.00 $6,320.00 $70.00 $22,120.00 $25.00 $7,900.00 $30.00 $9,480.00 $12.00 $3,792.00
29 For abandonment of standard sewer manhole 6 EA $1,200.00 $7,200.00 $500.00 $3,000.00 $700.00 $4,200.00 $445.00 $2,670.00 $200.00 $1,200.00
30-31 NOT USED N/A N/A
32 For removal and replacement of 8" reinforced concrete pavement 832 LF $32.00 $26,624.00 $40.00 $33,280.00 $39,00 $32,488.00 $60.50 $50,336.00 $62.00 I $51,584.00
33-35 NOT USED N/A N/A
36 For removal and replacement of 6# reinforced concrete Rip-Rap 9 SY $48.00 $432.00 $75.00 $675.00 $83.00 $747.00 $156.00 $1,404.00 $40.00 $360.00
37 Forfumishin9 and placing landscaping 1 LS $4,600.00 $4,600.00 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $15,000.00 $15,000.00 $1,000.00 $1,000.00
38 For Trench Excavation Safet~ and Support 2,601 LF $2.90 $7,542.90 $4.00 $10,404.00 $1.00 $2,601.00 $3.70 $9,623.70 $0.25 $650.25
For furnishing and maintaining Traffic Control signage, bari k,,~ding, etc.
39 dudng and through construction I LS $6,900.00 $6,900.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 $16,700.00 $16,700.00
40 For furnishing and placing 4" PVC sewer services 8 EA $840.00 $6,720.00 $750.00 $6,000.00 $900.00 $7,200.00 $425.00 $3,400.00 $350.00 $2,800.00
41 NOT USED N/A N/A
BidI RIVER VALLEY ENTER. LARRY JACKSON CONSTR. WRIGHT CONSTRUCTION ARCHITECTURAL UTIL I ATKINS BROS. EQUIP
Item Description! Qty Unil UnitPrice Amount Unit Pnce Amount ~~ Unit Pdce ~ Amount IUnitPdce I Amount
1 For furnishing and placing 6" Cl. 50 Ductile Iron Pipe 110 LF $251.30 $27,643.00 $170.00 $18,700.00 $63.00 $6,930.00 $60.60 $6,666.00 $71.00 $7,810.00
2 For fumishin~l and placing 8" Cl. 50 Ductile Iron Pipe 110 LF $256.20 $28,182.00 $180.00 $19,800.00 $66.00 $7,260.00 $65.00 $7,150.00 $74.00 $8,140.00
3 For furnishing and placing 8" SDR-35, PVC sewer {0'-10' depth) 13 LF $22.45 $291.85 $34.00 $442.00 $58.00 $754.00 $44.25 $575.25 $34.00 $442.00
4 For furnishing and placing 8' SDR-35, PVC sewer {10'-15' depth) 5 LF $28.90 $144.50 $49.00 $245.00 $63.00 $315.00 $51.00 $255.00 $47.00 $235.00
5-6 NOT USED N/A N/A
7 For furnishing and placin~110" SDR-35, PVC sewer (0'-10' depth) 2,314 LF $23.90 $55,304.60 $36.00 $83,304.00 $59.00 $136,526.00 $56.00 $129,584.00 $38.00 $87,932.00
8 For furnishing and placin~110" SDR-35, PVC sewer (10'-15' depth) 1,648 LF $30.45 $50,181.60 $50.00 $82,400.00 $65.00 $107,120.00 $57.00 $93,936.00 $50.00 $82,400.00
9 For furnishing and placing 12" SDR-35, PVC sewer (0'-5' depth) 15 LF $17.50 $262.50 $32.00 $480.00 $60.00 $900.00 $54.00 $810.00 $33.00 $495.00
10 For fumishin~l and placing 12" SDR-35, PVC sewer (5'-10' depth) 892 LF $25.65 $22,879.80 $37.00 $33,004.00 $62.00 $55,304.00 $57.00 $50,844.00 $41.00 $36,572.00
11 For furnishing and placing 12" SDR-35, PVC sewer {10'~15' depth) 2,477 LF $32.20 $79,759.40 $52.00 $128,804.00 $66.00 $163,482.00 $59.00 $146,143.00 $54.00 $133,758.00
12-18 NOT USED N/A N/A
19 For furnishing and placing 4 FT diameter standard manhole 13 EA $2,616.00 $~,008 m00 $2,000.00 $26,000.00 $2,000100 $26,000.00 $2,200.00 $28,600.00 $2,060.00 $26,780.00
20 For furnishing and placing 5 FT diameter standard manhole 2 EA $2,880.00 $5,760.00 $4,800.00 $9,600.00 $3,000.00 $6,000.00 $3,500.00 $7,000.00 $3,140.00 $6,280.00
21 NOT USED N/A N/A
22 For fumishincj and placing 4 FT diameter drop inlet manhole 4 EA $2,900.00 $11,600.00 $2,500.00 $10,000.00 $2,700.00 $10,800.00 $3,100.00 $12,400.00 $3,510.00 $14,040.00
23 For furnishing and plating 5 FT diameter drop inlet manhole I EA $3,890.00 $3,890.00 $4,000.00 $4,000.00 $3,700.00 $3,700.00 $4,500.00 $4,500.00 $4,360.00 $4,360.00
24 NOT USED N/A N/A
25 For furnishing and placing 5 FT diameter Type'S" manhole I EA $2,910.00 $2,910.00 $2,000.00 $2,000.00 $3,400.00 $3,400.00 $3,000.00 $3,000.00 $3,160.00 $3,160.00
For furnishing all labor, materials and incidentals required to complete Siphon
26 structure per contract recluirements I EA $21,500.00 $21,500.00 $21,000.00 $21,000.00 $21,000.00 $21,000.00 $13,600.00 $13,600.00 $17,500.00 $17,500.00
27 For furnishing and placing 20" diameter dr,/bore 15 LF $62.00 $930.00 $300.00 $4,500.00 $350.00 $5,250.00 $400.00 $6,000.00 $635.00 $9,525.00
28 For furnishing and placing 20" diameter casing pipe 15 LF $20.00 $300.00 $120.00 $1,800.00 $25.00 $375.00 I $30.00 $450.00 $12.00 $180.00
29 For abandonment of standard sewer manhole (~ EA $1,200.00 $7,200.00 $500.00 $3,000.00 $700.00 $4,200.00 ! $440.00 $2,640.00 $200.00 $1,200.00
30 For abandonment of sanitary sewer clean out 4 EA $400.00 $1,600.00 $300.00 $1,200.00 $300.00 $1,200.00 $100.00 $400.00 $60.00 $240.00
For placement of 6' Class "B' concrete embedment across entire trench
)1 width 48 LF $55.00 $2,640.00 $75.00 $3,600.00 $22.00 $1,056.00 $12.00 $576.00 $15.00 $720.00
)2-34 NOT USED N/A N/A
)5 For removal and replacement of asphaltic concrete pavement 6,998 LF $22.00 $153,956.00 $14.00 $97,972.00 $15.00 $104,970.00 $7.30 $51,085.40 $8.00 $55,984.00
~ For removal and replacement of 6" reinforced concrete Rip-Rap 7 SY $48.00 $336.00 $90.00 $630.00 $170.00 $1,190.00 $150.00 $1,050.00 $40.00 $280.00
)7 For furnishing and placing landscaping LS $7,850.00 $7,850.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $22,000.00 $22,000.00 $7,000.00 $7,000.00
)8 For Trench Excavation Safety/and Support 7,346 LF $3.30 $24,241.80 $3.00 $22,038.00 $1.00 $7,346.00 $5.00 $36,730.00 $0.25 $1,836.50
For fu,~;shlng and maintaining Traffic Control signage, barricading, etc.
)9 during and through construction LS $12,500.00 $12,500.00 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $10,000.00 $10,000.00 $17,600.00 $17,600.00
¢0 For furnishing and placing 4" PVC sewer services 18 EA $840.00 $15,120.00 $750.00 $13,500.00 $900.00 $16,200.00 $500.00 $9,000.00 $350.00 $6,300.00
¢1 NOT USED N/A N/A $570,991.05 $603,019.00 $707,278.00 $644,994.65 $530,769.50
SUBTOTAL (SECTION I-GRAPEVINE I~) $346,912.40 $689,706.00 $689,561.00 $546,396.10 $563,604.75
SUBTOTAL (SECTION II-GRAPEVINE IV) $250,363.60 $439,518.00 $423,681.00 $378,002.95 $355,217.25
SUBTOTAL (SECTION Ill-BETHEL ROAD) $570,991.05 $603,019.00 $707,278.00 $644,994.65 $530,769.50
tOTAL (SECTION I-GRAPEVINE Ill, SECTION II-GRAPEVINE IV, AND SECTION Ill-BETHEL ROAD) $1,168,267.05 $1,732,243.00 $1,820,520.00 $1,569,393.70 $1,449,591.50
Bid J.C. EVANS BAR CONSTRUCTORS PATE BROS. FOX CONTRACTORS
Item Description Qty Unil Unit Pdce I Amount Unit Price Amount Unit Price Amount Unit Price Amount
1-4 NOT USED N/A N/A I
5 For furnishing and placing 8" PVC sewer (15'-20' depth) 166 LF $75.00 $12,450.00 $54.00 $8,964.00 $24.07 $3,995.62 $57.00 $9,462.00
6-13 NOT USED N/A N/A
14 For furnishing and placing 5" SDR-35 PVC sewer (0'-10' depth) 20C LF $80.00 $16,000.00 $51.00 $10,200.00 $30.12 $6,024.00 $40.00 $8,000.00
15 For fumishin~l and placin~l 5" SDR-35 PVC sewer (10'-15' depth) 2,57£ LF $85.00 $218,450.00 $63.00 $161,910.00 $36.37 $93,470.90 $46.00 $118,220.00
16 For fumishin~l and placing 5" SDR-35 PVC sewer (15'-20' depth) 1,094 LF $90.00 $98,460.00 $73.00 $79,862.00 $48.86 $53,452.84 $51.00 $55,794.00
:17 For furnishing and placing 5" SDR-35 PVC sewer (20'-25' depth/ 23(; LF $95.00 $21,850.00 $94.00 $21,620~00 $86.35 $19,860.50 $66.00 $15,180.00
18 NOT USED N/A N/A
19 For furnishing and placin~l 4 FT diameter standard manhole ,~ EA $2,500.00 $12,500.00 $1,850.00 $9,250.00 $2,449.24 $12,246.20 $2,600.00 $1,300.00
:)0 For fumishin~l and placin~l 5 FT diameter standard manhole E EA $3,000.00 $24,000.00 $3,300.00 $16,400.00 $3,280.29 $26,242.32 $3,750.00 $30,000.00
:)1 For fumishin~ and placin~l 6 FT diameter standard manhole EA $3,500.00 $3,500.00 $5,200.00 $5,200.00 $6,608.06 $6,608.06 $5,500.00 $5,500.00
:)2 NOT USED N/A N/A
:)3 For furnishing and placin~l 5 FT diameter drop inlet manhole I EA $5,000.00 $5,000.00 $6,300.00 $6,300.00 $9,696.00 $9,696.00 $6,400.00 $6,400.00
Z4-26 NOT USED N/A N/A
:)7 For furnishing and placing 20" diameter dr~ bore 718 LF $240.00 $172,320.00 $165.00 $118,470.00 $182.68 $131,164.24 $175.00 $125,650.00
Z8 For furnishing and placin9 20" diameter casincj pipe 718 LF $25.00 $17,950.00 $19.00 $13,642.00 $22.55 $16,190.90 $20.00 $14,360.00
:~9 For abandonment of standard sewer manhole 9 EA $500.00 $4,500.00 $400.00 $3,600.00 $763.43 $6,870.87 $600.00 $5,400.00
30-31 NOT USED N/A N/A
32 For removal and replacement of 8" reinforced concrete pavement 12 SY $50.00 $600.00 $35.00 $420.00 $102.93 $1,235.16 $40.00 $480.00
33 For removal and replacement of reinforced concrete driveway 188 SY $45.00 $8,460.00 $44.00 $8,272.00 $94.48 $17,762.24 ! $42.00 $7,896.00
34 For removal and replacement of reinforced concrete 4 FT wide sidewalk 835 LF $10.00 $8,350.00 $9.50 $7,932.00 $15.97 $13,334.95; $14.00 $11,690.00
35-36 NOT USED N/A N/A
37 For furnishing and placin~ landscaping 1 LS $10,000.00 $10,000.00 $15,000.00 $15,000.00 $16,914.98 $16,914.98 $11,600.00 $11,600.00
38 For Trench Excavation Safety and Support 3,555 LF $1.00 $3,555.00 $2.50 $8,887.50 $8.11 $28,831.05 $1.00 $3,555.00
For furnishing and maintaining Traffic Control signage, barricading, etc.
39 :~udn~ and through completion of construction I LS $10,000.00 $10,000.00 $10,500.00 $10,500.00 $7,329.82 $7,329.82 $4,350.00 $4,350.00
40 For furnishing and placing 4' PVC sewer services 8 EA $1,000.00 $8,000.00 $465.00 $3,720.00 $968.99 $7,751.92 $550.00 $4,400.00
41 For furnishing and placing 24" ASTM F-497 PVC sewer (25'-30' depth) 102 LF $150.00 $15,300.00 $67.00 $6,834.00 $153.88 $15,695.76 $108.00 $18,360.00
SECTION I - GRAPEVINE Ill SUBTOTAL $671,245.00 $526,984.00 i $494,678.33 $469,297.00
For furnishing and placing 6" Cl. 50 Ductile Iron Pipe 215 LF $95.00 i $20,425.00 $183.00 $39,345.00 $36.83 $7,918.45 $55.00 $11,825.00
2 For furnishing and placing 8" Cl. 50 Ductile Iron Pipe 215 LF $70.00 $15,050.00 $206.00 $44,290.00 $39.54 $8,501.10 $60.00 $12,900.00
3 NOT USED N/A N/A
4 For furnishing and placin~l 8" SDR-35, PVC sewer (10'-15' depth) 13 LF $70.00 $910.00 $77.00 $1,001.00 $149.48 $1,943.24 $74.00 $962.00
5-9 NOT USED N/A N/A
10 For furnishing and placing 12" SDR-35, PVC sewer (10'-15' depth) 557 LF $75.00 $41,775.00 $38.00 $21,166.00 $27.35 $15,233.95 $34.00 $18,938.00
11 For fumishing and placing 12" SDR-35, PVC sewer (10'-15' depth) 1,565 LF $80.00 $125,200.00 $47.00 $73,555.00 $38.60 $60,409.00 $36.00 $56,340.00
12 For fumishing and placing 12" SDR~35, PVC sewer (15'-20' depth) 580 LF $85.00 $49,300.00 $53.00 $30,740.00 $46.10 $26,738.00 $66.00 $38,280.00
13-18 NOTUSED. N/A N/A
19 For fumishing and placing 4 Fr diameter standard manhole 8 EA $2,500.00 $2,000.00 $1,850.00 $14,800.00 $2,660.36 $21,282.88 $97R0.00 $18,000.00
20-23 NOT USED N/A N/A
24 For fumishin~l and placing 4 FT diameter T},pe "S' manhole 3 EA $2,800.00 $8,400.00 $2,000.00 $6,000.00 $2,483.10 $7,449.30 $2,425.00 $7,275.00
25 For furnishing and placing 5 FT diameter Type "S' manhole I EA $3,300.00 $3,300.00 i $3,300.00 $3,300.00 $2,444.97 $2,444.97 $2,775.00 $2,775.00
For furnishing all labor, materials and incidentals required to complete Siphon
26 structure per contract recluirements I EA $19,000.00 $19,000.00 $12,600.00 $12,600.00 $20,026.43 $20,026.43 $20,000.00 $20,000.00
27 For fum;sh;,y and placing 20" diameter dr~ bore 316 LF $220.00 $69,520.00 $128.00 $40,448.00 $155.62 $49,175.92 $140.00 $44,240.00
28 For fumishin~l and placing 20" diameter casing pipe 316 LF $25.00 $7,900.00 $20.00 $6,320.00 $22.55 $7,125.80 $26.00 $8,219.00
29 For abandonment of standard sewer manhole 6 EA $500.00 $3,000.00 $400.00 $2,400.00 $763.43 $4,580.58 $600.00 $3,600.00
30-31 NOT USED N/A N/A
32 For removal and replacement of 8" reinfomed concrete pavement 832 LF $35.00 $29,120.00 $41.00 $34,112.00 $102.93 $65,637.76 $30.00 $24,960.00
33-35 NOT USED N/A N/A
36 For removal and replacement of 6' reinforced concrete Rip-Rap 9 SY $45.00 $405.00 $30.00 $270.00 $94.48 $850.32 $120.00 $1,080.00
37 Forfumishing and placing landscaping 1 LS $5,000.00 $5,000.00 $2,550.00 $2,550.00 $3,946.83 $3,946.83 $2,800.00 $2,800.0(~
38 For Trench Excavation Safety and Support 2,601 LF $1.00 $2,601.00 $3.00 $7,803.00 $11.95 $31,081.95 $1.00 $2,601
For furnishing and maintaining Traffic Control signage, barricading, etc.
39 dudng and through construction I LS $5,000.00 $5,000.00 $7,000.00 $7,000.00 $4,510.66 $4,510.66 $8,000.00 $8,000.0~
40 For furnishing and placing 4' PVC sewer services 8 EA $1,000.00 $8,000.00 $465.00 $3,720.00 $1,339.99 $10,719.92 $600.00 $4,800.0{~
41 NOT USED N/A N/A
For furnishing and placing 6" Cl. 50 Ductile Iron Pipe 110 LF $95.00 $10,450.00 $281.00 $30,910.00 I $36.71 $4,038.10 $95.00 $10,450.00
2 For furnishing and placing 8" Cl. 50 Ductile Iron Pipe 110 LF $100.00 $11 ,(300.00 $290.00 $31,900.00 i $39.43 $4,337.30 $100.00 $11,000.00
3 For furnishing and placing 8" SDR-35, PVC sewer (0'-10' depth) 13 LF $65.00 $845.00 $45.00 $585.00: $42.75 $555.75 $57.00 $741.00
4 For furnishing and placing 8" SDR-35, PVC sewer (10'-15' depth/ 5 LF $70.00 $350.00 $45.00 $225.00 $42.75 $213.75 $58.00 $290.00
5~ NOT USED N/A N/A
7 For furnishing and placing 10' SDR-35, PVC sewer (0'-10' depth) 2,314 LF $70.00 $161,980.00 $34.00 $78,676.00 $21.75 $50;329.50 $33.00 $76,362.00
8 For fumishin~l and placing 10" SDR-35, PVC sewer (10'-15' depth) 1,648 LF $75.00 $123,600.00 $38.00 $62,624.00 $25.51 $42,040.48 $34.00 $56,032.00
9 For furnishing and placing 12" SDR-35, PVC sewer (0'-5' depth) 15 LF $70.00 $1,050.00 $40.00 $600.00 $21.05 $315.75 $35.00 $525.00
10 For furnishing and placing 12" SDR-35, PVC sewer (5'-10' depth) 892 LF $75.00 $66,900.00 $39.00 $34,788.00 $22.19 $19,793.48 $36.00 $3,212.00
11 For furnishing and placing 12" SDR-35~, PVC sewer (10'-15' depth) 2,477 LF $80.00 $198,160.00 $47.00 $116,419.00 $23.55 $58,333.35 $42.00 $104,034.00
12-18 NOT USED N/A N/A
19 For furnishing and placing 4 FT diameter standard manhole 13 EA $2,500.00 $32,500.00 $1,850.00 $24,050.00 $2,094.65 $27,230.45 $2,300.00 $29,900.00
20 For furnishing and placing 5 FT diameter standard manhole 2 EA $3,000.00 $6,000.00 $3,300.00 $6,600.00 $2,923.10 $5,846.20 $3,250.00 $6,500.00
21 NOT USED N/A N/A
22 For furnishing and plactng 4 FT diameter drop inlet manhole 4 F_A $5,000.00 i $20,000.00 $2,200.00 $8,800.00 $2,804.61 $11,218.44 $2,750.00 $11,000.00
23 For furnishing and placing 5 FT diameter drop inlet manhole I EA $5,500.00 i $5,500.00 $5,000.00 $5,000.00 $3,662.05 $2,336.05 $3,600.00 $360.00
24 NOT USED N/A N/A
25 For furnishing and placing 5 FT diameter Type "S" manhole I EA $3,300.00 $3,300.00 $3,400.00 $3,400.00 $3,163.45 $3,163.45 $3,000.00 $3,000.00
For furnishing all labor, materials and incidentals required to complete Siphon
26 structure Per contract requirements I EA $18,000.00 $18,000.00 $11,600.00 $11,600.00 $20,027.59 $20,027.59 $15,000.00 $15,000.00
27 For furnishing and pia,,;,,t~ 20" diameter dry bore 15 LF $500.00 $7,500.00 $500.00 $7,500.00 $575.11 $8,626.65 $600.00 $9,000.00
28 For furnishing and placing 20" diameter casing pipe 15 LF $25.00 $375.00 $35.00 $525.00 $22.55 $338.25 $44.00 $660.00
29 For abandoi~i~iei~[ of standard sewer manhole 6 EA $500.00 $3,000.00 $400.00 $2,400.00 $405.96 $2,435.76 $550.00 $3,300.00
30 For abandonment of saiii~:/sewer dean out 4 EA $150.00 $600.00 $150.00 $600.00 $101.49 $405.96 $100.00 $400.00
For placement of 6" Class "B" concrete embedment across entire trench
31 width 48 LF $16.00 $768.00 $14.00 $672.00 $16.01 $768.48 $27.00 $1,296.00
32-34 NOT USED N/A N/A
35 For removal and replacement of as?ha;[;c concrete pavement 6,998 LF $6.50 $45,487.00 $7.50 $52,485.00 $19.68 $137,720.64 $0.01 $69.98
36 For removal and replacement of 6" reinforced concrete Rip-Rap 7 SY $46.00 $322.00 $30.00 $210.00 $94.48 $661.36 $70.00 $490.00
37 Forfumishing and placing landscaping I LS $10,000.00 $10,000.00 $5,000.00 $5,000.00 $6,202.16 $6,202.16 $8,000.00 $8,000.00
38 For Trench Excavation Safety and Support 7,346 LF $1.00 $7,346.00 I $3.50 $25,711.00 $7.54 $55,388.84 $1.00 $7,346.00
For furnishing and maintaining Traffic Control signage, barricading, etc.
39 during and through construction I LS $15,000.00 $15,000.00 $14,000.00 $14,000.00 $11,276.65 $11,276.65 $18,000.00 $18,000.00
40 For furnishing and placing 4" PVC sewer services 18 EA I $1,000.00 $18,000.00 $465.00 $8,370.00 $443.34 $7,980.12 $600.00 $10,800.00
41 NOT USED N/A N/A, $768,033.00 $533,650.00 $482,910.51 $419,907.98
~""~:~ ;- . . ' --:..~l~i~i/~ ~..L:,~ .. ' L -..; :.~~~~~~
SUBTOTAL (SECTION I-GRAPEVINE Ill) $671,245.00 $526,984.00 $494,678.33 $469,297.00
SUBTOTAL (SECTION II-GRAPEVINE IV) $433,906.00 $351,420.00 $369,577.06 $287,592.00
SUBTOTAL (SECTION Ill-BETHEL ROAD) $768,033.00 $533,650.00 $482,910.51 $419,907.98
TOTAL (SECTION I-GRAPEVINE III, SECTION II-GRAPEVINE IV, AND SECTION Ill-BETHEL RO, $1,873,184.00 $1,412,054.00 $1,347,165.90 $1,176,796.98
o~
%45
~ I 4~4~ -7¢6 -
05
o5
BID AFFIDAVIT
nir
STATE OF
BEFOR ME
on this day personally appeared
Name
duly sworn, did depose and say:
b[a~e of Finn
foregoing on behalf of the said
00301-19
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed
and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or
all commodities upon which prices are extended at the price offered, and upon the conditions
contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will
calendar days from the date of the bid opening. (Period of acceptance will be
ninety (90) calendar days unless otherwise indicated by Bidder.)
COUNTY OF
BEFORE ME, the undersigned authority, a Notary Public in and for the State of
who after being by me
am a duly authorized office/agent for
and have been duly authorized to execute the
Name of Finn
I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder
or individual(s) engaged in the same line o~ business prior to the official opening of this bid.
Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly
or indirectly concerned in any pool, agreement or combination thereof, to control the price of
services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon."
Name and Address of Bidder: fvaff
Title: /~'cC ~)~ Sigmmre:
SUBSCmBED AND SWO~ to ~fore me by ~e a~ve mined
Nom~blic in
t99 .
REVISED 00301-1
95H08
SECTION 00301
BID FORR
PROJECT IDENTIFICATION:Sanitarv Sewer Imorovements for
~ranevine III, IV and Bethel Road.
CONTRACT IDENTIFICATION: SS 94-02
THIS BID IS SUBMITTED TO: pUrchastna Aaent. Cttv of Coooell, Texas
Z55 Parkway Boulevard. CoDoell, Texas 75019.
herein after referred to as OWNER.
City of Coppell Bid No: Q-0895-1
1. Enter Into Agreement.
The undersigned BIDDER proposes and agrees, if this Bid is accepted,
to enter into an Agreement with OWNER in the form included in the
Contract Documents to perform and furnish all Work as specified or
indicated in the Contract Oocuments for the Bid Price and within
the Bid Times indicated in this Bid and in accordance with the other
terms and conditions of the Contract Oocuments.
2. BIDDER Accepts.
BIDDER accepts all of the terms and conditions of the Advertisement
or Invitation to Bid and Instructions to Bidders, Including without
limitation those dealtng with the disposition of Bid security.
This Bid wtll remain subject to acceptance for ninety (90) days
after the day of Bid opening. BIDOER wtll sign and deliver the
required number of counterparts of the Agreement with the Bonds and
other documents required by the Bidding Requirements within fifteen
(15) days after the date of OWNER's Notice of Award.
The OWNER considers the work described by the Contract Documents
three separate and distinct projects. Bidder hereby agrees to
accept an award of contract based on any individual section.
3. BIDDER's Representations.
In submitting this Bid, BIDDER represents, as more fully set forth
in the Agreement, that:
BIDDER has examined and carefully studied the Bidding Documents
and the following Addenda receipt of all which is hereby
acknowledged: -(List Addenda by Number and Oate)
ADDENOA NO. DATE
REVISED 00301-3
any other BIOOER to submit a false or sham Bid; BIDDER has
not solicited or induced any person, ft~ or corporation to
refrain from bidding; and BIOOER has not sought by
collusion to obtain for Itself any advantage over any other
BIODER or over OWNER.
4. Bid Prices.
BIDDER wtll complete the Work in accordance with the Contract
Oocuments for the following price(s):.
All spectfic cash allowances are tncluded tn the prtce(s) set
forth above and have been computed In accordance with paragraph
11.8. of the Seneral Conditions. -
CITY OF
UNIT PRICE BID
FOR
COPPELL SEWER IMPROVEMENTS
SECTION I - GRAPEVINE III
ITEM ESTIMATED DESCRIPTION AND
NO. QUANTZTY UNIT PRICE IN NORDS
UNIT TOTAL
PRICE ANOUNT
1-4 N/A N/A NOT USED
5 166 LF For furnishing and plactng
8" P¥C sewer (15'-20' depth),
c~pl~te t~ place, the sum of
--~'",,-~2~ "~ DOLLARS
AND ' ^~/% CENTS
per 11near-foot.
6-13 N/A N/A NOT USED
14 200 LF For furnishing and plactng 15"~
SDR-35 PVC sewer (0'-10' depth),
comp}et;e in place, the sum of
~~c~OOLLARS
AND ~ /U~ CENTS
per 11near foot.
15 2570 LF For furnishing and placing
15" SDR-35 PVC sewer (10'-15'
depth), complete tn place,
t~o~_~ OOLLARS
AND / ~L~ CENTS
per linear foot.
00301-4 REVISED
16 1094
17 230
18 N/A N/A
19 5 EA
20 8
22 N/A
23 I
LF For furnishing and placing
15" SDR-35 PVC sewer (15'-20'
depth), complete in place,
the sum of
:~. ~A~. DOLLARS
AN~; /~Jc~ CENTS
per linear foot.
LF For furnishing and placing
15" SDR-35 PVC sewer (20'-25'
depth), complete in place,
DOLLARS
CENTS
NOT USED
FT~dt~eter standard manhole,
c~mp~ete in p_l~ace, the skm of
/' ~ '~,,.*.,~ I~LARS
AI~D ' ~J~ ~ENTS
I
EA For furnishing and placing 5 ~ ~.~.r~/
FT diameter standard manhole, ~
_.co~pletp in place,.t~e sum of
- ' DOLLARS
AND.m~.~CENTS
per each. I
EA For furnishing and placing 6
FT diameter standard manhole,
.r, ompl)te in. place,,tl)e sum of
DOLLARS
AND ~ CENTS
per each.
N/A NOT USED
EA For furnishing and placing 5
FT diameter drop inlet manhole,
~_~/in place, the, sum of
~ ~ ~J~-~_~,J~DOLLARS
AND /U~' ' CENTS
per each.
24-26 N/A N/A NOT USED
/
REVZSED 00301-5
27 718 LF
For furnishing and placing 20"
diameter dry bore, complete in
p~, ~he sum of
:~,. DOLLARS
AND ' ~ CENTS
per linear foot.
I
30-31 N/A N/A NOT USED
28 718 LF For furnishing and placing 20"
diameter casing pipe, complete
[ i~e, the sum of DOLLARS
AND ~J/~ CENTS
per linear foot.
I 29 9 EA For abandonment of standard
sewer manhole, complete in
I place, th~jsqm of. /
~x~13~/~/-Z~~DOLLARS
CENTS
per each.
I 32 12 SY For removal and replacement ~
· of 8" reinforced concrete
pavement, complete in place,
~ 'CENTS
per square )
I 33 188 SY For removal and replacement ~ 7/~00
of reinforced concrete
I driveway, complete in place,
th~sum of.
. , DOLLARS
i CENTS
per square yard.
34 835 LF
For removal and replacement
of reinforced concrete 4 FT
wide sidewalk, complete in
P~c??~2he sum °f DOLLARS
'AND CENTS
per linear foot.
35-36 N/A N/A NOT USED
00301-6 REVISED
37 I LS For furnishing and plactng
landscaping, complete tn
DOLLARS
CENTS
per lump sum.
LF For Trench Excavation Safety
and Support, complete tn
t~e sum of OOLLARS
~c~(~ CENTS
per linear foot.
LS For furnishing and maintaining
Traffic Control stgnage,
barricading, etc. during and
through completion of
construction, complete in
f OOLLARS
' CENTS
per 1 ump.sum.
EA For furnishing and plactng
4' PVC sMr services,
38 3555
39(A) 1
40 8
place, the sum of
OOLLARS
CENTS
41 102 LF
24' ASTM F-497 PVC sewer
(25'-30' depth), complete
tn place, the.sum of
~~DOLLARS
~ ~ CENTS
per each:
SECTION I- GRAPEVINE III
IOIA[ 8I~ ~OR AlE ~NIT PRICES:
Btdder agrees that all ~ork described tn SECTZON Z - G~PEVZNE ~Z[ ~t11
be completed wtthtn 120 calendar d~s.
per each. /
For furnishing and plactng ~ ~
Note: The City has set the time for this section at 120 calendar days.
Should the Contractor be the successful low bidder on Section ! and
Section !! and/or Section III, the Contractor shall be required to
complete Section ! within the first 120 calendar days of the total time
allotted for completion of the work.
REVISED 00301-7
SECTION II - GPu~PEVZNE IV
~ ITEM ESTIFtATED DESCRIPTION AND UNIT TOTAL
NO. QUANTITY UNIT PRICE IN WORDS PRICE N4OUNT
I 215 LF For furnishing and placing ~ jll,.OO, oo /'
6' Cl. SO Ductile Zron Pipe,
complet~in place, the sum of
~ ~'.~ DOLLARS
AN[V~ /~J~ CENTS
per linear foot.
I 2 215 LF For furnishing and placing
/
8' Cl. 50 Ductile Iron Pipe,
com. g.l~e in place, the sum of
I ~ IX)LIARS
AND ' J /,~'~ CENTS
per ltnearfoot.
m~
m~ 3 N/A N/A
I 4 I3 LE For furnishing and plactng 8'
SDR-35, PVC sewer (10'-15'
depth), complete in place,
AND ' CENTS
I per linear foot.
5-9 N/A N/A NOT USED
~. ]0 557 LF For furnishing and placing
12' SDR-35, PVC sewer (0'-10'
depth), co~lete tn place,
the~su.~.f
m ~ ~I]~)~LLARS
AND ~de~. '~ENTS
per Ilflear TOOt.
m 11 1565 LF For furnishing and placing
12" SDR-35, PVC sewer (10'-15'
i depth), complete in place,
DOLLARS
CENTS
I per llh~r' foot.
00301-8 REVISED
12 580
13-18 N/A
19 8
20-23
24
25
26
4~.oo
LF For furnishing and placing
12' SDR-35, PVC sewer (15'-20'
depth), complete tn place.
the sum ~f.
':~, ~ DOLLARS
AND ~D CENTS
per ltnear foot.
N/A NOT USED ~ .//__~
~EA For furntshtng~d plactng 4
FT dta,~ter standard manhole.
c~e ~ace, the sum of
'' ~LLARS ~r~//
per each.
~T"~!~ED~ ~
For furnishing and plactng 4
~ d~ter Type'S" manhole, ~ / I
c~]ete tn place, the sum of
x~ ---P c.oppte~e 11
'~. CENTS
For furnishing and plactng 5
FT dta~eter Type "S" manhole,
~lete tn place, the sum of
DOLLARS
1 EA For furnishing all labor,
materials and Incidentals
required to complete Siphon
structure per contract
requirements, complete
,~.place, ~he sum~f// ~
-~-*-~'/L~,~DOLLARS
~CENTS
per each.
27 316 LF
For furnishing and plactng 20' ~ ~_~c~
dtamter dry bore, complete tn
plac~:~e ~u~ of
~ ~ . DOLLARS
AND '-:~ ~ CENTS
pe~ linear foot.
RE¥[SED
28 316 LF For furnishing and placing 20" 20,00
diameter casing pipe, complete
~e' the sum°f OOLLARS
AND ~ CENTS
per linear foot.
29 6 EA For abandonment of standard
sewer manhole, complete in
~O -~ ~ CENTS
per
each.'
30-31 N/A N/A NOT USED
32 832 LF For r~val and replace~nt
of 8' reinforced concrete
pave~nt, complete in place,
per square yara.
33-35 "/A "/A NOT USED
36 g SV For ~.v,1 and replacement
of 6' retnforc~ concrete
Rip-Rap, complete in place,
the sum of .
~~L~RS
~~CENTS
per square ya~.
37 1 LS For furnishing and placing
landscaping, complete tn
)ua
-- ~ ' CEOS
per l u~ sum.
38 g60~ LF For Trench Excavatton Safet~
and Support, co~lete tn
pl~,_the sue of
~L~RS
~O ~ CENTS
per linear foot.
00301-10 REVISED
39(A) 1
LS For furnishing and matntatning~
Traffic Control stgnage,
barricading, etc. during and
through completion of
construction, complete in
'f DOLLARS
CENTS
per lump sum.
40 8 EA
For furnishing and placing
4" PVC sewer services,
the sum of
DOLLARS
CENTS
per each.
41 N/A N/A NOT USED
SECTION II - GRAPEVINE IV
TOTAL BID FOR ALL UNIT PRICES:
Bidder agrees that all work described in SECTION II - GRAPEVINE IV will
be completed within Z/~ calendar days.
'!
!
SECTION III - BETHEL ROAD
ITEM ESTIMATED
NO. QUANTITY UNIT
DESCRIPTION AND
PRICE XN WORDS
1 110 LF
For furnishing and placing
6' Cl. SO Ductile Iron Pipe,
~:omp)pt~ Jn~p}ace_~.~the sum of
J~u~/.~/~~ DOLLARS
AND' X~/~' ' CENTS
per linear foot.
LFFor furnishing and placing
8" Cl. 50 Ductile Iron Pipe,
~_c_om@lete ia pl.ace~g~he sum of
y~.~,~.~/~~ DOLLARS
AND ~0 ' CENTS
per linear foot.
3 13 LF
For furnishing and placing
8' SDR-3$, PVC sewer (O'-lO'
depth), complete in place,
~ND ~.~x~ CENTS
per linear foot.
4 5 LF
For furnishing and placing
8' SDR-35, PVC sewer (10'-15'
depth), complete in place,
the ,of
DOLLARS
/tP CENTS
per linear ~oot.
5-6 N/A N/A NOT USED
7 2314 LF
For furnishing and placing
10' SDR-35, PVC sewer (u'-lO'
depth), complete in place,
A~ID * ~ ' CENTS
per linear foot.
8 1648 LF
For furnishing and placing
10" SDR-35, PVC sewer (lO'-15'
depth), complete in place,
~.uo~ DOLLARS
·
ANO inearfoot. CENTS
per 1
REVISED 00301-11
UNIT TOTAL
PRICE A/4OUNT
00301-12 REVISED
9 15
10 892
1] 2477
12-]8 N/A
19 13
2O 2
21 N/A
22 4
LF Fo~ furnishing and placing , /~Z)~ ~ ~ ~r
12 SDR-26, PVC sewer (0 -5
depth), complete tn place,
th~sgm of
~ DOLLARS
AN[Y ,c~% CENTS
per 11near foot. J I
' depth), complete tn place,
AND ~0 CENTS
per 11near foot.
depth), complete In place,
the/sum of m
~~LLARS
m
~D - ~ CENTS
per linear foot.
N/A ~T~ I
EA For furn~ghtng and placing 5
FT diameter standard manhole,
o te tn. place, the sum of
~ OOLLARS
CENTS
pe~ _~ _
T USED ~- ....
For furnishing and placing 4
FT dt~ter drop inlet aanhole,
e in place, the sue
~ ~L~RS
~g CENTS
each.
23
24
25
26
! EA For~/furnishing"an~ placing 5
FT'diameter drop ~nlet manhole,
~om~l.~J~-inplace, the sum of
(~ ~ DOLLARS
, CENTS
p ach./L'~°
D
N/A N/A NOT USED
1 EA Fo~f~nishing andplacing 5
F~dia~ter Type
~°mplete ~t~place' the~L~RsSum of
~ ~O
1 ~ For furnf~htng all labor,
materials and incidentals
required to complete Siphon
structure per contract
require~nts, complete in
CENTS
pep each.
27 15 LF For furnishing and placing 20' ~
diameter dry bore, complete in
pl)ce, the sum of
per ~ 'CENTS
I LF For furnishing and placing 20'
28
15
diameter casing pipe, complete
in place, the sum of
DOtCARS
AND - ,~ CENTS
per linear foot.
I 29 6 EA For abandonment of standard
sewer manhole, complete in '
placg,
the
of
(::~ ~.,-~~DOLLARS
I
30 4 EA For abandonment of sanitary /-/~)~ ~
sewer clean out, cpmplete in
AND -- CENTS
per each.
~.SEVISED 00301-13
00301-14 REVXSED
3] 48
32-34 N/A
35 6998
36 7
37 1
38 7346
LF For placement of 6' Class 'B' ~ 0~97~_0L~ ~
concrete embedment across
entire trench width, complete
in.~p~c&v the sum of
~ ~ ~L~RS
~D ' ~ CENTS
per each.-
NOT USED
N/A
LF For re~vml and replmce~nt ~.~ ~.~
of asphaltic concrete *Se~ Description
pmve~nt, complete in place, Page 00]00-1] _
th~~ Section 13.2.1~
LLARS
CENTS
~ l tn~r foot.
SY For re. va1 and replacement ~
Rip-Rap, complete ~n'place,
~h~ s~ o~ -
~ ~ ~ CENTS
per square yard.
LS For furnishing and plactng ~ ~
landscaptng, co~lete t~
~l~e~ the F~ ~f~ ~
-- ~LLARS
~ ~ff ~CENTS per lump sum.
LF For Trench Excavation Safety 2J-~) ~A.~) ~
and SUpport, complete in i
DOLLARS
per 11 n'e/~'fOot. 'CENTS i
For furnishing and maintaining
Traffic Control signage,
barricading, etc. during and
through completion of
construction, complete in
39(A) 1 LS
per lump sum.
DOLLARS
CENTS
3g(B) 1 LS
REVISED 00301-15
For furnishing and maintaining
Traffic Control stgnage,
barricading, etc. during and
through completion of
construction, complete in
DOLLARS
CENTS
per lump sum.
40 18 EA For furnishing and placing
4' PVC sewer services,
~!, the sum of
DOLLARS
/LPp --CENTS
per each.
*See Description
Page 00100-12,
Sectton 13.2.18
41 N/A N/A NOT USED
SECTION 111 - BETHEL ROAD .~"-, /~'
TOTAL BXD FOR ALL UNIT PRICES.,'-OJ~Lr~~ /~f,c~,,,~-C~C~",,,t,q ~
(use words)
Bidder agrees that all work described in SECTION III - BETHEL ROAD will
be completed within~o calendar days.
00301-t9
i
i
i
!
I
!
!
!
I
]
]
I
BID AFFIDAVIT
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed
and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or
all commodities upon which prices are extended at the price offered, and upon the conditions
contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will
be c[O calendar days from the date of the bid opening. (Period of acceptance will be
ninety (90) calendar days unless otherwise indicated b~ .Bidder.)
STATE OF Tc°Nc'tr2~ COUNTY OF ~/Icl .% --
BEFORE ME, the undersigned authority, a Notary Public in and for the State of te~'~c~ ,
on this day personally appeared "~_-j:~ co ~cccxc~,c~¢, 3']- - who after being by me
duly sworn, did depose and say:
Nme
N~ of Fi~
to.going on ~lf ot
Name
am a duly authorized office/agent for
and have been duly authorized to execute the
Name of Firm
I hereby certify that the foregoing bid has not been pr~ared in collusion with any other Bidder
or individual(s) engaged in the same line oc business prior to the official opening of this bid.
Further, I certify that the Bidder is not now, nor has been for the past six (6) months, di~ctly
or indirectly concerned in any pool, agreement or combination thereof, to control the price of
services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon."
Title: ~fe~,c~ee ~" Signature:
s,~Bscm,~,m AN,~ SWOrn,, ~o before ~e by the at,ore n~ed
on this the ~ ~' ~ ,~y of bq'~q~-~
Notary Public in and for the State of
~c-~6¥~ ~. ~o~sl
00301-20
If BIDDER IS:
An Individual
By
doing business as
Business address
(Seal)
(Individual's Name)
PhoneNo.
, ..(Seal)
By
(Firm Name)
(General Parme0
Business address Phone No.
(Corporation Name)
,~ (State of lncprporation)
(Name of ~erson authorized to sign)
~itle)
1
(Co~ate S~ )~ ,
A Joint Venture
By
(Name) (Address)
By
(Name) (Address)
(Each joint venture must sign. The manner of signing for each individual, partnership and
corporation that is a partner to the joint venture should be in the manner indicated above.)
~ OF SF~'riON
REVISED 00301-1
SECTION 00301
BID FORM
PROJECT IDENTIFICATION:Sanitarv Sewer Imorovements for
Graoevine III. IV and Bethel Road.
CONTRACT IDENTIFICATION: SS 94-02
THIS BIO IS SUBMITTEO TO: pgrchasine Aaent~ City of Conoe11. Texas
255 Parkway Boulevard. Conpe11. Texas 75019.
herein after referred to as OWNER'
City of Coppe11 Bid No: Q-0895-1
1. Enter Into Agreement.
The undersigned BIDDER proposes and agrees, tf thts Bid ts accepted,
to enter tnto an Agreement with OWNER in the form tncludnd tn the
Contract Oocuments to perform and furnish all Work as specified or
indicated tn the Contract Oocuments for the Bid Price and wtthtn
the Btd Ttmes indicated tn thts Btd and tn accordance with the other
terms and conditions of the Contract Oocuments.
2. BIDOERAccepts.
BIDDER accepts all of the terms and conditions of the Adverttsemnt
or Invitation to Bid and Znstrectlons to Bidders, tncludtng wtthout
limitation those dealtng wlth the dtsposttton of Btd securlty.
This Bid w~11 remain subject to acceptance for ninety (90) days
after the day of Bid opanlng. ~ BZDDER w~11 slgn and deltver the
requtrnd number of counterparts of tho Agreement with the Bonds and
other documents required by the Btddtng Requirements withln fifteen
(15) days after the date of O~NER's Nottce of Award.
The OWNER considers the work described by the Contract Documn~s
three separate and dtsttnct projects. Btdder hereby agrees to
accept an award of contract based on any Individual sectton.
3. BIDDER's Representations.
Zn submitting this Bid, BIDDER represents, as more fully set forth
tn the Agreement, that:
BIDDER has examined and carefully studied the Btddtng Documents
and the following Addenda receipt of all whtch is hereby
acknowledged: (List Addenda by Number and' Oate)
00301-2 REVISED
be
Ce
ee
fe
ge
BIDDER has visited the stte and become familiar wtth and ts
satisfied as to the general, local and stte conditions that may
affect cost, progress, performance and furnishing of the Work.
BIDDER is familiar with and is satisfied as to all federal,
state and local Laws and Regulations that may affect cost,
progress, performance and furnishing of the Work.
BIDDER has obtained and carefully studied (or assumes
responsibility for having done so) all such additional or
supplementary examinations, investigations, explorations,
tests, studies and data concerning conditions (surface,
subsurface and Underground Facilities) at or contiguous to
the site or otherwise which may affect cost progress,
performance or furnishing of the Work or which relate to
any aspect of the mans, methods, techniques, sequences and
procedures of construction to be eJeployud by BIOOER and
safety precautions and programs incident thereto.
BIDDER does not consider that any additional examinations,
investigations, explorations, tests, studies or data are
necessary for the determination of this Bid for performance
and furnishing of the Work t'n accordance with the times,
price and other terms and conditions of the Contract Oocuments.
BIOOER has corrolatud tho information known to BIDDER,
e
tnfo~tton and observations obtained fr~ visits to the m
site, reports and drawings identified in the Contract Oocuments
and all additional exmtnattons, investigations, explorations,
tests, studies and data with the Contract Documents.
BIOOER has given ENGINEER written notice of all conflicts,
errors, ambiguities or discrepancies in the Contract
Oocuments and the written resolution thereof by ENGINEER ts
acceptable to BIOOER, and the Contract Oocuments are
generally sufficient to tndtcate and convey understanding
of all terms and conditions for performing and furnishing
the Work for whtch this Bid ts submitted.
Where conflicts, errors, ambiguities or discrepancies have been
dtscoverud tn or between Contract Documents and/or other
related docmments, and where said conflicts, etc., have not
been resolvud through the interpretations or clarifications by
ENGINEER as described tn the instructions to Bidders, because
of insufficient time or otherwise, BiDOER has tncluded in the
Bid the greater quantity or better qualtty of Work, or
compliance with the more stringent requirement resulting in a
greater cost.
This Bid is genutne and not made in the interest of or on
behalf of any undisclosed person, firm or corporation and
is not submitted in conformity with any agreement or rules
of any group, association, organization or corporation;
BIOOER has not directly or indirectly induced or solicited
REV[S£D 00301-3
any other BIDDER to submit a false or sham Bid; BIDDER has
not solicited or induced any person, fire or corporation to
refrain from bidding; and BIDOER has not sought by
collusion to obtain for itself any advantage over any other
BIOOER or over OWNER.
e
Bid Prices.
BIOOER will complete the Work tn accordance with the Contract
Oocuments for the following price(s):
All spectftc cash allowances are included tn the prtce(s) set
forth above and have been computed tn accordance wJth paragraph
11.8. of the Sonora1CondJtJons.
CITY OF
UNIT PRICE BID
FOR
COPPELL SL~ER IMPROVEMENTS
SECTION I - GRAPEVINE
ITEN ESTIMATEO DESCRIPTION AND
NO. QUANTITY UNIT PRICE IN NOROS
.... ..... ;;';;; ........ ....
$ 166 LF For furnishing and placing
8' Iq/C se~er (15'-20' depth),
comlete tn ~lace, the sma of
AN~£~ /~ ~ CENTS
pe~ ~ lnear ~oot.
UNIT TOTAL
PRICE ANOUNT
6-13 N/A N/A NOT USED
14 200 LF For furnishing and plactng 15' .~/~
SDR-35 PVC sewer (0'-10' depth),
caJ~le~o tn place, the sun of
~ ~P.~L~ u ,~- CENTS
pel'Tlnear foot.
I 15 2570 LF For furnishing and placing
IS" SDR-3$ PVC sewee (10'-15'
depth), conplete tn place,
the sun of
ANO ' u ~ CENTS
per lJnear foot.
00301-4 REVISED
16 1094
LF
17 230 LF
18 N/A
19 S
For furnishing and placing
15' SDR-35 PVC sewer (15'-20'
depth), complete in place,
the sum of
/~DD c~,~,.~~- ~'JL~CLOOLLARS
per linmir/f~o~. CENTS
For furnishing and placing
15" SDR-35 PVC ~ewer (20'-2S'
depth), complete in place,
the sum of
AND' £.~, CENTS
per linear foot.
N/A NOT USED
ER For furnishing and placing 4 /~? ~5~' .~
FT diameter standard manhole,
c.omplete in place, .tlte;s~a~. of
~Lu.~:L~oc~OCULARS
2O 8 EA
21 1
22 WA
23 I
per each.
For furnishing and placing 5
FT diameter standard manhole,
co~p~.lete tn place,
AND · ,~cc CENTS
per each.
ER For furnishing and placing $ .~,~L~ ,~~L?j
FT diameter standard manhole,
c.omplete tn place, the sum of
~CENTS ·
per each.
N/A NOT USED
ER For furnishing and placing $
manhol
FT diameter drop inlet
coml~lete in placq, the~.uF~ot
ANJ~' ' ' ~f ~,~ .... CENTS
per each.
24-26 N/A N/A NOT USED
27
28
2g
30-31
32
33
34
35-36
718
718
9
N/A
188
835
LF
LF
N/A
SY
SY
LF
N/A
For furnishing and placing 20'
diameter dry bore, complete in
~,l~ce, the sum of
AND ~ ~ CENTS
per linear foot.
For furnishing and placing 20'
dtmmeter casing pipe, complete
in place, the sum og
~,,~L.~c.CC~-~ DOLLARS
AND /7~.C~ CENTS
per linear foot.
For abandonment of standard
sewer manhole, complete in
place, the sum of
per each.
NOT USED
For removal and replacument
of 8" reinforced concrete
pavement, complete in place,
the sum of
AND ~ ~/~cc~ CE)ITS
per square yard.
For removal and replacement
of reinforced concrete
driveway, complete in place,
the sum of
~ ( ,'/yco- CENTS
square yard.
For removal and replacement
of reinforced concrete 4 FT
wide sidewalk, complete in
place, the sum of
~.~,.~ DOLLARS
AND ../~.,..~ CENTS
NOT USED
REVISED 00301-5
J
I
00301-6 REVISED
37 1
38 3555
39(A) 1
40 8
LS For furnishing and placing
landscaping, complete tn
place, the sum of
~,~i%.~ ~.~'z ~,~:~- DOLLARS
/~¢0~ ,,?~ CENTS
~lump sum.
CF For Trench ~cavat~on Safety
and Suppo~, complete
place, ~he s~.of
~ ~L~RS
~D ~ ~ ~ C~TS
per 1~, f~ot.
LS For fu~sh~n9 and mlntaJn~ng
Traffic Control s~gnage,
barricading, etc. durln9 and
through c~letton of
const~ctlon, co~lete
place, the sum of
AND' /~c.~~ CENTS
per Tump suB.
EA For furnishing and plactng ~.~oo j.~*TjO~
4' PVC sever services,
qumplete tn pl?ce, th¢,~JJm OT
~er~ach. /7Cc~ ucc'CENTS
41 102 LF
For furnishing and plactng
24' ASTI4 F-497 PVC smmr
(26'-30' depth), complete
tn place, the sum of
AND ~- CENTS
per each.
SECTION I - GRAPEVINE III ~ - ~ --
TOTAL BID FOR ALL UNIT PRICES: ~:,
Bidder agrees t~t all ~rk described In SEC~ I - ~P~INE III wtll
be completed ~tthtn 120 calendar days.
Note: The Ctty has set the ttm for thts sectton at 120 calendar days.
Should the Contractor be the successful lo~ btdder on Sectton] and
Sectton H and/or Sectton [Z], the Contractor shall be required to
complete Sectton ~ ~tthJn the ftrst 120 calendar days of the total tt~
allotted for completion of the ~ork.
REVISED 00301-7
SECTION II - GRAPEVINE IV
P
ITEM ESTIMATED
NO. QUANTITY
DESCRIPTION AND
UNIT PRICE IN WORDS
I 215 LF
2 215 LF
For furnishing and plactng
6' Cl. 50 Ductile Iron Pipe.
complete ~n place,,the~ujR~of
AND /)'~c?- ~ ' CENTS
per linear foot.
For furnishing and plactng
8' C1. 50 Oucttle Iron Pipe,
co~kolete,in place, t~; hum of
AND AuJ.?*' C~TS
per linear foot.
UNIT
PRICE
3 N/A N/A
4 13 LF
For furnishing and placing 8" 77°~
SDR-3S, PVC sewer (lO'-lS'
depth), complete in place,
the sum of
AND ~ CENTS
per linear foot.
5-9 N/A IVA NOT USED
i 10 557 LF For furnishing and placing
12' SDR-3S, PVC sewer (0'-10'
depth), complete Jn place,
the sum of
DOLLARS
AND "~C¢'~ CENTS
per 11near foot.
I1 1565 LF For furnishing and placing
II' SDR-3$, PVC sewer (I0'-15'
depth), complete in plmce,
p~sumof ,
£,.¢,-,,LoCc~..~t.., DOLLARS
-- /7co-- CENTS
linear foot.
TOTAL
ANOUNT
00301-8 REVISED
12 580
LF
For furnishing and plactng
12' SDR-35, PVC sewer (15'-20'
depth), complete Jn place,
the sum of
AND/;/~ ~ /**'/'~ "CENTS
peri,near fbot.
13-18 N/A
19 8
N/A NOT USED
EA For furntshtng:'and plactng 4 /~' J~".~
FT dtameter standard manhole,
comoTe~e tn ~la~e,.,th~ sum of
ANI~ /,~ L,' ' ~'- ._CENTS
per each.
20-23 N/A
N/A NOT USEO
EA For furnishing and plactng 4
FT dtmeter Type'S' manhole,
~_~.o=plete tn place, the sum of
AND .~o-- ,.cENTS
25 1 EA
26 1 EA
27 316 LF
per eich.
'For furnishing and plactng S
FT dtumeter Type'S' manholeT
c~,o~p!e_te tn placP, the
'AND ~ ,~ r- .~rAla
per eKh.
For Curntshtng all labor,
mtertals and Incidentals
requtred to complete Stphon
structure per contract
requtremnts,
ntace, the ~m or.~
per each.
For furnishing and plactng 20' /~*~
dtmeter dry bore, c~omple~e tn ,
place, the s,u~,.o,~f.~_Crx-~~
Ai~D'" (%Z-~'*~ CENTS
per 11near foot. '
I
I
I
i
!
I
!
28 316 LF
For furntshtng and placing 20'
dtameter castng pipe, complete
tn pla~e, the sum of
~-/.~6~ OOLLARS
AND ,~z.~-- CENTS
per linear foot.
29 6 EA
For abandonment of standard
sewr eanhole, coaplete tn
place, the sum of
,-,rc~- CENTS
per each.
30-31 N/A N/A NOT USED
i 32 832 LF For removal and replacement
of 8' reinforced concrete
pavelmnt, co. leto tn place,
the ~ua of
CENTS
peb/square yard.
33-35 N/A N/A NOT USEO
I 36 g SY For reeoval and replaceeent
of 6' reinforced concrete
REVISED 00301-9
. _ _ o~
Rip-Rap, coeplete tn place,
· the sum of
i per square yaro.
37 1 LS For furntshtng and plactng
landscaping, cmple~e ?
place, the
AND ~'L~-- C~S
per 1~
38 ~601 LF For T~nch ~cavatton Safety ~d Support, c~lete tn
placp,, the sue of
Z-/Lk~ L OOLLARS
AND /)LCr' CENTS
per 11near foot.
00301-10 REVISED
3g(A) ! LS For furnishing and maintaining
Traffic Control stgnage,
barricading, etc. during and
through completion of
construction, complete in
place, the sum of
~P~lO /-~-- CENTS
per lump sum.
40 8 EA For fu~ishing and plactng
4' ~C s~r se~tces,
oml eta t ~c~ the s~ of
O' ~- CENTS
per each.
41 N/A N/A NOT USED
SECTION II ' GRAPEVINE IV , ~ ,
TOTAL BID FOR ALL UNIT PRICES:/-y~. ~_~,~..~cP~L (use words)
~.~ ' (use figures)
Bidder agrees that a1..1 work described in SECTION ZZ - GRAPEVINE IV will
be completed within ~ calendar days.
SECTION II! - BETHEL ROAD
I
!
i
!
i
ITEH ESTIHATED DESCRIPTION AND
NO. QUANTITY UNIT PRICE IN WORDS
I 110 LF
2 110 LF
For furnishing and plactng
6' C1. 50 DucMle !ton Ptpe,
fp~plete tn.p!ace, the sum of
· ~,-~,..~t DOLLARS
AJlb~ ~ .,')c,c~ -' CEHTS
per 11near foot.
For furnishing and placing
8' C1. SO Ducttle !ton Ptpe,
,~et,e .tn pl,a.c.e~ the sum of
_~(~ _~c~. DOLLARS
~ ' ~: ~ C~TS
per 11near foot.
I 3 13 LF For furntsh4ng and plactng
8' SDR-35, PVC sewer (0'-10'
!
I
depth), complete tn place,
the sum of
ANq) ~c~ CENTS
per 11near foot.
4 5 LF
For furnishing and placing
8' SOR-35, PVC se~er (10'-15'
depth), complete tn place,
the sum of ,.
__~ ~oxv ./~,.u.,c~ OOLLARS
pe~ 11near fo~. CENTS
I
I
I
I
!I
!
S-6 N/A N/A
7 2314 LF
8 1648 LF
NOT USED
For furnishing and plactng
10' SDR-35, PVC sewer (0'-10'
depth), complete tn place,
the ~sum of
j~LC~_~-c~--~ ~ DOLLARS
AND V (,.~ C~TS
per linear foot.
For furnishing and plactng
10' SDR-35, PVC sewer (10'-15'
depth), complete tn place,
the sun of ,
,CI-~Lc~LT_.~J.-C~~' DOLLARS
AND u .,q,,~'-' CENTS
per linear foot.
REVISED 00301-11
UNIT TOTAL
PRICE AMOUNT
>~. ~,c,~ ~ c,~z.'
00301-12 REVISED
9 15 LF
10 892 LF
11 ~477 LF
For furnishing and placing
12' SDR-26, PVC sewer (0'-5'
depth), complete in place,
the sum of
.~/~L--,-r, OOLLARS
AND/~ , /~c~-' CENTS
per--linear foot.
For furnishing and placing
12' SDR-35, PVC sewer (5'-10'
depth), complete in place,
the sum of
'~.c~.~.~--.x~.'x,-~ NOLLARS
AND v /,%c,- CENTS
per linear foot.
For furnishing and plactng
12' SDR-36, PVC semar (10'-15'
depth), complete in place,
the sum of
,.~:?~C~ -.~L.c~,*~; DOLLARS
ANI~; ' ~,~-,- CENTS
per linear foot.
o° /ic q 9
1~-18 N/A
19 13
N/A NOT USED
EA For furnishing and placing 4
FT diameter standard manhole,
complete in_place, the Sue of
ANU ~ ~- L, CENTS
2O 2 EA
per each.
For furnishing and placing 5 ~_~
FT diameter standard manhole,
c,umplete tn place, the sum of
AND / ~?ccr- CENTS
per each.
2]. N/A
22 4
N/A NOT USEO
EA For furnishing and plactng 4
FT diameter drop tnlet manhole,
complete tn place, the sum of
'AND ?.~.-~ CENTS
per each.
I
I
I
I
I
I
i
i
t
i
23 I EA
24 N/A
Z5 1
26 I
Z7 15
For furnishing and placing 5
FT dianeter drop inlet manhole,
complete Jn place, the sum of
,-/._z.~, .-C"/,_u-'~bO_. ','P},-- OOLLARS
,,,,,ocr-- CENTS
REVISED 00301-13
N/A NOT USED
EA For furnishing and plactng 5 '--B~°°''~'
FT dtmeter Type'S' manhole,
conplete in pl,ace, the sum of
AND , (/ ,,'v~cr-' CENTS
per each.
EA For furnishing all labor,
naterials and incidentals
required to conplete Siphon
structure per contract
requirenents, cueplete in
place, the sun pf ~/~_~=/~oc~C
Aim _. ,,-/cc~ CENTS
per each.
LF For furnishing and placing 20' -~c~c~
dtamter dry bore, cueplete tn
pl~cp, tl~e sum~f
certs
per linear foot.
Z8 15 LF
29 6 EA
For furnishing and placing 20'
dtaneter casing pipe, complete
tn ~lace, theFun of
.~/~. - ,~u.~ DOLL.S
AND ~¢'.~ CENTS
per 11near f~'ot.
For abandonnent of standard
se~er nanhole, conplete tn
place, the, sue of
~9r each. ,~q-- CENTS
For abandonnent of sanitary
se~er clean out, complete in
place, the sun.of~
AND /~,.~-~ ~ CENTS
per each.
30 4 EA
00301-14 REVISED
31 48 LF
32-34 N/A
35 6998
35 7 SY
N/A
LF
37 1 LS
38 7346
For placement of 6" Class "B"
concrete embedment across
entire trench width, complete
in place, the sum of
,./c¢_u~-~. ~. x~ DOLLARS
AND (~ach./~co~ CENTS
per
NOT USED ~'-
For removal and replacemont
of asphaltic concrete
pavement, complete in place,
the su~ of
nD
per line
For removal and replacement
of 6' reinforced concrete
Rip-Rap, complete in place,
the su~ of
/-/f .ccb.~- DOLLARS
per square yara.
For furnishing and plactng
landscaping, complete in
pl,ace, tl~e, su~ of
j~/.~.. ,Z~'c~u.~'c ~ ~L~S
~- - ~ C~TS
~r 1~ s~.
LF For Trench Excavation Safety
and Support, complete in
place, .the su~ of
r- ~'-~LC~ OOLLARS
~CENTS
per~eoot.
39(A) 1 LS
For furnishing and maintaining
Traffic Control stgnage,
barricading, etc. during and
through completion of
construction, complete in
place, the s~ of
/~r~ CENTS
per lump sum.
-~tj~g-~scrtptioz
Page 00100-11
Section 13.2.1'
UC~ C.'
REVISED 00301-15
39(8) 1
LS For furnishing and maintaining
Traffic Control signage,
barricading, etc. during and
through completion of
construction, complete in
place, the ~ua of
ANO ~ CENTS
per lump su~.
40 18 EA For furnishing and placing
4' PVC sewor services,
co,~,lete~n pJ.a;e~., the sum of
~ANO ' ; //~L~' CENTS
per each.
*See Description
Page 00100-12,
Sectton 13.2.18
41 N/A N/A NOT USED
SECTION XX! - BETHEL ROAO
TOTAL BIO FOR ALL UNIT PrXCES: .~,',~;~L~. ;~L~%~-~c~u~.~o~*-
(~se words)
/~, ~ / (use ftgu~es)
Bidder agrees that all work described in SECTION III - 8EI~IEL ROAD will
be completed w~thtn ~ calendar days.
00301-16 REVISED
Unit Prices have been computed in accordance with paragraph
11.9.2. of the General Conditions,
BIDDER acknowledges that quantities are not guaranteed and final
payment will be based on actual quantities determined as provided
tn the Contract Oocuments.
5. Completion.
BIDDER agrees that the Work will be substantially c~leted
and ready for final payment in iccordance with paragraph
14.13. of the General Conditions on or before the dates or
withtn the nueber of calendar days Indicated in the
Agree.eot.
BIDDER accepts the provisions of the Agreement as to liquidated
damages in the event of failure to ceeplete the Work within the
times specified in the Agreement.
6. Attached Documents.
The following documents are attached to and made a condition
of this Btd:
a. Required Btd Securtty tn the fora of ~--~ ~c~ b~r~..~
8. Other Requtreeents.
Address for Comeuntcattons.
be
ee
Comuntcattons concerning thts Bid shall be addressed to
Purchasing Office
Z55 Parkway Boulevard
Coppe11, Texas 75019
BIDDER agrees that all Work awarded will be cmpleted
within the Calendar Oays ltsted for each section. Contract
time will coca. nc. to run as prevlded tn the Contract Ooceeents.
Commntcattons concernJng thts Btd sbe11 be to the address
of 8IOOER Indicated on the applicable signature page.
BIDDER understands that the Owner ts exempt fro~ State
Ltmtted Sales and Use Tax on tangible personal property to
be Incorporated into the project. Said taxes are not
included in Contract Prtce (See Instructions to Bidders).
The teras used tn this Btd whtch are deftned In the
General Conditions of the Construction Contract tncluded as
part of the Contract Oocuments have the meantngs assigned to
thee in the General Conditions.
Terms used in thts Btd which are deftned ~n the General
Conditions or Instructions will have the meanings indicated in
REVISED 00301-17
the Genera] Conditions or [nstructtons.
The Ctty of Coppe11 reserves the rtght to delete any portton of
this project as Jt ~ay deem necessary to stay within the Ctty's
available funds. Should the City elect to delete any portton,
the contract quantities wtll be adjusted accordlngly.
SUBMITTED on _
Il
El
I
00301-18
PREVAII, I~IG WAGE RATE FOR PL~LIC WORKS PROJECTS: The City shall ascertain
the general prevailing rate of wages for each craft of type of workman, or mechanic needed to
execute this contract and shall specify in the call for bids of this contract what the general
prevailing rate of wages is sin the City of Coppetl. The City shall also specify the prevailing
rate for legal holiday and overtime work. The contractor must pay the said specified rate to all
laborers, workmen, and mechanics employed by him or any subcontractor under him in the
execution of this contract. The City of Coppell resolution regarding prevailing wages
follows this section.
PENALTY FOR VIOLATION: The contractor or stibcontractor in violation of these rules is
liable to the City for a penalty of Sixty Dollars ($60.00) for each laborer, workman, or
mechamc employed for each calendar day or portion thereof, that such laborer, worlanan, or
mechanic is paid less than the stipnlated rates for any work done under this contract. The
money collected shall be used to offset the costs of administering these requirements. If the City
~ceives a complaint by a laborer, workman, or mechanic it shall determine within thirty (30)
days after receipt whether good cause exists to believe that the contractor or any subcontractor
has committed a violation of these specifications. The City shall provide written notice of its
determination to the contractor or subcontractor andy any affected laborer, workman, or
mechanic, the City shall retain any amounts due under the contract pending a trmai
determination. If the contractor or subcontractor and any affected laborer, workman, or
mechanic fail to resolve the alleged violation by agreement within fotlrte¢~ (14) days of the
determination by the City, the issues of the alleged violation, any penalties owed to the public
body, and any amounts owed to any affected laborer, workman, or mechanic shah be mbmiu~
to binding arbitration in accordance with the provisions of the Texas General A~oitrafion Act.
If the patties fail to agree upon an arbitrator within ten (10) days, the arbitrator shall be
designated by the District Court upon petition of any party. The decision and award of the
arbitrator is f'mal and binding upon all panics and may be enforced in any court of competent
jurisdiction. The City shall not be a party in the arbitration.
ARBITRATION: The arbitrator shall assess and award all reasonable costs, including the
arbitrator's fee, against the party or parties who fail to prevail in the proceeding. Costs may
be assessed against the laborer, workman, or mechanic only if the arbitrator finds that the claim
was frivolous. If the arbitrator does not fred that the claim is frivolous and does not make an
award to the laborer, workman, or mechanic, costs will be shared equally by the parties. If the
arbitrator determines that a violation of the specification has occurred, the arbitrator shall assess
and award penalties as provided in the Act and all amounts awed to the affected laborer,
workman, or mechanic against the contractor or subcontractor. The City shall use any amounts
retained under this provision to re'unburse the laborer, worknmn, or mechanic for the amount
owed to that person because of the failure to pay the person the general prevailing rate of wages
as provided in the arbitrator's award. If the amounts withheld by the City are insufficient to
fully reimburse the laborer, workman, or mechanic for amounts owed, the person has a right
of action against the contractor or subcontractor and the surety of that person to recover any
amounts owed.
00301-I9
BID AFFIDAVIT
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed
and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or
all commodities upon which prices are extended at the price offered, and upon the conditions
contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will
be calendar days from the date of the bid opening. (Period of acceptance will be
ninety (90) calendar days unless otherwise indicated by Bidder.)
STATE OFe'"'~ '5 COUNTY OF
I BEFORE ME, the undersigned authority, a Notary Public in and for the State of
on this day personally appeared ~n~,~ .Z,~./~---,'~ who after being by me
duly sworn, did depose and say:
Name
Name of Firm
foregoing on behalf of the said
Name
am a duly authorized office/agent for.
and have been duly authorized to execute the
Name of Firm
[
I
I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder
or individual(s) engaged in the same line & business prior to the official opening of this bid.
Further, I certify that the Bidder is not now, nor has been for the past six (6) n~ntlm, directly
or indirectly concerned in any pool, agreement or combination thereof, to control the price of
services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon.'
Name and Add~ss of Bidder:__
AtJdne Broe. Equip. Co., Inc
$18 W. b~r~tall
Grand Prairie, Tx 75O51
Telephone: (:a,~) ~e./7'-gl?qo by:
SUBSCRIBED AND SWORN to before me by the above named
on this the '~ '~ day of ,4~/,g/~,Z/r_5"/-
Notary Public in and for the State of
REVISED 00301-3
any other BIDDER to submtt a false or sham Bid; BIDDER has
not solicited or tnd~ced any person, ft~ or corporation to
refrain from bidding, and BIDOER has not sought by
collusion to obtain for itself any advantage over any other
BIOOER or over ONNER.
Bid
Prices.
BIOOER will complete the Work in accordance with the Contract
Documents for the following price(s):
All speciftc cash allowances are tncluded tn the prtce(s) set
forth above and have been computed in accordahce wtth paragraph
11.8. of the General Conditions.
UNIT PRICE BIO
FOR
CITY OF COPPELL SEWER IMPROVEMENTS
SECTION I - GRAPEVINE
ITE# ESTIMATED DESCRIPTION AND UNiT TOTAL
NO. QUANTITY UNIT PRICE ZN WORDS PRZCE AMOUNT
S 166 LF For furnishing and plactng
8" PVC se~er (15'-20' depth), '
complete in place, the sui of
~IITY ~
AND m CENTS
per ltnear foot.
I 5-13 N/A N/A NOT USED
I 14 200 LF For furnishing and placing IS"
SOR-35 P1/C sewer (0'-10' depth),
complete in place, the su~ of
F~rn OOLLARS
I AND ~ CENTS
per linear foot.
I 15 2570 LF For furnishing and plactng
lS' SOR-35 PVC sewer (10'-15'
depth), complete tn place,
the sum of
I FIFrY NI~ DOLLARS
AND ~ CENTS
per linear foot.
I
59. ffi 151~.88
00301-4 REVXSED
16 1094
17 230
LF For furnishing and placing
15' SDR-35 PVC sewer (15'-20'
depth), complete tn place,
the sum of
~¥ FI~ DOLLARS
AND m CENTS
per 11near foot.
LF For furnishing and plactng
15' SDR-35 PVC sewer (20'-25'
depth), complete tn place,
the sum of
NI~E~ DOLLARS
AND ~ CENTS
per linear foot.
18 N/A N/A
lg 5 EA
2O 8
21 I
22 N/A
23 1
NOT USED
For furnishing and plactng 4
FT dta~etar standard manho]e,
co~]gte tn place, the sum of
Tm r, eUS~Famlue~ DOLLARS
~ ~ CENTS
per each.
EA For furnishing and plactng S
FT diameter standard manhole,
co~lete tn place, the su~ of
FOra mOUS~ mO HUm~ SZX~ DOLLARS
ANO m CENTS
per each.
EA For furnishing and plactng 6
FT dtamter standard manhole,
s .he_ su~ of
~ "" CENTS
per each.
N/A NOT USED
EA For furntshtng and plactng 5
FT dta~eter drop tnlet manhole,
colmlete tn ~lace, the sum of
T~L~T~Ug~gE~UN~NZ~ET~ DOLLARS
AND ~ CENTS
per each.
818. 8~ 5,810. #
24-26 N/A N/A NOT USED
I
I
27 7]8 LF
For furnishing and placing 20"
diameter dry bore, complete in
place, the sum of
0NEHUM)RE~NII~TY ~V~ DOLLARS
AND FIF~ CENTS
per linear foot.
718 LF
For furnishing and placing 20"
diameter casing pipe, complete
in place, the su~
DOLLARS
AND ~ CENTS
per linear foot.
29 9 EA
For abandonment of standard
sewer manhole, complete in
place, the sum of
Tm~#D~DOLLARS
AND m CENTS
per each.
30-31 N/A N/A NOT USED
m 32 12 sY For removal and replacement
of 8' reinforced concrete
pavement, complete in place,
m sixw EIBHT DDLLARS
the
sum of
AND mJ CENTS
m per square yard.
33 188 SY For removal and replacement
of reinforced concrete
driveway, complete tn place,
the sum of
F~W DOLLARS
AND ~ CENTS
per square yard.
34 835 LF
35-36 N/A N/A
For removal and replacement
of reinforced concrete 4 FT
wide sidewalk, complete in
place, the sum of
FIFT~.N DOLLARS
AND ~ CENTS
per linear foot.
NOT USED
REVISED 00301-5
12.88 B.616.88
12,525, ~
00301-6 REVISED
37
38 3555
39(A) 1
40 8
41 102
I
LS For furnishing and plactng ;.m.~ ~.aM.gI
landscaping, complete in
place, the sum of
N~T~ OOLLARS
ANO ~ CENTS
per luep sue.
LF For Trench Excavation Safety ~25 _.__~.~
and Support, complete in
place, the sue of ~ OOLLARS I
AND T~XTYFI~ CENTS
per ltnear foot. I
LS For furnis:::ng and mainta,ning
Traffic Control signage,
i
barricading, etc. during and
through coepletion of
construction, coeplete in
place, the ~_.um of _
AND ~u CENTS
per 1rap sue.
EA For furnishing and plactng 35L~
4' PVC sever services,
complete tn place, the sub of
~I~EKIUGFXF~ DOLLARS
AND m CENTS
per each.
:
LF For furnishing and placing
24" ASTI4 F-497 PVC sewer 1~.#
(25'-30' depth), complete
in place, the sue of
ONE IIJW~ F~FTY FO~ OOLLARS
AND CENTS
per each.
SECTION I - GRAPEVINE III
TOTAL BID FOR ALL UNIT PRICES: (uso vords) ~,~.~s )
;I~I:iONI}i~I) SIX~ ~EI;HTI~MX~I) FOOR I)~llars and SEYE)JTYFI~EOmts ($ (use figures)
Bidder agrees that all tmrk described in SECTION I - GRAPEVINE III
be completed vithin 120 calendar d~ys.
Note: The City has set the time for this section at 120 calendar days.
Should the Contractor be the successful lo~ bidder on Section I and
Section II and/or Section III, the Contractor shall be required to
complete Section I vithtn the first 120 calendar days of the total time
allotted for completion of the york.
SECTZON ZI - GRAPEVINE IV
ITEM ESTIMATED
NO. QUANTITY UNIT
DESCRIPTION AND
PRICE IN MORDS
215 LF
For furnishing and plactng
6" C1. 50 Ductile Zron Ptpe,
co~lete tn place, the sum of
SZX~O,E DOLLARS
AND ~ CENTS
per linear foot.
2 215 LF
For furnishing and placing
8' C1. SO C.cttle Iron Ptpe,
complete tn place, the sum of
SlXTY FI~DOLLARS
AND "uCENTS
per linear foot.
3 N/A N/A
4 13
LF For furnishing and placing 8'
SDR-3S, PVC sewer (10'-15'
depth), caepleto tn place,
the su~ of
FZFTYFOURDOLLARS
AND m CENTS
per 11near foot.
I 5-9 N/A N/A NOT USED
10 557 LF For furnishing and placing
I ]2" SDR-35, PVC smeer (0'-10'
depth), coeplete tn place,
1] 1565
I
I
I
I
the sum of
FORTY DOLLARS
AND Ng ~ENTS
per linear foot.
LF For furnishing and placing
12' SDR-35, PVC se~er (10'-15'
depth), complete In place,
the su~of
AND Nu CENTS
per linear foot.
REVISED 00301-7
UNIT TOTAL
PRICE ANOUNT
61.~ 13,, 115.~
45. ee
0030~-8 REWSED
12 580 LF
13-18 N/A N/A
19 8 EA
20-23 N/A
24 3
For furnishing and placing
12" SDR-35, PVC sewer (15'-20'
depth), complete tn piece,
the sum of
~T~wr~ DOLLARS
AND = CENTS
per linear foot.
NOT USED
For furnishing and plactng 4
FT dtameter standard manhole,
complete tn place, the sum of
m0.Tm__~WF0URHmX~DTEX DOLLARS I
AND m CENTS
per each. I
N/A NOT USED
EA For furnishing and plactng 4
FT dtiter Typo "S" manhole,
comlete tn place, the sum of
Ii
AND NO CENTS
per eech.
26 1
EA For furnishing and plectng 6
FT dtaleter Type'S' lanhole,
cmplete tn place, the sum of
~THaUmO FOLIR IUIX~ ~ZFTYNO CENTsDOLLARS
26 1 EA
27 316 LF
per each.
·
For furnishing all labor, ~
materials end Incidentals
required to cmaplete Stphon
structure per contract 19,#e,# 19, IM.M
requirements, complete tn
pl&ce, the sum of
NZ..TE~NlmgWD DOLLARS I
AND m CENTS
per eech.
For furnishing and plactng 20'
dtaleter dry bore, complete tn
place, the sum of
ONEm~mE~SEVee~FZ~ DOLLARS
AND m CENTS
per linear foot.
I
I 28 316 LF For furntshtng and plactng 20
dtameter castng pipe, complete
I tn place, the sum of
T~V~ OOLLARS
AND ~ CENTS
per ltnear foot.
I 29 6 EA For abandonment of standard
sewer menhole, complete tn
place, the sum of
T~O ~ OOLLARS
ANO ~ CENTS
I per each.
30-31 N/A N/A NOT USED
I For remeval and replacement
32
832
LF
of 8' retnforced concrete
pavument, complete tn place,
I the sum of
TwoDOLLARS
RIZTY
ANO ~CENTS
i per square yarc.
33-35 N/A N/A NOT USED
36 9 SY For r~val and replacement
of 6" reinforced concrete
Rip-Rap, complete tn place,
the sum of
F ,°R2~pOLLARS
AND 'CENTS
per square yard.
37 ! LS
38 2601 LF
For furntshtng and placing
landscaping, cumplete tn
place, the sue of
rlr T,a~OOLLARS
AND ~:ENTS
per lump sue.
For Trench Excavatton Safety
and Support, coeplete tn
place, the sue of
mOOLLARS
ANO TW_NTYFI~ENTS
per linear foot.
REVISED 00301-9
12, M 3.792. ae
2M.M
1.aM.M
00301-10 REVISED
39(A) 1 LS
For furnishing and maintaining
Traffic Control stgnage,
barricading, etc. during and
through completion of
construction, complete in
place, the sum of
R~y~ ~ ~ ~ OOLLARS
AND m CENTS
per lump sum.
16~ 7~. ~ 16, 7M. ee
40 8 EA For furnishing and plactng
4' PVC sewer services,
coeplete tn place, the sum of
ra~tm~FZFTY DOLLARS
AND m CENTS
per each.
41 N/A N/A NOT USED
SECTION Il - GRAPEVINE IV
TOTAL BID FOR ALL UNIT PRICES:
(use words)
11~EEtU~E~FIF1~I~lI~BqNBNIIL~TYEIGHT ~ll~s and11~lTYFZ~Ce~ts ($ 3~1~9,~ )
(use figures)
Btdder agrees that ell work described tn SECTZON Z! - 6RAPEVZNE ~¥ wtll
be completed wtthtn I~-~ celendar d~ys.
I
REVISED 00301-11
m SECTION III - BETHEL ROAD
m ITEM ESTIMATED DESCRIPTION AND UNIT TOTAL
NO. QUANTITY UNIT PRICE IN WORDS PRICE ANOUNT
m i 11o LF For furnishing and placing
6' Cl. 50 Ductile Iron Pipe,
complete in place, the sum of
m ~ ~
DOLLARS
AND m CENTS
per linear foot.
m 2 11o LF For furnishing and plactng 76.~ 6,36&6~
8' C1. 50 Ducttle Iron Ptpe,
complete tn place, the sum of
m SEVEXTY SlX DOLLARS
AND NO CENTS
per linear foot.
m 3 13 LF For furnishing and placing
8' SDR-3S, PVC sewer (0'-10'
m depth), complete in place,
the sum of
THIRTY FOUR DOLLARS
AND .0 CENTS
I 11near foot.
per
4 5 LF For furnishing and plactng
I 8' SDR-35, PVC sewer (10'-15'
depth), complete tn place,
the sum of
FORTY EI~4T DOLLARS
AND I~ CENTS
per llne&r foot.
5-6 N/A N/A NOT USED
7 2314 LF
For furnishing and plactng
10' SDR-35, PVC sewer (0'-10'
depth), complete tn place,
the sum of
mZmYNI[ DOLLARS
AND ~ CENTS
per 11near foot.
8 1648 LF
For furnishing and placing
10" SDR-35, PVC sewer (10'-15'
depth), complete in place,
the sum of
FI~TYO~ DOLLARS
AND ~ CENTS
per linear foot.
51.66 8~MS.M
00301-12 REVISED
9
LF
10 892 LF
11 2477 LF
]2-]8 N/A N/A
19 13 EA
20 2 EA
21 N/A
22 4
For furnishing and plactng
12" SDR-26, PVC sewer (0'-5'
depth), complete In place,
the sum of
~RW F~ DOLLARS
AND ~ CENTS
per 11near foot.
34,6~
For furnishing and plactng
12' SDR-35, PVC se#er (5'-10'
depth), complete tn place,
the sum oF
Fm~ol~ DOLLARS
AND m CENTS
per linear Foot.
For furnishing and plactng
12' SOR-3~, PVC se~er (10'-16'
depth), conq)lete tn place,
the sum of
FIIrTY FOLa DOLLARS
AND HQ CENTS
per 11near foot.
NOT USED
133,756.#
For furnishing and plactng 4 ~e6o.# 26,78&# ~
FT dtamter standard mnhole,
·
complete tn place, the sum of
T~OTHOL~SIXW OOLLARS I
AND NO CENTS
per each.
For furnishing and plactng 6 ~1~# ~.e.# B
FT dtamter standard manhole,
·
complete tn place, the sum of
AND ke CENTS
per each.
N/A NOT USED
EA For furnishing and placing 4
FT dlmter drop inlet manhole, 1
,~.~ ,-~ ~ ~,~.u ,~. DOLLARS
AND ~ CENTS
per each.
23 1 EA
REVISED 00301-13
For furnishing and placing 5 ~ ~,~_~.M
FT diameter drop inlet manhole,
coaplete tn place, the sue of
FOUR THOUSa~T~vwa~-nR~OOLLARS
AND ~ CENTS
per each.
24 N/A N/A NOT USED
For furnishing and placing 5
FT dtameter Type'S' eanhole,
complete in place, the sue of
~R~THOU~OEHU~S[X~ DOLLARS
AND m CENTS
per each.
25 ! EA
26 I EA For furnishing all labor,
metertals and Incidentals
requtred to complete Stphon
I structure per contract
requir~nts, complete in
_a]_~e.._~he sum of
I ~V~NII~N ~ FI~
DOLLARS
AND m CENTS
per each.
I 27 15 LF For and 20'
furnishing
plactng
dtmeter dry bore, coeplete tn
place, the sub of
SIX I4N)R~mlRTYFI~ DOLLARS
AND m CENTS
per 11near foot.
For furnishing and plactng 20'
dtameter castng ptpe, complete
tn place, the sma of
T~EL~ DOLLARS
AND ~ CENTS
per linear foot.
28 15 LF
29 6 EA
For abandonment of standard
sewer manhole, complete tn
place, the sum of
~o~ DOLLARS
AND ~ CENTS
per each.
For abandonment of sanitary
sewer clean out, complete in
place, the sum of
Rr¥~ DOLLARS
AND m CENTS
per each.
30 4 EA
00301-14 REVISED
31 48 LF
3Z-34 N/A
35 6998
36 7 SY
N/A
LF
For placement of 6' Class "B'
concrete embed~ent across
entire trench width, complete
in place, the sum of
FiU~N DOLLARS
AND ~ CENTS
per each.
37 1 LS
NOT USED
For re~mval and replacement
of asphaltic concrete
pavemnt, complete in place,
the su~ of
Elam DOLLARS
AND ~ CENTS
per 11near foot.
Fm, re. va1 and replacemnt
of 6' reinforced concrete
Rip-Rap, cmaplete tn place,
the su~ of
~ DOLLARS
AND m CENTS
per square yard.
For furnishing and plactng
landscaping, cemplete tn
place, the sub of
SE~ ~,US~ DOLLARS
AND ND CENTS
per lump su~.
· m --~tptton
Page 00100-11 ,
Section 13.2.1~-
7tMLN
38 7346 LF
39(A) I LS
For Trench Excavation Safety
and Support, colplete in
place, the su~ of
~ DOLLARS
AND ~FI~-CENTS
per ltne&r foot.
For furnishing and maintaining
Traffic Control stgnage,
barricading, etc. during and
through completion of
construction, complete tn
place, the sum of
AND m CENTS
per lump sum.
17,6M.M
REVISED 00301-15
39(8) ] LS
For furnishing and maintaining
Traffic Control signage,
barricading, etc. during and
through completion of
construction, complete in
place, the sum of
~_rv~lm~SmDSlX~ DOLLARS
AND m CENTS
per lump sum.
*See Description
Pag41~-1Z,
Section 13.2.18
40 18 EA For furnishing and placing 3~.. 6,3~.#
4" PVC sever services,
complete tn place, the sum of
~mE~)F~FT~ DOLLARS
~ m CENTS
per each.
41 N/A N/A NOT USED
SECTION III - BETHEL ROAD
TOTAL BID FOR ALL UNIT PRICES:
(use words)
I wheel..
FIVE ~ FI)RTY SIX IH~ SIX ~ EIGHTY (]NE {)ollars and FIFTY Cents ($ (use ftgures)
Bidder agrees that ell ~rk described in SECTION III - BETHEL ROAD wtll
be completed within I~ calendar days.
I
00301-19
BID AFFIDAVIT
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed
and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or
all commodities upon which prices are extended at the price offered, and upon the conditions
contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will
be calendar days from the date of the bid opening. (Period of acceptance will be
ninety (90) calendar days unless otherwise indicated by Bidder.)
STATE OF ~i-~)~ COUNTY OF
BEFORE ME, the undersigned authority, a Notary Public in and for the State of
on this day personally appeared C~/~.r~.-p. ~o:~4~ who after being by me
Name
duly sworn, did depose and say:
"I, r~ -p. ~4- am a duly authorized office/agent for
Name
~ q..qa..~q6 ~t~3i~ and have ~n duly au~o~ to ex.ute ~
N~ of Fi~
forgoing on ~if of ~ ~id ~-~V~ ~~
N~ of Fi~
[ hereby certify that the fOregoin~ bid has fibt ~g~n pre~ In'~.ollusion.~i~?~y~ .~r Bidder
or individual(s) engaged in.the same line o' business prior to the~offi~.'.~. ~ning.of this bid.
Further, I certify that the Bidder is not now, nor has been for the pas~'~ (6)~months,
or indirectly concerned in any pool, agreement or combination the~o conuoi th~ori~e of
services/commodities bid on, or to influence any individual(s) to bid ~t t~ bidr
Name and Address of Bidder: ~ ~'~ (.~frl~/~ Co.I
Telephone: (V~)~"l~ ~ 0~ __ by: ~7~i Z'~ ~'
on this the ~2~11~ day of ~4c 199~-~'
Nota~, Public in and for the State of '~X~'~ __ __
REVISED 00301-3
any other BIDDER to submit a false or sham Bid; BIDDER has
not solicited or induced any person, firm or corporation to
refrain from bidding; and BIDDER has not sought by
collusion to obtain for itself any advantage over any other
BIOOER or over OWNER.
4. Bid Prices.
BIDOER will co~olete the Work in accordance with the Contract
Documents for the following price(s):
All specific cash allomances are included in the price(s) set
forth above and have been computed in accordance with paragraph
11.8. of the General Conditions.
UNIT PRICE BID
FOR
CITY OF COPPELL SEgER IMPROVEMENTS
SECTION I - GRAPEVINE III
ITEN ESTIMATED DESCRIPTION AND UNIT TOTAL
.......
1-4 N/A N/A NOT USED ' ' '
5 166 LF For furnishing and placing "d~, ~
8' PVC sewer (15'-20' depth), --
c~map~ete J~ place, the'sum of
OOL ARS
AgDX ~ x~,.~' 'CENTS
per 11nearfoot.
6-13 NOT USED
N/A N/A
14 200 LF For furnishing and plactng 16' ~.~ ~
SDR-35 PVC sever (O'-lO' depth),
complpte tn place, the sum of
DOLLARS
AND · CENTS
per~
]5 2670 LF For furnishing and plactng ~.~.o~ .L~tc~a~,ec~
15' SDR-36 PVC sewer (]0'-15'
depth), complete tn place,
the sum of
~, ~-~ ~Cj~e DOLLARS
AND I ~ CENTS
per linear foot.
I
00301-4 REVZSCD
16 1094
LF
17 230 LF
18 N/A
]9 5
2O D
21 I
2~ WA
23 I
24-26 N/A
For furnishing and placing
15' SDR-35 PVC sewer (15'-20'
depth), complete in place,
the sue of
~:v~ OOLLARS
AND CENTS
per 11near foot.
For furnishing and placing
15" SDR-35 PVC sewer (20'-25'
depth), complete in place,
the sue of
~z,~E,r~F~ ~---tv~ DOLLARS
AND 1~. ' CENTS
per linear foot.
N/A NOT USED
EA For furnishing and plactng 4
FT dtueeter standard .anhole,
complete tn place, the sue of
.JOOLLARS
CENTS
per each.
EA For furnishing end plactng 5 ~~ ~
FT dtmeter standard mnhole,
complete tn place, the sue of
CENTS
per each.
EA For furnishing and pl&ctng 6 ~ ~
FT dtmeter standard manhole,
complete tn place, the sum of
CENTS
per
N/A NOT USeD
EA For furnishing end placing 5 ~ ~
FT dtaeeter drop tnlet manhole,
complete tn place, the sum of
ba~4:l.a~A~-..~ h=~:L~/ 0OLLARS
AND '- ~ CENTS
per each.
N/A NOT USED
REVISED 00301-5
Z7 718 LF For furnishing and placing 2~ diameter dry bore, complete
sum qf
place,
the
~ Wu~vLF~d i~y~ DOLLARS
AND ~.. -- CENTS
per linear fobt.
28 718 LF For furnishing and placing 20'
diameter casing pipe, complete
in place, the sum of
AND ' ~ CENTS
per linear foot.
29 9 EA For abandonment of standard
sewer manhole, complete in
p~ace, the su,, of
ANO f~ CENTS
per each.
30-31 N/A N/A NOT USEO
32 12 SY For removal and replacement
of 8' reinforced concrete
pavement, complete in place,
I the sum of
,l~P4:~ DOLLARS
AND ' ' ')~ CENTS
I per square yard.
33 188 SY For removal and replacement ~.~m~_~_.
of reinforced concrete -
drtvewmy, complete in place,
the sum of
34 835 LF
~cOOLLARS
ENTS
per square yard.
For removal and replacement
of reinforced concrete 4 FT
wide sidewalk, complete in
place, the sum of
~ DOLLARS
AND ~o CENTS
per linear foot.
35-36 N/A N/A NOT USED
00301-6 REVISED
37 I
38 3555
39(A)
40 8
41 102
LS For furnishing and plactng
landscaping, complete in --
place, the sum of
~c~ t'~,~,~,~A DOLLARS
AND ~ - CENTS
per lump sum.
LF For Trench Excavation Safety
and Support, complete in
place, the sum of
AND ~ CENTS
per Ti-~Foot. --
LS For furnishing and maintaining
Trafftc Control signage,
barricading, etc. durtng and
through completion of
construction, complete in
place, the sum of
DOLLARS
~Q~L--~~~~~ CENTS
per lump sum.
EA For fu~tahtng and plactng ~ ~
4" PVC sMr services,
complete tn place, the sum of
NTS
per each.
LF For furnishing and plactng
24" ASTM F-497 PVC se~er
(25'-30' depth), complete
tn place, the sum of
/~. ku.vJ~n// ~ DOLLARS
· ' ~ CENTS
per each.'
SECTION I - GRAPEVINE III ~
TOTAL BID FOR ALL UNIT PRICES:
Bidder agrees that all ~ork described in SECTION I - GRAPEVINE III wtll
be completed wtthtn 120 calendar days,
Note: The Ctty has set the time for this sectton at 120 calendar days.
Should the Contractor be the successful low btdder on Sectton! and
Section II and/or Sectton Iii, the Contractor shall be requtred to
complete Section I within the first 120 calendar days of the total time
allotted for completion of the work.
SECTION II - GILAPEVINE IV
REVISED 00301-7
j ITEM ESTIMATED DESCRIPTION AND UNIT TOTAL
NO. QUANTITY UNiT PRICE IN WORDS PRICE AMOUNT
215 LF For furnishing and placing -~,a~
6' Cl. 50 Ductile Iron Pipe,
complete i.n p~,ace, the sum of
~u~J-~ J-~ DOLLARS
~ ~ CENTS
per linear foot.
215 LF For furnishing and plactng
8" Cl. 50 Oucttle Zron Ptpe,
c~lete Jn place, the sum of
' '~L~RS
~/a ~/~
13 LF For furnishing and placing 8" ~0~~ ~.~
SDR-35, PVC se~r (10'-15'
depth), c~lete tn place,
~~L~
~0 v, ~ ~ CENTS
per llnear foot.
a/A N/A ~T USEO
557 LF For furnishing and placing ~,~
12' S~-35, PVC sewer (0'-10'
depth), co~lete in place,
t begum o~.
~~L~S
~ ~ - ~ t CENTS
per llnear foot.
I 11 1565 LF For furnishing and placing
12' SDR-35, PVC sewer (10'-15'
depth), complete in place,
the sum DJ'
AN " DOLLARS
CENTS
0030~-8 RE¥~SED
~ $80
13-18
19 8
20-23 #/A
24 3
26 I
27 316
!
LF For furnishing and placing ~...~,,,.~ .~7).F~.~o I
12' SOR-35, PVC sewer (15'-20'
depth), complete in place, m
the sum of~
~,x~. ~ DOLORS
C[.TS
per linear foot,
N/A ~T USED m
~ For furnishing and placing 4
FT dieter standard manhole~
c~lete in place, the sum ot
~ For fumishtng and placing 4
· · hole
~ dieter Type S man
c~lete tn place, the s~ of
~r each.
c~ete tn p~ace, the sm o~
pe~ each.
. For fu~tshtng ,11 la~r, ~ ~ J
Mtertals a~ Incidentals
requtr~ to c~lete Stphon
st~cture per contract
requtrMnts, c~lete tn
place, the ~M of
LS CEOS m
per each.
LF For furnishing and plactng 20' ~ ~.~.i~'''~ m
dieter dry ~re, complete in
place, the sub of
CE TS
per~
I
REVTSED 00301-9
28 316 LF For furnishin, g and placing 20" __~ (~).~?.~.ao
diameter casing pipe, complete
in place, the sum of
4~xc~a:~ DOLLARS
AND ~ ~ CENTS
per l~near foot.
29 6 FcA, For abandonment of standard ~-J~.~ ~
sewer manhole, complete in
place, the sum of
~:~u#. hu~ OOLLARS
AND ~ CENTS
per each.
30-31 N/A N/A NOT USED
I For reflmval and replacement
32
832
LF
of 8' reinforced concrete
parent, complete in place,
I the sum of
~CENTS
per square yar~.
I 33-35 N/A N/A NOT USED
I 36 9 SY For removal and replacement
of 6' reinforced concrete
Rip-Rap, complete in place,
the sum of.
I ~ ~:~~OOLLARS
~CENTS
4~.~ 40~.~°
per square yard.
I 37 1 LS For furnishing and placing
landscaping, complete in
I place, the sum of
~ OOLLARS
CENTS
per lump sum.
m 38 2601 LF For Trench Excavation Safety
and Support, complete in
I place, the sum of
~r~ DOLLARS
AND ~o CENTS
per linear foot.
00301-10 R£VISEn
3g(A) 1
LS
40 8 ~
For furnishing and maintaining~ ~
Traffic Control signage,
barricading, etc. during and
through completion of
construction, complete in
place, the sum of
~DOLLARS
~CENTS
per lump sum.
For furnishing and placing
4" PVC sewer services,
c?~~om~)ete in pl ace, the sum of
DOLLARS
CENTS
41 N/A N/A NOT USED
SECTION II - GRAPEVINE IV
TOTAL BID FOR ALL UNIT PRICES:
(use wor~s;I
m
Bidder*agrees that all work described in SECTION II - GRAPEVINE IV wtll t
be completed within ~ calender dmys.
I REVISED 00301-11
I SECTION III - BETHEL ROAD
I ITEN ESTIMATED DESCRIPTION AND UNIT TOTAL
NO. QUANTITY UNIT PRICE IN ~ORDS . ~!~ _A~..~!
I 1 110 LF F~r furnishing and placing --~, ~)Z~,
6 C1. 50 Ductile Iron Pipe,
complete in IL13ce, the sue of
I ~_..~.j~DOLLARS
CENTS
pep tlinear foot.
I 2 110 LF For furnishing placing
and
8" C1. $0 Ductile Iron Pipe,
complete in place, the sum of
'~L_~~DOLLARS
I 3 13 LF For furnishing and plactng
8' SDR-3$, PVC se~er (0'-10'
depth), complete in place,
i the of~
CENTS
I per ltneer foot.
4 $ LF For furnishing end placing
8' SOR-3S, PVC se~er (10715'
I depth), coeplete
tn
place,
the sum of
~ DOLLARS
I AND a'~ 4 ~ CENTS
per linear foot.
N/A N/A NOT USED
2314 LF For furnishing and plactng
10' SOR-35, PVC se~er (0'-10'
depth), complete in place,
the~l DOLLARS
~CENTS
per lTnear foot.
8 1648 LF
I
I
I
For furnishing and plactng
10" SDR-35, PVC sewer (10'-15'
depth), complete tn place,
the~-q~°f~v~ DOLLARS
AND' ' : ~ k~ CENTS
per linear foot.
00301-12 REVISED
9 15
LF
10 892 LF
11 2477 LF
12-18
19 13
For furnishing and placing
12' SDR-26, PVC sewer (0'-5'
depth), complete in place,
the sum of
~ DOLLARS
AND ~'~.~ CENTS
per linear foot.
For furnishing and placing
12' SDR-35, PVC sewer (5'-10'
depth), complete in place,
DOLLARS
CENTS
For furnishing and plactng
12' SDR-3~, PVC sewer (10'-15'
depth), complete tn place,
the sum
~ DOLLARS
CENIS
per ~
N/A NOT USED
u For f. tsht ,nd p .tng 4 t
FT diameter standard manhole, '
complete tn place, the sum of
~ U'~,d. ~,e_ In,u.,,,~L~d DOLLARS
· ~,~ CENTS
20 2 EA
21 N/A ~A
22 4 EA
per each.
For furnishing and plactng S
FT dtamter standard manhole,
complete tn place, the sum of
' - DOLLARS
~ CENTS
per r ach.
NOT USED
For furnishing and plactng 4
FT dtamter drop tnlet manhole,--
.complete tn place, the som of
DOLLARS
~ ~,~ CENTS
per each.
!
REVXSED 00301-13
I 23 I EA For furnishing and placing 5
FT diameter drop inlet manhole,--
I complete in place, the sum of
Jo~m~sa~ ~. ~Lred DOLLARS
AND ~.~ CENTS
I per each.
24 N/A N/A NOT USED
I 25 I EA For and 5
furnishing
placing
FT diameter Type'S' manhole,
complete in place, the sum of
i 6~' ' DOLLARS
AND t~' CENTS
per each.
I 26 I EA For furr:ishing all labor,
materials and incidentals
required to complete Siphon
I structure per contract
requirements, complete in
place, the sum of
I ~LLARS
AND ~o CENTS
per each.
I Z7 15 LF For furnishing and placing 20'
diameter dry bore, complete in - '
place~ the sum of
I LLARS
AND ' ~ CENTS
per linear foot.
I ~8 15 LF For furnishing and plactng 20" ~ ~
dt~eter casing ptpe, complete
in place, the sum of
I AND '(;;~J~(~r~l CENTS DOLLARS
per ltnear foot.
!
29 6 EA For abandonment of standard
sewer manhole, complete in
I pl~c~e~ the sum of
~,1 cL/~z~L DOLLARS
~ ~ CENTS
~ pe~ each.
30 4 EA
For abandonment of sanitary
sewer clean out, complete in
place, the sum of
~)ux~,~J h"Pcu DOLLARS
AND 1~.~ '' ~ CENTS
per eac
h:
00301-14 REVISED
31 48
3Z-34 N/A
35 6998
36 7
37
38 7346 LF
39(A) ] LS
II
II
LF For placement of 6" Class "B" [~.~o
concrete embedment across I
entire trench width, complete
in place, the sum of
~l,~v ,:, 0OLLARS
AND ~CENTS I
per each.
N/A NOT USED mm
LF For removal and replacement ~,~ ~.~O.~
of asphaltic concrete *~e Description
pavument~fcumplete tn place, SecttonPage 00100-1113.2.1~.
DOLLARS
CENTS
SY For removal and replacement
of 6" reinforced concrete
Rip-Rap, complete tn place,
the sum of
per square yard.
LS For furnishing and plactng q.~f).,e ~
landscaping, cmaplete tn
place, t~he sum of
' ' ~Ao · DOLLARS
~CENTS
per lump sum.
For Trench Excavation Safety
and Support, complete in
place, the sum of
~ IX)LIARS
AND y~ CENTS
per ltnear foot.
For furnishing and matntatntng~:/~_~e° _~
Traffic Control stgnage,
barricading, etc. during and
through completion of
construction, complete in
of DOLLARS
CENTS
per lump sum.
REVXSED 00301-15
I
I 39(B) 1 LS For furnishing and maintaining
Traffic Control signage,
barricading, etc. during and
through completion of
construction, complete in
place,.the sum qf
~u,~l DOLLARS
CENTS
per lump sue.
*See Oescrtptton
Page 00100-12,
Sectton 13.2.18
I
!
I
I
I
40 18 EA For furnishing and placing ~D. ~r+_'~:~L_~
4" PVC sewer services,
complete tn place, the sum of
~L.~ ~,,,~c~-ed DOLLARS
AND/ ~ CENTS
per each.
41 N/A N/A NOT USED
I SECTXON III - BETHEL ROAD
TOTAL BXD FOR ALL UNZT PRXCES:~X~-~e~
~(use vords) ~ '
Bidder agrees that all ~ork described in SECTION ]1! - BETHEL ROAO
be completed within ~_ calendar days.
i
II
I
II
I
I
I
II
II
II
II
II
II
Ii
II
ii
!
I
00301-19
BID AFFIDAVIT
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed
and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or
all commodities upon which prices are extended at the price offered, and upon the conditions
contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will
be t~O calendar days from the date of the bid opening. (Period of acceptance will be
ninety (90) calendar days unless otherwise indicated by Bidder.)
STATE OF "/-e./Y /l ,5 COUNTY OF 'Td/t-r/J-a45~--
BEFORE ME, the undersigned authority, a Notary~ ~P?lic in and for the State of To. Artt ~: ,
on this day personally appeared "~.~ · ti ]Ct 5: ~;~ t Sba [ { c. who after being by me
- J Name
duly sworn, did depose and say:
- J Nam,,e
Name o( Fire J
foregoing on ~half of ~e said
am a duly authorized office/agent for
and have been duly authorized to execute the
Name of Fi~m
I hereby certify that the foregoing bid has not been prepared in collusion wi.th any other Bidder
or individual(s) engaged in the same line oc business prior to the official opening of this bid.
Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly
or indirectly concerned in any pool, agreement or combination thereof, to control the price of
services/commodities bid on, or4o influence any individl3al(s) to bid or not to bid thereon."
Name and Address of Bidder: F~[~'~ T'~) S ~'~"[' ~ ~
Telephone: (~7)
SUBSCRIBED AND SWORN to before me by the above named
on this the ~ _J~
day of ~.--~ /4 ,~ '~-
Notary Public in and for the State of "[-P~_. d~5'~-
199~'
If BIDDER IS:
An Individual
By
00301-20
I
I
!
(Seal) !
doing business as
(Individual's Name)
Business address
Phone No.
A Partnership.
By (Seal)
(Firm Name)
(General Partner)
Business address
Phone No.
A Corporation
By
(Corporation Name)
(S_.mte of Incorporation) ~~
ame of person authorized to signed
(Corporate Seal)
Attest
Business address
A Joint Venture
By
(Title)
~'s;cre-ry) i-- -
(Name) (Address)
By
(Name) (Address)
(Each joint venture must sign. The manner of signing for each individual, partnership and
corporation that is a partner to the joint venture should be in the manner indicated above.)
~ OF SECTION
95H08
SECTION 00301
BID FORM
REVISED 00301-1
PROJECT IDENTIFICATION:Sanitary Sewer Imerovements for
Grapevine III, )V and Bethel Road.
CONTR~ACT IDENTIFICATION: S$ ~4-09
THIS BID IS SUBMII'rED TO: Purchasino Aqent. City of Coooell. Texas
255 Parkway Boulevard. Coooell. Texas 75019.
herein after referred to as OWNER.
· City of Coppell Bid No: Q-0895-~
1. Enter Into Agreement.
The undersigned BIDDER proposes and agrees, if this Bid is accepted,
to enter into an Agreement with OWNER in the form included in the
Contract Documents to perform and furnish all Work as specified or
indicated in the Contract Documents for the Bid Price and within
the Bid Times indicated in this Bid and in accordance with the other
terms and conditions of the Contract Documents.
BIDDER Accepts.
BIDDER accepts all of the terms and conditions of the Advertisement
or Invitation to Bid and Instructions to Bidders, including without
limitation those dealing with the disposition of Bid security.
This Bid will remain subject to acceptance for ninety (90) days
after the day of Bid opening. BIDDER will sign and deliver the
required numberof counterparts of the Agreement with the Bonds'.and
other documents required by the Bidding Requirements within fifteen
(15) days after the date of OWNER's Notice of Award.
The OWNER considers the work described by the Contract Documents
three separate and distinct projects. Bidder hereby agrees to
accept an award of contract based on any individual section.
3. BIDDER's Representations.
In submitting this Bid, BIDDER represents, as more fully set forth
in the Agreement, that:
BIDDER has examined and carefully studied the Bidding Documents
and the following Addenda receipt of all which is hereby
acknowledged: (List Addenda by Number and Date)
ADDENDA NO. DATE
00301-2 REVISED
bo
BIDDER has visited the site and become familiar with and is
satisfied as to the general, local and site conditions that may
affect cost, progress, performance and furnishing of the Work.
BIDDER i~ familiar with and is satisfied as to all federal,
state and local Laws and Regulations that may affect cost,
progress, performance and furnishing of the Work.
BIDDER has obtained and carefully studied (or assumes
responsibility for having done so) all such additional or
supplementary examinations, investigations, explorations,
tests, studies and data concerning conditions (surface,
subsurface and Underground Facilities) at or contiguous to
the site or otherwise which may affect cost progress,
performance or furnishing of the Work or which relate to
any aspect of the means, methods, techniques, sequences and
procedures of construction to be employed by BIDDER and
safety precautions and programs incident thereto.
BIDDER does not consider that any additional examinations,
investigations, explorations, tests, studies or data are
necessary for the determination of this Bid for performance
and furnishing of the Work in accordance with the times,
price and other terms and conditions of the Contract Documents.
BIDDER has correlated the information known to BIDDER,
information and observations obtained from visits to the
site, reports and drawings identified in the Contract Documents
and all additional examinations, investigations, explorations,
tests, studies and data with the Contract Documents.
BIDDER has given ENGINEER written notice of all conflicts,
errors, ambiguities or discrepancies in the Contract
Documents and the written resolution thereof by ENGINEER is
acceptable to BIDDER, and the Contract Documents are
generally sufficient to indicate and convey understanding
of all terms and conditions for performing and furnishing
the Work for which this Bid is submitted.
Where conflicts, errors, ambiguities or discrepancies have been
discovered in or between Contract Documents and/or other
related documents, and where said conflicts, etc., have not
been resolved through the interpretations or clarifications by
ENGINEER as described in the Instructions to Bidders, because
of insufficient time or otherwise, BIDDER has included in the
Bid the greater quantity or better quality of Work, or
compliance with the more stringent requirement resulting in a
greater cost.
This Bid is genuine and not made in the interest of or on
behalf of any undisclosed person, firm or corporation and
is not submitted in conformity with any agreement or rules
of any group, association, organization or corporation;
BIDDER has not directly or indirectly induced or solicited
REVISED 00301-3
any other BIDDER to submit a false or sham Bid; BIDDER has
not solicited or induced any person, firm or corporation to
refrain from bidding; and BIDDER has not sought by
collusion to obtain for itself any advantage over any other
BIDDER or over OWNER.
4. Bid Prices.
BIDDER will-complete the Work in accordance with the Contract
Documents for the following price(s):
All specific cash allowances are included in the price(s) set
forth above and have been computed in accordance with paragraph
11.8. of the General Conditions.
UNIT PRICE BID
FOR
CITY OF COPPELL SEWER IMPROVEMENTS
SECTION I - GILAPEVINE III
ITEM ESTIMATED DESCRIPTION AND
NO. QUANTITY UNIT PRICE IN WORDS
UNIT TOTAL
PRICE ANOUNT
1-4
5
N/A N/A NOT USED
166 LF For furnishing and placing ~,, 7~
8' PVC sewer (15'-20' depth),
cqmplete in place, the sum of
T~L~T~$~m.~q DOLLARS
AND ~;~.U~'~T~ ~ CENTS
per linearfoot.
6-13 N/A N/A
14 200 LF
15 2570 LF
NOT USED
For furnishing and placing 15" J~.i~
SDR-35 PVC sewer (0'-10' depth),
complete in place, the sum of
~"(.,ue~ ~,.~ DOLLARS
AND ~egq ~tue CENTS
per linear foot.
For furnishing and placing
15' SDR-35 PVC sewer (10'-15'
depth), complete in place,
t~ sum o¢~ DOLLARS
AND ~ CENTS
per linear foot.
00301-4 REVISED
16 1094
LF
17 230 LF
18 N/A
lg $
20 8
21 1
22
23
For furnishing and placing
15" SDR-35 PVC sewer
depth), complete in place,
t~e sumlt~
tO~Ttl DOLLARS
AND ~Iq~qL(T', CENTS
per linear'fo~.
For furnishing and placing
15" SDR-35 PVC sewer (20'-25'
depth), complete in place,
the sum of
~h~?~ ~F~ DOLLARS
AND ~o~l~'~k CENTS
per linear foot.
N/A NOT USED
EA For furnishing and placing 4
FT diameter standard manhole,
complete in place, the sum of
TU~ 1)~4~ C)~G ~eA ~q~, ~4qh~ DOLLARS
~O T~ ~ CENTS
per each.
EA
For furnishing and placing $
FT diameter standard manhole,
~lete in placer the sum of
~R~l~i(xarl~ f~4~ DOLLARS
AND ~TY' CENTS
per each.
EA For furnishing and placing 6
FT diameter standard manhole,
comDlet.,e in place, the sum of
u~' l'~S,~J'ilJt~ ~.,rl~ ~, ~'~,.~ DOLLARS
AND ~ CENTS
per each.
N/A N/A NOT USED
EA For furnishing and placing 5 ~'~j~
FT diameter drop inlet manhole,'
, compl%te in place, the sum of
pL~I'~'~SMp,~.~,,,~AJk,~I~q~iY,~,,~.~ DOLLARS
AND FL[~e~R CENTS
per each.
24-26 N/A N/A NOT USED
REVISED 00301-5
27
28 *
30-31
32~lac
33r~
35-36
718
718
9
N/A
12
188
835
N/A
LF
LF
For furnishing and placing 20"
diameter dry bore, complete in
place, the sum of
C~ ~ G~b~t~ DOLLARS'
ANDS~ ~l CENTS
per linear foot.
For furnishing and placing 20'
diameter casing pipe, complete
in place, the sum of
~bO~lqLuo ~ DOLLARS
AND Kt~h ~dl~ CENTS
per linear foot.
For abandonment of standard
sewer manhole, complete in
~pl~ce, the spm of
t~,/~c~.q~iLc~l~a~A DOLLARS
AND l~,~, CENTS
per each.
N/A NOT USED
SY
SY
· LF
N/A
For removal and replacement
of 8" reinforced concrete
pavement, complete in place,
the sum of
~v~1 ~ull~r' DOLLARS
AND ~qcl~*o,'tg CENTS
per square'yard.
For removal and replacement
of reinforced concrete·
driveway, complete in place,
the sum of
~Tt~ qt06 DOLLARS
ANO~ 'A~ · CENTS
per square yard.
For removal and replacement
of reinforced concrete 4 FT
wide si,dewalk, i complete in
place, 'the sum of
-TbOeld~ DOLLARS
AND ~ta l~ O~e CENTS
per linear fbot.
NOT USED
00301-6 REVISED
37 1 LS For furnishing and placing /~J?4.e~ 11,~7~,~
landscaping, complete in
· __ place,, the sum of
~J~4a~ll~oq~ld 74)o~l~ua4~S~ DOLLARS
AND ~l~r ~t~ ' CENTS
per lump'sum.
38 3555 LF For Trench Excavation Safety
and Support, complete in
place, the sum of
SL~ DOLLARS
ANO q%b~t~4~ ~ ~ CENTS
per linear'foot.'
3g(A) 1 LS For furnishing and maintaining ~I~.~$ ~V~.~f~
Traffic Control signage,
barricading, etc. during and
through completion of
construction, comp]ete in
· nlace, the sum of
Ta~e 177~(al~&~ltt(el~ &~ DOLLARS
AND ~ ~q/~qt~ CENTS
per lump s~m.
4O
8 EA For furnishing and placing
4' PVC sewer services,
~l~cqmplete iR place, the sum of
' DOLLARS
AND ~)~U~X~l~ea~.. CENTS
per each.'
41 102 LF For furnishing and placing /q6t~.~ J~?7~.~o
g4' ASTH F-497 PVC sewer
(25'-30' depth), complete
)n place~ the sum of
~R~klbj~ ~-. DOLLARS
~D ~u~ ' CENTS
pet each. I
SECTION I - GRAPEVINE III ~ ~ .
TO~AL BID FOR ALL UNIT PRICES: ~O~b~
(u e words)
-- ' (use figures)
Bidder agrees that all work described in SECTION I - GRAPEVINE III will
be completed within 1gO calendar days.
Note: The City has set the time for this section at 120 calendar days.
Should the Contractor be the successful low bidder on Section I and
Section II and/or Section III, the Contractor shall be required to
complete Section I within the first 1~0 calendar days of the total time
allotted for completion of the work.
REVISED 00301-7
SECTION II - GP~APEVINE IV
ITEM ESTIMATED DESCRIPTION AND
NO. QUANTITY UNIT PRICE IN WORDS
UNIT TOTAL
PRICE AMOUNT
I 215 LF
2 215 LF
3 N/A N/A
For furnishing and placing
6" Cl. 50 Ductile Iron Pipe,
complete in place, the sum of
~LUG~tqII'F DOLLARS
AND ' ~e.~,~--'~, CENTS
per linear foot.
For furnishing and p)acing
8" Cl. 50 Ductile Iron Pipe,
~plete in place, the sum of
t~'hllr'~,o DOLLARS
AND F~g~ %~L~ CENTS
per lifiear'foot.
5>.v7 ¢,9er. oS
4 13
LF For furnishing and placing 8"
SDR-35, PVC sewer (10'-15'
depth), complete in place,
~the sum of
~A~ia~.~I~.OR~ OOLLARS
AND F~I~ a~n~ CENTS
per ltnea¢ foot.
5-9
10
11
N/A
557
1565
N/A
LF
LF
NOT USED
For furnishing and placing
12" SDR-35, PVC sewer (0'-10'
depth), complete in place,
the sum~f
~(4,aM~ ~,F-,' , DOLLARS
AND ~Fl~l ~ ~r4L CENTS
per lineaV foot.
For furnishing and placing $/.~
1Z' SOR-35, PVC sewer (10~-15'
depth), complete in place,
~sum of
~.ltl ~ DOLLARS
ANO~:t~qa ~uo CENTS
per linear foot.
00301-8 REVISED
12 58O LF
13-18
19
20-23
24
25
26
27
For furnishing and placing
12' SDR-35, PVC sewer (15'-20'
depth), complete in place,
th~sum of
~¢itl DOLLARS
AND ~/~q~q CENTS
per linelr root.
N/A N/A NOT USED
8 EA For furnishing and placing 4
FT diameter standard manhole,
_c~mnlete in place, the sum of
~lO0 ~/4~blJ ~,~~/~.J~ n IA~'Jt~ ~ DOLLARS
AND '01~ ' CENTS
per each.
N/A N/A NOT USED
3 EA For furnishing and placing 4
FT diameter Type'S' manhole,
, ¢ojapl~te in place, the sum of
ANO ~e~r~I Fb~4~ CENTS
per each.
I EA For furnishing and .placing 5
FT diameter. Type "S' manhole,
__ ~ompl~te in place, the sum of
~ ll. bqs~d-~ ~J/l~l~w~ ~,~ DOLLARS
AND S~Ttl '11~i~(~ CENTS
per each.'
I EA For furnishing all labor,
materials and incidentals
required to complete Siphon
structure per contract.
requirements, complete in
.~ _ pla~e, the sum of
. ~O ~ CENTS
per each. '
316
LF For furnishing and placing 20"
diameter dry bore, complete in
.~place, t~e su~of
6~:~1~,~/:~ fL.~.l~ DOLLARS
AND ~tq ~'~ CENTS
per linear ~oot.
REVISED 00301-9
28 316 LF
29 6
For furnishing and placing 20'
diameter casing pipe, complete
in place, the sum of
~Ld~'V)lt~ ~cU~ DOLLARS
AND q(F~1 ~ CENTS
per linear foot.
EA For abandonment of standard
sewer manhole, complete in
Rlace, the sum of
~-~b~5~q~h~a: DOLLARS
ANO ~ lq~h~a'~ CENTS
per each.
30-31 N/A N/A
32 832 LF
33-35
36
37
NOT USED
For removal and replacement
of 8' reinforced concrete
pavement, complete in place,
the sum of
Fl. Pm4 ~&K . , DOLLARS
ANO ~Ft~l~l THi~ CENTS
per square yard.
N/A N/A NOT USED
9 SY
For removal and replacement
of 6" reinforced concrete
Rip-Rap, complete in place,
ANDS~b~q-A1 CENTS
per square yard.
1 LS For furnishing and placing
landscaping, complete in
plaRe, the su~ of ~
AN &
per ~
38 2601
LF
For Trench Excavation Safety
and Support, complete in
place, the sum of
~A DOLLARS
AND ~F~ ~ CENTS
per linear' foot.
/LYf
00301-10 REVISED
39(A)
I LS For furnishing and maintainingJjgY~,/~
Traffic Control signage,
barricading, etc. during and
through completion of
construction, complete in
, pla~e, the Sum of
~c~O~S,tn~6l~h~l'l~n~,~J~l~'~ DOLLARS
AND ~T~q~ CENTS
per lump sum.
40 8 EA For furnishing and placing /,/~I.~7
4' PVC sewer services,
coqpleteln place, ~he sum of
(~F/l~ 7~F~ ~)(g ~b((d~lc( ~DOLLARS
AND~ CENTS
per
41 N/A N/A NOT USED
SECTION II- GRAPEVINE IV ~ ~6~4/~
TOTAL BID FOR ALL UNIT PRICES: · (~ ~~)
(use words)
(useJ figures)
Bidder agrees that all work described in SECTION ZZ - GRAPEVINE IV will
be completed within/~:) calendar days.
REVISED 00301-11
SECTION III - BETHEL ROAD
ITEM ESTIMATED
NO. QUANTITY UNIT
DESCRIPTION AND
PRICE IN WORDS
1 110 LF
2 110 LF
For furnishing and placing
6" Cl. 50 Ductile Iron Pipe,
~tlete in place, the sum of
P~ff~. DOLLARS
AND T~.~ CENTS
per linear foot.
For furnishing and placing
8' Cl. SO'Ductile Iron Pipe,
comolete, in place, the sum of
DOLIJ~RS
AND ~R~l~vt~ CENTS
per linear ?Dot.
3 13 LF
4 5 LF
For furnishing and placing
8' SDR-35, PVC sewer (0'-10'
depth), complete in place,
the sum of
~o~it~ ~ L ~' OOLLARS
AND ~t~Jh'l,I CENTS
per linear foot.
For furnishing and placing
8' SDR-35, PVC sewer (10'-15'
depth), complete in,place,
AND '~[4RF~ CENTS
per lindar Toot.
5-6 N/A N/A
7 2314 LF
8 1648 LF
NOT USED
For furnishing 'and placing
10" SDR-35, PVC se~r (0'-10'
depth), complete in place,
th~sum of
'((~l~l/)l~l ~ DOLLARS
AND~04 ~c~ CENTS
per lidear~foot.
For furnishing, and piacing
10" SOR-35, PVC sewer (10'-15'
depth), complete in place,
the sum of
~F'b(/~lh ~t~, DOLLARS
AND ~t~l~ ~L~4~ CENTS
per linear 'foot.
UNIT TOTAL
PRICE AHOUNT
00301-12 REVISED
9 15 LF
10 892 LF
11 2477 LF
12-18 N/A
19 13
2O
21
22
For furnishing and placing
12" SOR-26, PVC sewer (0'-5'
depth), complete in place,
the sum of
~q.~-~ CENTS
per linear' foot.
For furnishing and placing
12' SDR-35, PVC sewer (5'-10'
depth), complete in place,
the sum of
13J,/~ *"~ DOLLARS
AND 'Fq~ CENTS
per lfnear foot.
For furnishing and placing
12' SDR-3S, PVC sewer (10'-15'
depth), complete in place,
~o~ DOLLARS
AND ~t2~ ~ CENTS
per linea~ foot.
N/A NOT USED
EA For furnishing and placing 4
FT diameter standard manhole,
. compltte in place-~(~khe sum of
per eacn. '
2 EA For furnishing and placing 5
FT diameter standard manhole,
comple&e in place, &he sum of
AND ~ $~ CENTS
per each. '
N/A N/A NOT USED
4 EA For furnishing and placing 4 ,3;~¢.~
FT diameter drop inlet manhole,
· comple[e in plact, the sum of
per each.~
c/ / I . leo
REVISED 00301-13
23
I EA For furnishing and placing $ ~i~.~
FT diameter drop inlet manhole,
~ . co~letain ~lace, the.~tum of
~O' ~ ~ CENTS
per eachL'
24 N/A N/A NOT USED
25 1 EA For furnishing and placing 5
FT diameter Type'S' manhole,
~ F7yo..t' ,rcom~ete to place, the sum of
per each.'
26 I EA For furnishing all.labor,
materials and incidentals
required to complete Siphon
structure per contract
requirements, complete in
p)acq, the sum of
~ ~l~ l~ ~-a~~' ~F~ ~f~'. CENTsOOLLARS
27 15
28
15
per e
LF For furnishing and placing
diameter dry bore, complete in
place, the sum of
--'AND ~(i~La:~ .CENTS
per linear foot.
LF For furnishing and placing
dieter casing pipe, complete
in place, the sum of
~ ~ . ~LLARS
~O ~l~ F~e CENTS
per 11nea~ foot.
29 6
EA For abandonment of standard
sewer manhole, complete in
place, the sum of
~x~.~k,~,,.xdn~ G~ DOLLARS
AND d~ S~ CENTS
per aach.~
30 4 EA
For abandonment .Qfsanttary
sewer clean out, complete in
place, the sum of
~l_.~ ~.AJ~el) ~r~ DOLLARS
AND ~-r~. 61~ CENTS
per each.
0030~-14 REVISED
31 48
32-34 N/A
35 6998
LF
36 7 SY
37
38
N/A
LF
For placement of 6" Class
concrete embedment across
entire trench width, complete
~place, the sum of
/~l~)'/ DOLLARS
AND ~ CENTS
per
NOT USED
For removal and replacement
of asphaltic concrete
pavement, complete in place,
L lum of
ty~ DOLLARS
AND ~IJE'/~ ///H~ CENTS
per Tin6aV foot.
For removal and replacement
of 6' reinforced concrete
Rip-Rap, complete in place,
the.~um Qf~
,~'-I~/.'/f'b /'at4~F-~. DOLLARS
ANO-~~_c~CENTS
per square yara.
1 LS For furnishing and placing
landscaping, complete in
p)ace, t~he )um of
~u j>/y~.~ CENTS
per lump sum.
7346
LF For Trench Excavation Safety
and Support, complete (n
place, the sum o~ '
~ ~.~ ,~ DOLLARS
AND ~! F-~ hu ~ CENTS
per linear foot.
39(A) 1 LS
For furnishing and maintaining
Traffic Control signage,
barricading, etc. during and
through completion of
construction, complete in
place, the~sum of
AND Fo~iq~ ne
per lump ~um.
DOLLARS
CENTS
scription
Page 00100-11
Section 13.2.1--*,-
REVISED 00301-15
3g(B) 1 LS For furnishing and maintaining ~Y~.~G ~, ~?~.~
Traffic Control signage,
barricading, etc. during and
through completion of
construction, complete in
_/ nlace, the sum of
DOLLARS
AND ~,~Tt~ ~ CENTS
per lump sue.
*See Description
Page 00100-1~,
Section 13.2.18
40 18 EA For furnishing and placing
4' PVC sewer services,
cpmplete in place, the sum of
~4~ ~n~')td~ DOLLARS
AND F~FI~'Tc~O CENTS
per each.
41 N/A N/A NOT USED
SECTION III - BETHEL ROAO
TOTAL BIO FOR ALL UNIT PRICES: ~L~I~ ~19~i) ~Jl~, ~' ~
(use words)
(use ~igures)
Bidder agrees that all work described in SECTION III - BETHEL ROAO will
be completed within/J~__ calendar days.
mi
II
00301-16 REVISED
Unit Prices have been computed in accordance with paragraph
11.9.2. of the General Conditions.
BIDDER acknowledges that quantities are not guaranteed and final
payment Will .be based on actual quantities determined as provided
in the Contract Documents.
5. Completion.
BIDDER agrees that the Work will be substantially completed
and ready for final payment in accordance with paragraph
14.13. of the General Conditions on or before the dates or
within the number of calendar days indicated in the
Agreement.
BIDDER accepts the provisions of the Agreement as to liquidated
damages in the event of failure to complete the Work within the
times specified in the Agreement.
6. Attached Documents.
The following documents are attached to and made a condition
of this Bid:
a. Required Bid Security'in the form of
8. Other Requirements.
Address for Communications.
Communications concerning this Bid shall be addressed to
Purchasing Office
255 Parkway Boulevard
Coppell, Texas 75019
BIDDER agrees that all Work awarded will be completed
within the Calendar Days listed for each section. Contract
time will commence to run as provided in the Contract Documents.
c. Communications concerning this Bid shall be to the address
of BIODER indicated on the applicable signature page.
BIDDER understands that the Owner is exempt from State
Limited Sales and Use Tax on tangible personal property to
be incorporated into the project. Said taxes are not
included in Contract Price (See Instructions to Bidders).
The terms used in this Bid which are defined in the
General Conditions of the Construction Contract included as
part of the Contract Oocuments have the meanings assigned to
them in the General Conditions.
f. Terms used in this Bid which are defined in the General
Conditions or Instructions will have the meanings indicated in
REVISED 00301-17
the General Conditions or Instructions.
The City of Coppell reserves the right to delete any portion of
this project as it may deem necessary to stay within the City's
available funds. Should the City elect to delete any portion,
the contract quantities will be adjusted accordingly.
SUB.~TTED o. /'~,~ ;~I¢ , ~g~-~.
00301-18
PREVAILING WAGE RATE FOR PUBLIC WORKS PROJECTS: The City shall ascertain
the general prevailing rate of wages for each craft of type of workman, or mechanic needed to
execute this contract and shall specify in the call for bids of this contract what the general
prevailing rate of wage§ is sin the City of Coppell. The City shall also specify the prevailing
rate for legal holiday and overtime work. The contractor must pay the said specified rate to all
laborers, workmen, and mechanics employed by him or any subcontractor under him in the
execution of this contract. The City of Coppell resolution regarding prevailing wages
follows this section.
PENALTY FOR VIOLATION: The contractor or subcontractor in violation of these rules is
liable to the City for a penalty of Sixty Dollars ($60.00) for each laborer, workman, or
mechanic employed for each calendar day or portion thereof, that such laborer, workman, or
mechanic is paid less than the stipulated rates for any work done under this contract. The
money collected shall be used to offset the costs of administering these requirements. If the City
receives a complaint by a laborer, workman, or mechanic it shall determine within thirty (30)
days after receipt whether good cause exists to believe that the contractor or any subcontractor
has committed a violation of these specifications. The City shall provide written notice of its
determination to the contractor or subcontractor andy any affected laborer, workman, or
mechanic, the City shall retain any amounts due under the contract pending a Final
determination. If the contractor or subcontractor and any affected laborer, worlcman, or
mechanic fail to resolve the alleged violation by agreement within fourteen (14) days of the
determination by the City, the issues of the alleged violation, any penalties owed to the public
body, and any amounts owed to any affected laborer, workman, or mechanic shall be submitted
to binding arbitration in accordance with the provisions of the Texas General Arbitration Act.
If the parties fail to agree upon an arbitrator within ten (10) days, the arbitrator shall be
designated by the District Court upon petition of any party. The decision and award of the
arbitrator is final and binding upon all parties and may be enforced in any court of competent
jurisdiction. The City shall not be a party in the arbitration.
ARBITRATION: The arbitrator shall assess and award all reasonable costs, including the
arbitrator's fee, against the party or parties who fail to prevail in the proceeding. Costs may
be assessed against the laborer, workman, or mechanic only if the arbitrator finds that the claim
was frivolous. If the arbitrator does not find that the claim is frivolous and does not make an
award to the laborer, workman, or mechanic, costs will be shared equally by the parties. If the
arbitrator determines that a violation of the specification has occurred, the arbitrator shall assess
and award penalties as provided in the Act and all amounts awed to the affected laborer,
workman, or mechanic against the contractor or subcontractor. The City shall use any amounts
retained under this provision to reimburse the laborer, workman, or mechanic for the amount
owed to that person because of the failure to pay the person the general prevailing rate of wages
as provided in the arbitrator's award. If the amounts withheld by the City are insufficient to
fully reimburse the laborer, workman, or mechanic for amounts owed, the person has a right
of action against the contractor or subcontractor and the surety of that person to recover any
amounts owed.
?
;~IDDE~R IS:
Individual
00301-19
(Seal)
(Individual's Name)
t
doing business as
Business address
A Partnership
PhoneNo.
(Seal)
By
(Firm Name)
(General Partner)
Business address Phone No.
I
!
I
I
!
!
A Corporation
(Corporauon Name)
,,, (State of Incorporatio,,n) ,
By ~.,I. A cd a~ ~ 1/61,_~ t~n !lq
(Najn~: of person authorized-
(Title)
(Corporate Seal)
Attest
(Secretary)
Business address 7¢0 b~_A~tCc~.S,C;e~b{
A Joint Venture
By
By
(Name) (Address)
II
Il
!
(Name) (Address)
(Each joint venture must sign. The manner of signing for each individual, partnership and
corporation that is a partner to the joint venture should be in the manner indicated above.)
END OF SECTION
- ~?/12/95
09:06 CITY OF CDPPELL ~ 817 483 0899
H0.274
REVISED 00301-1
$$CGl1
S£CTION 0030]
BID FORR
PRCL1ECT IDENTIFICATION: anlt er e t
a · IV R
CONTRACT IDENTIFICATION: S$ g4-O?
THIS BID IS SUBHITTED TO: Purchastno Aeent..Ctty of CooDe11. Texas
2SS Parkway Boulevard. Co~°011. Texa~ 75019.
herein after referred to as OWNER.
City of Coppe11 Bid No: _ ..~ ~U--~"~ -
1. Enter trite Ageeluent.
The undersigned B[DDER proposes and agrees, if thts Bid is
accepted, to enter into an Agreaaent wtth OWNER in the fane
included in the Contract Oocuaents to perfom and furnish all
Work as specified or indicated in the Contract Documents for the
Btd Price and within the Bid Ttmes indicated tn this Bid and in
accordance with the other rems and conditions of the Contract
Oocu~ents.
BIDDER Accepts.
BIDDER accepts all of the topes and conditions of the
Advertlselaent or Invitation to Bid and Instructions to Btdders,
including without limitation those dealing with the disposition
of Bid security. Th~s Bid ~tll remain ~b~ect to acceptance
for ninety (90) days after the d~y of Bid opening. BIDDER will
sign and deliver the required number of counterparts of the
Agra?ant ~h the Bonds ~nd ~ther documents required by the
Bidding Requirements ~tth~n f~fteen (lS) days ~fter the date of
OWNER's Notice of A~ard.
B~DOER's Representations.
In submttJng tht$ Bid, BIDDER represents,
forth in the Agree~nt~ that:
as ~ore fully set
BIDOER baa examined and carefully studied the Bidding
Oocuments mhd the following Addenda receipt of ell ~hich
hereby acknowledged: (List Addenda by Number and Oate)
- 07/12/95 09:06 CITY OF ~ELL * 817 483 0~ ~,274 D06
00501-2 REVISEO
BIODER has vSslted the site ind becolae familiar with end is
satisfied es to the general, local and site conditions that
may e~fect cost, progress, performance and furnlshtng of
the Work.
BIDDER is famtltar with and is satisfied as to all federal,
ktate and local Laws and Regulations that may affect cost,
progress, perfo~nce and furnishing of the Work.
BIDDER has obtatnad and carefully studied (or assumes
responsibility for having done so) all such additional or
supplementary examinations, investigations, explorations,
tests, studtes and dsta concerning conditions (surface,
subsurface ~nd Underground Facilities) at or contiguous to
the site or otherwise ~htch may affect cost progress,
performance or furnishing of tho Work or which relate to
any aspect of the means, methods, techniques, Sequences and
procedures of construction to be.employed by BIDDER and
safety precautions and programs incident thereto.
BIDDER does not consider that any addtttonsl examinations,
investigations, explorations, tests, studies or data are
necessary for the determination of this Bid for performance
end furnishing of the Work in accordance with the times,
price and other te~ms and conditions of the Contract
Documents.
BIDDER has correlated the information )mown to BIODER,
information and observations obtained from vlslts to the
site, reports and drawings identified in the Contract
Oocuments and all additional examinations, tnvestigetlons,
explorations, tests, studies and dais with the Contract
Oecuments.
BIDDER has given ENGINEER w~ttten notice of all conflicts,
errors, ambiguities or discrepancies in the Contract
Documents and the written resolution thereof by ENGINEER is
acceptable to BIDDER, and the Contract Documents are
generally sufficient to indicate &nd convey understanding
of all terms and conditions for performing and furnishing
the Work for which this Bid is submitted.
Where conFIi'cts, errors, ambiguities or discrepancies have been
discovered in or between Contract Documents and/or other
related documents, and where said conflicts, otc., have not
been resolved through the interpretations or clarifications by
ENGINEER as described in the Instructions to Bidders, because
of insufficient time or otherwise, BIDDER has included in the
Bid the grea~er quantity or better quality of Work, or
compliance w~th the more stringent requirement resulting in a
greater cost.
87×12x95 09:0? CITY OF COPPELL ~ 817 483 8899 N0.274 ~
REVISED 0o301.3
This Bid ts glnutno end not lade tn the interest of or on
behalf of eny undisclosed person, firm or corporettofl and
is not submitted tn conformity with any agreement or MUles
of anY 9roup, association, organization o~ corpoP,tion;
BIDDER nas not directly or indirectly induced or solicited
any other BIDOER to subltt a fa]se or sham Btd; BIDDER has
Dot solicited or induced soy person, firm or corporation to
refrain from biddtng; and BIDDER hes not sought by
collusion to obtain for itself any advantega over any other
BIDDER or over OWNER.
4, Bid Prices,
will cor~lste the Work in accordance with the Contract
Docmaents for the following price(s):
All specific cash allowances mre included in the price(s) set
forth above and have bmmn computed in accordmnce with paragraph
11,B. of the General Conditions,
UNIT PRICE BID
FOR
CITY OF COPPELL SEWER IMPROVENENTS
SECTION ! - GRAPEVINE III
ITEl( ESTIMATED
No. qUAt4TITY
DESCRXPTION AND
UNIT PRICE IN MOROS
UNIT TOTAL
PRICE A~UNI
N/A N/A NOT USED
166 LF For furnishing and placing J~/,~
8' PVC sewer (15'-~0' depth),
complete in place, the sum of
~ev~ ~EHTS
pe~ 11nea~ fHt.
6-13 N/A
1~ ~OO LF *
NOT USED
For furnishing and plmclng 15" ~
Si)R-aS PVC sewe~ (0'~10' depth),
complete in place, the sum of
AND~CENTS
per
07/12/95 09:07 CITY OF COPRELL * Bi7 483 0899 N0.274 D08
00301-4 REYZSED
15 ;570 LF For furnishing and placing
IS' SDR-3S PVC se~.r
depth), complete iff place,
the sum of
, ~ ~,~ DOLLARS
per II~e~r rO0~,
16 1094 LF For furnishing and placing
IS' SDR-35 PVC se~er (15'-20'
depth), complete in place,
the sum of .
mD ~,~1~-'~ ~ CENTS
per ltne&r fdot,
l? Z30 LF For furnishing and placing ~,,
15' SDR-35 PVC swer
depth), complete in place,
the sum of
A~D~CENTS
pe~
18 N/A ./A NOT USED
19 5 EA For furnishSng and placing 4
FT dtameter standard manhole,
co~ete ~n place, thu sum of
~~ ~ : ~ - ' DOLLARS
~CE~S
20 8 EA For furnishing and placing 5
FT diameter standard manholes
_ complete i~ place, the sum of
7'~i~t.~,-'f~. h~4r¢o( ~ ,~x~/~:~... DOLLARS
~~CENTS
pep elcO. ~
21 1
EA For furnishing and plactng 6
. FT dt~net~r standard manhole,
· complete ~n pltce, the sum of
-- ~D , ~;~ ' CENTS
pep each.
ZI N/A N/A NOT USEO
09:08 CITY OF CORPELL * 817 483 ~899 NO. 274 D09
REVISED
~7
29
30-31
33
34
! EA For furnishing and p]actng 5
Fl diameter drop inlet manhole,
. complete ill p.lmce, the sum of
AHD ~]~ ~ CEOS
N/A ~A ~T ~ED
718 LF For furntshtngand placing 20"
dta~eter dry bore, complete in
place, the.s.ue of
0 ~ ~d,+~-~o DOLLA~
~D ~CENTS
per ilaear T~C. '
718 LF F~r furnishing and placing ~0" ~ )L.Iqo.iO
diameter casing pipe, complete
in place, the sum of
-[l~b~---~uo DOLLARS
AND ~-~-~(~ CENTS
per llne~r
EA For abandonment of standard
sewer manhole, complete in
place, ~he sum of
ScVta~J~b~v~(~ s; ~+z~-~t~rce-OOLLARS
RNO ..~F~Ke~CENTS
per each. ~
N/A
12
835
N/A
SY
SY
LF
NOT USED
For removal and replacement
of 8" reinforced concrete
pavement, complete tn place,
the sum of
~t~/~.~qCuao OOLLAR$
D~CENT$
per square y~re.
For r~oval and replaceMnt
of reinforced concrete
driveway, complete in place,
thq su~ of
/(J: ~Lf~ ~Co~ p DOLLARS
I~D~CENTS
per square yaro, ,
For removal and replacement
of ratnforced concreta 4 FT
wide sidewalk, complete in
place, the sum of
~ ~--~e e~ DOLLARS
AND ~'~6~-~F¢~-~ CENTS
per linear
07/12/95 09:~ CiTY OF' COPRELL -~ ~? 483 0B99 N0.274
00301-6 REVISED
36-36 H/A N/A NOT USED
37 ] LS For furaishing and placing
landscaping, complete tn
· place, the sum of
38 3656 LF For Trench Excavation Safety ~.1/. ~:g31.6f
and Support, complete in
placa,~the sqmof
- .~caX~i~i.i-~OOLLARS
~CEN~
per linear TOOt.
39
! LS For furnishing end maintaining
Traffic ~ontrol stgnage,
barricading, etc. during and
through completion of
construction, complete in
place, the sum of
per~cENTS
40 8 EA For furnishing a~d placing ~G~.qq ~
4' PVC sewer services,
complete ~n plscn~ the sum of
RND~CENTS
Der e~c~, -
41 102 LF For furnishing and placing /~.~?
S4" ASTI4 F-497 RVC se~er
(25'40' depth)t co~lete
tn phce_,.the sum of
per eacB~ ·
SECTION I - GRAPEVINE III ,,j.~
TOTAL BID FOR ALL UNIT PRICES:-~/~I~r~y~J.~/ U[,--~,~ -/~ar'c~L~,7
~use ~s) ' '
~T?12xS5 09:08 CITY OF COPPELL ~ 817 483 0899 I40.274 Dll
REVISED 00301-7
SECTION II - GRAPEVINE
ITE# ESTIMATED
NO. QUANTITY UNIT
1 Zl$ LF
Z Z15 LF
IV
DESCRIPTION AND
PRICE IN MOROS
For furntlhlng and placing
6" C1. 50 Oucttle Iron Ptpe,_
copplete tn place, the sma of
'lqqi ~-~. ~ ~ ,DOLL.S
~ ~C~
pm~ I1fliir TOO~,
For furnishing and placing
8" Cl. $0 Ductile I~on P~pe,
complete In place, the sum of
"i~[~.~-~ i~c-. DOLLARS
ARo~CENTS
per ii~eir Too~,
UNIT TOTAL
PRICE NqOUNT
3 N/A N/A
4 13
CF For furnishing and placing
SDR-3$, PVC seNer (10'-15'
depth), complete tn p]ace,
the sue_ of
AND ~CENTS
per
5-g N/A
10 557
11 1565
N/A NOT USED
LF For furnishing and plactng
1~" $DR-3S, PVC sewer (0'-10'
depth), complete tn place,
the sum of
~+?~_¢,¢~ CENTS
per 11near ~oot.
LF For furnishing and placing
1~' SOR-35, PVC se~er
depth), complete in place,
the sum of
"~i r-~,_~b(a~ DOLLARS
~ g~x~' ~ENTS
~er 1~lir f~,
07/12/95 09:08 CITY 0~ COPPE]_L ~ 817 483 0B99 N0.294
00301-8 REVISED
lZ
13-18
19
LF For furnishing and placing
12" SDR-3$, PVC sewer
depth), ceepIete tn place,
the sum of
"grh ~-~,, - ~. IXILLNis
AND ' ~L~ CENTS
per linear' foot.
N/A N/A NOT USED
8 EA For furnishing and plactng 4
FT diameter standard manhole,
c. omplete In ~ace, the su~ of
per each.
20-z3 #/~ WA
~4 3 EA
27
NOT USED
complete in ~lace, the sum of
AND -r ~ ' CENTS
per each.
For furnishing and plscing $
FT dla~eter Type'S" mnhele,
complete In plece, the sum of
per each. ·
For fu~Jshtng all labor,
materials and Incidentals
re~d to c~plete Siphon
structu~ per contract
eequtr~nts, co~ete In
place, the s~ of
~O'%~~ee CENTS
per each. '
For furnishing and placing
FT dia~tar Type'S' manhole~
316
LF For furnishing and plactng 20"
diameter dry bore, co. leto in
place, the .sum of.
~O ~ ~'~. ~ ~ C~TS
per ltnea~' foot.
09:09 CITY OF COPPELL ~ 817 483 ~899 N0.274 Q13
REVISED 00301-9
28 315 LF
30-3 ! N/A
32 832
36 9
37
38
EA
For famishing ami placlng 20'
dia~ter castng plpe, complete
tn place, the sum of
A~-~o DOLLARS
-:~-~_C~ ¢~- CENTS
per l~ear foot.
For abandonment of standard
se~er manhole) complete tn
place, the sum of
O ~ c..~--,'t~c CENTS
per ~ch. ~
N/A NOT USED
LF For removal and replace;ant
of 8' reinforced concrete
pavement, complete in place,
the sum of
O)te~( .~+~o DOLLARS
AND~CENT$
per
N/A NOT USED
SY For removml and replacement
of 6" reinforced concrete
Rip-Rap, complete in place,
the ~um of
A),~- ~u~ DOLLARS
A~O ~cENTS
per square y~ro. '
2 LS For furnishing and placing
landscaping, complete in
place, the sum of
-~,.~_,i,t(. h4,~,~,+-.~nr-.h.,-&~¥ ~LLARS
per mu~ ~
LF · For Trench Excavation Safety
and Support, complete in
place, the sum of
AND~~Lm~
per ]1near ?oot.
87/12/95 89:89 CITY OF COPPELL ~ 817 48~ 8899 N0.274 D14
00301~10 REVISED
3g
! LS For furnishing and ~atntatntng ~_~/_~
Traffic Co.tro! stgnage,
~ ber~tcad~ng, etc. during
through cgkpletton of
coflst~uct~on) c~mplete
place, the sum o~
~r~-~-~l(C ~.~ ~ DOLLARS
AND '5~ ~-I-~ ~,~l~ CENTS
per lU~ ~.
41 N/A WA NOT USED
SECTION 1[ -GRAPEV]NE ]V
TOTAL BED FOR ALL UNIT PRZCE$:..-T~4~eC
(use ~or~s)
I ~ ~ ~. (use
SECTZON ~Z! - BETHEL ROAD
ITEJq ESTU~ATED DESCRZPTZON AND UNZT TOTAL
NO. qUANTZTY UNZT PRZCE ZN WORDS PRICE AJqOUNT
110 LF For furnishing and pllclng
6' C1. 50 Ductile [~on P~pe,
e~_~ete ~n place, the sum of
i r~?~ - ~ i ~ , DOLLARS
ANO~CENTS
per 11flear foOt.
Z 110 LF For furnishing and placing
' 8' C1. 50 Ducttle Z~on Hpe,
complete in place) Lht sum of
AND -~r~-~F~(_ CENTS
par 1 tne~oot.
3 13 LF For furnishing and placing
$" $DR-35,' PVC sewer
depth), complete in place,
the su~ of
07/12/95 09:09 CITY OF COPPELL * 817 483 E~99 N0.274 D15
REVISED 00301-1!
~ $ LF
s-6 N/A N/A
7 Z314 LF
8 ~648 LF
g 15 LF
892 LF
11 Z¢77 LF
For furnishing end plactng
8" $OR-3S, PVC sewer (10'-15'
depth), coffq:~lete in place,
the sum of
FIOT USED
For furnishing and plectng
10' SOR-35, PVC se~et (o'-lO'
depth), complete tn place,
the sum of
J _ '¢~CENTS
AND~
pe~
For furnishing and plactng
10" $DR-35, PVC sewer (10'-]5'
depth), complete in place,
the sum of
.. OLLARS
AND . ':~'~'4~:~,~_ CENTS
per ltnear'fodt.
For furnishing &nd placing
lZ" SDR-~G, PVC sewer (0'-$'
depth), complete ~n place,
the sum of
C~ELLARS
NT$
For furnishing and placing
IZ" SDR-3S, PVC sewer (5'-10'
depth), complete tn place,
the sum of
Ai~DD~ ~ -'~..0o DOLLARS
per I~near
For furnlshJng and plactng ~ _c;~.~ ~ ~-
lZ" SDR-$5, PVC sewer (lO'-lS'
depth}, complete Jn pl~ce~
the sum
'l-~-~lre~ DOLLARS
~ND '"J-,'.~.f--,-~¢c.' CENTS
per 11~e~r
1~-18 N/A N/A NOT USED
~/12/95 09:10 CITY OF COPPELL ~ Bi? 483 0899 N0.274 Ql$
00301-12 REVISED
10 13
2O
EA For furnishing and placing 4
FT dt~eter standard manhole,
co~p~ete,~n place~ the s~ Of
~ ~'_ ~ v~. CENTS
par ~ach, ~
EA Fo~ ~urntshtng and placing S
FT diameter standard manhole,
?~plete tn place, the sum of
AND -~'-.e...,~J CENTS
per.ch.
z] N/A
N/A NOT USED
4 EA For furnishing and placing 4 ~
FT dta~eter drop tnlet aanhole,
coaalete tn place, the sum of
per each. ' J
23
I EA For furatshing and placing 5 3,b~Lr _~_~5-
FT dtameter drop inlet manhole,~
complete tn place, the sum of
-T~ir.~.s~xh.~.~,,-~.f-~-.i.~uo DOLLARS
~10 '-:~--~vc., CENTS
per each.
N/A N/A NOT USED
EA For furnishing and placing S
FT diameter Type "S" manhole,
complete tn place, the ~ua of
per
1 EA Far furnishing ~11 labor,
mterials and Incidentals
requtred to complete Stphon
structure per contract
requlreeents, complete
place, the sum of
RNO -~-p_~,__~-~CENTS
per ~ach: ~'
07/12795 09:18 CITY Of COPPELL ~ 817 483 8899 N0.274
REVISED 0030]-13
27
28
2g
3O
31
3Z-34
36
1S
15
6
48
N/A
6998
7
LF For furnlshln9and plncing
dtameter dry bore, complete
placer the sum of
LF For fUr~ishing and pl&clng 20' 3~.S-S--
diameter castng ptpe, complete
in place, the sum of
AND "~-l'lc-f~.-~-(Vc.- CENTS
per 11rider Yoot.
EA For abandonment of standard ~_,_,_,_,_,_,_,_~,
sewer manhole, complete in
E~ace, the sum of
r~.~r~'VC OOLLARS
~O ~,~,]~-~,~ 'CENTS
per i~ch, v
For abandonment of sanitary [nl.V9
se~r clean out, complete in
place, the sun of
~p b~d ~ ~ DOLLARS
per mich. /
LF For placement of 6" Class "B" /~.o/
concrete ambedment across
entire trench width, co,plate
in place, the sum of
~'~ ~-eer~-~ DOLLARS
AND D~-~ CENTS
per each.
N/A
LF
SY
NOT USED
For remeval and replacement i~,~? I~_~__~.
Of asphaltic concrete ~e Oescrtption
pavement, coeplete in place, Page
Sect$on 13.2.1
the su~ o~
AND . <~,~-~.~1~- CENTS
per linea~ fdot,/
For r~vil end replacement
of 6" reinforced concrete
Rtp-Rap, complete tn place,.
the s? of
/~/,~-~r DOLLARS
per squa~ yard, ~
07/12/95 09:10 CITY OF COPPELL ~ Bi? 483 0899 N0.274 D18
003QI-14 R£VISED
37
LS 'For furnishing and placing
landscaping, co~lete tn
place, the sum of
5 i X'~ -'~ ~',~ ~' ~ ~ n DOLLARS
AND J'i ~te~_ CENTS
per ~mp s~.
38 7346 LF
39 1 LS
For Trench Excavation Safmty
and Support, complete in
place, the sum of
~¢ ¢~,~,.~ DOLLAR~
AND =~-h~-t~nUL~CEgTS
pmr linem~
For furnishing tnd maintaining I1: ~?~.G~-. /~ JT~.~d-
Traffic Control stgnage,
barricading, arc. during and
through completion of
construction) complete in
place, the sum of
per Tump'su~. '
40 18 EA For furnishing and plactng
4" PVC sewer services,
complete in place, the su~ of
-~r h~ ~ ~h.+~r~OOLLARS
A~D ~i;~~ CENTS
per each; '
41 N/A N/A NOT USED
SECTION III - BETHEL
TOTAL BID FOR ALL UNIT PRICES:
(use words)
- - ~ ~sm ~igures)
07/12/95 89:11 CITY OF COPPELL ~ 817 483 8899 N0.274
REVISED 00301-15
COHBIW~TION OF SECTIONS
The undersigned Bidder hereby agrees to accept an award of
contrect based on eny individual section. Ho~ever, if awarded
t~o or more sections, the undersigned Bidder agrees to deduct
from all prtces na~d in those secttons the following a~ounts:
Combination of Sections I and II, deduct ~ 0.oo dollars.
TOTAL BID FOR ALL UNIT PRICES (AFTER DEDUCT) ~'~J~
_ . .... · _ . '(use'wo~s)
Co~tnmtton of Sacttons II and III, deduct ~.00 dollars.
lOl~ BID FOR ALL UNIT PRICES {A~ER DE.C)) ~ ~.~
. (use~rd~) '
~ ' - [use figures)
Combination ~f Sections I and IXI, deduct ~ ~,0o
TOTAL BIO FOR ~L UNIT PEICES [AFTER DEEUCT)~~-~et~
, . ~' (use words)
Co~inmtion of Smctions I, II, ~nd III, deduct ~,oQ__ dollars.
TOTAL BID FOR ~LL UNIT PRICES (AF?ER
~rcJ 4~r~$~~t~ {USe words)
~ ~. (U'Se figures)
Unit Prices have been c~ut~ in accordance with
1~.9.2, of the General Conditions.
BIDOER acknowledges that quantities are not guaranteed and final
paymnt will be based on actual quantities determined as.provided
in the Contract Documents.
Completion.
BIDDER agrees that the Work will be substantially completed and
completed and ready for final payment in accordance with
paragraph ~4,!3, of the General Conditions on or before the
dates or w~th~n the number of calendar days indicated in the
Agreement.
~?x12/95 09:11 CITY OF COPPELL ~ 817 483 0899 N0.274 P20
00501-16 REVISED
BIDDER eccepts the provisions of the Agreement as to liquidated
damages in the event of failure tn complete the Work wtthtn the
times specified in the Agreement.
Attached Oocuments.
The following documents are attached to and made a condition
of this Btd:
a. Required Bid Security in the form of
8. Other Requirements.
Address for Co~ntcattons.
a. Communications concerning this Bid shall be addressed to
Purchasing Office
Z55 Parkway Boulevard
Coppe11, Texas 75019
b. BIDDER agrees that ell Work awarded wtll be completed
within ~SO Calendar Days. Contractor wime will commence
to run as provided in the Contract Oocumants.
c. C~unicattons concerning this Bid shall be to the address
of BIOOER indicated on the applicable atgnature page.
d. BIOOER understands that the Owner is exempt from State
Limited Sales and USe Tax on tangible personal property to
be incorporated into the project. Said taxes are not
included in Contract Price (See Instructions to Bidders).
e. The terms used in this Bid which are defined in the
General Conditions of the Construction Contract included as
part of the Contract Documents have the meanings assigned to
them in the General Conditions.
f. Terms used in this Bid which are defined in the General
Conditions or Iflatructtons will have the meanings indicated in
the General Conditions or Instructions,
The City of Coppe11 reserves the right to delete may portion of
thi~ project as it may deem necessary to stay within the City's
available funds. Should the City elect to delete any portion,
the contract quantities will be adjusted accordingly.
00301-17
PREVAILING WAGE RATE FOR PUBLIC WORKS PROJECTS: The City shall ascertain
the general prevailing rate of wages for each craft of type of workman, or mechanic needed to
execute this contract and shall specify in the call for bids of this contract what the general
prevailing rate of wages is sin the City of Coppell. The City shall also specify the prevailing
rate for legal holiday and overtime work. The contractor must pay the said specified rate to all
laborers, workmen, and mechanics employed by him or any subcontractor under him in the
execution of this contract. The City of Coppell resolution regarding prevailing wages
follows this section.
PENALTY FOR VIOLATION: The contractor or subcontractor in violation of these rules is
liable to the City for a penalty of Sixty Dollars ($60.00) for each laborer, workman, or
mechanic employed for each calendar day or portion thereof, that such laborer, workman, or
mechanic is paid less than the stipulated rates for any work done under this contract. The
money collected shall be used to offset the costs of administering these requirements. If the City
receives a complaint by a laborer, workman, or mechanic it shall determine within thirty (30)
days after receipt whether good cause exists to believe that the contractor or any subcontractor
has committed a violation of these specifications. The City shall provide written notice of its
determination to the contractor or subcontractor andy any affected laborer, workman, or
mechanic, the City shall retain any mounts due under the contract pending a final
determination. If the contractor or subcontractor and any affected laborer, workman, or
mechanic fail to resolve the alleged violation by agreement within fourteen (14) days of the
determination by the City, the issues of the alleged violation, any penalties owed to the public
body, and any amounts owed to any affected laborer, workman, or mechanic shall be submitted
to binding arbitration in accordance with the provisions of the Texas General Arbitration Act.
If the parties fail to agree upon an arbitrator within ten (10) days, the arbitrator shall be
designated by the District Court upon petition of any party. The decision and award of the
arbitrator is tm,al and binding upon all parties and may be enforced in any court of competent
jurisdiction. The City shall not be a party in the arbitration.
ARBITRATION: The arbitrator shall assess and award all reasonable costs, including the
arbitrator's fee, against the party or parties who fail to prevail in the proceeding. Costs may
be assessed against the laborer, workman, or mechanic only if the arbitrator finds that the claim
was frivolous. If the arbitrator does not find that the claim is frivolous and does not make an
award to the laborer, workman, or mechanic, costs will be shared equally by the parties. If the
arbitrator determines that a violation of the specification has occurred, the arbitrator shall assess
and award penalties as provided in the Act and all amounts awed to the affected laborer,
workman, or mechanic against the contractor or subcontractor. The City shall use any amounts
retained under this provision to retmburse the laborer, workman, or mechanic for the amount
owed to that person because of the failure to pay the person the general prevailing rate of wages
as provided in the arbitrator's award. If the amounts withheld by the City are insufficient to
fully reimburse the laborer, workman, or mechanic for amounts owed, the person has a right
of action against the contractor or subcontractor and the surety of that person to recover any
amounts owed.
00301-18
BID AFFIDAVIT
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed
and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or
all commodities upon which prices are extended at the price offered, and upon the conditions
contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will
be calendar days from the date of the bid opening. (Period of acceptance will be
ninety (90) calendar days unless otherwise indicated by Bidder.)
STATE OF '-'~Y.J~(A.~ COUNTY OF '-[-a r lr'fl~b~''-
BEFORE ME. the undersigned authority, a Notary Public in and for the State of-{-~,ggt fi' .
on this day personally appeared "~Lckr, Irt5 ~ ~ba_ !Iff- who after being by me
'- - ] Name
duly sworn, did depose and say:
[3 ' JNaro~
Name of Firm
foregoing on behalf of the said
am a duly authorized office/agent for
and have been duly authorized to execute the
Name of Firm t
I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder
or individual(s) engaged in the same line oc business prior to the official opening of tiffs bid.
Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly
or indirectly concerned in any pool, agreement or combination thereof, to control the price of
services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon."
Name and Address of Bidder: 9/J,.~x--~ ~(]~r0"~.gV5 (~_£/M-g4'~¢-c~"'~
Telephone:(~[*)Uc6~ Dqq~ by: Oal&S ~))iS~tl
Title: V[~ ce ~f'~' G[d~ Signamr
SUBSCRIBED AND SWORN to before me by the above named '~ f~aala*
/
on this the [ ~dr'o'' day of ~ [\/ 199~
Notary Public in and for the State of "~
I
I
I
!
I
I
I
I
I
I
I
I
I
I
!
!
00301-19
If BIDDER IS:
An Individual
By
(Seal)
doing business as
(Individual's Name)
Business address
Phone No.
A Partnership
By_ (Seal)
(Firm Name)
(General Partner)
Business address
Phone No.
A Corporation
(Co¢oration Name)
(State of Incomoration)
By
(Name
(Title)
(Co.orate Seal)
(Secremu)
Business add.ss ,?gO IxS, ~s~iu~
A Joint Venture
By
By
(Name) (Address)
(Name) (Address)
(Each joint venture must sign, The manner of signing for each individual, partnership and
corporation that is a partner to the joint venture should be in the manner indicated above.)
END OF SECTION
4
4
1
4
35
1
~r
Sz ~0~'
~ ~+ ~(s~ oss~)
~---- ~ s~ ~ ................... ~o~s ~
43q 518
I
!
I
If BIDDER IS:
An Individual
By.
00301-19
(Seal)
doing business as
Business address
A Partnership
By
Business address
(Individual's Name)
PhoneNo.
(Sea~)
(Finn Name)
(General Partner)
Phone No.
A C o._A_.~__t~.~ation
(Corporate Seal)
AtLest
(Title)
sign)
By
corporation
(Address)
(Address)
The manner of signing for .each individual, partnership and
venture should be in the manner indicated above.)
EilD OF SEL-tlOI~
COMBINATION OF SECTIONS
00301-15
The undersigned Bidder hereby agrees to accept an award of
contract based on any individual section. However, if awarded
two or more sections, the undersigned Bidder agrees to deduct
from all prices named in those sections the following amounts:
If Awarded:
Combination of Sections I and II, deduct ~:~66- dollars.
Combination of Sections II and III, deduct ~ "),50- .dollars.
Combination of Sections I and III, deduct~m"' --
Combination of Sections I, II, and III, deduct ~ dollars.
Unit Prices have been computed in accordance with paragraph
11.9.2. of the General Conditions.
BIDDER acknowledges that quantities are not guaranteed and final
payment will be based on actual quantities determined as provided
in the Contract Documents. ~
Completion.
BIDDER agrees that the Work will be substantially completed and
completed and ready for final payment in accordance with
paragraph 14.13. of the General Conditions on or before the
dates or within the number of calendar days indicated in the
Agreement.
BIDDER accepts the provisions of the Agreement as to liquidated
damages in the event of failure to complete the Work within the
times specified in the Agreement.
6. Attached Documents.
The following documents are attached to and made a condition
of this Bid:
a. Required Bid Security in the form of X;J ~Y J'~
8. Other Requirements.
Address for Communications.
00301-16
a.
Communications concerning this Bid shall be addressed to
Purchasing Office
255 Parkway Boulevard
Coppell, Texas
BIDDER agrees that all Work awarded will
within ~ Calendar Oays.
to run as provided in the Contract Documents.
c. Communications concerning this Bid shall
of BIDDER indicated on the applicable signature page.
d. BIDDER understands that the Owner is exempt from State
Limited Sales~:and Use Tax on tangtb!epersonal pr0Pgrty to
be incorporated into the project. S~idtaxes are not
included in Contract Price (See Instructions to Bidders).
The terms used in this Bid which are defined in the
General Conditions of the Construction Contract included as
part of the Contract Documents have the meanings assigned to
them in the General Conditions. ' ~
Terms used in this Bid which are defined in the General
Conditions or Instructions will have,the meanings indicated in
the General Conditions or InstruCtions.
The City of Coppell reserves the rightto delete any portion:of
this project as it may deem necessary to stay within theCtty's
available funds. Should the City elect to delete any Portion,
the contract quantities will be adjusted accordingly.
SUBMITTED on
75019 m
ll (o) be completed m
r ~y~ Contractor wime will commence
n ~e nt .
be to the address
onrn Ch,lg 'e pag~e. · m
ha ti '& 's~ate ·
e ax ) r~op~e~rty to m
t )1 a~e'not'
P ic~ o Bidders).
is )t~ n the m
f ~e .t included a
CoO ~t':um ~g: assigned m
td,h JGenera' ~ m
ct 3n: n, s tndt~
ns
th r r' ion of
ec ss~ e CttY~s m
ci ~ , otton,
be
m
m
i
I
I
i
m
m
not lubittted tn conrgritWwl~h in~ igremInt or l~Ilit
Bl~O hu not dl~otl~ or t~tr~tl~ J~d or Ioltet~K
no~ ~14c1~d or 1~ I~, ~1~ ~r~ratd~tO
~e~iln ~bt~t~; a~ B[DD~ htl.nut. I~ ~y .
Bid
Dc~Ien~l for the ¢0110~Ing prlceCs):
Ali spectft~ cub .al.i?tgIS I~ln~lMId tn the prtcI(S) let
fOY~h above ind h&YIblIn computed In 'iO00~da~I~tth p~rlgraph
UNIT PRZCE
CITY Or COFPELL SEIl[R ]HPROVKfl~NTS
SECTION [ - G~PEVZ#E l~l
ITEH ESTIHATED DESCRIPTION AND.,
HO. QU~ITITV UNET PRICE IN ~
UNIT ~OT~
PRICE AJ~N1
1-4
6-LS H/A
14
For fui~tshtng ondplm-ing .~ 7~.
the sum
~S
N/A NOT USED,
IDR-II PVC ItII~
per,~l~~cENT5
2570
]~ 10~4
lB
tO
21
LF Fo~ fU~nllhlP9 BPd plictn9 , ,~/. ~ ~
18' ~ol~-~s lYc s~ ~lo'-2S '
~ For ~fnishtng u~ placing ~. ~ ~' ~ /
d~th), c~letm tn place,
t ' or , ~
C~
~A ~T ug~ ~
N/A
$ I~A For furfl4lhlma lnd
c~litl~plEc~ t~s~ or
~- - ~ each,
8 ~ Fo~ furnishing AM ptBIng S ~ ~~'
FT dt~r ttudl~ m~ule,
~2
N/A N/A NOT USEO
23
26
29
3o-$L
33
34
R~ISED 0O301-5
EA For Furnishing arid plKtng
FT dtLMtar drop Inlet
~o. d~/~'
718 LF For fu~ntsh~,glnd plKtng
p~cev th& s~ 0
~ 'c~s
718 LF FO~ Yu~tshlng ~ pllctng_t0'
d'la~ir cu~l~ P!~,
/d~,~,
g
N/A
635
N/A NOT USI[O
SY For rmnov,l er~.repl~c .eMflt ~ --~ /
p~V~t,~lo~l tn place;
pe~ squa~ ~ ~
~--~~¢EKT$
,/
OITY OF 60PPELL ~ 9?718498
N0.275
0030~-$ REVZSED
36-36 WA IVA HOT U~ED
37 ] LS FoP h~llhiRI and
pl ici~a~ Of
thrown
e~structlon,
A~ l~ II,'
4~ ~ II~ II~JelI~ .
~ ~]etelInl ~ the
~4"
(25~-30; ~th)~ c~lete
1 pl e OT
TOTAL BZD FOR ALL UNIT PRICE$:,~-~
(III
10:54
CITY OF ¢OPPELL
REVIS~) 0030l-7
N0.275
$~crzu. Il - GIGF~¥IHE IV
ITEH ESTIRATET) DESCRIPTION AND
NO. QUANTITY UNIT PRICE I#NORD$
~ 21S
UNiT
PRICE
3
4
5-9
10
11
SS7
N/X
LF For fumlshtng ond pli~tng
SOn-35, P~ IMf
depth)', cmOlot~ ti plato,
o
po~ 11~a~ fQo~
~A X~
depth), ~lete Jfl pilot,
A~ ,~
pe~ linear foot';
*LF For fur~lshlngW placln~.lS'
l~· ~ 36, P~
d~th), c~letl
~ ~th~.pf
~ ~CENTS
./
003014 REVISED
l~ 880
13~la WA
19
Z0-23
24
3 EA For ~rntshtng and plKtng 4
~ ~r each.
~ dieter T~e S
~,~ ~ ~~L~S
furnishing'and plaaing SO."
dry bol'm, complete tn
:CENTS
33.31
36
O
~n '-See, .....
~ FO~ I~~nt Of ~ttnd~d
Se~ ~hole, cO~i~fl~
pl~o, tht ~ O~
· kt' For removal, and .~pltc_e~._nt
o1' t" reinforced
~CENTS
pet' squibb .yaru,
REVISED
~C£11T$ . ~ ./ ^'. o.._O ,/
LS For pflrnlshit~g
lalMeGaptng, ~0ml~le to
per ,up ,--.
for Trench Excavation 5&fO~Y
· ~C£NTS
OQqlO[*~O RE¥1SB)
40 ~
41 M/A N/A NOT ~ED.
REVISED 00301-11 ,.*
4 Il LF For furnl*htng ~nd pli¢tn_g ~': /(/~'
Ii# SDR-3S,
dipth), c~lo~e J~ plm~
~A ~ USED o
7 ~314 LF For fu~tlhtng aM plBct~g , ~ , ~,~
10N ~-36, pVC s~r.(O -10
i 114I L~ For f~IIhtnl
t~ .... ~L~
11 '~477 LF For ~tsh4ng
IZ'
~CENTS
per 11hilt fooI~
12-18 N/A H/A HOT USED
REVISED
ZO ~
23
f4
25
N/A
4
N/A PlOT USED
For fu~etaht~
per elch,
N/A II/A HOT USg)
I ~ For fu~ntlhtflg and plsctng S ~/~ o~.~
FT diameter 1~;p$ RS" ~nho1%
I ~ FoP furnishing ill
Itertals and tncld~tals
st~cture ~r contract
~qulremnts, ~lete
/~ ~D .... ~ CI~
DOP eaoh,
27
$1 4B
3Z-a4
~CE~S
~F For plac~flt.Of
tu.,p'l, AA., .the. s,fl o~ .
';/,UL~_ ' ~'.,.~.,..~ ~LI.A~
~er each.
N/A NOT USED .~ ~
CF For re/ovil lad Fepllcimonk ~L~? /~'~ ~5-~, ~
Of asphaltic colgate P&gl OOlOO-tJ
piwtt.~lete ~n plice, s~tl~ 13,2.T
c[ms
~er ~i~ font. o o ~
07/12/95
10:37 CITY OF COPPELL ~ 9~?18498
00301-14 REV:$~O
t7 !
'For fu~n]ahtng i.~ plKtng
per ]Ul,~ sum.
$8 7~46 LF
4O
For Trench [xeav&?,ton
IIId Sgl)port, couplets in
pl#~ the sum of'
~TAL BiO ~R ALL UNIT PRXCES~ ~ . ~ ~ ~ (use
10:4Z
CITY OF COPPELL - W1W bw2 Uwiu
Atkins Bros· Equip. Co.. Inc
918 W. Marshall
Grand Prairie, Tx 75051
SECTION 00301
BID FORM
N0.275
R~V15ED 00301-1
PXOdC~T IUFNTIFICATION,~an~tarv .ij~m~ lmnrevemel,ls for
Gvanevtne II2L_IV and B,~lihel Rg~,
CONTRACT [OENTIF[CATJU~: ~_$_.9~-02
IHI5 8ID [$SU~[TTED TO: Purchasinn Auen~. City ~P ¢,~poell. T~xa~
Parkway Boulevard,' CoIp~Jl, T~x~"-:7~OIg,
h~retn aftarreFerred to as OWNER.
City of Coppell Bid No: ~ _
1, Enter Into Agraamant.
The undersigned BIDDER pr,,po~es and agrees~ if thl~ Bid 1~
~cceptad, to e~te~ into an'Agrcement with OWNER in'the form
mnc)udad in the Contr4¢t Documents to pe~form~d f~P~i~h all
WQrk ~ =pccif)ed ~Y lndi:a[~d in tho Contract Documents for tile
8tdPrice and wttMn t~a Bid llmos indicated in %hi~ Bid ~nd in
accordance w(th th~ other ter~ and cend't'o,s ur th~ Cum)tract
2, BIDDER Accepts,
BIDDER accepts all of the te~n~ and conditions of time
-Advertisement e~ Inv~[ation ~o Bid and In{tYuctien~ to,Bidders,
including without limitation ti)o~'daalin0 with the'dl~po~ltion
of §td security. This Bid will ~emain ~ubJa¢[ to acceptbnce
Far ninety (90) da~s arte~ tbs day Of ~td opening, rBIDDERwIll
sign anddeliv~ tho required number of counterpar~ of tho
Agrem,,ent with the Bonos ~nd other documents required by thm
~iddin9 Requirement~withln Fifteen (1~] da~ after th~ d.te uf
OWNER's Noti~m of AivBrd.
In ~ubmitting this B{d, BIDDER represents, az more f(,lly set
forth tn'theAgreemunt, that:
~, BIDDER h~= ~X~mlnQd ~RU o~roful]y ~tudied the Bidding
D~cuments and the followin~ Addenda receipt O~ all which is
h~robY acknowledged: (Li~t Adde~d~ by Number and Date)
ADDENDA N~. DATE
:~ ~-/)_,-9_4F~
L0:44
CIT' OF SEIF'F'ELL - 214 ~132 U'dlu
REVISED
bIDDER has v {~ted tie sit~ and bocom~ fa~ liar with and Ix
sati~fled'-aA ~o the ~encr~l. local and;xike conditions tllat
Work,affect cost, program{, ~,rfer~:nce and furnishin{ of
BIDDER. Is familiar with ~nd Is sati~ftoda~ to all f~'U~rM,
and local La~s mndReoulmtions that maya(Fsct
progreaa. ~crfomance and ~urnishino of the Work.
UIDD~R has obtained ,nd carefully studtmd (or assumes
~.~on{ibtlt:y for havio~ done so) all such additiona] or
supplement~wy examinat~ons i~ve~ttga%lons, explorations,
Ze{l{, ~tudic{ and datu concerning conditions
sub~urr~ce and Underground Facilities) at or contiguous 'to
Zhe ~ite or otherwise which may ~ffec~ co~t progress,
p~rfon~ance ~ furnishing of tho Work or which re]~'~e to
~ny ~pcct Of ~he ~lean~ m~Lh~ds, technlquB~, ~equence$ and
pr~]cedure~ of ?nStrucMon to DO em~loye~ by BIDDE~ and
~afotY prec~uMons a)~d pr.gram~ incident thereto.
BIDdeR d~es nec cu.sider th&t ~n~ additional examinations,
investigations, oxpiorattona, '~m~. studies ~r d~t~ ~r~
nmces~a)~ ?~r U~ d~termin~tion of this Bid f~r~porformamce
and Furnishing of the Work in accord4nce with tim time~,
pr(ce a~d e~her te~ms ano conditlon~ of the Contract
BIDDE~ has correlated the Infomatlon known So. BIDDEI(.
information and ob~awvationa 'obtMned ~rom vt~i~ ~o t)m
site, reports ~nd drawings identified in,She 6on%tact
Oecumen~ and M1 addttlo~al e~aminations, tnw~tig~tlons,
explorations, te~ts. ~tudios and d~B With ~[)e Contract
8IDDE~ ha~ given EN6IN£ER written nDtlco of all
· Pro~. ,amblgui%ie~ or discrepancies in tim Contract
Documents a~)d th~ written resolution thereof by EHGINEER is
~c¢optable to.~lDO[~, ~nd th~ Contract ~ecument~ are
generally sufficient to indicate and :onvey understandin~
of all, Sorm~ and condltio.~ for performing and furoiAhing
th. Work for which thi~ Bid l~ aubmlDtod,
Wh~r~ coofliot$~ Q~VOrs, ambiguities or dJ~cr~pa[~cies have been
discovered ~n o~.hatweertContract Documont~ and/or other ,
rmlited document., an~ where ~Mdconflicts, otc',. ))ave not
been rosolwd through the lnterpret~MO~ ap cl:Pifications by
~H~IHC~R as de~cribed~:ln ~he~Ins~ructions t~ Bidd~rs~ because
oB insufficient ttm~ or oSh~rwi~e~~ BIDDER. ha~.included tn the
Bid th~ greater quant(ty'~r better quMtty of Work, o~
complt~ic~ with the moro'otrtng~n~ requirement resultt))g in a
HO. 2?5
95 28:44 CIT/ OF CFJPPELL - Zi4 bL12 0910 I-ICI, 2'7'5
REVISED o0301-3
~. Th'Is'Bid ls genuine and ~ot ~ade in %to {nt~e~C
of any group, ~o¢t~t~on~ org~nlza~lOll or corporat~oat ,
BIDDER ~ notd~rect]y or indirectly tnduce~ oF ~olIc~c~d
A~y ~Lher BIDDE~ to ~ubm')~ a ~a]~e Qr sham Bid; BIDDER
collu~lonre~atn f)~ bidding; and BIDDER hasn.t sought ~y etlon
BIDDER or ov~r OWNER.
Bid Prtce~.
8IDD£Rwill completq .'[h~ Work)n acco~d,nfe Wlth th~
Document~ for the following
All ~peclfiq ca~ a)l~w~nce~ a,e included hi t~e pPic~{s} see
forth abmve a~!d have be~n compu[ed in
11,8. of the ~en~ral Condi~ion~, with P~ragraph
U~IT PRZCEBID
FOR
CXI¥ OF COPPELL SEWER IN?ROV[NENTS
- GRAPEVINE III
-ESTIMATED DESCRIPTION AND
NO.:'QUANTIT¥ UNIT PRICE IN
~-4 N/A N/A NOT USED
5 168
CF For ru~qtshing ~nd Pl~cin
c"-'/...~comp,e~e 1~ plato; ~he sum of
N/A ~/A NOT USED
2o0 LF
UNIT TOTAL
PRICE ~4OUNT
For furnishin~ and'placing ]~,,
~DR-3~ PVC s~we~
· {O'-]O°;depth)~'' -~
co~plQte (n Place, tho' sun of
per ~'~-0-~.. HD .C~Nl'S
61.8~
50. ~O
18,126, 88
10.8~0.0
lO:4E CITY OF
00~01-4
16 ~0~4
18 N/A
19 ~;
20 8
Zl I
]OF?ELL - 214 u, u2 U'dlc
LF FoP fur~t~hing and placing
l~"$Dg~35,PVc,sewer.(lO,-lB,
dePth),'complete in:Place,
the sum of
AND
per lln~
LF For furnl~fl~og and placing
15' SDR-35P~C se~ov (~5'-~0~
d.~M)~ complete ~n place,
thc ~unl
DOLLARS
per
?0r fur~i~hino and plactn~
doP%hJ, complete in place,
the sum of
NZNETY FOUR DOLLArs
NO CENTS
N/A NOT USED
For furnl;lin~ aaO p!aclng 4
FT dtampter'~±andard manhole,
complete in place, ~he ~um of
~unlc~N~ FOUR HUNDRED TEN DOLLARS
per
FA For f:Urnlshlng and Placing 5
PI dl~letcr slandard manhole,
FOUR ~WO HUqDRED ~IXTY ~LLARS
?~ CENTS
EA For furni~hing and placing 6
FT diameter ~tandard ~anhole,
complete in ~l~ce, thm sum of
FIV~_TH~t~D EIGHT NUNORED TEk[X]
~-=NDA =" ' Lt. ARS
. __~CENTs
2Z N/A N/A
NOT USED
60. ~0
75. ~8
5~810.0D
HO.
B2, 8.58. B6
12, ~50.0~
5,810.00
23
24-26
~7
CITY OF ZOFF'ELL - 214 ~0,= C310
718
28 718 LF
29 9 [A
33
34
REVISED
N/A N/A
12 SY
EA FO~ furnishing and placing S
[1 dtameter, dr~p Inlet manhole,--
completein p)aGe~ %he'sum:of
T[.JELVE THDUSAHD DNE HUNDRED !J!)~FT'¢ DOLLARS
~1~i
~jCENTS
~r each,
N/A NOT USED
IF
SY
LF
For furntshtn9 andplacin9 20"
dlamoteY dPy bere~ complete in
Rlace tho o
ONE HU)qDRED N)~ tEVEN DOLLARS
AND FIFTY CENTS
pOP lih~'a~ foo~.
For furnlsh(ng and plat(ns 20"
~lem~ter ca,lng pipo, comp)Btm
~n place, the~um of
IWELVEDDLLARS
~l~l~'~--' ~ CENTS
per")'tnear foo~',
For abandonment of
sewe~ manhole, complete in
plmcm, thesum
TWO HUNDRED DULLA~S
NO CENTS
pop
NOl USED
For Pemoval aM replacement
of 8" reinforced ¢~ncrete
the sum of
SIXTY EIGHT DQLLARS
~ND ND ~ENTS
p~ ~qu~r~ yard.
of r. inf~rced concrete
driveway, complete ~n place,
th~ ~um of
..... FDRTY~OLLARS
~5 m'CENTS
~m' rpmowl ~nd
of ~lnfor¢od concrete 4 FI
wide sidewalk, complute in
place, the su~ oF
FIFTEE~ DOLLARS
~ ......................... -~ENTS
po~ line~ foot,
lz, 190, ~0
197.58 141,
12.88 Bi
288.88
6B.8~
40.00
[5.80
7i
12,525;
10:46 CIT'~ OF CQPFELL - 214 bd~ 0910 ,10.~'m=~,w ~10,
~ 36-36 ~/A N/A
~9 I LS
NOT U~ED
For fUPnishing ~lld plBcino
landscapin9~ cnmplete in
place, :h~ sum of
~iTNE TH~JSO~n DOLLARS
ANU N0 C~lS
per lump sum.
For T~¢ncb EXCaVation 5aFc~
aJld Suppa~L~ complete in
place, Lhe gum of
NO DOLLARS
~ TWENTY FIVE -CENTS
For furni~hing ~nd maintaining
Traffic Con%rol
barricading,
through completion
construction, complete in
"lace~W~q~s~Ob~NO DOLLARS
AND NO~-_~CENTS
PO~ lump
For furnishing.and placing
4" PVC sewer.servlce~,
com~]9_te~4.~_,]~C~. ~he sum of
THREE HUNL)J~ h 171 Y
DOLLARS
~j,~'; NO , CENTS
pep
4] lOZ LF FoP furnishing and p acing
24" ASTMF-497 PVCsewer
(25'-~D~ d~pth), complete
in
DNE HUNDRED..~I~.TY FDUR DOLLA~S
AND N~ CENTS
SECT[ON I - GRAPEVINE
.iglAL BID FOE ALL UNIT PRICES:
THOUSAND SIX HUNDRE: FOUR Dollars ann SEVENTY FIVE Cents
8.25
154.80
563, 604.75
9~ 860.00 '
888.75
2, B00,08 ~
15~708.00
95 10:4~3 CiTY OF ]OPPELL - W14 C,~2 8'310 N0,275
,SEC'rION,: , II - Q~PEVINE lV
~ITEH,, ESTIHAT£Q OE~CRIPTIO~ A~O
NO. qU.~TITY UNIT PRIUE IN WORDS
uNiI
PRTCE
1 ~I5 LF
2 2]5 LF
~0
1]
3 N/A N/A
4 13 LF
55Z
15~5
For furnishing and pla¢'lng
6" C1, SO Ouc~tle Iron PI~,
comolctc In plane; the sum of
SIXTY THR~ .....DOLLARS
~ tENTS
~or ?qrni~hlng and placing
DOLLAES
AND NU~CENT$
SIXTY THREE
Fur furnishing and pt~c~ng 8"
'~DR-35, PVC'sew~r [10 -15~
dopth}, complete in place,
the sum of
~D- ...... ~;~TV ~n,;~ DOLLARS
........... CENTS
pot 1 ~a)' floor, "~
N/A NOT USED
L~
~or furnishing and placing
1Z" SDR-35, PV¢ ~cwor (O~-iO~
depth), complete in pl~c~,
FORTY TWO DOLLARS
ANU ~o' tENTS
per ~~
LF
For furnishing amd placing
1~" SDR-35, PVC s@war
depZh), cumul~l;j in plato,
the sum o~
FIFTY THeE DOLORS
pot ~o~-T
REVISED 00301-7
TOTAL
AMOUNT
63. ~ 13, 545.00 ~/~:~
67.88 14,485.00
54.88 782.~
42. ~ 23,
53.88 82, 9~5.0~
~95 1Fl:a? CIT' 3F 20PF'ELL - 214 682 U'~lU N0.295
LF
g4 3
316 L~
~" ~OR-3~, PVC sew~ (lS~.2o,
~n~ ~um o~
SIXTY F~VE ~^-
-- ~u~LARS
~0T USED
Fer f~PntAh}n9 and PlAcihg 4
FT di~n]eCer ~tandArd
comp]ete In place, Che ~um of
TWD THin, Nb
pe~ ~
~/A NOT USED
YPO S munholQ,
TWO THOUS~D FOUR HUNDRED $~ENiY
~,,
EA For fuPnl~hin~ and placing
THREE TH~ FOUR HUNDRED~Ir~, per ~'
£A
For furni~hln~ all.libor.
~eria]~'~flU~lDcid~nt~ls
~tructur; Po~ contract
requirements~ complete
place, the ~um Df
__ .NINETE~ THOUSAND DOLLA~
AN~-------- _'
2,410.(~0
2,470.00
., 4u0.
19, 00~. 00
For furnishing and placing ~o"
~i~oter dr~ bore, comp)~te in ....
pF~O~ONg~F~ENTY FIV~oIIARt r IlA~ar foot.
37,708.)0
19, 280.00
7,410.00
55,
07/12
10:47
28
29
30-31
~7
38
,SIT OF SC{PF'ELL - 214 E. OS ~{91CI
N/A
832
R/A
2601
G
LF For furnishin~ amd plactn9
diameter ca~ln~ pipe complete"
in place, ti,. sumef
TW~.VE DOLLARS
uer lin~ap tOot,No .'CENTS
EA For abanuonm~nt of standard
place, the aum'of
AND TWO HUNDRE)~DOLLARS
N/A
N/A
SV
LS
LF
NOT USED
Fop Yemovnl and replace~:~t
oF 8" rolnforoed concrete
pavement, canlplele in place,
~ha sum of
~D~' ~IXTY TWD . DDLLARS
.... No CCNTS
per squar~
~OTUsED
For removal a~d replacement
of 6" reinforced concrete
RIp-R~p~ CO~pIoto in place,
the sum of
FOR~ OOL~R$
Aqq~" ~0' CENTS
Pot ~quaro
For furnishing a~d placing
landscaping, compl.l.e in
place, th~rsqm Of
ONEYRDUSAND DOLLARS
~P rCENTS
pop lump ~um.
For Trench Excavation ~afaty
and SuPport, complete in
place, the ~um of
NO DOLLARS
~D . '~NTY FIVE~CENTS
per linear foot. '-- :
REVISED 00301-9 ~,
' 12:00 3,792, ~
62, 80 51,584.
~0, 80 360.80
1,000.00 1,~00.~
0.25
10: 4,Z
.JFFELL -Z14 EU20Di~
;[T L-iF CF -
NU. ,-_, ~, D~4
3g 1 l$ For furnishing ~nd m~lntainlng
Tr~fflCrCOn~rol
~ barricading, ~t¢, during and
through~c~mpletion
construction, comp)Bte in
place, ~he sum of
DOLLARS
SIXTEEN
~'~ N~ CENTS
p~r lump sum,
40 8 E~ Far ~u~n~shin~ and placing
~ll~PO~, the sum or
DOLLAR~
~(D NO CENTS
16,
29
4] N/A N/A NDI' USED
SECTION Il - ~gAPEVINE IV
TOTAL BID FOR ALL Un~[ PRICES:
(uso words)
FIVE THOLJSRN2 TWO HL;NDRE~ 5E-UENTEE~C-1)~tI~r~' 'a~ TWEmTf F~w uenrs
355,217,25 ,,~
figure~)
SECTION III - BETN£L ROAD
ITEM ESTIMATED
NO, QUANTITY
DESCRIPTIONANo
UNIT P~ICE IN WORDS
] llO LF
2 lid LF
For furnishing and placing
6" Cl. ;0 Ductile I~on Pipe,
complete in place, the sum of
~EVENTYDNE DOLLARS
AND Nfl CENTS
[,o,r furnishing and placing
8 C1, 50 Ductile IY'On Pipe~
complet~ in pl~c~ Lhn sum of
~EVENTY FDUR DOLLARS
par ~.~CENTS
3 13 LF
For furnishing,and placing
8" SDR-3~, PVC ~ew~ ~0'-10?
depth), completein place.
the sumof.
THtRT~ FpUR DOLLARS
CENTS
p~r linear foot.
UNIT TOTAL
PRICE ~40UNT
71.00
74.80
34, O0
7,818,
8?
lC, 4~.
lIT
CF CCPPELL -- }14 2,0~ OqiO
NO. 2?5 ~ P15
LF
N/A N/A
2214 .F
10
]1
8 1640 LF
2477
N/A
LF
LF
LF
REVISED 00301-11
For fu~nish{n~ and placing ,
8" SDR-3$, PVC ~ewer 110'-15
the ~um ~f
FORTY SEVEN DOLLARS
NO __CENTS
~ limber foot,
NOT U~ED
For furnishin~ and pl~ciflg
10~ SDR-3$, PVC sewer (O.'-]O'
depth), complete t~ place,
the sum of
THIRTY EIGHT DOLLARS
CENTS
per linear foot.
For furnishing and placing ,
10' SDR-35, PVC,scwer (lO'2]H
oepth),.complete in place,
the sum of
FIFTY DOLLARS
AN~ NO_ CENTS
Fo~ furnishing and pl:¢ing ,
1Z SDN-26, PVC sewer (0/-5
depth), complet, in place,
the ~um
_THIRTY TNRFF DOLLARS
AND ~ NO CENTS
per l;near ~uut.
For furnishing and placing
IR" SDR-3S, PVC ~ewor (5'-10'
depth),'complete in place,
th~ sum of
F~TY DME DOLLARS
AND 'CENTS
pe~ ~O
For furnishing and plat-lng
]2" SDR-35, PV¢ sewe~
depth), complete tn
tho ~um ~iFTY FOUR
· DOLLARS
CENTS
pe~ ~~
NOT USED
47.08
38.88
33.08
41, 80
54.08
235.88
87,932.~
36,
1L,4:
3ITY.UF CLFFELL - 214 ~O2 8910
h10,275 ,'. r
00301-12 REVISED
1~ ~3 EA
2] N/A
72 4
23
24
For furnishing and Placing 4
FT diameter standard m~nhole.
TWO THOUSAND SIX_TY DOLLARS
~ -- CENTS
par ~c,~o
EA For furnishing and placing 5
FTdl~meter ~tandard manhole,
eom leto in'R ~
THREE THOUSAND ~E HUNDRED ¢0~ the ~um of
DOLLARs
~' NO ..... _CENTS
per each.
N/A NOT USED
EA FoP furnish(ns and placing 4
FT diameter ~top inle~ manhole,
complete tnplac~ th~ ~q~ of
THREE THDUSA~FI~HtIND;TED TEN DOLLARS
/~D NO CENTS
per e~.--
1
For furn)$hing'a~? placih§ 5
FT diameter drop mlet manhole,
complete t~ place, the sum of
FDURTHDUSAN~NT~FK ~)INnREn ~IXTy DOLLARS
pere--~E-h, bio CENTS
N/A NOT USED
EA For furnishing arid placing 5
FT diameter i~p~ "S" manhole
THREE THOUS~l~tl~b~4~E~)~t))h the sum or
AND .... NO DOLLARS
CENTS
p~F each.
For fuPniShtn~ all Tabor,
mat#rials.end Incidentals
required:to complete'Siphon
requirements, complete hl
place, the ~m of
SEVENTEEN THOUSnND FIVE ~RED DOLLARS
~I)----~' CENTS
per ~acl. ..... _NO
2, 068.~0
31140. 00
3, 510.
360.00
3, 160.88
17,
26
27
29
3O
3G
ClT' dF .JFFELL - 214 FO2 O'}lO
J6
48
N/^
15
2?5
REVZSED 00201~13
LF For furnishing and placing 20"
dtmmeter dry bode, complet~ in
place, the ~um.or
S~]NDOnKDTH-IR_TYFIVE OOLLARS
· NO
per lineaP~
.diameter casing pipe~ complete
In Place, the stem ~
TWELVE OOl LARS
EA
_F
LF
S¥
For' abandonment oflat~nd~rd
~ewar manhole~ complete in
place, Lira $t1~1 Of
~., ~n HUN~EE~ DOLLAR~
per ~" N~ _CENTS
t. or ~bandonmen: of ~aMlta~
sewer clo~n out, complele ~n
alice, the sum of
SIXTY DOLLARS
For placeme,t of 6" Class
concPete embedmeat
antt~e [ranch width, complete
in ~lace. the su~ of
~ ~_DOLLARS
per ea~j ~JENTS
NOT USED
For re,ova) and replacement
oF asphaltic concrat~
Pavement, complete in Place,
the sum of
EIGHT DOLl. ARs
AND _. _ _ No-CENTS
per linear
Fnr rumoVll a~d replacement
of 6'~ rninforced concrete
Rip-Rap, co,plate in place,
the snm of
FORTY.DOLkARS
~ NO~ENTB
Per~rd~
60.00
15.80 72Q. ffi 'i
'~c~iptidmjx
Section '13,2.
B. 08. ~
01
10:49 :ITY -IF 30F'PELL - 214 602 Er_-qlO
37 I LS
For f~n~shtng ~nd placing
pl~c~, ~ho sum of
SEVEN THOUSflND DOLLARS
pe~ u~u~p ~U~.
7,0~0[g0
~8 7~46 LF
For Trench ExcavatioflSafety
and Support, ¢ompletu in
place, the ~um of
ND DOLLARS
A~b._.___IWENTY FIW.~GENTS
per linear foot, -
LS For Furnishing ~nd maln%)lning
Traffi: Cofltrol Stgnage,
barricading, ~tc. during and
throqgh completion
~.nstructlofl~ complete
SEVENTEE~ll~Rb~h ~ I ~ ~N~D
DOLLARS
~ND NO CENTS
per ]umo
40 lfl EA
For furni~hing ~nd ~l~ciny
4" PVC ~w~r
DOLLARS
AND '--' NO CENTS
p~r' e6ch. '"'
41 N/A N/A NOT USED
SFCTIDN III - ~ETHEL ROAD
TOfAL BID FOR ALL UNIT PRICES:
THOUSAND SEVEN HUNDRED SIXTY NINE Dollars and FIFTY Cents
0.25
608. 88
358.88
538,769.58
N0.275 PlO :'
1,836.58
10:50 CITY DF
]OPPELL - 214 602 ~910
COMBINATION OF SECTIONS
The u~Q~r~l~ed Bidder-hQroby agree~,to.occeps~am ~ward of
c.n~r~cL based on any ~ed~vidu~l s~cLinn. However, if
¢r~m all prices named in.thes~isections the folloWf~g .mounts:
Combination of, Sections I and Ii, deduct
dollars.
TOTAL BID FOR ALL UNIT PRIGB$ {AFTER DEDUCT)
NINE HUNDRED EIGH~T~oUS~ND EIBH) HUNUR~Ni'¢'~D Dollars .,,d NG (U~ figUr~)
Co~bin~tiO~ 6f S~CtiO~ IIan~) 111 deduct ~ do'I)~Ys
.~ . IOTAC BID FOR ALL UNIT PRICES (AFTER DEDUCT)
(u~e
-..'._? [us~ figures)
Combination of S~tions ) ~nd III. d~duct ~ dolla~.
TOTAC BID FOR ALL UNIT PRICES (AFTER DEDUCT)
ONE ~]LL~ON N~NET~ F~R TH~ND~SEVENTY FOUR DoHars .and ~TY FIVE C~n~
Combination of Socttons I. II, and III, deduct _~ dolla~a,
ZO?AL BIO FOR ALL UNIT PRICES (AFTEn
FOUR ~NDRED FORTY N~ ~'.~NEIY_~E.,.D~ar~ ann FIFTY Cents
Unit Pric~ h~v~ been compu~d In ao~ord~no~ With
BIDDER acknowledge~ that quantitie~ are not guaranteed.and final
p~yment Will ~e based on ~ctual quantities determined as provided
i~ thm Contract Docum~nt~.
S:. Complmtten.
BIDD~R.~ea~ th&% the Work will be substonDially completed and
paragraph 14,13 Of the General Condit'ion~ o? o~ b~fore th~
dat~ or within the number nf c~l~ndar days ,ridicuLed In the
Atk/ns Bros· Equip. Co., Inc
918 W. Marshall
Grand Prairie· Tx 75051
7/1~- _J
~0~50
CITf OF CI]F'PELL - 214 6,02 8910 NO. 295
OO~Ol.16 R£VISEL)
BIDDER accepts the provisions of %he Agreement ss to liquidated
damage~tntheeVenc of failure to complete ~he Work within the
Lime~ ~p~tfied in the Agreement. ~
Attached ~ocuments. ...
The following documents are aL~ached :o and made a condition
of this Bidl
a. Required Bid Security in t~e for~ of
Other gequtramants.
Address ?or Communications.
Con~untcotinn~ cnncmrntng this Bid ~hall ~e addressed [o
~urchasing Office
255 Parkway Boulewrd
Ceppell, Texas 75019
b, BIDDER agree~ that all Work awarded will be completed
within' Calendar Days. Con~)'ac~or wime'will commence
to run as provided in ~he £entract Documents.
c. Communic~tton~ c:ncerning Lids Bid shall be to the address
of BIDDE~ indicated on the applicable ~Ignature p~ge.
d. BIDDER understands that tho Owner is exemp: fPo~
Limited S~les and Use Tax on fungible personal preper~y to
be incorporated into the project. Said taxes are not
included in Contract Price (See Instructions to Bidders).
e, The terms u~ed in this )id which are d~finod in the
General Conditions eF the Construction ~nntrect included
part of the Con~ract Documents have %he ~c:B~gs a~signed
thom in the General Conditions.
f. lerm~ u~eo )n this Bid Which ~re defined in the General
Conditions or Instructien~ will have the meanings indicated in
the General Conditions Gm Instructions.
The City of Coppell re~arvo~ the right ~o delete any portion of
this project as it M~Y dee~ necessary to ~tay within th~
avatl~bl~ fund~. Should the Ottytelect to delete any portion~
:he ¢ontr~:% quantities willbe ~dJu~%ed accordingly.
00301-18
BID AFFIDAVIT
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed
and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or
all commodities upon which prices are extended at the price offered, and upon the conditions
contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will
be calendar days from the date of the bid opening. (Period of acceptance will be
ninety (90) calendar days unless otherwise indicated by Bidder.)
STATE OF COUNTY OF
BEFORE ME, the undersigned authority, a Notary Public in and for the State of
on this day personally appeared who after being by me
Name
duly sworn, did depose and say:
Name
Name of Firm
foregoing on behalf of the said
am a duly authorized office/agent for
and have been duly authorized to execute the
Name of Firm
I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder
or individual(s) engaged in the same Iine of business prior to the official opening of this bid.
Fun. her, I certify that the Bidder is not now, nor has been for the past six (6) months, directly
or indirectly concerned in any pool, :agreement o~(~.m~',~, tion thereof, to control the price of
services/commodities bid 'on, or to influence any ~ividual(s) to bid or not to bid thereon."
Name and Address of Bidder: ~ : ~'~_~-~Tt~- %
Telephone: ( .)
:. ~ :
Title: ~/t~g_.~. ~ll:~77 ,
SUBSCMBED AND SWO~ t0 ~fore me by
on this ~e ~ day of
......... ~)m~ ~blic in and for ~e State of
95C~11
sECTION 00301
BID FORH
PRO~ECT IDENTIFICATION: a~t _ r e
I lethe1
CONTRACT IDENTIFICATION: _SS 94-o2 .
THIS BID IS SUBIqITTED TO: e It ell
255 parkway Boulevard. C~~ -- "
~eretn after referred t5 as O~NER. '
Ctty of Coppell Bid No:
1. Enter Into Agreement.
The undersigned BIDDER proposes and agrees, if this Bid is
accepted, to enter tnto an Agreement with O~NER tn the form
Included Jn the Contract Documents to perform and furntsh
gork as specified or t~dicated in the Contract Documents for the
Bid i~tce and vithtn tho Bid Times Indicated Jn this Bid and in
accordance wtth the other terms and conditions of the Contract
DocuISentl,
2. BIDDER Accepts.
BIDDER accepts all of the terms and conditions of the
tflCludtng .$t~OUt ilmicatlofl ~nose aea, m~.-.~.,..-- -- ~
~eimmnt ,ith the Bonds ~nd other d~.meqts re~]?~y,~
ddt~g Requirements ~tthln fifteeo ~l~J gays aT, er ~nu u~w Of
OM4ER's Nottce of AwaY.
BIDDER's Representations.
Zn sublattting thts Bid. BIDDER represents, as more fully set
forth in the Agreement, that:
e. BIDDER has examined and carefully stud~e~
Documents and the following Addenda rece~pT of
hereby acknmeledged: (List A~denda by Humber and Date)
ADDF./~3A NO. DATE
00301~2 R£VISEO
BIDDER has vistt~ad the st%e ar~l becoa~ famt]tar with and ts
satisfied eS to the genera], local and site conditions that
m~y affect cost, progress, parfo~nc, ~ furnishing of
the Work.
c. BXODER is fmmtllar with m~d is satisfied ms to all fader)l,
~tete mhd local Laws mhd Regulations that ~ty affmct cost,
progress, performmnce end furnishing of the Work.
d. BXDDER has obtained and carefully studied (or assumes
responsibility for having done so) all such additional or
supple~ntary ~amtnattons, tnvesttgmttons, explorations,
tests, stUdies end data concerning conditions (surface,
mubsurfmce ~nd Underground Facilltlea) at or contiguous to
the site orothe~tse.which m~y affect cost progress,
performance or furnishing of the Work or which relate to
~ aspect of the meana, methods, techniques, sequences a~d
procedures of construction to be employed by BIDDEN and
safety precautions and p~ogr&ms incident thereto.
BIDDER does not consider that any additional examtnattons~
investigations, explorations, tests, stu~!~s.or dat~ are
necessa~ f? the determination of this BlS rot performance
and furntshmg of the Work in accordance with the items,
and other te~ms and condlttons of the Contract
~tce arm i
cuments.
BZDD£R has co.elated the information known to BXDDER,
Information and observations obtained from visits to the
siti, reports ~nd drawings identified in the Contract
Oocun~nts and all additional examinations, Snvosttgattons.
explorations, telts, studies and data with the Contract
Docents.
BZDDER ha5 given EJ4GI~EER written notice of all conflicts,
errors, ambiguities or discrepancies tn the Contract
Docu~nts and the written resolution thereof by ENGZ#EER ts
acceptable to BIDD£R, and the Contract Documents are .
generally sufficient ~o.indicete and convey understanding
of e11 terms and conditions for performing and furnishing
the Work for which thts Bid ts submitted.
Where conflicts, errors, ambtguttles or discrepancies have been
discovered in or between Contract Documents and/or other
~elated documents, and where said confl~ct$~ otc,, have not
been resolved through the interprstattons or clarifications by
EHGZNEER as described in the Znstructlons to Bidders, because
of Insufficient tJme oc othe~tse, 8ZDD£R has included in the
Bid the grea~er quantl~y or better quality of Work~ or
compliance w~th the more stringent requirement resulting in a
graater cost.
RE'VISED 00301-3
This Bid is genuine and not made in the interest of or off
behalf of any undisclosed person, ftc. or corporation and
ts not submitted tn confo~tty wtth any agreement or rules
of any ~reup, assottetton, organization or corporation;
BIDDER nas not dtrectly or indirectly induced Or solicited
a~V other 81DOER to subltt a false or sham Btdl BIDD~ has
not solicited or induced any person, ftrm or corporation to
ref~atn from btddSng; and BIDDER has not sought
bY
co]]usion to obtain for ttself an~ advantage over any other
BIDDER or over OWNER.
Btd Prices.
BIDDER wtl] complete the Work t, accordance with the Contract
Documents for the following price(s):
All spectftc cash allowances are included tn the prtco(s) set
forth above and have bain computed in accordance with paragraph
1Z,8. of the General Conditions.
CITY OF
UNIT PRICE BID
FOR
COPPELL SEHER IHPROVENENT$
SECTION I - GRAPEVINE III
ITOI
ho,
ESTINATED DESCRIPTION AND UNIT
QUANTITY UNIT PRICE IN ~ORD$ PRICE
TOTAL
ANOUNT'
N/A
166 LF
NOT USED
For furnishing and placing
8" PVC sewer (I$'-ZO' depth),
complete in )lace, the sum of
per linear foot.
6-13 N/A
14 ZOO
N/A NOT USED
LF For furnishing and plactng 15" /-~ ~<~ /
SOR-3$ PVC sewer (O'-10' depth)~"-'-
complet~.t~ p~aco, the sum of
/'~TT/ 0OLLARS
AND ~ CENTS
per nT~ ~ '
,00301-4
18 2570 LF
16 1094
17 23O
For furnishing and plactng
IS" $DR-35 PVC sewer (lo'-15'
depth), complete tn place,
the sum of _
COLlArs
~ND ' ' CENTS
par 1In--foot.
~5' $D~-38 PVG sewer
depth), complete in place,
~DOLLAR$
LF For furnishing and placing ,
IS" $DR-36 PVC se#er ~20'-25
dote tn pl~ce,
depth), comi:
AND~CENT$
per linear foot,
]8 N/A
2O
N/A NOT USED
EA For ~urnJshlng and placing 4
irT diameter stlnd&rd manhole,
~ ~omp]~e J.n, pla¢% the sum of
' ~ CEOS
per each.
8 EA For furnishing and placing S
FT dtameter standard manhole,
__ complpte in place, the sum of
"/mg~'l/.ee~V/~DOLLARS
pep each.
Z1 1 EA
For furnishing and placing 6
FT dta~ter standard manhole,
complete_, in place, the sue of
per e~h.
22 N/A N/A NOT USEO
RE¥ISED 00301-6
23
24-26
26
2g
30-31
32
33
34
H/A
718
718
g
N/A
12
188
835
£A For furnishing end plactng 5 ~2~~,d)
FT diameter drop Inlet manhole,
complete in.place, the sum of
..~ ' ~ DOLLARS
~ CENTS
per each.
NOT USED
LF For furnishing and plactng 20"
dtameter dry bore, complete in
~4~-/f,~ ~ OOLLARS
cr TS
par Iln61r
LF
For furnishing and plactng 20" ~,a~ .
dtametor castmJ pSpe, complete
ENTS
EA For abandonment of standard
place, th~ sum of
~ ..~OOLLARS
~ CENTS
per each.
fl/A NOT USED
SY For removn~ and replacement
of 8" reinforced concrete
pavement, comp1 ere tn pl ace
the
s~DOLLARS
~CENT$
per square ~
S¥ For remova~ and replacement /p/~:~) '7~,~'Z'/~,e~d'~, ,,
of re~nfo~ed concrete
drJve~, co.leto ~n place,
the sum
CEHTS
per square yaed.
LF For removal and replacement
of reinfo~ed concrete 4 FT
wide sJde~alk, coeplate in
per ~
.00201-6 REVISED
37
N/A NOT USED
~ LS For *'u,-.~.~.~ ,n~ p~c~n, /~/.~-~ _ /~ /
landscaping, ce~la~e tn
_ ~ce, the~u~f
38 3S55 LF
39
40 8
per ~u~p su~:-
For Trench Excavation Safety
and Support, complete in
plsc~e sum of DOLLARS
41 102
CENTS
tS For furnishing and maintaining ~)~ ~,~r~ ~
Traffic Control stgnage)
b&rrlc~dtng, etc. during and
through co~letton of
construction, co~letm in
~..placl, the sum of
AND ~ / CENTS
per 1-ump sum.
EA For furnishing and placing
.._~o~.pJete tn p~Ge).the stea of
AND ~_ / C~TS
per'ch.
LF For furnishing and placing
24" ASTH F-497 PVC sewer
(25'-30' depth), complete
.... Jo p. lace,.~he sum of
D)~NF-~~ CENTS
per~
SECTION I - GRAPEVINE III
TOTAL BID FOR ALL UNIT PRICES:
~se words)
(use figures)
SECTION II - GRAPEVINE
ITEH ESTIHATED
NO. QUANTITY UNIT
! 215 LF
2 2Z5 LF
IV
DESCRIPTION AND
PRICE IN WORDS
For furnishing and plactng
6" C1, 60 Oucttle Iron Ptpe,
comp_)ete tn nlace, the sum of
pet" ilfleat' TOOT,
UNIT TOTAL
PRICE AJ4OUNT
For furnishing and plactng ~p,dO
8" Cl. 50 Ducttle Iron Ptpe,
the sum of
~CENTS
3 N/A N/A
4 13 LF
For furnishing and plscJng 8' 7~0
SDR-36, PVC smee~" (10'-15'
depth), complete tn place,
5-9 WA
IO 567
1565
N/A NOT USED
LF For furnishSng end pl4c~n9 ~
12" $DR-35, PVC sewer (0'-10~
depth), complete tn place,
_LLA S
'~N~~CENT$
pe~ 11near ~oo~,
LF Eo~ ~ur~t~htn9 ~d p~actn9 ~/~
12" S0R-35, PVC se~e~ (lO'-lS'
depth), c~plete Jn place~
00301-8 REVZSEO
580 LF
For furnishing and plactl~l
12' $OR-3S, PVC setm~ (IS -20'
depth), complete tn place,
N/A N/A NOT USED
20-23
24
2S
26
27
N/A
316
N/A NOT USED
$ EA For furnishing and placing 4
FT dtm~etar Type'S" manhole,
_~-_.,,tfC.~te J_~p]~ce...t~. sum of
~D~CENTS
pep
For furnishing and pllctng $ ~77~',0c> ~.~,~b ~'
FT dimetor Typo 'S' man~le,
~lp~e In place, the s~ of
CLARS
per each.
EA For fu. rnJshtng 111 labor,
mter~als and tncldontels
required to complete Stphon
structure per contract
requirements, complete In
LF For furnishing and plactng 20" /~
dieter dry bo~. co~lete Jn
OLdS
ENTS
28
2g
30-31
32
33-35
36
37
38
N/A
9
6
REVISED 00301-9
LF
For furnishing and pltctng
diameter castng pipe, complete
t_,n. pta~e, the sum of
.. ~ DOLLARS
per lJndir
For abandonment of st&ndard
setmr manhole, complete tn
OLLARS
ENTS
per each, -
N/A ~OT USED
LF
For~.~ovil and replacement
of 8" ~elnforced concrete
pavement, complete tn place,
th,~,~// DOLLARS
AND ~;~ ,ard'. GENTS
per square ,~
N/A NOT USED
SY Foe t~aoval and replacement
of G" reinforced concrete
RIp-R~, c~plete tn place,
~u ~CE~S
per square ~ard.
L$
landscaping, complete tn
CENTS
per lump sum,
LF
For furnishing and placing ~__,~¢~ ~p,,~c~ ~/~
For Trench Excavation Safety
~d Support, complete tn
ace,.~sum of
(-/)~-/ DOLLARS
AND ~:~, --CENTS
per ltrmar foet~ '
00301-10 REVISED
39 I L$
40 8 ~
For furnishing and mJntalntngg~/-~~
TraCfl¢ Control Mgnage,
barricading, erG, durlng and
through cf~Pletton o~
construction, complete in
c DOLLARE
ENT$
For furnishing .nd plactng ~'~ ~.a~
4' PVC ;e~er services,
, the sum of
DOLLARS
CENTS
per each, '
4] N/A N/A NOT USED
SECTION ZT - GRAPEVINE IV
TOTAL BID FOR ALL UNIT PRICES:
SECTION ZZ! - BETHEL ROAD
ITEH EST]NATED DESCRIPTION AND UNIT TOTAL
NO. QUANTITY UNIT PRICE IN NORDS PRICE AMOUNT
I 1]0 LF
For furnishing and plactng
6' C1. 50 OuctJ]e l~on Pipe,
eomplet, e ink,lice, the sum of
~ ~OL~RS
~D ~CEMS
pep II~P ~GOT,
2 IlO LF
For furnishing,and plact~g
8" Cl. 50 Ductile Iron Pipe,
complete/in place, the sum of
~r~_.z~?~__DOLLARS
-AND CENTS
pep 11near fo~t.
3 ]3 LF
For furnishing and placing
8" SDR-35, PVC sewer
depth), complete in place,
y' DO u RS
AND ~ _ ' CENTS
per 11near foot.
fi-
REVISED 00301-11
5-6
4 5 LF
8
10
11
23]4
1648
15
892
2477
For furnishing and plactng
6' $DR-~S, PVC se~er (lOS-lS
depth), complete in place,
~~LI.AI~
~D ----~ CENTS
per 11nea~' foot.
N/A
LF
LF
LF
NOT USED
For furnishing and placing
10" SDR-35, PVC sewer (iO'-]S'
depth), coe~lete in place,
t h~sam of
/ff I DOLLARS
~¢EHTS
For fumtshlng and placing
1~" SDR-26, PVC sewer (0~-5/
depth), complete tn place,
~~DOLLARS
~(;ENTS
LF
For furnishing and plactng
12' SDR-35, PVC sewer (5'-10'
depth), cmaPlete tn place,
~ --"CENTS
per T~nilar fOOt.
LF For furnishing and pl&cJng~7~'~
12" $DR-35~ PVC sewer (I0'-15'
depth), coaplete tn pl&ce,
DOLLARS
CENTS
t2-18 N/A N/A NOT USEO
*00301-12 REV[SED
19 13
EA For furnishing and plactng 4
FT dlameter standard manhole,
~ d~a~ter standard manhole,
~7~ ~oq)ete In place, the sum of
21
22
~/A ~/A ~OT USED
u For ~u~i.h~n~ a,,d p~.~.g 4 ~'~ //~'~'
FT dieter drop inlmt ~hole,
~ ._q~]~.~ (p ~]ac~, th~ sum of
~~~_~~LL~
' / ~C~TS
23
EA For furnishing and placing 5
FT dl~eter drop inlet manhole,
cowlete tn ~l~ce, ~be s~ of
~C~T$
24
26
1
N/A NOT USED
EA For furnishing and p. lacing 5
FT diameter Type's" manhole,
~ co~lJ~t~n place, the s,,~ of
per h~c~
For furnishing all labor,
materials and incidentals
required to complete Siphon
structure per contract
requirements, complete in
/~/~ DO~LA~S
· ~CE~S
per each.
28
29 6
3O 4
32 46
32-34 N/A
35 6gg8
REVISED
LF For furnishing and placing
diameter dry bore, complete
place~ the/su~ of
~OOLLARS
ANU / - CENTS
per 11neEt
LF For Cumishing and p]actng 20'
diameter castng ptpe, complete
~um of DOLLARS
CENTS
per linear foot.
sewer manhole, complete tn
plqcp, .the sumAf
OOtCAaS
/ CENTS
per ~
EA For abandonment of santtar~
sewer c]ean out, complete tn
DOLLARS
LF For placement of 6' Class "B" ~7'~a ,,//~-~/~'~ /
concrete embedment across
enttre trench width, complete
OOLLARS
CENTS
per each;
N/A NOT USED
LF For removal and replacement
of asphaltic concrete
pavement, complete tn place,
the ~um of
DOLLARS
'CENTS
36 7 SY
For removal and replacement
of 6" reinforced concrete
Rtp-Rap, complete tn place,
the sum of
AND~DOLLA~
per~CENTS
sqUe~ $
~-~See~ecrtptten
Page OOlO0-11
Section 15.2.1
.00301-14 REVISED
37 ] LS
'For furntshtng
landac&ptng, complete tn
~DOLLAP~
per lump
38 7346
39 ]
40 18
LF For Trench Excavation Safety
and Support, complete ~fl
place,~)Td~lum of
DOLLARS
LS For furnishing and mJntatnlng/~'~'~,~.
Traffic ~ontrol stgnage,
b~r~tc~dtng, etc. durJng and
through completion of
constructton, comlete ~n
~O'~~CE~$
pep 1~ fa,
EA For furnishing aAd plactng
4' PVC se.er services,
LIARS
NTS
41 N/A N/A NOT USED
SECTION II! - BETHEL ROAO
TOTAL BID FOR ALL UNIT PRXCE$: _/~/-//~. /~/~5/~//_~e~C)~~~
(use words)
/V~/v/~;~;'~/7/~ ~_~;~/~ (Use flgures)
REViSeD 00301-15
COHB]NATZON OF SECTIONS
Tho uode~stgned Bidder hereby agrees to accept an ewerd of
contrect based on any Individual soction. However) tf aw&rded
two or more secttons~ the undersigned Bidder agrees to deduct
from all prtces hanoi in those secttons the following ~unts=
Combination of Sections ! and I~, deduct __
TOTAL BED FOR ALL UNIT PRICES (A~TER DEDUCT)
Combination of Secttons I! and ~[~, deduct
TOTAL B~D FOR ALL UN;T PR{C£S (AFTER DEDUCT)
Combination of Secttons I and Z~l, deduct
TOTAL BIO FOR ALL UNIT PRICES (AFTER D£OUCT)_
(use uo~is)
-C~ ,. dollars.
(use
(S
~ _ dollars,
(use WOrds)
(S
Combination of Sections I, II, and IIl~ deduct
~O Foe ALL UNiT PRICES (AF?~R DEDUCT)
TOTAL B
- / //
11.9.~, of the ~ene~i conditions.
B[OOER acknowledges that quantities are not guaranteed and
p y ent will be based on actual quantities determneo as prowaea
in the Contract Documents.
Completion.
810DER agrees that the ~ork will be substantially completed and
co~p~etea and ready for final payeen~ ~n accordance utt~
paragraph 14.13. of the Gene?l ~on~lti~fls o~ ~ b~f~re t~
dates or within the number Or calenaar Rays ~n~catea tn :ne
Agree~nt.
BIDDER accepts the provisions of the Agreement es tn liquidated
damages in the event of fatlure to complete the gert within the
times specified in the Agreement.
Attached Documents,
The follow~ng documents are attached to and msde t condition
of this B~d:
a, Requtred Bid Security in the form of ~/~ ~#]P
8. Other Requirements,
Address for Com~nications.
a. CommUnications concerning this Bid shall be addressed to
Purchasing Office
256 Parkway Boulevard
Coppe11) Texas 75019
b, BIDOER agrees that all Hork awarded wtll be completed
withtn ~ C~lendar Days, Contractor wime will commence
to run as p~owdad tn the Contract Documents.
c. Cmmmunicat~ons concerning this Did shall be to the address
of BIOOER indicated on the applicable signature page.
d. BIDOER understands that the Owner is exempt from State
Ltwited sales and Use Tax on tangtble personal property to
be Incorporated ~nto the project. Said taxes are not
tncluded tn Contract Price (See Znstructtons to Bidders).
e, The terms used tn this Bid ~htch are deftned in the
Gemeral Conditions of the Construction Contract included as
part of the Contract Documents have the meanings assigned to
thee ~n the Gener~l Conditions.
f, Terals used in this Bid which are defined in the General
Coadittens er Instructions will have the meinings indicated in
the General Conditions or Instructions,
serves the right to delete any portion of
The City of Coppe11 re 's
this project as it .~_deem .~c)ssa~y To.st~y.v~Th!~.t~_~
evailible funds. Should the city elect To aele~e any pur~v-,
the contract quantities will be adjusted accordingly,
_, 19_~.
SUBMITTED on ~'./~
REVISED 00301-1
S£CTIO~J 00301
811) FO~
NWJF. CT IDENTIFICATIOI(:
COIITR~T IDENTIFIUTIOII: ss 94-o~ ,, ,
TH~S 8ID I$ SUBHITTED TO:
here~n e ,
C11~y of eol~e11 eld No: ....
X. IE.1~r Into Agreemmt.
e
accepted, to enter tnt. an Agre,.mt vlth?N~ll ~m tho.~.om..
tmclidnd tn the Contract Bec.rants to perroru and furmsn III
York a~ spectP~od or Indicated In the Cor~ac~ Documents for the
8td I~ce tnd vtth~n the 8id Ttmes ~fldtcotnd tn thts Bid lad 1.
accordance vtth the other tem~ e~d condKtons of the Contract
Documents.
BII]D£R Accepts.
BIDDER accepts &l] of the tl~mS and coMitJons of the
Advertisement or lnvltetton to B~d mad Instructions to Bidders,
Including .tthout limitation thole doellflg ~tth the disposition
of Btd security. This Bid vtll rumtn subject to eccoptmnce
for nl~ety (90) days after ~hs ds~ O~ 8.1d o~.ning. 81~ Wt11
sign end dmltver the requt~ number, or counterparts or ~ne
Ag~amNnt with the Bonds end other oocuaeflts requJred by the
g~ddtng ItequJrmmnt$ vlthtn fifteen (15) days after Ohm date
OWIE.q's Notice of Aklaw:l.
3. mIDI)ER' s Aep~ese~tattons,
In submitting th1! Bid, BIDOEA represents, is more f~11y set
loath tn tim Agreemflt, that:
8II~EP, ha~ exmtnod &M ce~efully studl~ ~ko 81ddlng
Oocumnts and the followJng Addenda receipt of oll uhtch ts
hereby &Ckllowledged: (List Addenda by flUBlmr arKI D~te)
0030]-2 REYtSED
B[0OER has vJIJtid the IiSI end btcoa fItlier
satisfied as &o the gone~al, 1~1 end site c~Jtlenl
~rk.
BIDOEIt is fmtltar utah usa ts satisfied es to el! federal,
kaita end local LMdS and ReguTatlons that may afi~ct cost,
progress, perForuonce and furnishing of abe Ibrk.
d. BXDOER has obtained and carefully studtad (eT esaqualu
respmmlbtltty for havteg done so} all such additional or
aupPllmlntat-y w~jlnatlons, Investigations. explor`attons,
alisa, studios and data comcerntug condtttons (surface,
lUbeerfice N UielurgrOUIKI FKI]ttlas) at or conttgueus to
perfurllnce or fUrBishing of the llork or uhtch relsta to
a~y eSl)OCt of tho lelma, methods, techniques, sequences and
procedures of construction to be eeFlo~edi)y BIDOER end
safety prnceuttona and p~ogreas Incident there~o
B[DOER does not consider that any additional examinations,
Investigations, e~lorettons, tests, studios or, date ere
necessary f~r the detoretnetton uP this Btd for pir~o~e
a~ Fu~tshlng of the Murk tn a~o~ance vt~ the taws,
prt~ ~ ot~r ~ ~ c~itt~s oF the Contr~
e. BZDOER his correlated the Infonmtion known to BlOt)ER,
iflFoMattoa and ebaervetJons obtained ~ vJsf¢~ to the
sit], reports and drmslngl 1dentil'tod tn ~m Contract
Documents and alt addltlonal examinations, Investigations,
explor,attons, tests, studies and data vlth the Contract
Decants.
f. BIDDER haa g~v.~.,EAIG]NEER ffrttte~ notice o~ all ce~flicts.
errors, ambiguities or dlac~panCtos tn tho C~trac~
~c~ts a~ t~ ~ttt~ rasolutine therlof by ~INEER ts
Kc~ble to BI~, a~ t~ Contract ~ts ITu
g~erally sufftcl~t ~ Jodtcate ~ conve~ ~ratl~l~
of all ~ nd co~tttons for perfomln9 and ~iskt~
tam Nm-k for uhJch thts Bid ts submitted.
Vhe~ conflicts, error`s, ambtg,*Jtles or dtscrepasctes have bain
discovered in oF b.twem Cofltract Documeuti a~/o~ other
~leted docunmnts, and ~bere satd conflicts, eec., hive not
been PeIOIvEd threug~ ~e tfft_e~p~mtettons er clar'tflcattons by
ENGINEER es described In the Instructions to Bidders, becuuae
of tnsu~recteut ttm or otherwlle, BIDDER has Jnclu~red tn the
tim greater quauti~y e~ better qualtty of ~rk, or
cnepltaKe ~Jth the more stringent requtr`eMnt resulting tn a
greater cost,
REVISED
g. Th{s Bid ts goeu{nl iud not uafe in tho interest of ~ on
Mail of eux ~lsclosM ~rsofl, tim or ~or~tton a~d
of ~ ~, is~It~l o~lntzi~tan or
B~ h~ not d~otly
~ o~br B~ ~o subJ~ a false o~ sba etd; BZ~ has
~f~aJn f~ biddf~, a~ BEOOER h~ not ~ght by
collus~ to ~4u ~or 4tself ~ idvn~age ov~ ~ o~he~
4. $1d P~Jces.
eIOOEI ~11 complete the l/ork tn accordance with the Contract
Documents fertlm folloutng p~tce(a):
All spncJftc cash ellouances are t~cluded in the
forth above and have been cmnputed Jn accordance
11,8. of the GlUm'aT Coodtklons.
uttb paragraph
CITY OF
IAIT PRICE BIO
FOR
COPFELL SEWER IHPROV~EJI~S
SI~CTION I - GRAPEVINE Ill
ITEM ESTINAT~D DESCRIPTION AND UNIT TOTAL
NO. QUMITITY UNIT PRICE IN ~QI~S PRICE ANOU~
!-4 N/A WA NOT USED
S 166 LF For fur~tshtng and placing ~,~
8' PVC sWer (16'-20' depth),
cau~let.e tn pTace, the sum of
~~DOLLARS
AH ~ C~S
~-1~ ~A ~A
14 200 LF
HOT USED
For' ~urnJshJng and placing 15." __~ I~?oC~3.
SDK-3S MC s.?e~ (O'-lO' d~th),
c~!~ tn place, t~ s~ of
per liMa"foot, '"
00301-4 IIEVISB)
15 ~70
16 IQ94
17 230 LF
LF For t~tshlng and plictng
15' ~ 35 Pvc sever (10'-IS'
depth), c~mplete tn place,
the sub oJ~
.~ 6.~[~.
MD' '~
LF For fu~Jshtflg and plactflg '~°~-°
IS' SDR-IB PVC IOW)' (15'-~0'
depth), cauplete tn pike,
the si of
AND ~.~-- C~tT$
per 'llnea~' foot,.
For ~urntshing end
15' SDR-IS PVC sever
~epth), complete fn plat_e,
the si
18
19
2O
Z!
N/A ~A NOT USE]O
5 EA For fu~tshtng and placing 4 ~ 1~/~.
~le~ tn pla~, ~ s~ of
cEm
poF
FOr furmishtng and plKlng S
FT dJw~e~er standard inhule,
c .o~ple~e in place, the sa of
For fuFetshing a~l placing
standard
IrT dt Iter InhoIe,
coiple~.u tfl place, th s~
22 ii/A N/A NOT USE1)
~4 -~6
~7
Z8 718
20-3! #/A
32 ]2
33 188
For furntshtng~ pluctngSOw
dtamete~ drX ~, ~aplit~ In
p)l~ the sum qf
REVISED 00301-5
LF Far ~val a~ r~lecemnt
af ~tnFo~ed concF~e 4 FT
uide stdMlk, ~lete tfl
place, the sm ~
~,
CENTS
~F~c~ I~LLAP~
D ~ CENTS
per ~qu~m y.ra,
sv ~o...m.1 mi rep~ac~nt
of reinforced ¢onc~t~
pavemflt).c~lete In plac*,
the sum o?
drtve~y, ceopleta in p]ace,
the ~tlm of
per tqu&~l
38 3555
3g I
40 8
N/A It01' USIEO
LS For furfltshing and p~actng
landsciptng, campleto in ' -
plece, the suu
per ]~p sum,
For Trench Excavation $1ht,,y
and Support, coaple~e
pliCl, the Sul of
]Qa~~~E LLARS
NTS
per
LS For furnishing and maintaining
Trifftc Cont~l SJllnage,
barricading, acc. during &nd
through C_mlplettm.o.l' .
const~ucklon, COIl)leTO In
peF 1~ sum.
For furnishing and pllctng
4w ~ SMr services,
complete tn pltce; the sum of
per each.
41 102 LF For furnishing and plactng 150. )~:~.
24" ASTI4 F-497 PVC sever
per eaCh~
SECTION [ - ~E1/ZItIr Ill
TOTAL BiO FI)Il ALL ~IT PRICES~ ~1~ %ur~(~l
(use uo~is)
, } i {use ftgu~s)
REViSEO 00301-I
SECTION Il - ~H~APEVZNE
ZTL'N ESTIHATED
I ZI$ LF
IV
0E~CRIPTION AND
PRICE IN ¥ORD$
For Purutshtrg and placing
6' (;1. 50 Oucttle l~on Pipe,
coa~let~ In j~llce, the sun of
For Nrnlsht~g and plactng
8" Cl. SO I)ucttle Iron PIpe,
complete l~n place) ~ke sum of
? 'CENTS
P
UNTT
TOTAL
oo
3 N/A
4 I`1
$-0 N/A
lO ,567
11 1565
I~A HOT USED
LF For furmtsht~g afld placing ~.~ ~,|;~.~
~pth), c~l~e t~ pl~,
~e sm of
per 11ne&r fo~. ~.~ .
LF For fumt~lng
12' ~-35, ~ sweF (10'-15*
00301-8 REVISED
1! MO
LF For furn~sMng nd pllclng
1~' SDR-3S, PVC sever
depth), _c~ple~4 In place,
~be sug of
AND ~--~ CEN[5
per linear foot,
13-18
N/A N/A HOT USED
~0-23
2~
27
WA H/A gOT US[D
3 EA For furntshtng lad placing 4
FT dtOmt~r T~o 'S' mnhole,
complete tn plac.e, th.e sum of
£A For fur, tshtng and plactng $
FT dlimter Tjq)e 'S' -lnhole,
c~pleto In place, the sum of
per e~ch.
316
~equtred to complete S4p~oli
structure per contract
place, tim sm of
· ' DOLLARS
-AND-- ' t
per llhO~F foot~
i~qiftremeJits, colplitl In
place, the sum of' .
' - a~d WI. ARS
AND- *L~ .... CENTS
LF For Furnishing and placing 20' ~...~,~:~?_~.oo
dtameter dry bore, cemplete In
2g
37
632
9
REVISED O0301-O
For aba~onmnk of sta~a~
se~eY manhole, e~lete tn
LF
For removal and ~epJ~cm~
of 8' relnfa~ co~crete
~hymnt, cm~lete tn place,
N/A #OT USED
SY
For ~uo~l! iai replacment
Of 6~ ~ln~o~ cO~c~ltn
RIp-Rap~ c~lete in pllce,
tim sm of
DOLL.S
~¢ENTS
LF For Trench Excavation Safety
end Support, camplete tn
place, the sum of
~.~ DOLLARS
MD CENTS
pit ~
00301-1D R~-VISED
i LS
For fu~sts#lng iud
Tr~fl'ic Co.tro! ~tg#nge,
bartlett, Etc.
c~st~tlon, c~l~
For furollhlng lad plKtng
4' PVC se~r sewlces,
complete Jn place, the sum of
~ r%~ CENTS
p~P each.
41 N/A N/A riOT USED
5~CTION II - 6RA~[~INE IV
TOTAL BIO FOR ALL UNTT PRICES:,. ~or
(,se vordf) I
SECTION 1II = 9~q14EL HOA0
ITEH ESTIMATED OF~AIFTION kJiO
HO. QUANTITY WIT PRIC£ IN ~ORDS
I IlO LF
For furnishing afld placing
6' Cl, 50 Ductile lPo, Pipe,
eempllteJw place, the sum of
cms
UNIT TOTAL
PRICE ~lNrr
z
3 13
LF E? fu~ishtng and placing
8 C1. 50Ductile Iron Pipe,
cogplete in place, the sum of
LF For furnishing and plKing
6" 5DR-35~ PVC Im~r (0'-10'
deptH, complete iii plicap
~e sm of ~
REVISED 00~01-II
4 5
5-6
2~14
1648
9 15
10 692
l I 2477
LF For furnishing an~ plact~ ,
depth), COl~l~e tit place,
tim sm of
N/A NOT USED
LF
LF
~.,0.~° %%0.~°
For fmmishtng and plKln, g ,
10' S01t-3S. P~C smmr (0 -10
d~pth)~ cgmplete tn plKe,
tim sm of
AND ~ ~. ' ,, CBIT$
ixkr llmeir ~oOt.
For farnlshlnga~d plactng -~%,~ J.?,~.J~
lO' SDR-3~, PVC smmr (10~-~5' -- '
de~th), cMaplete tn place,
tim sm of ~
~ CENTS
LF For furnishing and pllctng
IZ' ~)R-3S, PVC se~er (5'-!0'
depth), cmaplete tn plice,
tim sm of'.
AND ~ C~S
pe~ 11ne~r foot.
F~r f.rntsking and pl&ctng ~O.~
Il" $0R-35, PW; se~er (Ig'-15'
deptk)) ~1~1 tn pl&cm~
~he sum of
A~ ' ' ' ~S
12-]8 N/A #/A KOT USED
00301-12 REVISED
lg
2~
13 EA For fu~ishtnf and plactn9 4
FT dtem~er atnnda~ mnbole,
cmeplet, e In place, the sue of
2
ll/A
4
For furntshteg Ind llctng 4 ~:~,* ~
F~ dtamter drop tfl~et aumkole~
c~pleta in pls~, ~e s~ ~
~r each.
23
24
26
N/A
For furnishing and placing 6 ~ .~-~ ·
FT dtameter drop inter mm~e, '
~l,~Jn pl.e, ~o ~ ot
N/A NOT USED
1 EA For fuPnishtng all labor,
materials and tactdemta~a
~equtred ~o oomplete Siphon
structure per contract
place, ~he sma ar .
par each; ~"
!
~I$~ 00301-13
27 IS LF
28 lS LF
3O
31
32-34
35
36
69~
7
For fur~hlng In4
per ~lJ~alr Foot,
Fog' abandonment o~ standard
Sekler mnhola~ complete tn
pl~, the III of.
For abandoiien% of flnttar.y
seder c~ean out, ~lete tn
I)IICI, ~;Itl ag of
pal' ~ch.
LF Far pl~t of 6" C~ass
cenc~e ~nt ~c~ss
tn plea; ~ sum oF
~'A NOT USED
Of as~altJc ~te
Page
~vlt, c~JetI ~n pl~, S~tion 13.2.1
t~ si of
SY
For rmmvul ami riplace~ent
of 6' r~tpfor~d concrete
fltp-Rap~ couplete tn place~
the SI of
~,~$~ IX)LLARS
O0-t0)-~4 RL'VTSED
38 734~ LF
30 1 LS
For T~nch
and Sui)pon, cmple~u
In
place, ~he SUB O~
o~ BOLLHLS
40 lB EA For furntlhlng and placing ~(~.. ~
4' I~ r~mF services,
complete tn place, the sm of
~ CmTS
41 N/A N/A mw UsED
SECTION ZII - ~L'TH[L ROAD
TOTAL BiD FOR ALL IMIT ~lCES: ~J,(-~
(use vords}
1~I4BINATiON OF SECTIONS
COati'aCt bued off I~y tndtvlaaa! sec~lon, mvuvar, ..
two Or Bore snctlens, the ulld~tgl~l Bf.d.~er_a~.r~. tO
fr~ all prtces nmod In t~se ~t~ t~ roll.lng ~un~s,
Citnillon of SKIJonl J and lis deduct ~_-~ro ._ _ dollars.
BID FOR ALL UfllT PRICES (AFTER DEDUCT) ~_Q_~oo
TOTAL
~uam rl~UrUl
Canb4nEtton of Secttoas !I and III, deduct ~o~cO , dollars.
TOIAK BID FOR ALL tl4lT PRIC~S (AFTFJI. DEDUCT)~rlc/~
[,use tm~g)
~AL BZD F~ ~ UNiT ~C~ [AF~ ~O~T)~
, ' (ark ftgu~si
~TAL BIO FOR A~L~TT ~lC~ (~[g O~1)~
U~tt ~l~s have ~n ~ tn ~co~c~ ~tth parqr~b
]l,g,S, of ~e bMrtl ~tttens,
BIDDER acknovledges that q,i~t.itte~ .a.?.not.g.uara.nte~d. and ft.n~?,
pa~flii_ nt vtll be based o.n Ktual qtJaht;1tlaa dare,linen is.pro¥1aea
tn the CoflWact I)oc~almlts.
Cmt~l arian.
BiODER agrees th&t the Uork .v111 be subStanttal, ly coeq~.l~pt~d nnd
Calpl~ ~ld Flad~_ for final pqment in accora~nca
paragraph 14.13, of the liener&l Conditions on or f~re the
climes or wltkln the nmlbe~* of oAlendnr days 1edit&ted In the
Agreeiant,
0D301-16 REVISEO
BTM accepts the provtslms of the Age#met ss te 11991.da..l~d
dmaiges 4a the event of failure te template khe Work wit#tn
tt/S spwclfted tn
Actic~ ~nts.
~e fo11~tng ~ts a~ att~ to and mdc a co~ttion
of ~is Bid:
a. ~ut~ Bid S~r4ty
~ss ~or C~ntcattens.
f~ Pl~ Bouleva~
b. BZ~ER q~es
~tu ~ Ca~r
c, C~tcaLt oas
of BI~ t~S~tK on the ~14CeDle SI~iT~ pig
d. 8I~R ~e~t~d8 thlt tko ~er.)~ exit f~g Stit~__
L~mttK Sales
~ t,~ed
e. The terms used tn this Btd vhl.ch ~.~. de.rtn?d ~..n ,the,_j_j es
G~naril Conditions of the COflSTJ'UCT,1On contract lfl¢l.UUgu. _
~-~f the Co~trKt Documents have the tmantngs Ililgf~a To
Lhem In the brdril Conditions.
Terms used tn t~hi$ 8td which a~e defined tn the Gener&l
Conditions or
the 6e~erll
07×12/95 14:21 CITY OF COPPELL
REVISED 00501-1
StrCTION 00301
BID FORN
MWd£CT IDENTIFICATION.*
CONTRACT IODITIFICATION: SS 04,02
THIS BID IS S~8NITJ~O TO: Dell .Texas
~SS ParJadalf loulfJval~fI 1~ooo0 ,
herein after referred to as ONNER.
CJ~y of Coppe11 Bid No: ~-05q~'-o~
t. ~nter Into Agreeaent.
The u_ndq, rstgnud BIDI~ proposes and agrees, if thf$ Bfd is
.accepted, to enter into an Agreement with ONNER in the foe
included In the Contract.Documnts to Ilarfom end furnish all
York as spKlfind or inchcatmd tit the Contract Oocunmntsfor the
Bid Price and vlthtn the Bid Ttmos Jndtcatod fn thts Btd and tn
accordance Mth the other terms and cond~tlans of tim Contract
Documents.
2, BIDO[R Accepts.
BIDOER aCCOpt! all of the terns end conditions oF the
Adve~tt~emant or lnvttotton to Bid and Instructions to Btdder$,
lflcl.dtng utthout limitation those dealtng ~tth tho dtaposltiou
of Btd se~u~fty. This Bid #tll rmmatn subject th ~ceptance
for nSnety (90) days after tim day si~ Bid opofltng. BIDOER wtl1
.atgh and de31ver tim re(IUtrnd number of counterparts of the
Agreement wtth the Bonds end other docuamntl required by the
61riding Requirements wtthtn flftann (15) days after tim date of
O~NER's Nottce of A~ard.
BIDOER's Pap~aentsttens.
In sIdmttting thts Bid, BIDDER represents, as mor~ fully set
forth tn the Agrmmamnt, that:
a. BIDOER hu ~xamtnnd and carefully studted tim Bidding
poc.mmnts and the following Addenda r~catpt of &11 ~hich is
MrODy acknowledged; (List Addenda by Number and Oate)
Er//12.×95
14:21 CITY DF COPPELL
R[VI$~
BZOIXl hal Vtl~tid tho lite and becola fimt]taf with end is
satisfied is to tho gunoral, local and sate conditions that
~ee a~ect cost, progress, performnce and furnishing of
c. BIOOER ts fmtltar wtth and ts setlsftnd as to all fnderil,
State and ]nco1 Lays and Regulations that ~ affect cost,
progress, performance and furnishing of the York.
BIDDER has obtained and carefully studted (or assumes
responslblltt~ for havtng done so) all such &cldttteool or
evpplelnontery exuatnatton$, Investigations, explorettona~
tests, studtes and data concerning condttJofla (aurfiCO~
subsurface and Underground Facilities) at or contiguous to
the site or otherwise vhtch ma~ affect cost ptrogt'~as~
per,america o~ furnishing of the York or vhtCh relate to
any aspect of abe manl, mthoda, techniques, sequences and
procedural of conatrectton to be en~l~yed by BIDOEJt and
safot~ precautions and progren$ tnctdant thereto.
9IOOER does not constdor that a~y additional examinations,
Investigations, ex~.lorettons, testl,, studte~ or data are
n~oelaa~ ~r the aete~inatt~ OF thts 8td for pe~o~nce
and fu~tsh~ of the Nork in accedence with the tl~l,
and other toms and conditions of the Contract
camaro.
BIDOER has correlated the tn~nm&tton knovn to BIODER,
In,emotion and observations obtetnnd from vtstts to the
atto, repo~ts end drawings Identified tn tho Contract
Documents and e11 nddttton~l examinations, Investigations,
~lorattons, tests, studtes and data #lth tho Contract
ocuamnts.
f. BIDOER has given ENGINEER w~ttten nottce of all conflicts,
errors, ambiguities m' discrepancies tn tho Contract
Documents and the vrlttAn resolution the~of b~ ENGINEER t3
acceptable to BIDOER, and tho Contract Documents ere
generally sutYlctent to lndtcate And convoy understanding
of all toms and conditions for perfomtng and furetshtng
tho York for vhtch thts Btd ts suhnt~tod.
Vhere con'Flicts, errors, ambiguities or discrepancies have bain
discovered tn or between Contract Documents and/or o~er
related documnts, and vbere sntd conflicts, etc., hl¥t riot
been resolved through the lnterpretattonl or cle~tflcat$ons by
ENGINEER es descrtbnd tn the lnstruct4on8 to Bidders, because
of insufficient ttau or othervlse, BIDDER has included tn the
Btd the greater ~anttl~y or bettor queltt~ of York, or
compliance vtth the more stringent requtr~laorrt resuJtlng In a
greater cost.
07/12/95 14:22 CITY OF COPPELL ~ 922?9043 N0.275 QO?
RE¥ISEDO0301-3
This B~d 1s 9enutne and not made tn the interest of or on
babe]f of any undisclosed person, ftmor co~por~t~on a~d
~s not auim~tthd tn confom~t~ ~th any agreement o~ ruIii
of any g~oup, ISSQC~ltiOfl, Orglfl(zlt?on or COlrpOritlOnl
BIDDER his not dtrectly or Indirectly tnduced or so]tctted
amy other BIDDI~ ~o submit a f&lse or shm Bid; BIDDER his
not solicited or induced any person, ¢lrm oe co,potation to
refYaln frmablddtng; and BIDDER has not sought by
collustno to obtain for itself any advantage over any other
BIDD~ or over
4. Bid Prices.
BIDDER will complete the ~rk tn accordance wtth the Contract
DOcuBe~ts for the ¢o110~tug price(s):
All spectftc cash allowances are included tn the p~tce(s) set
forth above and have been cmq)uthd tn acco~clance v4th parlgraph
11.8. of the General Condtttofls.
UNIT PRICE BID
FOR
CITY OF COPPELL SEVER INPROVENENTS
SECTI~ I - GRAPEVINE Ill
ITEN £~i'IHAT~
NO. QUANTITY
DESCRIPTION AND UNIT TOTAL
UNIT MICE IN NORO$ PRICE AJqOUffT
I-4
S
N/A N/A NOT USED
166 LF For fu~tshtng end plictng
8' PVC sever (15'-20' depth),
coTuplgte_tn place, the sum of
- DOLLARS
G-13
14
N/A N/A NOT USED
ZOO LF For furnishing and plactug IS' ~/ /(~_~(~;oo
SDR-3S PVC sever (O'-ZO' d~th)~ '
coqplete In place, the sum of
DOLLARS
~CENTS
07/12/95 14:22 CITY OF COPPELL ~ 922?9043 N0.275 Q08
0030]-4 R[¥ZSED
]5 tS70
]O94
For furnishing and plactng (v5°° I~lc~lC'°o
lS' SOR-3S PVC sever ~10'-1S'
depth), complete tn piece,
the
SUB Of .
_" ~ ~L~
LF For furnlshlflg End plictng
IS' SDR-3S PVC sewr
depth), complete tn place,
the IUB of ,
~CU~~DOLLARS
~CENTS
230 LF
18 N/A K/A
19 S EA
ZO 8 £&
al I EA
IS" SDR-3S PVC sever
depth), co~p]ete tn piece,
ghe s~o~
NOT USED
For Furnishing and placing 4 /~oo C)~
~T d~am~e? standard mublo,
C~tu tn B~G~ sub of
FO~ furnishing ~ placing S _S~'O°° ,~G~?°
FT dt~ter standa~ ~hole,
c~le~ l~olace, tho sm o~
~ C~S
For furnishing and plactng S .~z~/DC~°° '-~00~
FT dieter stndi~ manhole,
c9~Te~ ~, tht s~ of
per toch,
22 IVA N/A NOT USED
07×12×95 14:25 CITY OF COPPELL ~ 92299045 N0.275 009
718
28 718
REYISED 00301-5
EA For .furnishing and placing S /~ ~
I~ d~amter d~p tnlot ~hole,
c~1~ In. slack, t~ s~ o~
~r each,
N/A mT ~
LF For furntshtJtg end plactng 20"
dl~ne~er dr~ bore, coll)~qte In .
LF Fei' furnishing and placing ZO' /~)o~_~_ /_~/~o~
diameter cajtng piped complete
in Of
place, the sum
29 9 EA
30-3! N/A N/A
32 lZ SY
33 18~ SY
34 835 LF
For abandonment of standard
sm~er manhole, complete In
place, the sue .of
m . ~ OOLLAR~
~ CENTS
per each.
NOT USED
For rlmovll and replacemnt
of 8' reinforced concrete
pavement, complete tn place,
the sum of
CENTS
per square yard.
FOr ~umovl! K replacement
of reinforced concrete
drtveviX, celpllte tn plies,
the sum of
per square
For removal and replicement
of reinforced concrlt, a 4 FT
#1de stdeualk, complete tn
place, the. sum of
ENTS
14:25 CITY OF C~PELL ~ 9~45 N0.275
00301-6 Rk*VISED
37 ~
38 3SSS
3g I
40 8
41 10~
BI/A ~ USF, O
LS For fU~ishtng and plict~g /~000~, /.~0~
land~c~Jng, complete ta " '
p]o,~ the. sum of ,
LF For T~t~ch Excavation
plac~tbe s~ of
For ful~lshtflg and placing
4' ~ IIl#~' services,
For furnishing and rain. thing /~--~'~': /0~'~-~®
TraFfic C~t~l Slgnlgl,
conltr~I~, ~lete IK, .
..°°
cOOENTS s.m of
LLAFLS
LF For furnishingimf plactng
S4" Abflq F-#7 PV£ smmr
75':30' depth), cmplete
fl piicet the sum of
: - - OOLLARS
AND' '
per eich.
07/12/95 14:23 CITY OF COPPELL ~ 922?9045 ~u.~¢'~ uu.~.
REVISED 00301-?
SECTION I1 - GRAPEVINE IV
IT[N [STZ/'IA~rO DrSCKIPTIOfl AND
NO. QUANTITY UNIT PRICE IN VORDS
215 LF
215 LF
UNIT TOTAL
PRICE N40UKr
For fur. tsh~ng and placing
S' C1. $00ucttle Iron Ptpe,
the sue of
Fo~ furnishing and placing
8" CI. SO Ductile leon Pipe,
C~ete~t.n p. lice, .t~he sue of
r~ ~ ~ ~L~
o~OG? ° ~0°°
3 N/A N/A
4 13 LF
I0
11
N/A
SS7
1565
For furntsiljflg lied plictng 8" 77~oo
5DR-38, PVC leuer
depth), complete in place,
~he sum of
ANO ~ CEHT$
per linear foot.
N/A NOT USED
LF For furnishing and plict~ ,
12" SOR-3S, PVC s~der (0 -10
depth), coglplete tn pl&cl,
th~ ;ua of .
pe~ l llea~ tog.
LF For furnishing and plectng
12" SOR-35, PVC sever (10'-]S'
depti~s~ ~faa~l.t. in place,
~DOLLAqS
07×12795 1~:24 CITY OF COPPELL * 92279~43 N0.275 Q12
REVISED
For f~tshtag ~nd plactng
1Z' SOR-35, PVC
depth), complete tn place,
12-18 N/A N/A NOT USED
19 8 EA
SO-Z3 N/A K/A NOT USED
24 3
Z6 I
26
EA For fuymtshtng and placing 4
FT diameter Type'S' nunhole,
S:oeqlleTe. tn pl~, ~e s~ oF
~ For fu~t~l~ ~ plact~.S
~ dliter Ty~ uSS ~hOle,
c~leto lq plKq, th~ll of
~ For fu~Jsht~ 811 l~or,
Mtertals ~ t~tdentals
27 316 LF
required to col~llte Siphon
structure p~r contract
requtremnts, complete tn ,.~
~C~S
For furnishing a~ plict~ ~0" /~
dtmtlr dr~ ~, c~lete In,
14:24 CITY g~ COF~ELL ~ 9227~43 N0.275 ~13
Z8 3~$ LF
30-31 N/A N/A
32 832 LF
36 9
37 I
REVISED 00301-9
For furwlshtng and plicing ZO' c~O~ ~,-~
diameter oist~ pl~, c~lete
NOT USrn
For rea oval ind'replacelent
Of 8' reinforced concrete
pivemflt, complete In placer
tM sim of
~C:ENT$
N/A NOT
SY
For riflOVl! lid replacement
of 6" reinforced coucTete
RIp-RIp, cogolete tn place,
the. sm of
LS For furllshtng aM placing
I andscaptlJg, COl~lnte
LF For Trench Excavation Safety
and Support, complete tn
placid, the sub of
07×12×95 14:24 CITY OF COPPELL ~ 922?9043 H0.275 D14
REVISED
39 ] LS
4O 6
For furnishing and mtntatntng
Trat'ffc Control slgnage,
h~t~i~, etc. durt~ and
th~ ~letton of
cmst~t~, c~le~ tn
pll~, t~ s~ Of
~r ~ ~.
41 N/A N/A HOT USED
SECTION lZ - GRAPEYINE IV
TOTAL BID FOR ALL U. IT PRICES: ~(_~/~ .~~
(use .ordf)/~C~
SECTZ~ iii - ~EL ~
11'01ESTII~TED OESCRIPTION ANO UNIT TOTAL
NO. QUANTITY UNIT PRICE IH ~ PRICE A#OU#T
I IlO LF For furfltlhtllcj and placing ,;~/~ ~/C
6' C1. SO Ouctile IPon PIPe,
c~j~,~lete~ ~ suni of'
I 110 LF For furnishing and plictng ~0o° ~/~OO
6' C1. 50 I~tle Iron Pipe,
3 13 LF For furnishing and placing %%~
r soR-3s. ~C lever (0'-10'
~lo~e la pllce,
depth), coq
the sum of
eOLLARS
~CENT$
07/12/95 14:25 CITY OF COP~ELL - 92279~43 N0.275 Q15
4
S-6 N/A N/A NOT USED
7 2314
8 1648
LF For furnishing a/KI plictng , 5~-°° ~'~7~~
10u SOR-3S, PVC sever (0'-10 --
depth), calPlete tn place,
tlm~_sWn ,of .
LF FOr fllrnishtng and plictng ~?~o
10" SDR-3S, PVC IJ4r (lO'-lS'
depth), COelplltl tn p1Ka,
g IS LF
For furnishing and placing
TI' S~-Z6, PVC sever (O'-S'
depth}, coapllte tn plact,
lO 692
2477
11
LF For furnishing &nd plecl,ng
12' SOR-3S, PYC sever [S -lO'
depth), camplo~ In pl&ce,
per lSnear foot,
LF For ~urotshtngind p~ac1~
depth), complete tn place,
tl~s#moF
' CENTS
I~r linear foot,
12-1n WA ff/A ~ USED
07×1~95 1~:~5 CITY OF COPPELL ~ 9~79~4] NU.~Y~ ~lb
00301-12 RL'~ ISED
19 13
FT dtsm~er s~undurd R.ho~e,
EA For furnishing and plictng S ~ ,,~/J~'-
FT dtmeter standard manhole,
.cwp~e~_e In ~e, the sum of
z] N/A N/A NOT USE~
zZ (
1
EA For fur~tsht_ng &nd plictng S __~
FT dlamt4~ di~p Inlet muhole,
CPal)lete~tn place, t~ sun of
24 N/A ./A .OT USED
26 I ~A
For furutshtng a11 libor,
mtertals and Incidentals
requtred to ce~lete Stphon
structure .r contract
roqutrmnent$, complete tn __
p)mce, ~h. sm, o(
CITY OF COPPELL ~ 922?9043 NO. 275
28 IS LF
30 4 EA
3] 48 LF
3Z-34 I(/A N/A
3S 6998 LF
36 7 SY
REVISED 00~01-13
Fo~ furnishtngiM p]ictng 20' :0~., -~-C
dtimtor dry bo~, coapletl tn
p~uco, the bum. of ,
For abandonment of standard
segtr mphole, complet, e tn
pl.~ace, tht~ II o,f _~ .~, .
~C£NTS
For abandonment of santtarX
sewer clean out, complete tn
place, tho sun Qf.
For placemnt of 6' Cl&ss 'B'
concFete edmdmnt across
enttre trench width, cmplete
per each.
NOT US~
For remval Ind replacement
of Isphaltic concrete
pivem~, complete In place,
the suB of
DQLLAR~
CENTS
For remvll and repJacemnt
of 6' reinforced concrete
Rtp-Rap, complete tn place,
c l]OEEFLLARS
S
oO
~scr~ptton
Plge 00100-11
Sect*on ~3.2.1
~/0°°
14:25 CITY OF COPPELL ~ 922?9043 N0.275 Q18
00301-14 REVISED
37 I
LS ~For furnishing and plactng ~ -~
landscaping, cmplete tn
place, ~he ~ua of ~
· LLAR5
38 7346
LF For Trench Excavation Sufsty
40 18
~57//°°
end SupPOrt, couplete
placenta of
39 ] L$ For f..rntshtng alxl
TrafY~c Coatrol stgnage,
ba~lcadtng, etc. duetng and
through ceeq)l teton
constructton, coaplete tn
place, the sum~o¢
EAFor t'urntshtng ll~d plactng '_
4' PVC seuor #evlce$,
c~a~lete~in.p;J~q,.~e sum of
DOLLARS
~CENT$
~570°°
41 N/A N/A NOT USED
TOTAL BZD FOR ALL UNIT PRZC~S:
~se
07/12/95 14:26 CITY OF COPPELL ~ 9227°~43 blO.~7~ ~19
REVIS~ 00301-1S
CI~8INATIOfl OF SECTIOflS
T~e undoFsig~d_ Bidder hereby Igrees to accept on sword of
co, tract hued off i~y Jndtvlduil sKtton. Mr, tfM~d
~ or ~ sKt~ous, ~e ~t~ Btddor ~s to de~
f~ all prtcos n~ iff those s~i~ t~ fo11~i~ ~unts~
Ceabtnitton of Sections ! and II, deduct '~0~
~TAL 8ID F~ ALL WIT PRICES (~ D~T) ~ ~~~~
~ BID F~ ~L ~IT ~IC~S (A~ER O~)
~use
~Jna~ion ~ SecU~a ] ~ Ill, ~K~ ~
~ 8ZO F~ ~L
(use
TOT~ B~ ~R
~tt Prtcos hove
BZDD~R acknowledges that quaflttttes are not guaranteed and ftnal
pa)lent vt11 be minion ictu&l quonUties dete~utned is provtded
tn the ContrKt Documuts.
Coq)leSSon.
BIDDER agrees th&t the YOrk will bo substantia11~ completed and
completed end ~oa~y for ftnal po)lent in accordance #1th
plrigrliph )4,13. Of the General Conditions on of befome ~he
da~es oJ' vtthtfl ~e number of cl~e~dar d~s indic&ted tn the
07x12/95 14:26 CITY OF' COPPELL ~ 922?9043 N0.275 Q20
00301-16 REVI$[O
BIDOER accepts tim p~ovls~ons of the Agreement as to liquidated
diages tn tim event of fetlu~e to complete the Horkvith~n the
alms specified t, tho Agremumnt.
6. Attached DoCUlllant~.
The follofftn~ do~illlllts are attached to and m~do a condition
of thts Btd:
a. DoqeJred etd Sh'~rtty tn the fore oF ~ ~ ~
8. Othmr Requirmmn~s.
Address for Communications.
i. Cmimtcat~ons conc~rel~g this Btd shell be addressed to'
Purchutng Offtce
255 Parbay Doulevo~l
Coplm11, Texas 76019
c. Communications co,corning thts Bid $ha11 be to the address
of BlflOER tndicltdd on tho applicable signature page.
d, BIDOER understands that the Odner ts exempt Prat State
Ltmtted Sales and Use Tax on tong4ble personal prepev~y to
be Incorporated 1flee the project, htd ams are not
tncluded tn Contract Prtce (~ Instr~ttons to Bidders).
The terms used In thtl Btd ~htch are defined tn the
Gmara1 Conditions of tim Construction Contract tncludod as
part ~f the Contract Documents have the Imantngs &lstgned to
them tn the General Condtttofls.
Tone used tn tht$ Btd t~tch ire defined in tho General
Conditions er Instructions v111 have the men, trigs Indicated tn
tim Gennrel Conditions or lnstructtons.
The Ctty of Coppell reserves the rtght to delot~ any portton of
this pro~le~t as tt m~y dom necessa~ to stay ¥1thln khn Ctty's
available funds. Slmuld the Ctty elect to delete any portton,
the contract qoantJtfes vi11 be adjusted aconrdtngly.
00301-18
BID AFFIDAVIT
The undersigned certifies that the bid prices contained in this bid have been carefully reviewed
and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or
all commodities upon which prices are extended at the price offered, and upon the conditions
contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will
be calendar days from the date of the bid opening. (Period of acceptance will be
ninety (90) calendar days unless otherwise indicated by Bidder.)
STAT - OF COUNTY Or
BEFORE ME, the undersigned authority, a Notary Public in and for the State of -~xo-co ,
on this day personally appeared '~cJic'q> /~-~ci.-$r.~;c~¢,~r: who after being by me
Name
duly sworn, did depose and say:
Name
Name of Firm
foregoing on behalf of the said
am a duly authorized office/agent for
and have been duly authorized to execute the
Name of Firm
I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder
or individual(s) engaged in the same line oc business prior to the official opening of this bid.
Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly
or indirectly concerned in any pool, agreement or combination thereof, to control the price of
services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon.
Name and Address of Bidder: ~/~ ~-- O-----°c~b~C~5°'S ~
SUBSCRIBED AND SWORN to before me by the above named __~
on this the [ c~ r~ day of ,~o, / ~,~ 1992~.
Notary Public in and for the State of
Charlotte A. Humphrios
NOTARY PUBLIC
ST~A,,~ OF TEXAS
Comm~Jon Expires 7-29.g5
T~XC~
00301-19
If BIDDER IS:
An Individual
By
( Seal )
(Individual's Name)
doing business as
Business address
PhoneNo.
A Partnershiu
By (Seal)
(Firm Name)
(General Parmer)
Bus/ness address
Phone No.
A Corporation
By ('~3~ ~-~
T~c,s
(Corporation Name)
By
(State of lncorporati~on)
(Name of person authorized to sign)
(Title)
· (Corporat~ ~e..ai~ /'~
' ~ ~(Secre~)
A Joint Venture
By
By
(Name) (Address)
(Name) (Address)
(Each joint venture must sign. The manner of signing for each individual, partnership and
corporation that is a partner to the joint venture should be in the manner indicated above.)
~ OF SE~'riON
1. Secgoa 00(Il0 - INVITATION TO BID, ~ (II(D0-1, BIOTICB TO BIDDBP.3: Change
'2:00 p.m. o~ Thursday, JuIy 6, 199S,' to '2:00 p.m. o~ Tucshy, luly 18, 1995,'.
2~
So0iion 00100, Pago 8-* Fol~ lm~r~h 13,2, add lbo fnlLowlflg p~,
A minimum of 12 1~ ~ushaf 8to~ embMment shell bo phood over Mp of piPO.
Materiel tbr Water end hnitiry Sower'Maim.'
Section 00100, P~e 12: Followini Pwg~l~h 13. I2.19, add the foUowi~,.
'13,2.20. P~y llgm N'O.
u~xiaf~d with pipe Jfuudisii~.
JnoMen~s neom~ m oomplm ~e work.'
4. ,~ 00301: Replac~ aeotkm with ~vised Seotion 00501 aUacl~ to this addendum.
Secdon 00~o0, P~ :~: pollowt~ ~ ~0, add ~ho fo~owtns i~m,
10~ LF
ASTM F-'7~ Pvc sew~r (2S'.30'
depth), oomplete in place, the sum of
sec,~on 0O5OO,
1. Sheet No. 29, Mbcelhnoom Dettlls: Add "Typlolt Rmbedmmt Detgl'* to ~s sheet,
Rmbedment deudl Is ef~____,'~od in this addendum.
Ail it.ms in ~ with this nddmdurn ~rs hereby deleted,
~ ADDIINDUM I~ MADI~ PART OF TI~ DRAWINGS, SPBCIFICATION-8, AND
CON'r~CT DOCUMEN~ AND ~ Bli NOTi~ ON TI~ PR~.
TYPICAL NATIVE MATERIAL COMPACTED TO'
9§% OPTIMUM MOISTURE ! 3% UNDER PAVEMENT
90% OPTIMUM MOISTURE £3% OUTSIDE CURB LINES
JETTING IS NOT ALLOWED
BACKFILL TO BE COMPACTED IN 6"± L~I~TS
CRUSHE STONE
(SEE SPECS)
EMBi[DMENT
REVISED 00301-1
9SCGI1 SECTION 00301
BID FORM
PKO~gCT IDENTIFICATION:
CONTRACT IDENTIFICATION: ss 94-02 ....
THIS BID IS SUBlqITTED TO: ~
here ·
City of Coppell Btd No: ......
1. Efltor Into Aeru~mant,
The undersigned BIDDER proposes and agrees. If this Btd ts
accepted) to enter tote in Agreement trlth O~NI~ In the rom
Included tn the Contract.Documents to perfom and furnish all
~ork as specified or tnd~cstod tn the ContraOt Docu,mnts for the
Btd Price and vtthtn the Btd Ttms indicated tn thts Btd and tn
accordance wtth the other term and conditions of the Contract
Documents.
2. BIDDER Accepts.
BIDDER accepts al~ of the rems ~nd conditions of the
Advertisement o~ Invitation to Btd and Instructions to Biddtrs,
InCluding vithout ~lmltatlon tho~l dlalln9 wtth the disposition
of 8td security. This Btd wtll ~mmtn subject to acciptance
for ntnety (90) days after the day of Bid opening. BIDDER ~11
stgn and de]tver the requl~ed number of ~ounterpart~ of the
A§reemlnt #1th the Bonds and other documentl required by the
Bidding Requtwments within ft~teen (15) days after the date of
OMNER's Nottce of A~a~. '-
BIDDER's RepreSentations,
In submlttln9 thts Bid, BIDD£R represents, as more fu?~y set
forth in the Agreimnt, that:
a. 8IDDER has ~xmtnnd and carefully studted the Btddlng
Bocumente end the following Addenda recetpt of all which
hereby acknovlodged: (Ltst Addenda by Number and Date}
ADO£NDA No. OATE
one ( 1 ) 6-30-95
Two ( 2 ) -30-95
Three ~3) /-1z-9~
00301-2 ~EVI$~D
BIDD[R has vSsttnd tho stte and becom famtlta~ wtth end ts
aatisflnd as to the generll, 1ocll and atto conditions that
mW affect coat, progress, perfoIm~nce and furnishing of
Work.
BIDDER is famlltar with and ts satisfied as to all federal,
irate and local Lens and Regulations that amy affect cost,
progress, perfomance and furnlshlng of the kbrk.
d. BIDDER has ebtatnad and carefully studtod (or assumes
~sponstbtlit~y for havtng done so) all such nddtttonaT or
supp, le~entary ~examtnatlons~ tnveatigittons, ~loritl~s,
testa, at.tel aM data co~ce~tng CO~tttonl (su~ice~
subsurface ~ U~e~o~ Fictlltlis} at ? ~nttguous to
per~o~e Or ~ntshtng of the York or~t~ relate to
~ upec~ o~ t~, mth~s, technt~es, s~nces a~
proc~ures of c~structton to ~ e~l~edbx BI~R and
s&~et~ p~ca~tons &nd p~TIws tnctdent ~e~ito.
BIDDER does not consider that any additional exl~atnatlons~
Investigations, explorations, tests, studtas or data are
necaasa~ for the deteminstlon of thts Bid for perfomance
and ~urnishtng of the iork tn accordance Mth the ttmes,
price and other tones and conditions of the Contract
Docmients.
o. BIDDER his coTl'elated the Information known to BIDDER,
tnfomatlon ~Ad absa~vattona obtltned I~om vtstts to the
site, ~epor~s iud dravtflga Identified tn the ~ntrlct
~nts and a)l additional ixmtnittons, Investigations.
explorations, tests, studies and data vith the Contrlct
Documents.
BIDDER has g~ven ENGINEER w~ttten notice of ali conflicts,
errors, ambiguities or diSCrepanCies tn the Contract
Documents &nd the vrltte~ resolution thereof by ENGINEER
acceptable to BIDDER, and the Contract Documents a.~e
generally sufficient to indtcate lad conv~y unoersthndtng
of all tams and conditions for performing end fu~tshtng
· the Work for whtch this Bid ts suhnttted.
Where contrltcts, errors, ~Jnbtgutttas or dlscrepanctes have b~en
discovered tn or burmese Contract Documents and/or other
~elated documents, and vho~ satd conflicts, etc,, have not
been resolved th~ongh the Inta~pretattons or clartflcatlons by
~#GZNEER as described In the instructions to Btddera, because
of Insufficient time or othe~tse~ 8[DDFA has tnclnded tn the
Btd the greater quanttty or better qualtt~ of Hor~, or
compliance ~tth tho more stringent requirement resulting tn a
greater cost.
REVISED 00301-3
g. Thts Btd ts OenUtno and ~o~ Bade tn tho interest ?~ or oR
behelf of any undt$¢]oseo person, ftm or corporation eno
ts not submitted tn confomt~ wtth any agreement or rules
of any group, assoc~u~ton~ organization or corporotton;
RIDOER has not dtreotly or Indirectly ~nduced or solicited
any other BIOOER to submtt a false or sham Btdi BIDDER has
not solicited or 1educed any person, firm or corporation to
refrain from b~ddtng; and BtDD£R has not soughtby
co13uslon to-obtain for ttsetf any advantage over any other
8IDO£R ~ over OtOIER.
4. Btd P~tCO$.
-BIDDERwill complete the Hork tn IccoPdlnce wtth the Contract
Documents for the following prlceCs):
All spectftc c~sh a11ouonces are Included tn the pFtce(s) set
forth above and have been computed tn accordance wtth p~ragraph
~1,8. o~ the General Conditions.
UNIT PRICE BIO
FOR
CITY OF COPPEL~ SEYER IIIPROVEHEHTS
SECTION Z - GRAPEVIHE
ESTI~4ATED DESCRIPTION AHO UNIT TOTAL
QUANTITY UNIT PRICE IN t~ORDS PRICE ANOUIfT
I-4 N/A N/A NOT USED
5 t66 LF For fu~'ntahtng ind placing ~ -'1~'~/~""~
8' PVC se~er (15'-ZO' depth), '"
c_ompl~t~ In place, tho sum of
6-13 .N/A N/A NOT USED
~4 200 LF For fur~tshtng and plictng
SDR-3S PVC sewe~* (O'-lO' depth),
complete tn 4)]ace, the sum of
~CENT$
00301-4 REVISED
]5 Z570
1094
17 230
15' $0R-35 PVC smdr ~10'-15'
c~plete tn place,
depth}, _
~CENTS
i5' $DR-3S PVC sent (1S'-20'
d~'~th), comlete tn place,
~CENTS
For furnl shJng
depth}, go~lete
the s~ ~f
~CE~S
]8 N/A
#/A NOT USED
EA For furntshtng and plicing 4
FT dtmeter standard manhole,
. complete.tn plaep, the sum of
per e&cn,
20 8
EA For furnishing and plKing S ~ ~.~v~-.'
FT d~l~eter stenderd manhole,
.compl~t~i.lpp~ace, UPe sum of
DOLLARS
~CENT$
per each. '
For Furnishing and plactng 6
FT dtameter stand&~(I manhole,
complete $~ plac~ tho sum of
AND ~ CENTS
pe~ ea'~h.
22 N/A N/A NOT USED
23
~?
28
2g
~0-31
33
34
./A
718
N/A
188
635
REVISED 00301-$
EA For Rlrnishlng and plnctng 5 f~a:~.~
FT dtlmte~ 'drop Inter miflhole,
colale~ tn.pTace, the sum of
'~ - DOLLARS
NOT USED
dt~eter dry bore, complete In
~OOLLARS
LF '-For furnishing and pl,ctng 20" ~ _~_~:~.~
dlamtor cestng pipe. complete
~CENTS
EA For abandonment of
smmrmnhole, complete
~CENTS
N/A NOT USED
of 6" reinforced concrete
pavement, couplete tn place,
the ,s~ o~ /
per square yard,
SY For rmoval and replacemnt
of reinforced concrete
drtvewly, COIq)]ete tn pl&co,
-CENTS
per~
LF For removal and replacemnt
of re~nforced concrete 4 ~ ''
utde sidewalk, c~lete
place, the%s~ of
~ DOLORS
37
38 3555
3g !
NOT USED
! L$ For furnishing and plactng landscaping, complete
~L~
and ~po~t~ c~lete
Pl~R, ~he_sm of
FO~ fu~tshtng I~d mltn~alntng~
LS
Trafftc Cont~ atgnage,
ba~tc~J~, e~, du~l~ and
through c~lett~ of
c~structlon, c~lete
40 8
4~ P~C ~IM~P ~rvJc~sl
~_ ,, complete In p~a_c.~ the s~ of
'
~r each.
4] ]02 LF For furnishing ,~ plictng~'~ ~,~,~
24" ~H F-497 PVC s~r '
(25'-30' dmpth), c~le~e
~~~LLARS
per each,
SECTION I - G~PEVINE III
IOTAL BZD FOR~L UNIT PRICES:
I~¥I$E0 0030~-7
SECTION Il ° GRAPE¥INE
ITEM ESTIMAT£D
NO. QUNfTITY UNIT
1 215 LF
con~te, ta ,lace, the sum of
' ~gXTOfj~__~eOLtARS
~CENTS
LF Fo~ fu~lsht~ a~ placing
8" C1. 50 D~tle Irp~ Pipe,.
~CE~S
IV
DESCRIPTION AND UNIT TOTAL
PRICE ]N~ORDS PRICE NdOUNT
For ~urnt~htng and pllctng
G" ¢1. SO Oucttle Iron Ptlm,
3
4
10
11
H/A
13
#/A
567
~1565
N/A
LF
N/A NOT USED
LF For furnishing ind plactng ~
12' SM-35, FVC se~er (0'-10'
depth), complete te place,
~CENTS
LF For furntshlllg
12" S~-35, PVC s~er (lO~-lSt
depth), co.lore In place,
the s~
~CENIS
00~01-8 REVISED
12
Ii' S~-35, PVC sowtr
depth), c.ou~lete ~ place,
13-18 N/A H/A IIOT US~'I)
20-23 N,/A N/A NOT USED
24
26
3 £A For fu~ntsb4ng and placing
FT dtemeterT~pe "S"
EA For fu~n4shlng I~ pluctng
~ dl~tor T~po "S" mnhole,~
1 ~ FOr fu~lshtng Ill labor,
~rtals and Incidentals
re~t~ to c~l~te Stroh
28
29
30-31
32
33-3q
37
316
REVISED 00301*g
S EA FOP ibandomNnt of standard
se~eP manholo, coaq)lete tn
p.] ace, t o
per each.
N/A N/A NOT USED ..
83Z LF For removal and replncemnt
of 8' reinforced concrete
plvement.~complete tn place,
tho sum~of_. /
~>%~z__OOLLARS
~WTS
per ~.
N/A N/A NOT USED
, sY For ..o.,~ .d ,.,~..,t ~ 1 ~' ~
of 6N rotlJfoi'cod coiTcrgl;8
RJp*~, co. lore tn place,
the sum Of.
per squaro yam. '
38 260] LF
For Trench £xcavatton Safety
a~ Support, complete in
c OOLLARS
ENT$
00~01~10 REVISED
40
pl ca the s f
pe~ lump sum.
g F.A For furnishing
4" PVC s~r sl~lces~
41 N/A N/A NOT USED
SECTION Il - GP~PEVZNE IV ~
TOTAL BID FOR ALL UNIT PRICE$z~
SECTION III - BETHEL ROAD
ITEIq' ESTIMATED DESCRIPTION ANO UNIT TOTAL
NO. QUANTITY UNIT PRICE IN NOP, DS PRICE NqOUNT
I lid LF For furnishing and pTac~ng ~:~ ~::~c~.
6' C1. 50 Ductllm l~on Pipe,
eomplet, tn plat_e,/the sum of
~LLARS
8' Cl, 50 Oucttle Iron Pipe, '
complet~ ~.n, p]qc_,,, ~he sum of
DOLLARS
per ! 1near toot,
6" $DR-35,' PVC ~e~r ~0~-10*
depth), complete in place,
LLARS
NT$
z
3 13
REVISED 00301-11
4
S-6
8
]0
11
1648
1S
892
2477
LF For furntehtng and plactng ~ ~-~,.-~
8' SDR-3S, PVC sewer (iO'*lS'
depth), co~01ete tfl plafl,
NOT USED
10' ~R-3S, ~VC s~r (O'-lO'
dupth)~ ~lete tn plice~
~~L~
depth), c~]ete tp place,
1Z' SDR-26, PVC Sower (0 -S
depth), complete tn places
.~~~DOL~S
LF FO~. furnishing and placing ~ ~_.~.9
12 Si)R-iS, P~C s~er (6'-I0'
depth), c~le~ In place,
12-]8 N/A N/A NOT USEO
00301-Z2 RLrVZSEO
19
Z0 Z EA FOr furntihtng and placing 5 ~___~-~
FT dtlmetlr standiY~J manhole,
~, .' c~le~t tRpl~e. ~he s~of
' ~~ CENTS
2] N/A N/A HOT USEO
22 4 EA For furntsh$~9 and plactng 4 ~__~.o .o
FT dtamter atop inlet manhole,
par
5 ~
EA For t'urrdshlng ~nd pl~ctng ~.d ~.*
FT diameter drop inlet manhol, e,
.c~leTe ~n plice, the sw or
23
24 N/A N/A NOT USED
26 Z
26 Z
EA For ~urntshJng and placing 6 ~,~ ~.e
FT dtameter Type "5" manhole,
_, c_o~.lete 1. p~ce, the sm of
~terlals and Incidentals
re.trod to c~plete Stphon
requirements, c~lete tn
laca~ s m of
ANO - ' ~.l~ ~anta
per each.
27
]5
ZB ~5 LF
2g
3O
31
32-34
35
REVZSLq) 0030Z-~3
LF For furnishtn9 and pl&ctng
dtameter dry bore, complete
~lsce,.the su~f
£EN~S
For fu~ishtng and plactng 20'
diameter casingpipe, complete
in plebe, the, sum of
~CE#TS
36
~6 EA For abandonment of standard
sever manhole, complete in
nl~:e, the s~,~ of
'~CENTS
per e~cn.
4
7
48
6998
FA For abandonment of santtsry
se~er clean out, complete
i] ace, the
LF For plaemaent o~ $' Class "B" .~-'~ ~:~'~(-~"
concrete ~nbtdnmnt ICrOS$
enttre t~ench wtdth, complete
t~p. lace, ~he sum of
~CENTS
per each,
LF
NOT USE0
of asphaltic concrete
pavement, complete tn place, Page 00100-II
the sum o~ Sectto~ 13.2.1
DOLLARS
~CENT$
Sy For re.)vi1 el~d replacement
of G" reinforced concrete
Palp-Rap, comp3eta;tn place,
__,~esmof_ , /
~ ~ ~:\~;rT~ ~ DOL~RScE~S
pep squire yard.
00101-~4
37
I
l~ndeciptng, complete tn
place the s of
,- - ·, "~cE~s
per 1map sum.
38 7346
LS *For furnishing and plictng ~-}(~:~;~0'~C~'~
LF For Trench Excav&tton Safety
Tr&fflc Control stgnlge,
b~r~tcidtngt etc. durtng an~
th~ough'cogq~letton oF
construction, comp~Ke tn
OLLARS
Lift'S
40 ]e EA F? fUlrntshtng and plictng
4 P'~ semt services,
, coapl.e~e ~n place, the sum of
41 ~A N/A ~T
BETHEL ~
TOTA~ BID FOR ~use
REVISED 0030~-15
COHaINATION OF SECTIONS
The undersigned Btdder hereby agrees to accept an award of
contract based on a~y individual section. However) if awarded
two or more sections, the undersigned Btdder agrees to deduct
from all prices named tn those secttons the following amounts:
Combination of Sections I and I[, deduct ~dollere,
TOTAL BID FOR ALL UNIT PRICES (AFTER DEDUCT)~
.... ~use figures)
Combination of Sections I! end III) deduct ~ol~-.~.~ dollars.
TOTAL etd FOR ALL UNIT PRICES (AFTER DEDUGT)~ ~
Combination of Se(atone I and III, deduct \~;c~_\?~.~ ~011ars,
TOTAL BZD FOR ALL UNIT PRICES (AFTER DEDUCT)~~U~D~/
Combination of Sections l, II, and III, deduct~..~dollars.
TOTAL BID FOR ALL UNIT PRIC~$ (AFTER DEDUCT)~
(use ftgu~es}
Unit Prlces have been computed tn accordance wtth paragraph
11,9.2. of the ~neral Conditions,
BIDDER acknowledges that quantities a~ not guaranteed and ftnal
payment wtll be baaed on actual quantities detemln.d ts provided
In the Contract Documents.
6. Completion.
BIDDER agrlla that the )lork will be substantially completed and
completed end pead~ for ftnal payment in accordance with
paragraph 14.13.of the GeneraT Conditions on or before the
dates or withtn the number of calendar di~s lndJcitld Iff the
Agreement.
REVISED
BIDDER accepts the provisions of the Agreement as to liquidated
dslige~ tn the event of fa$1u~e to complete the #ork wt~htn the
ttms speclfltd tn ~he Agremnlnt,
Attached Documents,
The following documents are attached to and Bade a condition
of thls Bid:
a. RequtT~d Btd Sec~rtty tn the foTmof 5%Bid Bond
Other Requtrlmnts,
Address for Communications,
Communications concerning thts Btd shall be addressed to
Purchasing Offtce
255 Par]May Boulevard
Coppe11, Texas 760]9
b, BIDDER agrees that all gork awaked w111 be completed
withtn 270 Calendar Days. Contractor vtle wtll coamence
to run ~s provtded tn the Contract Documents.
c. Cm~untcattona concerning thta Bid shell be ko the address
of BIDDER Indicated on the applicable
Ltmtted Sales and Usa Tax on tangtblo personal property to
Satd
be Incorporated tote the pro~ect, taxes are not
tncluded tn Contract Price (See lnskrocttons to Bidders).
The tams used tn this Bid which are defined tn the
Ge~nral Conditions of the Construction Contract tncludnd as
part of the Contract Documnts have the ~eantngs isltgned to
them in the General Conditions.
Terms used In this 8td ~hlch are deflnnd tn tho General
Conditions or Instructions will have the meantngs Indicated in
tho 6innral Conditions or Instructions,
The C1~ of Coppe11 reserves the right to delete an~ portton of
this pro, ecL aS Jt m~Y deeflt necessary to stay ~ithtn the CtW'I
available funds. Should the Ctty elect to delete any portton)
tho contract quantities #t11 be adjusted accordingly.
SUB#~TTED on July 18 , 195 .
14:15 CiTY ~ COPPELI- '* 9817481~97
AImENDUM
TO
DRAWINGS, CONTRACT ~, AND SPECIFIC&TIONS
lq)U
SAMTAIY SEWER IMI~O~
FOR
GRAFEViI~ ~I, IV AND BE'A'itEL RO~, aS
CFFY OF COIVEI,L, TEXAS
NO.~O~
1. Sec~ 0~0-1N3~TA~ TO BE), Pog~ G(X~0-1, NoT~r~ TO BE)DERS: Clunge
*2.'G0 p.m. oa TlnnM~ Jul7 6, 1995,' to ~2:00 p.m, oa Tues., Zul~ 18, 199~,*.
2..~i~m0G301: RepbceFage00301-3wi~h~lmgsG0301'3.
3. Sec6oa00301: Repbmpqo00301-Tw~hREVl~EDpogo(X)301-7.
~ ADDBlqDUM IS MADE PART OF THR DRAWINGS, SPEc~t~,ATIONS, AIqD
COtrD~CT ~ AND SHALL B~ NO~-~-., ON Tm~ PROPOSAL.
07/17/~5 1~:1~ CITY ~ C~ELL ~ ~17~1~5~?
St/. 85 '95 GM~4~F~ HI~ EMGR DF. PT 37 (214)9G~-4471
NO. ~4~3
P.~/4
REVISED Q0301-3
g. This BId Is genuine a~d not Bade tn the ~ntlrest of or on
behalf of any undtsclosnd ~reon, fie or co~oritJon
ts not su~lttnd tn confoml~
of m4zatt~ or co~rition;
~ ~ g~, association, o~
8I~ER bis no% dJ~tly or J~re~l~ lnd~ed or sollct%~
not ~ollcited o~ tnduced
~frain f~ bt~tng; ~nd
~11uston ~o ~ltn for ILsolf
8~[R or ever
¢. 814 Prtces.
BZDOERV111 COmplete the Work tn mccordmnce vtth the Contract
Documntl for the follovlng price(s):
All specific cash allowances ire Included tn the price(s) set
forth above and have been comuted In accordance vlth paragraph
11,8, oF the General Conditions.
~IT P~ICE
CITY OF COPPEU. SEVER ll4PRQYOENTS
SECTION I - GRAPEVINE III
ITBq £5TIHATED DESCRIPTION Alll)
ilO. QUANTITY UNIT PRICE IN #ONDS
UNIT TOTAL
.1 I0~ LF
For furnishing ~nd placing
24' PVC sever (25'-30' depth),
cmoplete tn place, the sum of
OOLLA~
per 11near foot.
2-4
6 171
N/A NOT USE])
LF For furnishing ind placing
8" PVC siwr (t$'-20' depth),
complete In place, the mm of
E~TS
per ~
6-x$ N/A N/A
14 S06 CF
NOT USED
For fmlishtng aim plactng 15' __
SDK-3S PVC se~er (O'-lO'depth),
comlete In place, tho smlof
DOLLARS
AND COnS
per linear foot,
87/17/95 14:16 CITY OF' COPPELL "* 9817481259?
H0.303
P.4/4
R~VISED 00301-7
SECTION II - ~d~PEVINE
ITEN ESTIHATED
ZV
D£SCRZPTION ANO
PRICE IN MOND$
UNIT
LF For furnishing m~d placing
6' C1. 50 Ductile Iron Pipe,
complete tn place, the sma of
OOLU~S
JUg) CENTS
pot linear foot.
2 215 LF
For fu~lshtng and pllctng
6' Cl. 50 Ductile Iron Pipe,
complete in place, tho sum of
DOLLARS
All0 CENTS
par linear foot.
3
4
N/A
N/A
LF For furnishing and placing 8'
SDR-3$, PVC aeimr (10'-16'
depth), cumplete in plice,
the sum of
. DOLLAKS
AND CENTS
per llHlr foot.
S-I N/A N/A
10 557 LF
11
1665
NOT USED
For furnishing and plmcl,ng ,
12' ST~-3S, PVC sewer (0 -10
depth), c_~letm in place,
the sum
of
~D CENTS
I~r linear foot.
LF For furnishing and placing
12' SDR-35, PVC sever (10'o15f
the sum
Of
DOLLARS
AgO CENTS
i~r Hnear foot.
TOTAL
Sa:~nGGG~0-1NVITA73(~TOB~D, PI~I, NO17(33TOBIDDBRS: Chinp
'2:00 p.m. m Thund~, Zul~ 6, 199~,' ~o '2:00 p.m. ~ 'l'ugod~y, ,July 18, 199~,'.
2,
Se~m 001G0, Pq~ 8: ~ imupuph X3.2. add Ihe f,~,d~ Imqmph,
'Pipo embedmm b all umiUry #wet lines dudl be u hllows:
A mb~nmn of 12 llq crushed stmu embMmmt dudl bo plural over mp of pipe.
Crudmd m d~l be us specif~ in Smdurd ~ 8pooifl~jonO 2.1.8.L, Pipe
Stolon 001~0, Pqe 12: Ponowing ~ X3. X2.19. uddtbo folloMnL
-13.2.20. hybml~ro.~x: Tbb~dunomifo~rumhmngndplaoins24' ASTM
4, ~ 01~01: i~pla~ minim wilh x~vlml Stolon 00301 affaclml to _~i_. addmdum.
NOT U~BD"
e
Se~ion 00600, l~p 13: Following 12m 40, Md th, followi~ i2m,
'4! I~/A N/A NOT
_~ON~l~rIoN PLA~TS.
THIS ADDBNDUM I~ MAD]~ PA~,T OF THE DRAWINGS, SI~C]]~.AT~ AND
CONTaACT ~ AND ~F, ALL B,~ NOII~
2
TYPICAL NATIVE MATERIAL COMPACTED TO
95% OPTIMUM MOISTURE _~ 3% UNDER PAVEMENT
90% OPTIMUM MOISTUI~E ~% OUTSIDE CUR8 LINES
JETTING IS NOT ALLOWED
BACKFILL TO BE COMPACTED IN 6"~ UFT$
CRUSH
( SEE SPECS)
EMSEDM£NT
Atm~:~t~vM I~. 5
REVISED 00301-1
9SCGII SECTION 00301
BID FOI~
PRGJECT I[k~ITIFICATION:
CONTRACT IOENTIFICATION: ss 94-Q~
THIS BID IS SUaHITTED TO:~Agent. Cttv of Cannel1. T*x~I
255 Parbfiy Bouleva~. Cnnnm . OXes lg.
herein after referred to iS MER. ' '
Cit~ of Coppo11 etd No:
1. Enter Into Agrummnt.
The undersigned BIDDER proposes end agrees, if thts Btd is
fccepted, to enter into an Agreement ~lth OtMER In the rom
]ncludnd in the Contract Doconnts to perforu ~nd fu~lsh ell
York is specified or Indicated in the Contract Documentsfor the
Btd J~tce and vtthtn tho Bid Ttmes indicated in thts Bid and In
accordance utth the other terms end coedtttons of the Contract
Documents.
2. BIDD[RAccepto,
BIDDER accepts ell of the toms and conditions of the
Advertllali~t or Invitation to Bid and Instructions to Bidders,
lncleding without limitation those dealtng uJth the disposltlofl
of 8id security, This Bid vtll rmutn suGJ
. oct to acceptance
for ninety (gO} daxs after the d~yof B,d opening, lIDO[R viii
sign Ind deliver the required number of counterparts of the
6A~c~.mNn~VITh the. Bonds ind_o~her docualents required by the
oolncj KeqUlr~nTs #1thin fifteen (15) d~ys after the date of
MER's Notlca gfAvarcl,-
3. BIDDER's Representations.
In submitting this Bid, BIOO~R represents, as mo~e fully set
forth in the Agremaent, that:
a. BIDDER has oxmtnnd and carefully studied the 8tddtng
Oocumnts end tho relieving Addenda receipt of ell vhtch is
hereby acknowledged:
(List Addenda by Number and OBoe)
0Alt
O0301-Z P~ISED
BH)DE]I has visited the site and become fami]tor with and ts
satisfied as to the general, loca] and site conditions that
~ a~fact cost, progress, performance and furnishing of
BZDOER ls famtltar utth and ts satisfied as to all fedora1,
trite and local Lays and Regulations that ~ay affect cost,
progress, performance and furnishing of tho York.
d. BIDDER has obtatnnd and carefully studied (er assumes
responsibility for havtng doH I0) all such additional or
supplementary examtonttons, Investigations, explorattofls,
tests, studies and data
. COaCernlng conditions (surface,
subsurface and Underground Facilities) at or contiguous to
tho sttm or othmratse~htch may affect cost p~ogress,
perfomance or forntshtng of the York or ~htch relate to
any aspect of the moans, methods, techniques, sequences and
procedures of constroctton to be employed by 8]DOEK and
safety pracauttons and programs tactdont thereto,
BXDDER do~$ not conslder that any additional examinations,
Jnvestlgattofls, explorations, tests, studto$ or data are
necessary for the determination of thts Btd for performance
and furnishing of the York tn accordance vrlth the Items,
~t~o and other terms and conditions of the Contract
clanonts.
BIDDER has correlated the Information known to BIDDER,
information and observations obtaJnml from vtstts to the
site, reports and drawtngm Identified in the Contract
Documents end ill additional examinations, Investigations,
explorations, tests, studtes and data vtth the Contract
Oocumants.
BIDDER has given ENGIN[ER ~ttton notice of all convicts,
errorS, iad~tgutties or discrepancies In the Contract
Documents and the ~lttefl resolution thereof by ENGINEER ts
acceptable to BIDDER, and thu Contract Documents are
g?oral~y sufficient to indtcate ~ convey understanding
et all ~ornm ina conditions for pur~ormlng and furnishing
the tlork for ~hich this Btd ts sutmttted.
k~ro confTJcts, errors, ambiguities or discrepancies have been
discovered tn or between Contract Oocunmntl and/or other
related documents, and vhere said conflicts, etc., have not
been resolved through the Interpretations or clarifications by
ENGZNEER as described tn the Znstr~ctton$ to Bidders, because
of tnsufficte.t time or otherwise, BIODER has included tn the
Btd the greate~ quantity or bettor qualtty of Uork, or
comp~lanco vith the more stringent requirement resulting in a
greator cost.
P/VISED 00301-3
9. Thtl 8td ts 9enutne and sot Ildl tn the tntere~t of or on
behalf of i~ ~tsclos~ ~rl~, ftm or co.option ~
ts n~ su~ttt~ tn c~fo~t~ vl~ ~y ag~T or f~leS
of ~ g~, us~tltt~, oqlntzatton or co~ofltt~;
BZ~ has not dlNctly or t~t~tly t~ o~ soltctt~
a~ o~r Bl~ to su~tt a falH o~ she Old; 8I~ has
~t ~11ctbd or tnd~ a~ parson, ftm or ~ration to
~fratn f~ btddt~; a~ BI~ER has not ~ght by
collusion to ob~tn for ttselF a~ adverse wet any other
8I~ or over ~ER.
4. Bid Prtces.
BIDOER wt11 complete the Work ta accordanca ~lth the Contract
Oocmnents for the roller, tn9 price(s):
All spactftc cash allo~ancms arm tncluded tn the prtcm(s) sst
forth above and have boon computed tn acco~lance vtth paragraph
11.8. of the Ganaral Conditions.
UNIT PRICE BIO
FOR
CITY OF COPPELL SEVER II~ROVENEHTS
SECTION I - GRAPEVINE I11
ITEN ESTIMATED DESCRIPTION MD
NO. QUANTITY UNIT PRICE IN fJORDS
UNIT TOTAL
PRICE MOUNT
]-4 N/A N/A
~ 6 166 LF
NOT USED
For furnishing and placing
8' PVC smmr (15'-20' depth).
com~lmta tn place, the sum of
C~S
per 11near foot,
6-13 N/A
~/ 14 200
WA NOT USED
LF For fulmtshing and placing IS'
SDIt-3S PVC smm~ (0'-10' depth),
com~p~lste in ,lace, the Still of
AND ~CENT5
per
0030~-4 REYZSL'D
16 1094
17 230
IS' SDR-3S PVC seve~' (IS'-20'
IS' SOR-3S PVC sever
dep~), catp~ete In p~uce,
t~s~of
dep b p ace,
the s
LF For furnishing and pl&ctng
15' SDR-35 PVC sever (20'-~5'
depth), complet, e tn place,
the sum ot~e~,~
S
N/A ~/A
19 S
2O 8 [A
z1 I
NOT USED
For furnishing and placing 4
FT altimeter standard manhole
couplete tn p}ace, the sun
~ ~o DOLLARS
per
Foe furn4shtng and placing S
IrT diameter standard mflhole,
complete tn pl&ce, the sum of
RqO---~r~--CENTS
pereich,
EA For furntshing and plactng 6
IrT dtameter standard manhole,
complete tn place, the sm of
~e~c~e~ DOLLARS
0 CENTS
per each.
22 N/A N/A NOT USEO
23
Z4-26
28
29
33
34
N/A
718
g
K/A
lZ
835
For furnishing end plactng S .~..~.- 5~o.
FT dtemter drop Inlet uan#ole,
cmaplete in pl.ace, tho sum of
per each.
NOT USED
LF For furntshtnge~J plactng 20' ~--90~ ~.0(~, Z~.~
dtamter dry ~re, c~lete tn
place, tho ~ of
LF FO1' furnishing and pl&ctng 20' ~--~ L'T°~:).°~-
dlamter casing pipe, complete
in place, the sum of
EA
For abandonmflt of standard
seuer manhole, cmoplete tn
lace, the S~lal of
AND ~ (% CENTS
per each.
qt 3?
f~A NOT USED
SY For ~movul and replacewflt ~ (.~.o~_
of 8' ~etflforcod concrete
SY
LF
pavement, coeplete tn place,
the sum
~ DOLLARS
per square yard.
For removal and topi&cement
of re~nforced concrete
driveway, complete in place,
the lure of
~cDOLLARS
per squmre ymr~.
~c~.e-° ~.337_. ~
FoP removal and replacemnt
of reinforced concrete 4 FT
wtde sidewalk, complete 'in
pl~c,e, the s~um of
per 11near foot.
oo3o1-$ REVISED
37 1
38 3SSS
3D I
N~A NOT USED
L$
FoP furnishing and I)~igJncj
landKiping, c~lote
pla~, ~ s~ o~
per ~ s~.
through complettofl of
cpnstructJon, complete tn
place, the swop
For furnishing end plKtng
4' PVC $et41' services,
complete .IR place) the sum of
AAD ,, ~ CENTS
per ach.
40 8 EA
102
LF For furnishing and plictng
24' ASTII F-497 PVC se~er
(25'-30' depth), cumplete
_in place, the sum of
per eacn.
SECTION I - GRAPEVINE III ~ ,&
TOTAL BIO FOR ALL UNIT PRICES.'~ IA,:~,~e~w~ ~T~ ~ ~
(usu ~s) /
REVISED 00301-7
SECTION II - GRAPEVINE IV
ITE# ESTJNATE1)
NO. QUANTITY
DESCRIPTION AND UtlIT
UNIT PRICE IN ~ORDS PRICE
TOTAL
MIOUNT
1 215 LF
For f.urntshtng and plictng
6' CT. 50 Oucttle Iroe Pipe,
coapJete fn ~lice, the sum of'
~ ~ o DOLLARS
LF For furnishing and placteg
8' C1, SO Oucttle Iron Ptpe,
coe~ete tn place, the sum of
NTS
3 N/A
4 13
N/A
5-9
10
11
567
N/A
LF
NOT USED
For furfltshtnglnd placing
lZ" SOR-36, PVC smmr (0'-10'
depth), con~lete tn place,
the sum of
- ~._~OOLLARS
Am) i CENTS
per linear foot;--
12' SOR-3S, PVC slier (lO'-]S'
depth), complete in place,
the sm of
cDOLLARS
ENTS
per linear foot,
00301-8 REVTSED
13-18 N/A
~o-~3
ZS 1
26 I
Z7 316
LF
For fu~nlsMng and plactng ~ ~t~.~
]2' SDR-3$, PVC saner
depth),~hs sum ~foaplete in p]ace,
$
HOT USED
EA Fo~ fur~lshtng ~nd plactng 4
FT diameter af, eodard manhole,
complete In place, the sum of
CENTS
per each.
N/A NOT U~ED
EA For J~rntshtng and plactng 4 ~.~-- c~(c~).ec~-
~ dieter T~e 'S' mnhole, ' '
~r each.
For furnishing a11 labor,
MtortaTs and Incidentals
EA FO~ furnishing and pl&ctng 5 ~ ~,~.~
FT dtamter Type sS' mmhole,
complete In pl.~.e, tho sub of
AND~ l -~ --CENTS
per each.
~equJred to complete Stphon
ItFUCtUru per collt, ract
reqetremento, complete In
Place, the sum of
~.. 00LL/~S
AH~ - CEHTS
per elch~
LF For furnishing and placing
diameter dry bore, co~le%a
__~ace, the sum of
pe~A~ene~cENTs
28
30-31
32
33-36
37
38
336
6
IyA
83t
9
~60~
REVISED 00301-9
LF ~or furnishing and placing SO' ~.~:~-- ~(~C~.~'~
dlmeter cutng pipe, cogpltto
tn plico, tho sub of
per t iMar foot.
EA
For abandonment of st~nd&rd
sluer manhole, complete tn
p1KO, the, sum of
~ ~c~ - CENTS
per ~ch.
N/A
LF
NOT USED
For removal and ~eplactlent
of 8' reinforced concrete
pavement, c~lute ~n place,
the sum of
per squira ~?~d~.
WA
SY
LS
LF
NOT USEO
For ~enoval and repiocemnt ~ ~_~c~
of 6" ~o~nforced concrete
Rtp-RIp, cemlete tn place,
the sum Of
I~r oquore yaM.
For furnishing and plactng
landscaping, complete le
place, the sum of
per Jump sum.
For Trench Excavation Safety
~nd Support, co. leto tn
~ '~ CEOS
per li~ar foot.
00301-10 REVISED
3g
4O
LS For ~urntshlng and maintaining ~:~, ~,~%
Tr&fftc Control slgnige,
ba~.tc~ltng, etc. durTng and
through coaoletton of
constrocttoh coo~plete tn
pl~ace, the sum
.. ~ DOLLARS
~.~ CENTS
per 1~
$ ~/ EA For fur~tshlng and plectn9
4' P~ I~r s8~Jcos~
cogq)lete :Jp place, th sum of
L~ OOLLARS
CnTS
per otC#,
41 N/A N/A HOT USED
SECTIUN 1I - GRAPEVINE ]Y
TOTAL BXD FOR ALL UNIT PBICES:~)E
(use uords)
SECTION llI - BETHEL ROAO
ZTFJ4 ESTIIMTED DESCRIPTION AND UNIT TOTAL
NO. QUANTITY UNIT PRICE IN #ORDS PRICE AHOUNT
! 110 LF For furnishing and placing
6" C1. 50 Ductile lima Pipe,
Z 110 LF
3 13
coe~plete tn place, the sum of
AND~CENT$
~P Ilfleer TOOT.
For furnishing.and plectng
6" C1. ~ OUctlle lr~ Pipe,
complete in p_lace, the sum of
--~, ~ OOLLAAS
~CENTS
LF F? furnishing &nd plmc?g
6 $DR-35, PVC se~e.r (0 -lO
depth), complete in place,
the sum of
NT LLAR$
S
?
8
9
lO
11
4 $ LF
N/A
23]4
1648
15
892
2477
NOT USFJ)
LF For furnishing and plactng ~--~.°cb--~?-(o.~°- ~
1o' S0~-35, FVC smmr (0'-10'
dept,h), cemplet,e tn place,
the sum of
c DOLLARS
ENTS
LF For furnishing end plactng ~.~ l(~-T,(~.~3.C~
10' SDR-3S; PVC lower (10'-15'
depth), camplet, e Jn place,
the sum
oF
pe~ ~ tnear foot.
LF For fur~*sMng and p]a¢ing
12" ~-~, P~ sMr (0'-5'
depth)~ c~lete tn place,
the s~ o~
S,~ ~L~
~ ~or
per ~
LF For f~tsht~ ~d placi~
12' ~R-3S, ~ sMr {5'-10'
dep~), c~leto tn place,
~s~ oF
~~L~
LF
12-18 N/A N/A NOT USEO
00501-12 REVISED
19
22 4 EA
23 I
24
FoP furnishing and plactng 4
FT dtamter standard Ikmhole,
c~p_/eT, e~lete ~nln ~place, the sum of
CENTS
per each,
For furntshtn9 a~d pl~cln9 5
FT diameter atindlrdmnhole,
comp~lgte tn ~ce, the sum of
CENTS
per each.
For fu~tshln9 and piactng 4 ~
FT dlamter d~op Snlet manhole,
co_mplete In pllco, the s~ of
#/A NOT USED
FT dlamter Type'S" manhole,
.~lete Jn pla .ce, the sma of
For furnishing all lahor,
materials and Incidentals
mqutred to complete Siphon
structur~per contract
requfrement$, cmaplete
place, thl sub of
per each,
27
28
29
3O
31
3~-34
35
36
6
15
IS
4
6998
J~EV3$EO 0030~-13
c~letl tn
dlw~r d~
pla~, t~ I~ of
per ltMar foot.
LF
For ablfldoflent of stafldard
SMP nanholo~ complete In
plKe, the sm of
~ ~ CENTS
per eaCh.
EA For ahdonment of sanitary ~::::~
se.r clean out, complete tn
l~ce~ the sum of
per dich.
For plaCemnt of G" Class
concrete elbedmant ic~ss
entf~ t~nch wtdth, c~lete
in place, the s~ d
~ ~L~
per each.
LF
LF
SY
NOT USED
Fo~ raov&i and rep1
of aspkaltIc concrete ' *S~ hscr~ptton
Pl~ OO]O0-ll
Section 11.2,1
pavement,, co. leto tn place,
the sum el~
OOLLaS
ANO CENTS
per ~
For r~ovll afld rep)acemnt
of 6" r~toforced concrete
Rip-Rap, cou~lete tn place,
~ ~¢ENT$
00301-14 REVISED
37 ! L$
· For furnishing and plactng
landscaping, complete tn
place, the sug of
'
~ CENTS
per lump sum.
38 7346 LF
39 ! LS
4O
and $~pport, complete tn
pla~, s~ of
per t~near T~T.
For fuY~lShlng and nmtntatntng ~,~--
Trafftc Control $tgnage,
barrtcadlug, Itc, durtug and
through completion of
construction, complete In
place, tho SOl of
per l U~ sum.
]6 J EA FOr furnishing and pl&ctug (~.~
4" PVC swot services)
complete.tn place, the sum of
~ ' DOLLARS
r~ CENTS
per each.
4] H/A N/A HOT USED
SECTXON 11I - BETHEL ROAO .~ ,I ~
TOTAL BID FOR ALL UNIT PRZCES. 'use tm s O
REVISED O0$Ol-lS
COI~6INATIOR OF SECTIONS
The undersigned Bidder hereby agrees to accept In award of
contract based on iny tedividua] section. However, Jf awarded
too or mre sections, tho undersigned Bidder agrees to deduct
f~om all prices named tn those sectton, the folloutng anounts:
Combination of' Sections ! end IX. deduct ~ dollars.
TOTAL BID FOR ALL UNIT PRICES (AETER DEOUCT~
Combination of Sections II and III, deduct ~ dolllrs.
, ~_~ (~)
Combination of Sections ! and !11. deduct ~) dollar$o
TOTAL BID FOR ALL UNIT PRICES (AFTER DEOUCT~
TOTAL BiO FOB ALL UNIT PRICES (AFTEn
(use words)
Untt Prtces bawl mn ~puted tn accordance wtth par~h
11.9.2. of the bneri] Co~ltlons.
8IDI)ER acknowledges that quantities are not guaranteed and ftnal
pennant will be based on actual quantities detergined as provtded
in the Contract Docu~nts.
5. Completion.
BIDO£Rigroes that the t/o~k will be substantially completed end
completed and ready for ftnal p~nt in accordance with
paragraph 14.13. of the General Condltton~ on or befor~ ~e
di~ Or wtthtn the n~r of cile~ar days indicat~ ~fl tho
Agreement.
BIOOER accepts the provisions of the Agremaent es to liquidated
damgns in the event oF Cailure to complnto the #ork wtthln the
times spectftmd tn the Agreement,
6. Attached Documents.
The following documents are attached to and Bide a condition
of this Bid:
a. Required Bid Security in the form of ~o ~,~ ~o~/~ .
Other Requiremnt$.
Address for Cmmuntcatton$.
a, Cmmamtcations concerning this Bld shell be addrusaed to
Purch&atng Offtce
255 Parlmay Dou]evard
Coppel], Texas 75019
b. BIDOER~ees that all #ork awar~ndwtll ~ completed
withtn~4o Caleud~r Days: Contractor v~ will cMnce
to run as provid~ m the cont~ac~ ~c~n~s.
c. Cmmuntcet~ons concer~tnO this Btd shall he to the address
of BIOOER ~nd~cated on the applicable signature page.
d, BIOOER u~derstonds that the O~er is exempt fto~ State
Limited Sales ~d Use Tax on taeglblo pnrsonal property to
he Incorporated tote the pro~ect. Satd taxes are net
included tn Contract Price (See Instructions to Bidders).
The terms used in this Btd ~hich are defined In the
General Conditions of the Constrnctton Contract included es
partof the Contract Documents have the meantegs assigned to
thmn tn the General Conditions.
Tems used in this Bid ~htch are defined tn the General
Coudtttons or Instructions wtll have the meantngs Indicated tn
the Ge~nral CondJtlons or Instructions.
The Ctty of Coppe11 reserves the right to delete any portton of
thte project as it may die ~cessary to stay wtthtn the City's
avatllble funds. ~h?uld ~he Ctty elect to delete any portion,
thl contract quantities w~ll be adjusted accordingly,
~0
/OU
NO?IC~ TO IDD]~S: Chop
1. 9nctimIG0(120-{HVII'&TERqTOB{D'Pfig~iW~20'I' 18, 199~,'.
2. Secek~0O30l: ltq~l, qe(XB01.3wbhiB~poP00MI-3.
3. Sec~cu 0O{01: ~ po{~ (~B01-7 ~ RBVlSI3D p~ 00301-?,
p~r ~noar foo'r,.
1. hi~tm~i~0.DIVITATIC~TOBID, PIg~00Ii20-1, HOTICBTORmD~,3: Change
'2:00 p.m. -- Thunday, July 6, 199~,' ~o '2:00 p.m. oa Tumhy, JMy 18, 199'J,'.
smbn OOla). Po~ 8: Fonowh[ prqnph 13.2, add th. fonowin; lx,rqraph,
· l, ipo emlx~mmt for ail nnlftr~ m b shdl bO u J~)ws:
A nddmm of 6 m cnubed ,mo ,u,bed,nm ,ban be pl=~ below nd on each ,,ak,
. A..~,m,.- ~E 12 IN crulbM U mal~lmmt ~ b ~ ~ ~ ~
Cnulml ,,,--- ~hallb a, qmd~d ia Suudml Cuuma:tkm ~ 2. l.tL, l~e
4. Section (XJ301: itepll~ .l:~hxl wilh :~viued Souliml 00301 Il:ladled to {his adduadum.
NOT U~HD~
HOT us~)'
THiS ADDIINDUM 13 MA,DB PART OF THB DRAWINGS, SPHCIFICATIOIq$, AND
CO~t~s. CT ~ AND SHALL BI{ NOTBD ONTHB PBf:B'OSAL.
HDi B)TOIiq~.lNO, INC.
TYPICAL NATIVE MATERIAL COMPACTED TO
9§% OPTIMUM MOISTURE · ~,% UNDER PAVEMENT
90% OPTIMUM MOISTURE .f. 5% OUTSIDE CURB LINES
,,lETTiNG IS NOT ALLOWED
BACKFILL TO BE COMPACTED IN 6"::1: LIFTS
CRUSHED S~ -
{ SEE SPECS)
EM~IEDMENT
REVISED 00301-1
95CGll SECTION 00301
BID
PItO~£CT IOENTIFICATI0~:
CONTRACT IOF~I'IFICATION: ss g4-0~
~HI$ BID I$ SUBRITTEI~. !0'. _
City of Coppell Bid Iio:
I. Enter Into
The unde~tgn~ BI~ p~posol and ~rHs, tf thts B~d ~s
acc~, to ente~ tnton ~mnt wl~ tn the.fp~.
~ncl~ tn tho ~fltract
~rk is o~ift~ or t~tcat~ tn the COntFKt ~cmnts for the
8td ~tce ~ utthtn
ack.axe ~ the ot~r te~J and ~ttJ~s ~ the ContrKt
S. BI~ER
8Z~R ~s at1 of the tams and ~ltt~ of the
~l~tmt ~ luvttlttOn tO Bid ~ ]fllt~tons to Btd~rs,
1flc1~4~ ~ ]tut~t~ t~e ~alt~ ~th th d~s~ositlon
of Bid ~tt~.
For nl~ty (M) d~ after t~ ~ oF Bid o~t~. 8Z~ ~11
st~ ~ ~lvlr t~ ~t~ n~ of ~ynte~a~s.o~ t~
~t vtth ~ ~s ~d ether d~T, ~r~. Dy.C~e .
61ddt~ ~ntS vtth~n
MER's ~tt~ of
3. Bl~R's ~s~tatJ~s.
In s~ltting thts Btd, BI~ER represents, is m~ fuTly set
forth ~n the ~t, that:
BIDDER has exmtnnd and carefully studlnd the 81riding
Oocuments and the following Addenda race?pt of all ~htch ts
hereb~ icknoulodged: (List Addenda by R.ldmr end 0ate)
00301-2 REVISED
b. BIDDER has vtslted the atto and becon fatllar utah ~d ts
sa~tsft~ u ~ t~ ~nerel, 1~al and slte c~lons ~at
a~ aff~t cost~ p~sl~ ~Ffo~ce and ~s~t~ of
c. 8I~ ts fmt11~ utah ~ h sattsfl~
~tite i~ 1~il L~s a~ Regulittons that my Iff~t cost,
pre.ss, ~o~ce ~ ~tsht~ of the York.
d. BZ~R has obtitnK and c.efu11~
~stbtllt~ for havt~ d~e
s~]~tiry ~tM~tons, lnvest~gR1ons, ~lor~t~s,
tease, st~Se3 ~ ~te con~Jng ~ttJons
Ig~urfKe ~ U~e~ro~ Factlifl#)
the sib or ~ ~t~
~rfo~ce or fu~tshtng oF tho ~rk or ~tch ~lu~ to .
W as~t of t~ ~ns~ mth~l~
pr~s of c~lt~lon to ~ ~l~ed b~ BJ~ aM
safeW p~i~lons ~d p~r~ tnctdeut thereto.
BIDDER dona not consider that a~y additional exutnatlofls,
1nv.algerians. exp]orettons, tests, studio or data are
for the htem~nlt~on of th~s etd faf perforce
~hhl~ of ~e hrk tn IKo~ance ~th the alms,
~er te~ ~ cantatas of the Contra
e. BZDOER has correlated the tnfomRJofl knmm to BIIOOER.
Infatuation and ob. wetlons obtained from visits to the
atto, reports and dra#,tnga Identified tn the Contract
Ooculmte led all ~dd~tIoral eximtoattoM, Investigations,
explorattoM, teats, studies and date with the Contract
Oocumnt$.
BIDDER has gtven ENGINEER wttten Mttca of ill cant'Itch,
errors, ambiguities or dtscrep_ncles tn the Contract
Once.nil end the wrttten resolution thereof by ENGZNEER ts
acceptable to StIX)ER, and the CofltractDocumnts ire
generally sufficient to indicate ~ convey understanding
oF all terms and conditions for performing and furnishing
the York for vhtch this etd ts suhnttted.
bra coal]Joel, el~'ors, ulbtglii~JlS or discroponc~ea have been
d~scovered tn or bntmn Contract O~cunieflts and/or other
related documents, and ~hera said coflfilctl, etc., have not
been resolved through ~he tnhrpratatlOM or clarifications by
ENGIK~R as described tn tho lnstructtofls to gtdders, because
of ~nsuffIctent tim or nthervhe, BIDDER has included tn the
Bid the greater quantity or ~etter qullty of York, or
c--pltance with tho ~ora stringent raqutramnt r-suiting tfl a
greater cost.
R[VlSED 00301
Th~l B~d ts 9enulne and not Bade tn the Interest of or on.
boh&lf of iny undisclosed person, .tim or co~povTtton a.M
t$ not sulaattted tn confomt~ vtthLif~y Igl~glllel~t o1' ~UlBS
Of &RY group, association, o~gentzatton or cerporatJon;
BIOOFJ has not dtrectly o1' Indirectly tnduced or solicited
a~y other BIOOER t~ sub~tt · filse or shin Bid; BIDOER has
not solicited or tlKIuced a~y person, ftl~ o1' corporation to
refrain frme btddlng; nd BIDDER has not sogghtby
collusion to obtlJn for ttself a~y idvantagu over ~ other
BIOOER or over ON#ER.
4. 6td P~tces.
BIDOF~vIll cmnpletetheVork in icce~dancevith the Coat1'&ct
Documents For the relieving price(s):
Al! spectftc cash ·11.o~tncns are Included t~ the prtce(s) set
Forth above and h&veoeen computed tn ~ccoroancewtth pi1'ag1'aph
11.8. of the General Conditions,
UNIT PRICE BID
FOR
CITY OF COPI~LL SEV[~ IIL°ROVE~ENTS
$~TION I - GRAKVlNE III
DESCRIPTION AND UNIT TOTAL
UNIT PRICE IN ItOIIOS PRIC[ AfIOUNT
1-4
5 166
8/A HOT USED
LF For fumtshlng tnd placing //~1'~ ~
8' PYC sever (lB'-20' depth),
coaplgte tp p]ice,.the suni of
6-13 N/A
14 200
LF For fumtshJng and placing IS' ~
SOR-3SI~;C seuer (0'-10' depth),
00301-4 REVISED
16 1094
17 230
LF For ~nishtng and plactng
IS' ~)R-35 PVC smmr (10'-15'
complete tn place,
~P~), _
~e s~B uT ,
--CEN S
per i]near T~,
LF For ~rntsht~ and plactng
1S' S~-35 ~ s~r (IS'-~' "'
dep~), c~lete ~n place,
LF For ~rfl~shi~ ~ placi~ .~/~
15' ~-35 P~ s~r
depth}, c~lete ~. p/ice,
18
2O 8
z]
WA N/A NOT USeD ,~ ~
S EA For fUlfltJlhJmj arid pl&cing 4 ~ ~
~ dt~br standa~ mu~le,
complete .~n pJice, .th sug of
AND ,,~ CENTS
I~r ~ach.
For ~tshtM ~ placl~ S
FT dt~ter standu~ ~nhole,
/ CDO e.te .u of
LLAKS
per e~,cit, "~'~
,PO gsO
EA For fu~tshtng ~nd plictng 6 ~ ~
FT dtlMter standard amnhole,
the sum of
cpmple~! in placg, The
~~00LLARS
/~ CEI~S
per ench.
22 WA N/A NOT USED
P,~VlSEI) 00301-5
23
24-Z6
27
26
Zg
30-31
33
34
fl/A
718
718
9
Imf each,
N/A NOT USED ~
LF For furotshtng ~nd plactng 2Q" ,,,~/.~ ~
dJ~er dr~ ~, c~lete tn
LF F~ ~tsbtng ~ plact~ 20' ~ ~
dlmter casl~ pJ~, ~lete
tn pl~,, t~ O~ of
. -~~L~
s~r mnhole, ~lete In
f~ OOLLAqS
CENTS
per each.
Ii/A N/A NOT USED
12 SY For remvll and roplacemnt ~,-
of 8' reinforced concrete
188
635
SY
LF
pavement, co~le~ tn place,
the sm of
OOLLARS
~ OOLLARS
For remvul aud replacemmt
of ~e~nforoed concrete 4 FT
wide sidewalk, comlete in
place, th.e,;sum of
~LL~S
OO3O1-6 REVISED
36-36
37
39 I
40 8
41 102
WA H/A NOT USED
LS FOr furnishing and pl&ctng
landlclptng, complef~ tn
pla4e, th~ sum of j
]UlD~CEXT$
per 'lump sum,
3655 LF For T~ench ~xcavatlon Safety
and Suppo~, comlete In
plice,-~ of
per lump sum. ?~cp~ ~_
EA For furnishing and plactng , ~ ~
4' PVC smear services,
completedn p~ac, p,, .the sun of
(25'-30' dlp~), complete
~n p~ce,,thg. SUIli of
OLLARS
0O301-7
SECTION II - GI~P~INE IV
ITEN ESTINMEO
1
2
DESCRIPTION AND UNIT TOTAL
UNIT PRICE IN JIORDS PRICE ANOUNT
(;1. SO hcttll Iron Pipe,
complete tp .place, the sma of
' .~,,/~._~__DO L L~S
coeOlete tn pTace~ the sum of
· ~ DOLLAqs
~CEflTS
5-9
10
3 N/A
4 13
11
N/A
S67
1565
LF For furnSshi~g lid plictng 8"
S~-3S, ~ s~r (10'-15'
~th), c~lete tn place,
the sm o~ , .
LF For fu~tshS~ ~d pl~J~
~Z~ G-36, PVC sMr (0'-10'
depth), ~lete tn
~ CEOS
LF For furnishing &~l placing _~ ~
1~' SOP.-3S, PVC sever (lO'-lS'
dept~), coa~letu in place,
the ;ulN Of ' ,
00301-8 R[VI$~D
lZ
iF For furntsh~ng ~nd pll~tng ,,/~' ,
~2' SDR-3S, PVC sevin' (1i'-~O'
de~th), c ~]ete
the sm
~r~ ~OOLLAnS
13 - 18 K/A K/A
19 8 EA
For Furnishing end placing 4 ~1~ /~Y~-
FT dtiletJT' $~lndard aiflimle, --
ceapl.el~ to~place, r~m sum of
~~DOtLARS
CEHT$
per each.
20-23
24
27 3X6
WA NOT USED _.o ~o
EA For furnishing and p~ac~n~ 4 ~.~c1~ ~
FT diameter T~po 'S" mnlmle, -
cogplel:9 1T)pl~Jce,.th~ sum oF
EA For furnishing and plactng S
FT diameter T~pE 'S" mnhole,
cap91etq~tn place# tho sub of
per each. ~ ~.~
EA For fur~Johtng all labor,
mterill$ el~l incidentals
required to complete Stphon
requtrOlmntl, con,lute In
pTace,, t~ sua,f)f /~
LF Fog' furnlshtnglnd' placing
dtamtef dry ~, ~lete In
pac,t , f .
~~L~S
28
29
30-$!
22
36
37
38
316
H/A
N/A
2601
LF
REVISED 00301-9
For fu~tshleg and pltc*ng
dlmeter casing pipe, cmp~ete
lu pl,~um of ~LLARS
NID ~ CENTS
per
For ~l)lhdonmnt of st~da~
sever manbolo, couplete tn
par
LF For removal and replaceaent ~/-~
of 8' reinforced concrete
pavement, coeplete tn place,
the sun
per square ~ara.
SY For renoval and replacmmnt
of 6" reinforced concret~
Rip-Rap, Cliplite tn pl&cm,
the sm,orr.
~rsqunre yin.
~r ~lsht~ a~ placing
)late
landscapt~, coal
pJ~e, th~,em of~
LS
per 1map sum.
LF For Trench Excavation Safety
and Support, coaplete ~n
place, t, ho suni of
per 1T~ar foot.
00301-10 REVZSED
39
4O 8
] LS For furnishing
Traffic Cmt~l slgnage,
I ~i~t~, etc. durt~ and
thigh ~letton of .
~st~tl~ c~lqte in
pla~
EA Fo1' i g and plact~g ~ ~
4" PVC sever services,
complete lB It1Ke, the sum ot'
41 N/A N/A NOT USO)
TOTAL BTD FOR ALL UNiT PR]CES:~~
SECTZOtl Z][Z - BETHEL
[TDI £STZHATED D[SCRIPTZON AND
NO. Q~...~NTITY UNIT PRICE IN
I 110 LF
For furnishing and pllclng
6' £1. S0 Ductile Iron P$1m,
complete ,fo ;1Ke, ~the sum of
UNIT TOTAL
PRICE N40UNT
z ~io
$ 13
I~r 11nei~ foot.
LF For furnishing end plictng
8" C1. 50 I)ucttle I~on P~pe, ' '
complete ~n 91acgq,the sim of
per linear foot. ~ ao
LF For furnishing and ploctng . ~/ ~-~-
8" S0fl-3S, ~ sever (0'-10'
depth), cmq;lete in place,
the f
~00LLARS
REVISED 00301-11
4
5-6
8
]0
11
5
IS
8g~
2¢77
LF For ~rotshtng and pli¢tng
10' SDR-3B, PVC sever
depth), coiN)leto tn placl,
the sum
I~r Ttnoer foot.
LF For furnishing end placing ~/~--
IS' 50R-26, PVC sMr (O'-S'
depth), complete tn place,
per ~ foot,
LF For furnishing and plact~ ,
12' SDR-3S, I~C sever {5 -10
depth), cmaplete tn place,
$
per linear foot. .
LF For furnishing end placm9 ~x'~~ ~_~.~
Ir SOR-35, PVC sever (tO'.]S'
depth), COalp~ete in place~
the sum .~ DOLLARS - CENTS
p~t ~l~ir foot.
12-18 WA ~/A NOT USE])
00301-12 REVISED
19
t%
EA For furnishing and pllctng 4 ~ ~
FT dtIitlr stindard mmhele,
complete tno~lice, ~e ~um of
For furnishing and placing $
Fr dtii~er sLandird manhole,
c.oaqilet.e ]~ p,lice, t~e sum of
~CENTS
per ertl1,
2~
22 4
23 I
FA For furnlsht~g and plactng 4 ~
FT diameter drop Snlet aanhole,
cojq)le~e ~in pl~ce~tlT~ Sum of
per each.
For furnishing and pllctllg S
EA FT dtMmter d~p tnlet;
Koaple~,e tn I)1&~, the sm
per
25 I EA
26 I
HOT USED ~ ~
For furnishing ~nd plict~g 5 _~ -
~ dtlter T~e "S" i~le,
c~le~e.~n pl~ce,~t~ si of
For furnishing all labor,
Itertals and incidentals
requtred to complete Stphon
structure per contract
rlquireimnts, complete in
ptr iIch.
27
28 lB
REVISED 00~01-13
LF For furnishing and plactng
dtametor dr~ bore, c~late tn
place~the
LF For ~tshl~
dtmtor c~tng pt~, c~le~e
~~~t~
~ ~ C~S
29 6 EA
30 4
3] 48
For abandonment of stsnd.~d ~ -~
saver mnhole, comple~ In
UTS
per each.
tA For abandonment of santtir~
sMr c]eu ou~,
pll~ the~m ~
~ ~~L~
~~S
per
LF For pli~t of 6' Class
co.fete ~t ac~ss
· n~t~ t~ch wtdth, c~lete
in placp, ~hq sun at' _
DOLLARS
~CENT$
35 6998 LF For ramoval and replacmont //~7/ ~fc
of as~mlttc c~nte rtptim
36 7 $¥
~avement, cout)lete tn pllce, P&ge OOlO0-11
~I su,~ o1' ~- Soctton 13.2.1
~LU~S
~ CEOS
pIr limit foot. ~ ~
For ~v.1 a~ replace~nt ~ _ ~
of 6~ ~nfo~ C~te
Rip-Rap, complete tn place,
the sun o1'
per square yard
'~ aa301-14 RL'VIS~O
37 !
38 7346
3~ ] LS
40 18 EA
LS For furnishing and placing ~
landscaping, coaplete In
placq~.%hl~spn of ,,~
per lump sum.
LF For T~ench Excavation Safaty
ofld Suppol't, cmnp_lete
per'T'~'~2~'~~,
For fuF~ishtng and mtntilntng
Tr&~tcControl stgnage,
barr~cadlng~ etc. durtng a~d
con$~ructJon~ coiN)lite In
plicb the ~gu of
- ,~,~.,_,~,~oo L LARS
~ CmTS
per lump sim.
For furnishing mid plactng ?_~'~
4' PVC sever
41 N/A N/A NOT USEO
SECT]OW Z]~ - Kr.~. P.O~ . *" '
TOTAL BID FOR ALL UNXT
~' ~' REVZSED
¢Of~IW~TION OF SECTZONS
Tho undersigned Btddor her~b.~. ~lrees.~o accept in
contract based on any indtvlaua] set,loft, IJOWover~ 1T
tee or cora SKtlons, the Underslgnnd Btdder agrees to deduc~
from Ili prtces named tn those sec!tons the relieving
Combtfl&tton oF Sections ! and ]I, deduct /~ dollars.
TOTAL B!D FOR ALL UNIT PRZCE$ (AFTER O£D~CT)~~
Combtn&tton of Sections Il and III, deduct ~ do]lets,
TOTAL eTD FOR ALL UNIT PRICES {AFTER DEDUCT)~
Cmnbtnitton of Sec!tons ! and HI, deduct ~ dollars.
TOTAL BZD FOP, N.L UNZT PRZCES (AFTER I)~OUCT)~
o ' ' -t-,~ ~ (use *lgu~$J
Combination of Sections I, II, arid Ill, deduct ~ doltarl.
TOTAL BTD FOR ALL UNZT PRZCES (AFTER
Unit Prices hive b~en ~n~uted tn acco~ince with paragraph
ll,9.Z, of th~ G~llertl Conditions,
B!DDER ac..l~.lndges that quint!ties a~e not guaranto~ end
pe~nent w~11 I~ bisod on actull quantities detomined as prowaeQ
the Contract Documents.
5. Completion.
BXDOER ig~s !hit the I~ork ~11 be substantially completed and
COml)letndand ready for final payment in accordance wtth
paragraph ~4.~3, of the Denote1 Condlttons on or before the
dit~s or w~thm the number of c&lendi~ days Indic&ted in the
Ag~*~Ji~nt.
00301-10 REViSEO
B~DOER ac, ce;ti the p~Qvts~ons of tho Agraemnt as to 11qutditnd
SiMS specified in the ~reeMnt.
6. Attach~ ~c~.
~e fOll~ing dOCents a~ at~ached to and m~e
of th,, B,d: ~
a, ~qu~ Btd ~1ty t~ the fo~ of .
9- ~r Re~tr~nts,
~d~es~ for
a. C~cattons C~ce~i~ this Btd s~11 ~ a~ss~ to
~h~ing ~fJce
255 P&r~ Bouleva~
C~IT, T~as
b. BIOOER agrees that all ~rk ava .r~led ,vtll .be coed. leted
within ~ C&.I.u .~.r O.lYS: C. ont,~_cTo_.r, wi_?. wi Il commence
to run il provid~O in th~ conTraCT uocumeni~.
c. CmmUniCations concerfltng this Old shell be to the address
of BlOO~t tndtcat~l on the applicable stgnatum page.
d. 8lOOER understands that_ the O~er..t.s exert f.ro?~tatr~- to
timttnd Sales end Use TIX on tlnglUle
~e' Incorporated 1nSc _the. project: .Satd_t. axes?_~t~rs,.
tnclnded in Contract Price f, Soe InsTruCT, lOSS To D U~ I
e. l~e terns used In this Bid_~hl.ch a~ do.fin.ed t.n t. he .... . _
G~eral cufldtttons of the co.as?ucl;1.o.n
o, th. ,n,
th(iai tn the G~ne a
Toms used in this IHd ~htch are defined in the General
Conditions or InstFuctlons wtll have the ueaAtngs Indicated in
the g~neral Conditions or Instructions.
11 reserves the right to delete any portton of
The City of Coppe's
- it may deem necessary to stay ~thtn the .Ct. ty
the
tho contrsct quantities wt~1 be adjusted accordingly,