SS9402-BD 9509073id RIVER VALLEY ENTER. LARRY JACKSON CONSTR. WRIGHT CONSTRUCTION ARCHITECTURAL UTIL ATKINS BROS. EQUIP item Description Qb/ Unit Unit Pdce Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Pnce Amount 1-4 NOT USED ' N/A N/A 5 For furnishing and placing 8" PVC sewer (15'-20' depth) 166 LF $43.85 $7,279.10 $118.00 $19,588.00 $89.00 $14,774.00 $47.90 $7,951.40 $61.00 $10,126.00 3-13 NOT USED N/A N/A 14 For furnishing and placing 5" SDR-35 PVC sewer (0'-10' depth) 200 LF $27.50 $5,500.00 $40.00 $8,000.00 $61.00 $12,200.00 $51.30 $10,260.00 $50.00 $10,000.00 15 For furnishing and placing 5" SDR-35 PVC sewer (10'-15' depth) 2,570 LF $34.05 $93,637.50 $65.00 $167,050.00 $67.00 $172,190.00 $53.65 $137,880.50 $60.00 $154,200.00 16 For fumishing and placing 5" SDR-35 PVC sewer (15'-20' depth) 1,094 LF $48.45 $53,004.30 $80.00 $87,520.00 $95.00 $103,930.00 $57.15 $62,522.10 $75.00 $82,050.00 17 For fumishing and placing 5' SDR-35 PVC sewer (20'-25' depth) 230 LF $66.50 $15,295.00 $136.00 $31,280.00 $137.00 $31,510.00 $71.10 $16,353.00 $94.00 $21,620.00 18 NOT USED N/A N/A 19 For furnishing and placing 4 FT diameter standard manhole 5 EA $2,515.00 $12,575.00 $2,000.00 $10,000.00 $1,900.00 $9,500.00 $3,000.00 $15,000.00 $2,410.00 $12,050.00 Z0 For furnishing and placing 5 FT diameter standard manhole 8 EA $2,780.00 $22,240.00 $4,800.00 $38,400.00 $3,100.00 $24,800.00 $3,800.00 $30,400.00 $4,260.00 $34,080.00 21 For furnishing and @lacing 6 FT diameter standard manhole I EA $2,880.00 I $2,880.00 $5,000.00 $5,000.00 $4,500.00 $4,500.00 $5,300.00 $5,300.00 $5,810.00 $5,810.00 22 NOT USED N/A N/A 23 For furnishing and placing 5 FT diameter drop inlet manhole I EA $3,890.00 $3,890.00 $6,500.00 $6,500.00 $5,300.00 $5,300.00 $6,000.00 $6,000.00 $12,190.00 $12,190.00 24-26 NOT USED N/A N/A 27 For furnishing and placin(j 20" diameter dry bore 718 LF $62.00 $44,516.00 $260.00 $186,680.00 $290.00 $208,220.00 $201.00 $144,318.00 $197.50 $141,805.00 28 For furnishing and placing 20" diameter casing p~pe 718 LF $20.00 $14,360.00 $65.00 $46,670.00! $25.00 $17,950.00 $36.70 $26,350.60 $12.00 $8,616.00 29 For abandonment of standard sewer manhole 9 EA $1,200.00 $10,800.00 $500.00 $4,500.00 $700.00 $6,300.00 $440.00 $3,960.00 $200.00 $180.00 30-31 NOT USED N/A N/A 32 iFor removal and replacement of 8" reinforced concrete pavement 12 SY $42.00 $504.00 $90.00 $1,080.00 $100.00 $1,200.00 $76.00 $912.00 $68.00 $816.00 33 For removal and replacement of reinforced concrete driveway 188 SY $35.00 $6,580.00 $60.00 $11,280.00 $39.00 $7,332.00 $69.00 $12,972.00 $40.00 $7,520.00 34 For removal and replacement of reii,;'u,~ed concrete 4 FT wide sidewalk 835 LF $12.00 $10,020.00 $16.00 $13,360.00 $34.00 $28,390.00 $11.30 $9,435.50 $15.00 $12,525.00 36-36 NOT USED N/A N/A 37 For furnishing and placing landscaping I LS $8,500.00 $8,500.00 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $20,000.00 $20,000.00 $9,000.00 $9,000.00 38 ForTrench ExCavation Safety and Support 3,555 LF $2.90 $10,309.50 $2.00 $7,110.00 $1.00 $3,555.00 $3.40 $12,087.00 $0.25 $888.75 For furnishing and maintaining Traffic Control signage, ban~icading, etc. 39 :ludng and threucjh completion of construction I LS $5,960.00 $5,960.00 $15,000.00 $15,000.00 $9,000.00 $9,000.00 $5,000.00 $5,000.00 $20,000.00 $20,000.00 40 For furnishing and placin~l 4" PVC sewer services 8 EA $840.00 $6,720.00 ~;750.00 $6,000.00 $900.00 $7,200.00 $460.00 $3,680.00 $350.00 $2,800.00 41 For furnishing and placing 24" ASTM F-497 PVC sewer (25'-30' depth) 102 LF $121.00 $12,342.00 $144.00 $14,688.00 $105.00 $10,710.00 $157.00 $16,014.00 $154.00 $15,708.00 SECTION I -GRAPEVINE Ill SUBTOTAL $346,912.40 $689,706.00 $689,561.00 $546,396.10 $563,604.75 1 For furnishing and placin,q 6" Cl. 50 Ductile Iren Pipe 215 LF $48.00 $10,320.00 ~;55.00 $11,825.00 $62.00 $13,330.00 $60.60 $13,029.00 $63.00 $13,545.00 2 For furnishing and placing 8" Cl. 50 Ductile Iren Pipe 215 LF $55.00 $11,825.00 -~0.00 $12,900.00 $65.00 $13,975.00 $65.00 $13,975.00 $67.00 $14,405.00 3 NOT USED N/A NIA 4 For furnishing and placing 8" SDR-35, PVC sewer (10'-15' depth) 13 LF $32.00 $416.00 $141.00 $1,833.00 $89.00 $1,157.00 $51.00 $663.00 $54.00 $702.00 5-9 NOT USED N/A N/A 10 For furnishing and placing 12" SDR-35, PVC sewer (10'-15' depth) 557 LF $25.10 $13,980.70 = $43.00 $23,951.00 $59.00, $32,863.00 $47.25 $26,318.25 $42.00 $23,394.00 11 For furnishir~rand placing 12" SDR-35, PVC sewer (10'-15' depth) 1,565 LF $31.20 $48,828.00 $66.00 $103,290.00 $64.00 I $100,160.00 $54.00 $84,510.00 $53,00 $82,945.00 12 For furnishing and placing 12" SDR-35, PVC sewer (15'-20' depth) 580 LF $45.60 $26,488.00 $105.00 $60,900.00 $92.00 $53,360.00 $58.30 $33,814.00 $65.00 $37,700.00 13-18 i NOT USED N/A N/A 19 For furnishing and placing 4 FT diameter standard manhole 8 EA $2,515.00 $20,120.00 $2,000.00 $16,000.00 $2,000.00 $16,000.00 $2,500.00 $20,000.00 $2,410.00 $19,280.00 20-23 NOT USED N/A N/A 24 For fumishing and placincj 4 FT diameter T),PO 'S" manhole 3 EA $2,725.00 $8,175.00 $2,200.00 $6,600.00 $3,200.00 $9,600.00 $2,800.00 $8,400.00 $2,470.00 $7,410.00 25 For furnishing and placing 5 FT diameter Type "S" manhole I EA $2,780.00 $2,780.00 $5,000.00 $5,000.00 $4,500.00 $4,500.00 $4,500.00 $4,500.00 $3,450.00 $3,450.00 For furnishing all labor, rnatedals and incidentals required to complete Siphon 26 structure per contract requirements I EA $21,500.00 $21,500.00 $23,000.00 $23,000.00 $21,000.00 $21,000.00 $13,600.00 $13,600.00 $19,000.00 $19,000.00 27 For furnishing and placing 20" diameter dry bore 316 LF $62.00 $19,592.00 $265.00 $83,740.00 $290.00 $91,640.00 $205.00 $64,780.00 $175.00 $55,300.00 28 For furnishing and placing 20' diameter casing pipe 316 LF $20.00 $6,320.00 $70.00 $22,120.00 $25.00 $7,900.00 $30.00 $9,480.00 $12.00 $3,792.00 29 For abandonment of standard sewer manhole 6 EA $1,200.00 $7,200.00 $500.00 $3,000.00 $700.00 $4,200.00 $445.00 $2,670.00 $200.00 $1,200.00 30-31 NOT USED N/A N/A 32 For removal and replacement of 8" reinforced concrete pavement 832 LF $32.00 $26,624.00 $40.00 $33,280.00 $39,00 $32,488.00 $60.50 $50,336.00 $62.00 I $51,584.00 33-35 NOT USED N/A N/A 36 For removal and replacement of 6# reinforced concrete Rip-Rap 9 SY $48.00 $432.00 $75.00 $675.00 $83.00 $747.00 $156.00 $1,404.00 $40.00 $360.00 37 Forfumishin9 and placing landscaping 1 LS $4,600.00 $4,600.00 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $15,000.00 $15,000.00 $1,000.00 $1,000.00 38 For Trench Excavation Safet~ and Support 2,601 LF $2.90 $7,542.90 $4.00 $10,404.00 $1.00 $2,601.00 $3.70 $9,623.70 $0.25 $650.25 For furnishing and maintaining Traffic Control signage, bari k,,~ding, etc. 39 dudng and through construction I LS $6,900.00 $6,900.00 $10,000.00 $10,000.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 $16,700.00 $16,700.00 40 For furnishing and placing 4" PVC sewer services 8 EA $840.00 $6,720.00 $750.00 $6,000.00 $900.00 $7,200.00 $425.00 $3,400.00 $350.00 $2,800.00 41 NOT USED N/A N/A BidI RIVER VALLEY ENTER. LARRY JACKSON CONSTR. WRIGHT CONSTRUCTION ARCHITECTURAL UTIL I ATKINS BROS. EQUIP Item Description! Qty Unil UnitPrice Amount Unit Pnce Amount ~~ Unit Pdce ~ Amount IUnitPdce I Amount 1 For furnishing and placing 6" Cl. 50 Ductile Iron Pipe 110 LF $251.30 $27,643.00 $170.00 $18,700.00 $63.00 $6,930.00 $60.60 $6,666.00 $71.00 $7,810.00 2 For fumishin~l and placing 8" Cl. 50 Ductile Iron Pipe 110 LF $256.20 $28,182.00 $180.00 $19,800.00 $66.00 $7,260.00 $65.00 $7,150.00 $74.00 $8,140.00 3 For furnishing and placing 8" SDR-35, PVC sewer {0'-10' depth) 13 LF $22.45 $291.85 $34.00 $442.00 $58.00 $754.00 $44.25 $575.25 $34.00 $442.00 4 For furnishing and placing 8' SDR-35, PVC sewer {10'-15' depth) 5 LF $28.90 $144.50 $49.00 $245.00 $63.00 $315.00 $51.00 $255.00 $47.00 $235.00 5-6 NOT USED N/A N/A 7 For furnishing and placin~110" SDR-35, PVC sewer (0'-10' depth) 2,314 LF $23.90 $55,304.60 $36.00 $83,304.00 $59.00 $136,526.00 $56.00 $129,584.00 $38.00 $87,932.00 8 For furnishing and placin~110" SDR-35, PVC sewer (10'-15' depth) 1,648 LF $30.45 $50,181.60 $50.00 $82,400.00 $65.00 $107,120.00 $57.00 $93,936.00 $50.00 $82,400.00 9 For furnishing and placing 12" SDR-35, PVC sewer (0'-5' depth) 15 LF $17.50 $262.50 $32.00 $480.00 $60.00 $900.00 $54.00 $810.00 $33.00 $495.00 10 For fumishin~l and placing 12" SDR-35, PVC sewer (5'-10' depth) 892 LF $25.65 $22,879.80 $37.00 $33,004.00 $62.00 $55,304.00 $57.00 $50,844.00 $41.00 $36,572.00 11 For furnishing and placing 12" SDR-35, PVC sewer {10'~15' depth) 2,477 LF $32.20 $79,759.40 $52.00 $128,804.00 $66.00 $163,482.00 $59.00 $146,143.00 $54.00 $133,758.00 12-18 NOT USED N/A N/A 19 For furnishing and placing 4 FT diameter standard manhole 13 EA $2,616.00 $~,008 m00 $2,000.00 $26,000.00 $2,000100 $26,000.00 $2,200.00 $28,600.00 $2,060.00 $26,780.00 20 For furnishing and placing 5 FT diameter standard manhole 2 EA $2,880.00 $5,760.00 $4,800.00 $9,600.00 $3,000.00 $6,000.00 $3,500.00 $7,000.00 $3,140.00 $6,280.00 21 NOT USED N/A N/A 22 For fumishincj and placing 4 FT diameter drop inlet manhole 4 EA $2,900.00 $11,600.00 $2,500.00 $10,000.00 $2,700.00 $10,800.00 $3,100.00 $12,400.00 $3,510.00 $14,040.00 23 For furnishing and plating 5 FT diameter drop inlet manhole I EA $3,890.00 $3,890.00 $4,000.00 $4,000.00 $3,700.00 $3,700.00 $4,500.00 $4,500.00 $4,360.00 $4,360.00 24 NOT USED N/A N/A 25 For furnishing and placing 5 FT diameter Type'S" manhole I EA $2,910.00 $2,910.00 $2,000.00 $2,000.00 $3,400.00 $3,400.00 $3,000.00 $3,000.00 $3,160.00 $3,160.00 For furnishing all labor, materials and incidentals required to complete Siphon 26 structure per contract recluirements I EA $21,500.00 $21,500.00 $21,000.00 $21,000.00 $21,000.00 $21,000.00 $13,600.00 $13,600.00 $17,500.00 $17,500.00 27 For furnishing and placing 20" diameter dr,/bore 15 LF $62.00 $930.00 $300.00 $4,500.00 $350.00 $5,250.00 $400.00 $6,000.00 $635.00 $9,525.00 28 For furnishing and placing 20" diameter casing pipe 15 LF $20.00 $300.00 $120.00 $1,800.00 $25.00 $375.00 I $30.00 $450.00 $12.00 $180.00 29 For abandonment of standard sewer manhole (~ EA $1,200.00 $7,200.00 $500.00 $3,000.00 $700.00 $4,200.00 ! $440.00 $2,640.00 $200.00 $1,200.00 30 For abandonment of sanitary sewer clean out 4 EA $400.00 $1,600.00 $300.00 $1,200.00 $300.00 $1,200.00 $100.00 $400.00 $60.00 $240.00 For placement of 6' Class "B' concrete embedment across entire trench )1 width 48 LF $55.00 $2,640.00 $75.00 $3,600.00 $22.00 $1,056.00 $12.00 $576.00 $15.00 $720.00 )2-34 NOT USED N/A N/A )5 For removal and replacement of asphaltic concrete pavement 6,998 LF $22.00 $153,956.00 $14.00 $97,972.00 $15.00 $104,970.00 $7.30 $51,085.40 $8.00 $55,984.00 ~ For removal and replacement of 6" reinforced concrete Rip-Rap 7 SY $48.00 $336.00 $90.00 $630.00 $170.00 $1,190.00 $150.00 $1,050.00 $40.00 $280.00 )7 For furnishing and placing landscaping LS $7,850.00 $7,850.00 $5,000.00 $5,000.00 $5,000.00 $5,000.00 $22,000.00 $22,000.00 $7,000.00 $7,000.00 )8 For Trench Excavation Safety/and Support 7,346 LF $3.30 $24,241.80 $3.00 $22,038.00 $1.00 $7,346.00 $5.00 $36,730.00 $0.25 $1,836.50 For fu,~;shlng and maintaining Traffic Control signage, barricading, etc. )9 during and through construction LS $12,500.00 $12,500.00 $10,000.00 $10,000.00 $11,000.00 $11,000.00 $10,000.00 $10,000.00 $17,600.00 $17,600.00 ¢0 For furnishing and placing 4" PVC sewer services 18 EA $840.00 $15,120.00 $750.00 $13,500.00 $900.00 $16,200.00 $500.00 $9,000.00 $350.00 $6,300.00 ¢1 NOT USED N/A N/A $570,991.05 $603,019.00 $707,278.00 $644,994.65 $530,769.50 SUBTOTAL (SECTION I-GRAPEVINE I~) $346,912.40 $689,706.00 $689,561.00 $546,396.10 $563,604.75 SUBTOTAL (SECTION II-GRAPEVINE IV) $250,363.60 $439,518.00 $423,681.00 $378,002.95 $355,217.25 SUBTOTAL (SECTION Ill-BETHEL ROAD) $570,991.05 $603,019.00 $707,278.00 $644,994.65 $530,769.50 tOTAL (SECTION I-GRAPEVINE Ill, SECTION II-GRAPEVINE IV, AND SECTION Ill-BETHEL ROAD) $1,168,267.05 $1,732,243.00 $1,820,520.00 $1,569,393.70 $1,449,591.50 Bid J.C. EVANS BAR CONSTRUCTORS PATE BROS. FOX CONTRACTORS Item Description Qty Unil Unit Pdce I Amount Unit Price Amount Unit Price Amount Unit Price Amount 1-4 NOT USED N/A N/A I 5 For furnishing and placing 8" PVC sewer (15'-20' depth) 166 LF $75.00 $12,450.00 $54.00 $8,964.00 $24.07 $3,995.62 $57.00 $9,462.00 6-13 NOT USED N/A N/A 14 For furnishing and placing 5" SDR-35 PVC sewer (0'-10' depth) 20C LF $80.00 $16,000.00 $51.00 $10,200.00 $30.12 $6,024.00 $40.00 $8,000.00 15 For fumishin~l and placin~l 5" SDR-35 PVC sewer (10'-15' depth) 2,57£ LF $85.00 $218,450.00 $63.00 $161,910.00 $36.37 $93,470.90 $46.00 $118,220.00 16 For fumishin~l and placing 5" SDR-35 PVC sewer (15'-20' depth) 1,094 LF $90.00 $98,460.00 $73.00 $79,862.00 $48.86 $53,452.84 $51.00 $55,794.00 :17 For furnishing and placing 5" SDR-35 PVC sewer (20'-25' depth/ 23(; LF $95.00 $21,850.00 $94.00 $21,620~00 $86.35 $19,860.50 $66.00 $15,180.00 18 NOT USED N/A N/A 19 For furnishing and placin~l 4 FT diameter standard manhole ,~ EA $2,500.00 $12,500.00 $1,850.00 $9,250.00 $2,449.24 $12,246.20 $2,600.00 $1,300.00 :)0 For fumishin~l and placin~l 5 FT diameter standard manhole E EA $3,000.00 $24,000.00 $3,300.00 $16,400.00 $3,280.29 $26,242.32 $3,750.00 $30,000.00 :)1 For fumishin~ and placin~l 6 FT diameter standard manhole EA $3,500.00 $3,500.00 $5,200.00 $5,200.00 $6,608.06 $6,608.06 $5,500.00 $5,500.00 :)2 NOT USED N/A N/A :)3 For furnishing and placin~l 5 FT diameter drop inlet manhole I EA $5,000.00 $5,000.00 $6,300.00 $6,300.00 $9,696.00 $9,696.00 $6,400.00 $6,400.00 Z4-26 NOT USED N/A N/A :)7 For furnishing and placing 20" diameter dr~ bore 718 LF $240.00 $172,320.00 $165.00 $118,470.00 $182.68 $131,164.24 $175.00 $125,650.00 Z8 For furnishing and placin9 20" diameter casincj pipe 718 LF $25.00 $17,950.00 $19.00 $13,642.00 $22.55 $16,190.90 $20.00 $14,360.00 :~9 For abandonment of standard sewer manhole 9 EA $500.00 $4,500.00 $400.00 $3,600.00 $763.43 $6,870.87 $600.00 $5,400.00 30-31 NOT USED N/A N/A 32 For removal and replacement of 8" reinforced concrete pavement 12 SY $50.00 $600.00 $35.00 $420.00 $102.93 $1,235.16 $40.00 $480.00 33 For removal and replacement of reinforced concrete driveway 188 SY $45.00 $8,460.00 $44.00 $8,272.00 $94.48 $17,762.24 ! $42.00 $7,896.00 34 For removal and replacement of reinforced concrete 4 FT wide sidewalk 835 LF $10.00 $8,350.00 $9.50 $7,932.00 $15.97 $13,334.95; $14.00 $11,690.00 35-36 NOT USED N/A N/A 37 For furnishing and placin~ landscaping 1 LS $10,000.00 $10,000.00 $15,000.00 $15,000.00 $16,914.98 $16,914.98 $11,600.00 $11,600.00 38 For Trench Excavation Safety and Support 3,555 LF $1.00 $3,555.00 $2.50 $8,887.50 $8.11 $28,831.05 $1.00 $3,555.00 For furnishing and maintaining Traffic Control signage, barricading, etc. 39 :~udn~ and through completion of construction I LS $10,000.00 $10,000.00 $10,500.00 $10,500.00 $7,329.82 $7,329.82 $4,350.00 $4,350.00 40 For furnishing and placing 4' PVC sewer services 8 EA $1,000.00 $8,000.00 $465.00 $3,720.00 $968.99 $7,751.92 $550.00 $4,400.00 41 For furnishing and placing 24" ASTM F-497 PVC sewer (25'-30' depth) 102 LF $150.00 $15,300.00 $67.00 $6,834.00 $153.88 $15,695.76 $108.00 $18,360.00 SECTION I - GRAPEVINE Ill SUBTOTAL $671,245.00 $526,984.00 i $494,678.33 $469,297.00 For furnishing and placing 6" Cl. 50 Ductile Iron Pipe 215 LF $95.00 i $20,425.00 $183.00 $39,345.00 $36.83 $7,918.45 $55.00 $11,825.00 2 For furnishing and placing 8" Cl. 50 Ductile Iron Pipe 215 LF $70.00 $15,050.00 $206.00 $44,290.00 $39.54 $8,501.10 $60.00 $12,900.00 3 NOT USED N/A N/A 4 For furnishing and placin~l 8" SDR-35, PVC sewer (10'-15' depth) 13 LF $70.00 $910.00 $77.00 $1,001.00 $149.48 $1,943.24 $74.00 $962.00 5-9 NOT USED N/A N/A 10 For furnishing and placing 12" SDR-35, PVC sewer (10'-15' depth) 557 LF $75.00 $41,775.00 $38.00 $21,166.00 $27.35 $15,233.95 $34.00 $18,938.00 11 For fumishing and placing 12" SDR-35, PVC sewer (10'-15' depth) 1,565 LF $80.00 $125,200.00 $47.00 $73,555.00 $38.60 $60,409.00 $36.00 $56,340.00 12 For fumishing and placing 12" SDR~35, PVC sewer (15'-20' depth) 580 LF $85.00 $49,300.00 $53.00 $30,740.00 $46.10 $26,738.00 $66.00 $38,280.00 13-18 NOTUSED. N/A N/A 19 For fumishing and placing 4 Fr diameter standard manhole 8 EA $2,500.00 $2,000.00 $1,850.00 $14,800.00 $2,660.36 $21,282.88 $97R0.00 $18,000.00 20-23 NOT USED N/A N/A 24 For fumishin~l and placing 4 FT diameter T},pe "S' manhole 3 EA $2,800.00 $8,400.00 $2,000.00 $6,000.00 $2,483.10 $7,449.30 $2,425.00 $7,275.00 25 For furnishing and placing 5 FT diameter Type "S' manhole I EA $3,300.00 $3,300.00 i $3,300.00 $3,300.00 $2,444.97 $2,444.97 $2,775.00 $2,775.00 For furnishing all labor, materials and incidentals required to complete Siphon 26 structure per contract recluirements I EA $19,000.00 $19,000.00 $12,600.00 $12,600.00 $20,026.43 $20,026.43 $20,000.00 $20,000.00 27 For fum;sh;,y and placing 20" diameter dr~ bore 316 LF $220.00 $69,520.00 $128.00 $40,448.00 $155.62 $49,175.92 $140.00 $44,240.00 28 For fumishin~l and placing 20" diameter casing pipe 316 LF $25.00 $7,900.00 $20.00 $6,320.00 $22.55 $7,125.80 $26.00 $8,219.00 29 For abandonment of standard sewer manhole 6 EA $500.00 $3,000.00 $400.00 $2,400.00 $763.43 $4,580.58 $600.00 $3,600.00 30-31 NOT USED N/A N/A 32 For removal and replacement of 8" reinfomed concrete pavement 832 LF $35.00 $29,120.00 $41.00 $34,112.00 $102.93 $65,637.76 $30.00 $24,960.00 33-35 NOT USED N/A N/A 36 For removal and replacement of 6' reinforced concrete Rip-Rap 9 SY $45.00 $405.00 $30.00 $270.00 $94.48 $850.32 $120.00 $1,080.00 37 Forfumishing and placing landscaping 1 LS $5,000.00 $5,000.00 $2,550.00 $2,550.00 $3,946.83 $3,946.83 $2,800.00 $2,800.0(~ 38 For Trench Excavation Safety and Support 2,601 LF $1.00 $2,601.00 $3.00 $7,803.00 $11.95 $31,081.95 $1.00 $2,601 For furnishing and maintaining Traffic Control signage, barricading, etc. 39 dudng and through construction I LS $5,000.00 $5,000.00 $7,000.00 $7,000.00 $4,510.66 $4,510.66 $8,000.00 $8,000.0~ 40 For furnishing and placing 4' PVC sewer services 8 EA $1,000.00 $8,000.00 $465.00 $3,720.00 $1,339.99 $10,719.92 $600.00 $4,800.0{~ 41 NOT USED N/A N/A For furnishing and placing 6" Cl. 50 Ductile Iron Pipe 110 LF $95.00 $10,450.00 $281.00 $30,910.00 I $36.71 $4,038.10 $95.00 $10,450.00 2 For furnishing and placing 8" Cl. 50 Ductile Iron Pipe 110 LF $100.00 $11 ,(300.00 $290.00 $31,900.00 i $39.43 $4,337.30 $100.00 $11,000.00 3 For furnishing and placing 8" SDR-35, PVC sewer (0'-10' depth) 13 LF $65.00 $845.00 $45.00 $585.00: $42.75 $555.75 $57.00 $741.00 4 For furnishing and placing 8" SDR-35, PVC sewer (10'-15' depth/ 5 LF $70.00 $350.00 $45.00 $225.00 $42.75 $213.75 $58.00 $290.00 5~ NOT USED N/A N/A 7 For furnishing and placing 10' SDR-35, PVC sewer (0'-10' depth) 2,314 LF $70.00 $161,980.00 $34.00 $78,676.00 $21.75 $50;329.50 $33.00 $76,362.00 8 For fumishin~l and placing 10" SDR-35, PVC sewer (10'-15' depth) 1,648 LF $75.00 $123,600.00 $38.00 $62,624.00 $25.51 $42,040.48 $34.00 $56,032.00 9 For furnishing and placing 12" SDR-35, PVC sewer (0'-5' depth) 15 LF $70.00 $1,050.00 $40.00 $600.00 $21.05 $315.75 $35.00 $525.00 10 For furnishing and placing 12" SDR-35, PVC sewer (5'-10' depth) 892 LF $75.00 $66,900.00 $39.00 $34,788.00 $22.19 $19,793.48 $36.00 $3,212.00 11 For furnishing and placing 12" SDR-35~, PVC sewer (10'-15' depth) 2,477 LF $80.00 $198,160.00 $47.00 $116,419.00 $23.55 $58,333.35 $42.00 $104,034.00 12-18 NOT USED N/A N/A 19 For furnishing and placing 4 FT diameter standard manhole 13 EA $2,500.00 $32,500.00 $1,850.00 $24,050.00 $2,094.65 $27,230.45 $2,300.00 $29,900.00 20 For furnishing and placing 5 FT diameter standard manhole 2 EA $3,000.00 $6,000.00 $3,300.00 $6,600.00 $2,923.10 $5,846.20 $3,250.00 $6,500.00 21 NOT USED N/A N/A 22 For furnishing and plactng 4 FT diameter drop inlet manhole 4 F_A $5,000.00 i $20,000.00 $2,200.00 $8,800.00 $2,804.61 $11,218.44 $2,750.00 $11,000.00 23 For furnishing and placing 5 FT diameter drop inlet manhole I EA $5,500.00 i $5,500.00 $5,000.00 $5,000.00 $3,662.05 $2,336.05 $3,600.00 $360.00 24 NOT USED N/A N/A 25 For furnishing and placing 5 FT diameter Type "S" manhole I EA $3,300.00 $3,300.00 $3,400.00 $3,400.00 $3,163.45 $3,163.45 $3,000.00 $3,000.00 For furnishing all labor, materials and incidentals required to complete Siphon 26 structure Per contract requirements I EA $18,000.00 $18,000.00 $11,600.00 $11,600.00 $20,027.59 $20,027.59 $15,000.00 $15,000.00 27 For furnishing and pia,,;,,t~ 20" diameter dry bore 15 LF $500.00 $7,500.00 $500.00 $7,500.00 $575.11 $8,626.65 $600.00 $9,000.00 28 For furnishing and placing 20" diameter casing pipe 15 LF $25.00 $375.00 $35.00 $525.00 $22.55 $338.25 $44.00 $660.00 29 For abandoi~i~iei~[ of standard sewer manhole 6 EA $500.00 $3,000.00 $400.00 $2,400.00 $405.96 $2,435.76 $550.00 $3,300.00 30 For abandonment of saiii~:/sewer dean out 4 EA $150.00 $600.00 $150.00 $600.00 $101.49 $405.96 $100.00 $400.00 For placement of 6" Class "B" concrete embedment across entire trench 31 width 48 LF $16.00 $768.00 $14.00 $672.00 $16.01 $768.48 $27.00 $1,296.00 32-34 NOT USED N/A N/A 35 For removal and replacement of as?ha;[;c concrete pavement 6,998 LF $6.50 $45,487.00 $7.50 $52,485.00 $19.68 $137,720.64 $0.01 $69.98 36 For removal and replacement of 6" reinforced concrete Rip-Rap 7 SY $46.00 $322.00 $30.00 $210.00 $94.48 $661.36 $70.00 $490.00 37 Forfumishing and placing landscaping I LS $10,000.00 $10,000.00 $5,000.00 $5,000.00 $6,202.16 $6,202.16 $8,000.00 $8,000.00 38 For Trench Excavation Safety and Support 7,346 LF $1.00 $7,346.00 I $3.50 $25,711.00 $7.54 $55,388.84 $1.00 $7,346.00 For furnishing and maintaining Traffic Control signage, barricading, etc. 39 during and through construction I LS $15,000.00 $15,000.00 $14,000.00 $14,000.00 $11,276.65 $11,276.65 $18,000.00 $18,000.00 40 For furnishing and placing 4" PVC sewer services 18 EA I $1,000.00 $18,000.00 $465.00 $8,370.00 $443.34 $7,980.12 $600.00 $10,800.00 41 NOT USED N/A N/A, $768,033.00 $533,650.00 $482,910.51 $419,907.98 ~""~:~ ;- . . ' --:..~l~i~i/~ ~..L:,~ .. ' L -..; :.~~~~~~ SUBTOTAL (SECTION I-GRAPEVINE Ill) $671,245.00 $526,984.00 $494,678.33 $469,297.00 SUBTOTAL (SECTION II-GRAPEVINE IV) $433,906.00 $351,420.00 $369,577.06 $287,592.00 SUBTOTAL (SECTION Ill-BETHEL ROAD) $768,033.00 $533,650.00 $482,910.51 $419,907.98 TOTAL (SECTION I-GRAPEVINE III, SECTION II-GRAPEVINE IV, AND SECTION Ill-BETHEL RO, $1,873,184.00 $1,412,054.00 $1,347,165.90 $1,176,796.98 o~ %45 ~ I 4~4~ -7¢6 - 05 o5 BID AFFIDAVIT nir STATE OF BEFOR ME on this day personally appeared Name duly sworn, did depose and say: b[a~e of Finn foregoing on behalf of the said 00301-19 The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated by Bidder.) COUNTY OF BEFORE ME, the undersigned authority, a Notary Public in and for the State of who after being by me am a duly authorized office/agent for and have been duly authorized to execute the Name of Finn I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same line o~ business prior to the official opening of this bid. Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon." Name and Address of Bidder: fvaff Title: /~'cC ~)~ Sigmmre: SUBSCmBED AND SWO~ to ~fore me by ~e a~ve mined Nom~blic in t99 . REVISED 00301-1 95H08 SECTION 00301 BID FORR PROJECT IDENTIFICATION:Sanitarv Sewer Imorovements for ~ranevine III, IV and Bethel Road. CONTRACT IDENTIFICATION: SS 94-02 THIS BID IS SUBMITTED TO: pUrchastna Aaent. Cttv of Coooell, Texas Z55 Parkway Boulevard. CoDoell, Texas 75019. herein after referred to as OWNER. City of Coppell Bid No: Q-0895-1 1. Enter Into Agreement. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Oocuments for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Oocuments. 2. BIDDER Accepts. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, Including without limitation those dealtng with the disposition of Bid security. This Bid wtll remain subject to acceptance for ninety (90) days after the day of Bid opening. BIDOER wtll sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNER's Notice of Award. The OWNER considers the work described by the Contract Documents three separate and distinct projects. Bidder hereby agrees to accept an award of contract based on any individual section. 3. BIDDER's Representations. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: BIDDER has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged: -(List Addenda by Number and Oate) ADDENOA NO. DATE REVISED 00301-3 any other BIOOER to submit a false or sham Bid; BIDDER has not solicited or induced any person, ft~ or corporation to refrain from bidding; and BIOOER has not sought by collusion to obtain for Itself any advantage over any other BIODER or over OWNER. 4. Bid Prices. BIDDER wtll complete the Work in accordance with the Contract Oocuments for the following price(s):. All spectfic cash allowances are tncluded tn the prtce(s) set forth above and have been computed In accordance with paragraph 11.8. of the Seneral Conditions. - CITY OF UNIT PRICE BID FOR COPPELL SEWER IMPROVEMENTS SECTION I - GRAPEVINE III ITEM ESTIMATED DESCRIPTION AND NO. QUANTZTY UNIT PRICE IN NORDS UNIT TOTAL PRICE ANOUNT 1-4 N/A N/A NOT USED 5 166 LF For furnishing and plactng 8" P¥C sewer (15'-20' depth), c~pl~te t~ place, the sum of --~'",,-~2~ "~ DOLLARS AND ' ^~/% CENTS per 11near-foot. 6-13 N/A N/A NOT USED 14 200 LF For furnishing and plactng 15"~ SDR-35 PVC sewer (0'-10' depth), comp}et;e in place, the sum of ~~c~OOLLARS AND ~ /U~ CENTS per 11near foot. 15 2570 LF For furnishing and placing 15" SDR-35 PVC sewer (10'-15' depth), complete tn place, t~o~_~ OOLLARS AND / ~L~ CENTS per linear foot. 00301-4 REVISED 16 1094 17 230 18 N/A N/A 19 5 EA 20 8 22 N/A 23 I LF For furnishing and placing 15" SDR-35 PVC sewer (15'-20' depth), complete in place, the sum of :~. ~A~. DOLLARS AN~; /~Jc~ CENTS per linear foot. LF For furnishing and placing 15" SDR-35 PVC sewer (20'-25' depth), complete in place, DOLLARS CENTS NOT USED FT~dt~eter standard manhole, c~mp~ete in p_l~ace, the skm of /' ~ '~,,.*.,~ I~LARS AI~D ' ~J~ ~ENTS I EA For furnishing and placing 5 ~ ~.~.r~/ FT diameter standard manhole, ~ _.co~pletp in place,.t~e sum of - ' DOLLARS AND.m~.~CENTS per each. I EA For furnishing and placing 6 FT diameter standard manhole, .r, ompl)te in. place,,tl)e sum of DOLLARS AND ~ CENTS per each. N/A NOT USED EA For furnishing and placing 5 FT diameter drop inlet manhole, ~_~/in place, the, sum of ~ ~ ~J~-~_~,J~DOLLARS AND /U~' ' CENTS per each. 24-26 N/A N/A NOT USED / REVZSED 00301-5 27 718 LF For furnishing and placing 20" diameter dry bore, complete in p~, ~he sum of :~,. DOLLARS AND ' ~ CENTS per linear foot. I 30-31 N/A N/A NOT USED 28 718 LF For furnishing and placing 20" diameter casing pipe, complete [ i~e, the sum of DOLLARS AND ~J/~ CENTS per linear foot. I 29 9 EA For abandonment of standard sewer manhole, complete in I place, th~jsqm of. / ~x~13~/~/-Z~~DOLLARS CENTS per each. I 32 12 SY For removal and replacement ~ · of 8" reinforced concrete pavement, complete in place, ~ 'CENTS per square ) I 33 188 SY For removal and replacement ~ 7/~00 of reinforced concrete I driveway, complete in place, th~sum of. . , DOLLARS i CENTS per square yard. 34 835 LF For removal and replacement of reinforced concrete 4 FT wide sidewalk, complete in P~c??~2he sum °f DOLLARS 'AND CENTS per linear foot. 35-36 N/A N/A NOT USED 00301-6 REVISED 37 I LS For furnishing and plactng landscaping, complete tn DOLLARS CENTS per lump sum. LF For Trench Excavation Safety and Support, complete tn  t~e sum of OOLLARS ~c~(~ CENTS per linear foot. LS For furnishing and maintaining Traffic Control stgnage, barricading, etc. during and through completion of construction, complete in f OOLLARS ' CENTS per 1 ump.sum. EA For furnishing and plactng 4' PVC sMr services, 38 3555 39(A) 1 40 8 place, the sum of OOLLARS CENTS 41 102 LF 24' ASTM F-497 PVC sewer (25'-30' depth), complete tn place, the.sum of ~~DOLLARS ~ ~ CENTS per each: SECTION I- GRAPEVINE III IOIA[ 8I~ ~OR AlE ~NIT PRICES: Btdder agrees that all ~ork described tn SECTZON Z - G~PEVZNE ~Z[ ~t11 be completed wtthtn 120 calendar d~s. per each. / For furnishing and plactng ~ ~ Note: The City has set the time for this section at 120 calendar days. Should the Contractor be the successful low bidder on Section ! and Section !! and/or Section III, the Contractor shall be required to complete Section ! within the first 120 calendar days of the total time allotted for completion of the work. REVISED 00301-7 SECTION II - GPu~PEVZNE IV ~ ITEM ESTIFtATED DESCRIPTION AND UNIT TOTAL NO. QUANTITY UNIT PRICE IN WORDS PRICE N4OUNT I 215 LF For furnishing and placing ~ jll,.OO, oo /' 6' Cl. SO Ductile Zron Pipe, complet~in place, the sum of ~ ~'.~ DOLLARS AN[V~ /~J~ CENTS per linear foot. I 2 215 LF For furnishing and placing / 8' Cl. 50 Ductile Iron Pipe, com. g.l~e in place, the sum of I ~ IX)LIARS AND ' J /,~'~ CENTS per ltnearfoot. m~ m~ 3 N/A N/A I 4 I3 LE For furnishing and plactng 8' SDR-35, PVC sewer (10'-15' depth), complete in place, AND ' CENTS I per linear foot. 5-9 N/A N/A NOT USED ~. ]0 557 LF For furnishing and placing 12' SDR-35, PVC sewer (0'-10' depth), co~lete tn place, the~su.~.f m ~ ~I]~)~LLARS AND ~de~. '~ENTS per Ilflear TOOt. m 11 1565 LF For furnishing and placing 12" SDR-35, PVC sewer (10'-15' i depth), complete in place,  DOLLARS CENTS I per llh~r' foot. 00301-8 REVISED 12 580 13-18 N/A 19 8 20-23 24 25 26 4~.oo LF For furnishing and placing 12' SDR-35, PVC sewer (15'-20' depth), complete tn place. the sum ~f. ':~, ~ DOLLARS AND ~D CENTS per ltnear foot. N/A NOT USED ~ .//__~ ~EA For furntshtng~d plactng 4 FT dta,~ter standard manhole. c~e ~ace, the sum of '' ~LLARS ~r~// per each. ~T"~!~ED~ ~ For furnishing and plactng 4 ~ d~ter Type'S" manhole, ~ / I c~]ete tn place, the sum of x~ ---P c.oppte~e 11 '~. CENTS For furnishing and plactng 5 FT dta~eter Type "S" manhole, ~lete tn place, the sum of DOLLARS 1 EA For furnishing all labor, materials and Incidentals required to complete Siphon structure per contract requirements, complete ,~.place, ~he sum~f// ~ -~-*-~'/L~,~DOLLARS ~CENTS per each. 27 316 LF For furnishing and plactng 20' ~ ~_~c~ dtamter dry bore, complete tn plac~:~e ~u~ of ~ ~ . DOLLARS AND '-:~ ~ CENTS pe~ linear foot. RE¥[SED 28 316 LF For furnishing and placing 20" 20,00 diameter casing pipe, complete ~e' the sum°f OOLLARS AND ~ CENTS per linear foot. 29 6 EA For abandonment of standard sewer manhole, complete in ~O -~ ~ CENTS per each.' 30-31 N/A N/A NOT USED 32 832 LF For r~val and replace~nt of 8' reinforced concrete pave~nt, complete in place, per square yara. 33-35 "/A "/A NOT USED 36 g SV For ~.v,1 and replacement of 6' retnforc~ concrete Rip-Rap, complete in place, the sum of . ~~L~RS ~~CENTS per square ya~. 37 1 LS For furnishing and placing landscaping, complete tn )ua -- ~ ' CEOS per l u~ sum. 38 g60~ LF For Trench Excavatton Safet~ and Support, co~lete tn pl~,_the sue of ~L~RS ~O ~ CENTS per linear foot. 00301-10 REVISED 39(A) 1 LS For furnishing and matntatning~ Traffic Control stgnage, barricading, etc. during and through completion of construction, complete in 'f DOLLARS CENTS per lump sum. 40 8 EA For furnishing and placing 4" PVC sewer services, the sum of DOLLARS CENTS per each. 41 N/A N/A NOT USED SECTION II - GRAPEVINE IV TOTAL BID FOR ALL UNIT PRICES: Bidder agrees that all work described in SECTION II - GRAPEVINE IV will be completed within Z/~ calendar days. '! ! SECTION III - BETHEL ROAD ITEM ESTIMATED NO. QUANTITY UNIT DESCRIPTION AND PRICE XN WORDS 1 110 LF For furnishing and placing 6' Cl. SO Ductile Iron Pipe, ~:omp)pt~ Jn~p}ace_~.~the sum of J~u~/.~/~~ DOLLARS AND' X~/~' ' CENTS per linear foot. LFFor furnishing and placing 8" Cl. 50 Ductile Iron Pipe, ~_c_om@lete ia pl.ace~g~he sum of y~.~,~.~/~~ DOLLARS AND ~0 ' CENTS per linear foot. 3 13 LF For furnishing and placing 8' SDR-3$, PVC sewer (O'-lO' depth), complete in place, ~ND ~.~x~ CENTS per linear foot. 4 5 LF For furnishing and placing 8' SDR-35, PVC sewer (10'-15' depth), complete in place, the ,of  DOLLARS /tP CENTS per linear ~oot. 5-6 N/A N/A NOT USED 7 2314 LF For furnishing and placing 10' SDR-35, PVC sewer (u'-lO' depth), complete in place, A~ID * ~ ' CENTS per linear foot. 8 1648 LF For furnishing and placing 10" SDR-35, PVC sewer (lO'-15' depth), complete in place, ~.uo~ DOLLARS · ANO inearfoot. CENTS per 1 REVISED 00301-11 UNIT TOTAL PRICE A/4OUNT 00301-12 REVISED 9 15 10 892 1] 2477 12-]8 N/A 19 13 2O 2 21 N/A 22 4 LF Fo~ furnishing and placing , /~Z)~ ~ ~ ~r 12 SDR-26, PVC sewer (0 -5 depth), complete tn place, th~sgm of ~ DOLLARS AN[Y ,c~% CENTS per 11near foot. J I ' depth), complete tn place, AND ~0 CENTS per 11near foot. depth), complete In place, the/sum of m ~~LLARS m ~D - ~ CENTS per linear foot. N/A ~T~ I EA For furn~ghtng and placing 5 FT diameter standard manhole, o te tn. place, the sum of ~ OOLLARS CENTS pe~ _~ _ T USED ~- .... For furnishing and placing 4 FT dt~ter drop inlet aanhole,  e in place, the sue ~ ~L~RS ~g CENTS each. 23 24 25 26 ! EA For~/furnishing"an~ placing 5 FT'diameter drop ~nlet manhole, ~om~l.~J~-inplace, the sum of (~ ~ DOLLARS , CENTS p ach./L'~° D N/A N/A NOT USED 1 EA Fo~f~nishing andplacing 5 F~dia~ter Type ~°mplete ~t~place' the~L~RsSum of ~ ~O 1 ~ For furnf~htng all labor, materials and incidentals required to complete Siphon structure per contract require~nts, complete in CENTS pep each. 27 15 LF For furnishing and placing 20' ~ diameter dry bore, complete in pl)ce, the sum of per ~ 'CENTS I LF For furnishing and placing 20' 28 15 diameter casing pipe, complete in place, the sum of DOtCARS AND - ,~ CENTS per linear foot. I 29 6 EA For abandonment of standard sewer manhole, complete in ' placg, the of (::~ ~.,-~~DOLLARS I 30 4 EA For abandonment of sanitary /-/~)~ ~ sewer clean out, cpmplete in AND -- CENTS per each. ~.SEVISED 00301-13 00301-14 REVXSED 3] 48 32-34 N/A 35 6998 36 7 37 1 38 7346 LF For placement of 6' Class 'B' ~ 0~97~_0L~ ~ concrete embedment across entire trench width, complete in.~p~c&v the sum of ~ ~ ~L~RS ~D ' ~ CENTS per each.- NOT USED N/A LF For re~vml and replmce~nt ~.~ ~.~ of asphaltic concrete *Se~ Description pmve~nt, complete in place, Page 00]00-1] _ th~~ Section 13.2.1~ LLARS CENTS ~ l tn~r foot. SY For re. va1 and replacement ~ Rip-Rap, complete ~n'place, ~h~ s~ o~ - ~ ~ ~ CENTS per square yard. LS For furnishing and plactng ~ ~ landscaptng, co~lete t~ ~l~e~ the F~ ~f~ ~ -- ~LLARS ~ ~ff ~CENTS per lump sum. LF For Trench Excavation Safety 2J-~) ~A.~) ~ and SUpport, complete in i  DOLLARS per 11 n'e/~'fOot. 'CENTS i For furnishing and maintaining Traffic Control signage, barricading, etc. during and through completion of construction, complete in 39(A) 1 LS per lump sum. DOLLARS CENTS 3g(B) 1 LS REVISED 00301-15 For furnishing and maintaining Traffic Control stgnage, barricading, etc. during and through completion of construction, complete in DOLLARS CENTS per lump sum. 40 18 EA For furnishing and placing 4' PVC sewer services, ~!, the sum of DOLLARS /LPp --CENTS per each. *See Description Page 00100-12, Sectton 13.2.18 41 N/A N/A NOT USED SECTION 111 - BETHEL ROAD .~"-, /~' TOTAL BXD FOR ALL UNIT PRICES.,'-OJ~Lr~~ /~f,c~,,,~-C~C~",,,t,q ~ (use words) Bidder agrees that all work described in SECTION III - BETHEL ROAD will be completed within~o calendar days. 00301-t9 i i i ! I ! ! ! I ] ] I BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be c[O calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated b~ .Bidder.) STATE OF Tc°Nc'tr2~ COUNTY OF ~/Icl .% -- BEFORE ME, the undersigned authority, a Notary Public in and for the State of te~'~c~ , on this day personally appeared "~_-j:~ co ~cccxc~,c~¢, 3']- - who after being by me duly sworn, did depose and say: Nme N~ of Fi~ to.going on ~lf ot Name am a duly authorized office/agent for and have been duly authorized to execute the Name of Firm I hereby certify that the foregoing bid has not been pr~ared in collusion with any other Bidder or individual(s) engaged in the same line oc business prior to the official opening of this bid. Further, I certify that the Bidder is not now, nor has been for the past six (6) months, di~ctly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon." Title: ~fe~,c~ee ~" Signature: s,~Bscm,~,m AN,~ SWOrn,, ~o before ~e by the at,ore n~ed on this the ~ ~' ~ ,~y of bq'~q~-~ Notary Public in and for the State of ~c-~6¥~ ~. ~o~sl 00301-20 If BIDDER IS: An Individual By doing business as Business address (Seal) (Individual's Name) PhoneNo. , ..(Seal) By (Firm Name) (General Parme0 Business address Phone No. (Corporation Name) ,~ (State of lncprporation) (Name of ~erson authorized to sign) ~itle) 1 (Co~ate S~ )~ , A Joint Venture By (Name) (Address) By (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a partner to the joint venture should be in the manner indicated above.) ~ OF SF~'riON REVISED 00301-1 SECTION 00301 BID FORM PROJECT IDENTIFICATION:Sanitarv Sewer Imorovements for Graoevine III. IV and Bethel Road. CONTRACT IDENTIFICATION: SS 94-02 THIS BIO IS SUBMITTEO TO: pgrchasine Aaent~ City of Conoe11. Texas 255 Parkway Boulevard. Conpe11. Texas 75019. herein after referred to as OWNER' City of Coppe11 Bid No: Q-0895-1 1. Enter Into Agreement. The undersigned BIDDER proposes and agrees, tf thts Bid ts accepted, to enter tnto an Agreement with OWNER in the form tncludnd tn the Contract Oocuments to perform and furnish all Work as specified or indicated tn the Contract Oocuments for the Bid Price and wtthtn the Btd Ttmes indicated tn thts Btd and tn accordance with the other terms and conditions of the Contract Oocuments. 2. BIDOERAccepts. BIDDER accepts all of the terms and conditions of the Adverttsemnt or Invitation to Bid and Znstrectlons to Bidders, tncludtng wtthout limitation those dealtng wlth the dtsposttton of Btd securlty. This Bid w~11 remain subject to acceptance for ninety (90) days after the day of Bid opanlng. ~ BZDDER w~11 slgn and deltver the requtrnd number of counterparts of tho Agreement with the Bonds and other documents required by the Btddtng Requirements withln fifteen (15) days after the date of O~NER's Nottce of Award. The OWNER considers the work described by the Contract Documn~s three separate and dtsttnct projects. Btdder hereby agrees to accept an award of contract based on any Individual sectton. 3. BIDDER's Representations. Zn submitting this Bid, BIDDER represents, as more fully set forth tn the Agreement, that: BIDDER has examined and carefully studied the Btddtng Documents and the following Addenda receipt of all whtch is hereby acknowledged: (List Addenda by Number and' Oate) 00301-2 REVISED be Ce ee fe ge BIDDER has visited the stte and become familiar wtth and ts satisfied as to the general, local and stte conditions that may affect cost, progress, performance and furnishing of the Work. BIDDER is familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the mans, methods, techniques, sequences and procedures of construction to be eJeployud by BIOOER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work t'n accordance with the times, price and other terms and conditions of the Contract Oocuments. BIOOER has corrolatud tho information known to BIDDER, e tnfo~tton and observations obtained fr~ visits to the m site, reports and drawings identified in the Contract Oocuments and all additional exmtnattons, investigations, explorations, tests, studies and data with the Contract Documents. BIOOER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies in the Contract Oocuments and the written resolution thereof by ENGINEER ts acceptable to BIOOER, and the Contract Oocuments are generally sufficient to tndtcate and convey understanding of all terms and conditions for performing and furnishing the Work for whtch this Bid ts submitted. Where conflicts, errors, ambiguities or discrepancies have been dtscoverud tn or between Contract Documents and/or other related docmments, and where said conflicts, etc., have not been resolvud through the interpretations or clarifications by ENGINEER as described tn the instructions to Bidders, because of insufficient time or otherwise, BiDOER has tncluded in the Bid the greater quantity or better qualtty of Work, or compliance with the more stringent requirement resulting in a greater cost. This Bid is genutne and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIOOER has not directly or indirectly induced or solicited REV[S£D 00301-3 any other BIDDER to submit a false or sham Bid; BIDDER has not solicited or induced any person, fire or corporation to refrain from bidding; and BIDOER has not sought by collusion to obtain for itself any advantage over any other BIOOER or over OWNER. e Bid Prices. BIOOER will complete the Work tn accordance with the Contract Oocuments for the following price(s): All spectftc cash allowances are included tn the prtce(s) set forth above and have been computed tn accordance wJth paragraph 11.8. of the Sonora1CondJtJons. CITY OF UNIT PRICE BID FOR COPPELL SL~ER IMPROVEMENTS SECTION I - GRAPEVINE ITEN ESTIMATEO DESCRIPTION AND NO. QUANTITY UNIT PRICE IN NOROS .... ..... ;;';;; ........ .... $ 166 LF For furnishing and placing 8' Iq/C se~er (15'-20' depth), comlete tn ~lace, the sma of AN~£~ /~ ~ CENTS pe~ ~ lnear ~oot. UNIT TOTAL PRICE ANOUNT 6-13 N/A N/A NOT USED 14 200 LF For furnishing and plactng 15' .~/~ SDR-35 PVC sewer (0'-10' depth), caJ~le~o tn place, the sun of ~ ~P.~L~ u ,~- CENTS pel'Tlnear foot. I 15 2570 LF For furnishing and placing IS" SDR-3$ PVC sewee (10'-15' depth), conplete tn place, the sun of ANO ' u ~ CENTS per lJnear foot. 00301-4 REVISED 16 1094 LF 17 230 LF 18 N/A 19 S For furnishing and placing 15' SDR-35 PVC sewer (15'-20' depth), complete in place, the sum of /~DD c~,~,.~~- ~'JL~CLOOLLARS per linmir/f~o~. CENTS For furnishing and placing 15" SDR-35 PVC ~ewer (20'-2S' depth), complete in place, the sum of AND' £.~, CENTS per linear foot. N/A NOT USED ER For furnishing and placing 4 /~? ~5~' .~ FT diameter standard manhole, c.omplete in place, .tlte;s~a~. of ~Lu.~:L~oc~OCULARS 2O 8 EA 21 1 22 WA 23 I per each. For furnishing and placing 5 FT diameter standard manhole, co~p~.lete tn place, AND · ,~cc CENTS per each. ER For furnishing and placing $ .~,~L~ ,~~L?j FT diameter standard manhole, c.omplete tn place, the sum of ~CENTS · per each. N/A NOT USED ER For furnishing and placing $ manhol FT diameter drop inlet coml~lete in placq, the~.uF~ot ANJ~' ' ' ~f ~,~ .... CENTS per each. 24-26 N/A N/A NOT USED 27 28 2g 30-31 32 33 34 35-36 718 718 9 N/A 188 835 LF LF N/A SY SY LF N/A For furnishing and placing 20' diameter dry bore, complete in ~,l~ce, the sum of AND ~ ~ CENTS per linear foot. For furnishing and placing 20' dtmmeter casing pipe, complete in place, the sum og ~,,~L.~c.CC~-~ DOLLARS AND /7~.C~ CENTS per linear foot. For abandonment of standard sewer manhole, complete in place, the sum of per each. NOT USED For removal and replacument of 8" reinforced concrete pavement, complete in place, the sum of AND ~ ~/~cc~ CE)ITS per square yard. For removal and replacement of reinforced concrete driveway, complete in place, the sum of ~ ( ,'/yco- CENTS square yard. For removal and replacement of reinforced concrete 4 FT wide sidewalk, complete in place, the sum of ~.~,.~ DOLLARS AND ../~.,..~ CENTS NOT USED REVISED 00301-5 J I 00301-6 REVISED 37 1 38 3555 39(A) 1 40 8 LS For furnishing and placing landscaping, complete tn place, the sum of ~,~i%.~ ~.~'z ~,~:~- DOLLARS /~¢0~ ,,?~ CENTS ~lump sum. CF For Trench ~cavat~on Safety and Suppo~, complete place, ~he s~.of ~ ~L~RS ~D ~ ~ ~ C~TS per 1~, f~ot. LS For fu~sh~n9 and mlntaJn~ng Traffic Control s~gnage, barricading, etc. durln9 and through c~letton of const~ctlon, co~lete place, the sum of AND' /~c.~~ CENTS per Tump suB. EA For furnishing and plactng ~.~oo j.~*TjO~ 4' PVC sever services, qumplete tn pl?ce, th¢,~JJm OT ~er~ach. /7Cc~ ucc'CENTS 41 102 LF For furnishing and plactng 24' ASTI4 F-497 PVC smmr (26'-30' depth), complete tn place, the sum of AND ~- CENTS per each. SECTION I - GRAPEVINE III ~ - ~ -- TOTAL BID FOR ALL UNIT PRICES: ~:, Bidder agrees t~t all ~rk described In SEC~ I - ~P~INE III wtll be completed ~tthtn 120 calendar days. Note: The Ctty has set the ttm for thts sectton at 120 calendar days. Should the Contractor be the successful lo~ btdder on Sectton] and Sectton H and/or Sectton [Z], the Contractor shall be required to complete Sectton ~ ~tthJn the ftrst 120 calendar days of the total tt~ allotted for completion of the ~ork. REVISED 00301-7 SECTION II - GRAPEVINE IV P ITEM ESTIMATED NO. QUANTITY DESCRIPTION AND UNIT PRICE IN WORDS I 215 LF 2 215 LF For furnishing and plactng 6' Cl. 50 Ductile Iron Pipe. complete ~n place,,the~ujR~of AND /)'~c?- ~ ' CENTS per linear foot. For furnishing and plactng 8' C1. 50 Oucttle Iron Pipe, co~kolete,in place, t~; hum of AND AuJ.?*' C~TS per linear foot. UNIT PRICE 3 N/A N/A 4 13 LF For furnishing and placing 8" 77°~ SDR-3S, PVC sewer (lO'-lS' depth), complete in place, the sum of AND ~ CENTS per linear foot. 5-9 N/A IVA NOT USED i 10 557 LF For furnishing and placing 12' SDR-3S, PVC sewer (0'-10' depth), complete Jn place, the sum of DOLLARS AND "~C¢'~ CENTS per 11near foot. I1 1565 LF For furnishing and placing II' SDR-3$, PVC sewer (I0'-15' depth), complete in plmce, p~sumof , £,.¢,-,,LoCc~..~t.., DOLLARS -- /7co-- CENTS linear foot. TOTAL ANOUNT 00301-8 REVISED 12 580 LF For furnishing and plactng 12' SDR-35, PVC sewer (15'-20' depth), complete Jn place, the sum of AND/;/~ ~ /**'/'~ "CENTS peri,near fbot. 13-18 N/A 19 8 N/A NOT USED EA For furntshtng:'and plactng 4 /~' J~".~ FT dtameter standard manhole, comoTe~e tn ~la~e,.,th~ sum of ANI~ /,~ L,' ' ~'- ._CENTS per each. 20-23 N/A N/A NOT USEO EA For furnishing and plactng 4 FT dtmeter Type'S' manhole, ~_~.o=plete tn place, the sum of AND .~o-- ,.cENTS 25 1 EA 26 1 EA 27 316 LF per eich. 'For furnishing and plactng S FT dtumeter Type'S' manholeT c~,o~p!e_te tn placP, the 'AND ~ ,~ r- .~rAla per eKh. For Curntshtng all labor, mtertals and Incidentals requtred to complete Stphon structure per contract requtremnts, ntace, the ~m or.~ per each. For furnishing and plactng 20' /~*~ dtmeter dry bore, c~omple~e tn , place, the s,u~,.o,~f.~_Crx-~~ Ai~D'" (%Z-~'*~ CENTS per 11near foot. ' I I I i ! I ! 28 316 LF For furntshtng and placing 20' dtameter castng pipe, complete tn pla~e, the sum of ~-/.~6~ OOLLARS AND ,~z.~-- CENTS per linear foot. 29 6 EA For abandonment of standard sewr eanhole, coaplete tn place, the sum of ,-,rc~- CENTS per each. 30-31 N/A N/A NOT USED i 32 832 LF For removal and replacement of 8' reinforced concrete pavelmnt, co. leto tn place, the ~ua of CENTS peb/square yard. 33-35 N/A N/A NOT USEO I 36 g SY For reeoval and replaceeent of 6' reinforced concrete REVISED 00301-9 . _ _ o~ Rip-Rap, coeplete tn place, · the sum of i per square yaro. 37 1 LS For furntshtng and plactng landscaping, cmple~e ? place, the AND ~'L~-- C~S per 1~ 38 ~601 LF For T~nch ~cavatton Safety ~d Support, c~lete tn placp,, the sue of Z-/Lk~ L OOLLARS AND /)LCr' CENTS per 11near foot. 00301-10 REVISED 3g(A) ! LS For furnishing and maintaining Traffic Control stgnage, barricading, etc. during and through completion of construction, complete in place, the sum of ~P~lO /-~-- CENTS per lump sum. 40 8 EA For fu~ishing and plactng 4' ~C s~r se~tces, oml eta t ~c~ the s~ of O' ~- CENTS per each. 41 N/A N/A NOT USED SECTION II ' GRAPEVINE IV , ~ , TOTAL BID FOR ALL UNIT PRICES:/-y~. ~_~,~..~cP~L (use words) ~.~ ' (use figures) Bidder agrees that a1..1 work described in SECTION ZZ - GRAPEVINE IV will be completed within ~ calendar days. SECTION II! - BETHEL ROAD I ! i ! i ITEH ESTIHATED DESCRIPTION AND NO. QUANTITY UNIT PRICE IN WORDS I 110 LF 2 110 LF For furnishing and plactng 6' C1. 50 DucMle !ton Ptpe, fp~plete tn.p!ace, the sum of · ~,-~,..~t DOLLARS AJlb~ ~ .,')c,c~ -' CEHTS per 11near foot. For furnishing and placing 8' C1. SO Ducttle !ton Ptpe, ,~et,e .tn pl,a.c.e~ the sum of _~(~ _~c~. DOLLARS ~ ' ~: ~ C~TS per 11near foot. I 3 13 LF For furntsh4ng and plactng 8' SDR-35, PVC sewer (0'-10' ! I depth), complete tn place, the sum of ANq) ~c~ CENTS per 11near foot. 4 5 LF For furnishing and placing 8' SOR-35, PVC se~er (10'-15' depth), complete tn place, the sum of ,. __~ ~oxv ./~,.u.,c~ OOLLARS pe~ 11near fo~. CENTS I I I I !I ! S-6 N/A N/A 7 2314 LF 8 1648 LF NOT USED For furnishing and plactng 10' SDR-35, PVC sewer (0'-10' depth), complete tn place, the ~sum of j~LC~_~-c~--~ ~ DOLLARS AND V (,.~ C~TS per linear foot. For furnishing and plactng 10' SDR-35, PVC sewer (10'-15' depth), complete tn place, the sun of , ,CI-~Lc~LT_.~J.-C~~' DOLLARS AND u .,q,,~'-' CENTS per linear foot. REVISED 00301-11 UNIT TOTAL PRICE AMOUNT >~. ~,c,~ ~ c,~z.' 00301-12 REVISED 9 15 LF 10 892 LF 11 ~477 LF For furnishing and placing 12' SDR-26, PVC sewer (0'-5' depth), complete in place, the sum of .~/~L--,-r, OOLLARS AND/~ , /~c~-' CENTS per--linear foot. For furnishing and placing 12' SDR-35, PVC sewer (5'-10' depth), complete in place, the sum of '~.c~.~.~--.x~.'x,-~ NOLLARS AND v /,%c,- CENTS per linear foot. For furnishing and plactng 12' SDR-36, PVC semar (10'-15' depth), complete in place, the sum of ,.~:?~C~ -.~L.c~,*~; DOLLARS ANI~; ' ~,~-,- CENTS per linear foot. o° /ic q 9 1~-18 N/A 19 13 N/A NOT USED EA For furnishing and placing 4 FT diameter standard manhole, complete in_place, the Sue of ANU ~ ~- L, CENTS 2O 2 EA per each. For furnishing and placing 5 ~_~ FT diameter standard manhole, c,umplete tn place, the sum of AND / ~?ccr- CENTS per each. 2]. N/A 22 4 N/A NOT USEO EA For furnishing and plactng 4 FT diameter drop tnlet manhole, complete tn place, the sum of 'AND ?.~.-~ CENTS per each. I I I I I I i i t i 23 I EA 24 N/A Z5 1 26 I Z7 15 For furnishing and placing 5 FT dianeter drop inlet manhole, complete Jn place, the sum of ,-/._z.~, .-C"/,_u-'~bO_. ','P},-- OOLLARS ,,,,,ocr-- CENTS REVISED 00301-13 N/A NOT USED EA For furnishing and plactng 5 '--B~°°''~' FT dtmeter Type'S' manhole, conplete in pl,ace, the sum of AND , (/ ,,'v~cr-' CENTS per each. EA For furnishing all labor, naterials and incidentals required to conplete Siphon structure per contract requirenents, cueplete in place, the sun pf ~/~_~=/~oc~C Aim _. ,,-/cc~ CENTS per each. LF For furnishing and placing 20' -~c~c~ dtamter dry bore, cueplete tn pl~cp, tl~e sum~f certs per linear foot. Z8 15 LF 29 6 EA For furnishing and placing 20' dtaneter casing pipe, complete tn ~lace, theFun of .~/~. - ,~u.~ DOLL.S AND ~¢'.~ CENTS per 11near f~'ot. For abandonnent of standard se~er nanhole, conplete tn place, the, sue of ~9r each. ,~q-- CENTS For abandonnent of sanitary se~er clean out, complete in place, the sun.of~ AND /~,.~-~ ~ CENTS per each. 30 4 EA 00301-14 REVISED 31 48 LF 32-34 N/A 35 6998 35 7 SY N/A LF 37 1 LS 38 7346 For placement of 6" Class "B" concrete embedment across entire trench width, complete in place, the sum of ,./c¢_u~-~. ~. x~ DOLLARS AND (~ach./~co~ CENTS per NOT USED ~'- For removal and replacemont of asphaltic concrete pavement, complete in place, the su~ of nD per line For removal and replacement of 6' reinforced concrete Rip-Rap, complete in place, the su~ of /-/f .ccb.~- DOLLARS per square yara. For furnishing and plactng landscaping, complete in pl,ace, tl~e, su~ of j~/.~.. ,Z~'c~u.~'c ~ ~L~S ~- - ~ C~TS ~r 1~ s~. LF For Trench Excavation Safety and Support, complete in place, .the su~ of r- ~'-~LC~ OOLLARS ~CENTS per~eoot. 39(A) 1 LS For furnishing and maintaining Traffic Control stgnage, barricading, etc. during and through completion of construction, complete in place, the s~ of /~r~ CENTS per lump sum. -~tj~g-~scrtptioz Page 00100-11 Section 13.2.1' UC~ C.' REVISED 00301-15 39(8) 1 LS For furnishing and maintaining Traffic Control signage, barricading, etc. during and through completion of construction, complete in place, the ~ua of ANO ~ CENTS per lump su~. 40 18 EA For furnishing and placing 4' PVC sewor services, co,~,lete~n pJ.a;e~., the sum of ~ANO ' ; //~L~' CENTS per each. *See Description Page 00100-12, Sectton 13.2.18 41 N/A N/A NOT USED SECTION XX! - BETHEL ROAO TOTAL BIO FOR ALL UNIT PrXCES: .~,',~;~L~. ;~L~%~-~c~u~.~o~*- (~se words) /~, ~ / (use ftgu~es) Bidder agrees that all work described in SECTION III - 8EI~IEL ROAD will be completed w~thtn ~ calendar days. 00301-16 REVISED Unit Prices have been computed in accordance with paragraph 11.9.2. of the General Conditions, BIDDER acknowledges that quantities are not guaranteed and final payment will be based on actual quantities determined as provided tn the Contract Oocuments. 5. Completion. BIDDER agrees that the Work will be substantially c~leted and ready for final payment in iccordance with paragraph 14.13. of the General Conditions on or before the dates or withtn the nueber of calendar days Indicated in the Agree.eot. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to ceeplete the Work within the times specified in the Agreement. 6. Attached Documents. The following documents are attached to and made a condition of this Btd: a. Required Btd Securtty tn the fora of ~--~ ~c~ b~r~..~ 8. Other Requtreeents. Address for Comeuntcattons. be ee Comuntcattons concerning thts Bid shall be addressed to Purchasing Office Z55 Parkway Boulevard Coppe11, Texas 75019 BIDDER agrees that all Work awarded will be cmpleted within the Calendar Oays ltsted for each section. Contract time will coca. nc. to run as prevlded tn the Contract Ooceeents. Commntcattons concernJng thts Btd sbe11 be to the address of 8IOOER Indicated on the applicable signature page. BIDDER understands that the Owner ts exempt fro~ State Ltmtted Sales and Use Tax on tangible personal property to be Incorporated into the project. Said taxes are not included in Contract Prtce (See Instructions to Bidders). The teras used tn this Btd whtch are deftned In the General Conditions of the Construction Contract tncluded as part of the Contract Oocuments have the meantngs assigned to thee in the General Conditions. Terms used in thts Btd which are deftned ~n the General Conditions or Instructions will have the meanings indicated in REVISED 00301-17 the Genera] Conditions or [nstructtons. The Ctty of Coppe11 reserves the rtght to delete any portton of this project as Jt ~ay deem necessary to stay within the Ctty's available funds. Should the City elect to delete any portton, the contract quantities wtll be adjusted accordlngly. SUBMITTED on _ Il El I 00301-18 PREVAII, I~IG WAGE RATE FOR PL~LIC WORKS PROJECTS: The City shall ascertain the general prevailing rate of wages for each craft of type of workman, or mechanic needed to execute this contract and shall specify in the call for bids of this contract what the general prevailing rate of wages is sin the City of Coppetl. The City shall also specify the prevailing rate for legal holiday and overtime work. The contractor must pay the said specified rate to all laborers, workmen, and mechanics employed by him or any subcontractor under him in the execution of this contract. The City of Coppell resolution regarding prevailing wages follows this section. PENALTY FOR VIOLATION: The contractor or stibcontractor in violation of these rules is liable to the City for a penalty of Sixty Dollars ($60.00) for each laborer, workman, or mechamc employed for each calendar day or portion thereof, that such laborer, worlanan, or mechanic is paid less than the stipnlated rates for any work done under this contract. The money collected shall be used to offset the costs of administering these requirements. If the City ~ceives a complaint by a laborer, workman, or mechanic it shall determine within thirty (30) days after receipt whether good cause exists to believe that the contractor or any subcontractor has committed a violation of these specifications. The City shall provide written notice of its determination to the contractor or subcontractor andy any affected laborer, workman, or mechanic, the City shall retain any amounts due under the contract pending a trmai determination. If the contractor or subcontractor and any affected laborer, workman, or mechanic fail to resolve the alleged violation by agreement within fotlrte¢~ (14) days of the determination by the City, the issues of the alleged violation, any penalties owed to the public body, and any amounts owed to any affected laborer, workman, or mechanic shah be mbmiu~ to binding arbitration in accordance with the provisions of the Texas General A~oitrafion Act. If the patties fail to agree upon an arbitrator within ten (10) days, the arbitrator shall be designated by the District Court upon petition of any party. The decision and award of the arbitrator is f'mal and binding upon all panics and may be enforced in any court of competent jurisdiction. The City shall not be a party in the arbitration. ARBITRATION: The arbitrator shall assess and award all reasonable costs, including the arbitrator's fee, against the party or parties who fail to prevail in the proceeding. Costs may be assessed against the laborer, workman, or mechanic only if the arbitrator finds that the claim was frivolous. If the arbitrator does not fred that the claim is frivolous and does not make an award to the laborer, workman, or mechanic, costs will be shared equally by the parties. If the arbitrator determines that a violation of the specification has occurred, the arbitrator shall assess and award penalties as provided in the Act and all amounts awed to the affected laborer, workman, or mechanic against the contractor or subcontractor. The City shall use any amounts retained under this provision to re'unburse the laborer, worknmn, or mechanic for the amount owed to that person because of the failure to pay the person the general prevailing rate of wages as provided in the arbitrator's award. If the amounts withheld by the City are insufficient to fully reimburse the laborer, workman, or mechanic for amounts owed, the person has a right of action against the contractor or subcontractor and the surety of that person to recover any amounts owed. 00301-I9 BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated by Bidder.) STATE OFe'"'~ '5 COUNTY OF I BEFORE ME, the undersigned authority, a Notary Public in and for the State of on this day personally appeared ~n~,~ .Z,~./~---,'~ who after being by me duly sworn, did depose and say: Name Name of Firm foregoing on behalf of the said Name am a duly authorized office/agent for. and have been duly authorized to execute the Name of Firm [ I I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same line & business prior to the official opening of this bid. Further, I certify that the Bidder is not now, nor has been for the past six (6) n~ntlm, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon.' Name and Add~ss of Bidder:__ AtJdne Broe. Equip. Co., Inc $18 W. b~r~tall Grand Prairie, Tx 75O51 Telephone: (:a,~) ~e./7'-gl?qo by: SUBSCRIBED AND SWORN to before me by the above named on this the '~ '~ day of ,4~/,g/~,Z/r_5"/- Notary Public in and for the State of REVISED 00301-3 any other BIDDER to submtt a false or sham Bid; BIDDER has not solicited or tnd~ced any person, ft~ or corporation to refrain from bidding, and BIDOER has not sought by collusion to obtain for itself any advantage over any other BIOOER or over ONNER. Bid Prices. BIOOER will complete the Work in accordance with the Contract Documents for the following price(s): All speciftc cash allowances are tncluded tn the prtce(s) set forth above and have been computed in accordahce wtth paragraph 11.8. of the General Conditions. UNIT PRICE BIO FOR CITY OF COPPELL SEWER IMPROVEMENTS SECTION I - GRAPEVINE ITE# ESTIMATED DESCRIPTION AND UNiT TOTAL NO. QUANTITY UNIT PRICE ZN WORDS PRZCE AMOUNT S 166 LF For furnishing and plactng 8" PVC se~er (15'-20' depth), ' complete in place, the sui of ~IITY ~ AND m CENTS per ltnear foot. I 5-13 N/A N/A NOT USED I 14 200 LF For furnishing and placing IS" SOR-35 P1/C sewer (0'-10' depth), complete in place, the su~ of F~rn OOLLARS I AND ~ CENTS per linear foot. I 15 2570 LF For furnishing and plactng lS' SOR-35 PVC sewer (10'-15' depth), complete tn place, the sum of I FIFrY NI~ DOLLARS AND ~ CENTS per linear foot. I 59. ffi 151~.88 00301-4 REVXSED 16 1094 17 230 LF For furnishing and placing 15' SDR-35 PVC sewer (15'-20' depth), complete tn place, the sum of ~¥ FI~ DOLLARS AND m CENTS per 11near foot. LF For furnishing and plactng 15' SDR-35 PVC sewer (20'-25' depth), complete tn place, the sum of NI~E~ DOLLARS AND ~ CENTS per linear foot. 18 N/A N/A lg 5 EA 2O 8 21 I 22 N/A 23 1 NOT USED For furnishing and plactng 4 FT dta~etar standard manho]e, co~]gte tn place, the sum of Tm r, eUS~Famlue~ DOLLARS ~ ~ CENTS per each. EA For furnishing and plactng S FT diameter standard manhole, co~lete tn place, the su~ of FOra mOUS~ mO HUm~ SZX~ DOLLARS ANO m CENTS per each. EA For furnishing and plactng 6 FT dtamter standard manhole, s .he_ su~ of ~ "" CENTS per each. N/A NOT USED EA For furntshtng and plactng 5 FT dta~eter drop tnlet manhole, colmlete tn ~lace, the sum of T~L~T~Ug~gE~UN~NZ~ET~ DOLLARS AND ~ CENTS per each. 818. 8~ 5,810. # 24-26 N/A N/A NOT USED I I 27 7]8 LF For furnishing and placing 20" diameter dry bore, complete in place, the sum of 0NEHUM)RE~NII~TY ~V~ DOLLARS AND FIF~ CENTS per linear foot. 718 LF For furnishing and placing 20" diameter casing pipe, complete in place, the su~ DOLLARS AND ~ CENTS per linear foot. 29 9 EA For abandonment of standard sewer manhole, complete in place, the sum of Tm~#D~DOLLARS AND m CENTS per each. 30-31 N/A N/A NOT USED m 32 12 sY For removal and replacement of 8' reinforced concrete pavement, complete in place, m sixw EIBHT DDLLARS the sum of AND mJ CENTS m per square yard. 33 188 SY For removal and replacement of reinforced concrete driveway, complete tn place, the sum of F~W DOLLARS AND ~ CENTS per square yard. 34 835 LF 35-36 N/A N/A For removal and replacement of reinforced concrete 4 FT wide sidewalk, complete in place, the sum of FIFT~.N DOLLARS AND ~ CENTS per linear foot. NOT USED REVISED 00301-5 12.88 B.616.88 12,525, ~ 00301-6 REVISED 37 38 3555 39(A) 1 40 8 41 102 I LS For furnishing and plactng ;.m.~ ~.aM.gI landscaping, complete in place, the sum of N~T~ OOLLARS ANO ~ CENTS per luep sue. LF For Trench Excavation Safety ~25 _.__~.~ and Support, complete in place, the sue of ~ OOLLARS I AND T~XTYFI~ CENTS per ltnear foot. I LS For furnis:::ng and mainta,ning Traffic Control signage, i barricading, etc. during and through coepletion of construction, coeplete in place, the ~_.um of _ AND ~u CENTS per 1rap sue. EA For furnishing and plactng 35L~ 4' PVC sever services, complete tn place, the sub of ~I~EKIUGFXF~ DOLLARS AND m CENTS per each. : LF For furnishing and placing 24" ASTI4 F-497 PVC sewer 1~.# (25'-30' depth), complete in place, the sue of ONE IIJW~ F~FTY FO~ OOLLARS AND CENTS per each. SECTION I - GRAPEVINE III TOTAL BID FOR ALL UNIT PRICES: (uso vords) ~,~.~s ) ;I~I:iONI}i~I) SIX~ ~EI;HTI~MX~I) FOOR I)~llars and SEYE)JTYFI~EOmts ($ (use figures) Bidder agrees that all tmrk described in SECTION I - GRAPEVINE III be completed vithin 120 calendar d~ys. Note: The City has set the time for this section at 120 calendar days. Should the Contractor be the successful lo~ bidder on Section I and Section II and/or Section III, the Contractor shall be required to complete Section I vithtn the first 120 calendar days of the total time allotted for completion of the york. SECTZON ZI - GRAPEVINE IV ITEM ESTIMATED NO. QUANTITY UNIT DESCRIPTION AND PRICE IN MORDS 215 LF For furnishing and plactng 6" C1. 50 Ductile Zron Ptpe, co~lete tn place, the sum of SZX~O,E DOLLARS AND ~ CENTS per linear foot. 2 215 LF For furnishing and placing 8' C1. SO C.cttle Iron Ptpe, complete tn place, the sum of SlXTY FI~DOLLARS AND "uCENTS per linear foot. 3 N/A N/A 4 13 LF For furnishing and placing 8' SDR-3S, PVC sewer (10'-15' depth), caepleto tn place, the su~ of FZFTYFOURDOLLARS AND m CENTS per 11near foot. I 5-9 N/A N/A NOT USED 10 557 LF For furnishing and placing I ]2" SDR-35, PVC smeer (0'-10' depth), coeplete tn place, 1] 1565 I I I I the sum of FORTY DOLLARS AND Ng ~ENTS per linear foot. LF For furnishing and placing 12' SDR-35, PVC se~er (10'-15' depth), complete In place, the su~of AND Nu CENTS per linear foot. REVISED 00301-7 UNIT TOTAL PRICE ANOUNT 61.~ 13,, 115.~ 45. ee 0030~-8 REWSED 12 580 LF 13-18 N/A N/A 19 8 EA 20-23 N/A 24 3 For furnishing and placing 12" SDR-35, PVC sewer (15'-20' depth), complete tn piece, the sum of ~T~wr~ DOLLARS AND = CENTS per linear foot. NOT USED For furnishing and plactng 4 FT dtameter standard manhole, complete tn place, the sum of m0.Tm__~WF0URHmX~DTEX DOLLARS I AND m CENTS per each. I N/A NOT USED EA For furnishing and plactng 4 FT dtiter Typo "S" manhole, comlete tn place, the sum of Ii AND NO CENTS per eech. 26 1 EA For furnishing and plectng 6 FT dtaleter Type'S' lanhole, cmplete tn place, the sum of ~THaUmO FOLIR IUIX~ ~ZFTYNO CENTsDOLLARS 26 1 EA 27 316 LF per each. · For furnishing all labor, ~ materials end Incidentals required to cmaplete Stphon structure per contract 19,#e,# 19, IM.M requirements, complete tn pl&ce, the sum of NZ..TE~NlmgWD DOLLARS I AND m CENTS per eech. For furnishing and plactng 20' dtaleter dry bore, complete tn place, the sum of ONEm~mE~SEVee~FZ~ DOLLARS AND m CENTS per linear foot. I I 28 316 LF For furntshtng and plactng 20 dtameter castng pipe, complete I tn place, the sum of T~V~ OOLLARS AND ~ CENTS per ltnear foot. I 29 6 EA For abandonment of standard sewer menhole, complete tn place, the sum of T~O ~ OOLLARS ANO ~ CENTS I per each. 30-31 N/A N/A NOT USED I For remeval and replacement 32 832 LF of 8' retnforced concrete pavument, complete tn place, I the sum of TwoDOLLARS RIZTY ANO ~CENTS i per square yarc. 33-35 N/A N/A NOT USED 36 9 SY For r~val and replacement of 6" reinforced concrete Rip-Rap, complete tn place, the sum of F ,°R2~pOLLARS AND 'CENTS per square yard. 37 ! LS 38 2601 LF For furntshtng and placing landscaping, cumplete tn place, the sue of rlr T,a~OOLLARS AND ~:ENTS per lump sue. For Trench Excavatton Safety and Support, coeplete tn place, the sue of mOOLLARS ANO TW_NTYFI~ENTS per linear foot. REVISED 00301-9 12, M 3.792. ae 2M.M 1.aM.M 00301-10 REVISED 39(A) 1 LS For furnishing and maintaining Traffic Control stgnage, barricading, etc. during and through completion of construction, complete in place, the sum of R~y~ ~ ~ ~ OOLLARS AND m CENTS per lump sum. 16~ 7~. ~ 16, 7M. ee 40 8 EA For furnishing and plactng 4' PVC sewer services, coeplete tn place, the sum of ra~tm~FZFTY DOLLARS AND m CENTS per each. 41 N/A N/A NOT USED SECTION Il - GRAPEVINE IV TOTAL BID FOR ALL UNIT PRICES: (use words) 11~EEtU~E~FIF1~I~lI~BqNBNIIL~TYEIGHT ~ll~s and11~lTYFZ~Ce~ts ($ 3~1~9,~ ) (use figures) Btdder agrees that ell work described tn SECTZON Z! - 6RAPEVZNE ~¥ wtll be completed wtthtn I~-~ celendar d~ys. I REVISED 00301-11 m SECTION III - BETHEL ROAD m ITEM ESTIMATED DESCRIPTION AND UNIT TOTAL NO. QUANTITY UNIT PRICE IN WORDS PRICE ANOUNT m i 11o LF For furnishing and placing 6' Cl. 50 Ductile Iron Pipe, complete in place, the sum of m ~ ~ DOLLARS AND m CENTS per linear foot. m 2 11o LF For furnishing and plactng 76.~ 6,36&6~ 8' C1. 50 Ducttle Iron Ptpe, complete tn place, the sum of m SEVEXTY SlX DOLLARS AND NO CENTS per linear foot. m 3 13 LF For furnishing and placing 8' SDR-3S, PVC sewer (0'-10' m depth), complete in place, the sum of THIRTY FOUR DOLLARS AND .0 CENTS I 11near foot. per 4 5 LF For furnishing and plactng I 8' SDR-35, PVC sewer (10'-15' depth), complete tn place, the sum of FORTY EI~4T DOLLARS AND I~ CENTS per llne&r foot. 5-6 N/A N/A NOT USED 7 2314 LF For furnishing and plactng 10' SDR-35, PVC sewer (0'-10' depth), complete tn place, the sum of mZmYNI[ DOLLARS AND ~ CENTS per 11near foot. 8 1648 LF For furnishing and placing 10" SDR-35, PVC sewer (10'-15' depth), complete in place, the sum of FI~TYO~ DOLLARS AND ~ CENTS per linear foot. 51.66 8~MS.M 00301-12 REVISED 9 LF 10 892 LF 11 2477 LF ]2-]8 N/A N/A 19 13 EA 20 2 EA 21 N/A 22 4 For furnishing and plactng 12" SDR-26, PVC sewer (0'-5' depth), complete In place, the sum of ~RW F~ DOLLARS AND ~ CENTS per 11near foot. 34,6~ For furnishing and plactng 12' SDR-35, PVC se#er (5'-10' depth), complete tn place, the sum oF Fm~ol~ DOLLARS AND m CENTS per linear Foot. For furnishing and plactng 12' SOR-3~, PVC se~er (10'-16' depth), conq)lete tn place, the sum of FIIrTY FOLa DOLLARS AND HQ CENTS per 11near foot. NOT USED 133,756.# For furnishing and plactng 4 ~e6o.# 26,78&# ~ FT dtamter standard mnhole, · complete tn place, the sum of T~OTHOL~SIXW OOLLARS I AND NO CENTS per each. For furnishing and plactng 6 ~1~# ~.e.# B FT dtamter standard manhole, · complete tn place, the sum of AND ke CENTS per each. N/A NOT USED EA For furnishing and placing 4 FT dlmter drop inlet manhole, 1 ,~.~ ,-~ ~ ~,~.u ,~. DOLLARS AND ~ CENTS per each. 23 1 EA REVISED 00301-13 For furnishing and placing 5 ~ ~,~_~.M FT diameter drop inlet manhole, coaplete tn place, the sue of FOUR THOUSa~T~vwa~-nR~OOLLARS AND ~ CENTS per each. 24 N/A N/A NOT USED For furnishing and placing 5 FT dtameter Type'S' eanhole, complete in place, the sue of ~R~THOU~OEHU~S[X~ DOLLARS AND m CENTS per each. 25 ! EA 26 I EA For furnishing all labor, metertals and Incidentals requtred to complete Stphon I structure per contract requir~nts, complete in _a]_~e.._~he sum of I ~V~NII~N ~ FI~ DOLLARS AND m CENTS per each. I 27 15 LF For and 20' furnishing plactng dtmeter dry bore, coeplete tn place, the sub of SIX I4N)R~mlRTYFI~ DOLLARS AND m CENTS per 11near foot. For furnishing and plactng 20' dtameter castng ptpe, complete tn place, the sma of T~EL~ DOLLARS AND ~ CENTS per linear foot. 28 15 LF 29 6 EA For abandonment of standard sewer manhole, complete tn place, the sum of ~o~ DOLLARS AND ~ CENTS per each. For abandonment of sanitary sewer clean out, complete in place, the sum of Rr¥~ DOLLARS AND m CENTS per each. 30 4 EA 00301-14 REVISED 31 48 LF 3Z-34 N/A 35 6998 36 7 SY N/A LF For placement of 6' Class "B' concrete embed~ent across entire trench width, complete in place, the sum of FiU~N DOLLARS AND ~ CENTS per each. 37 1 LS NOT USED For re~mval and replacement of asphaltic concrete pavemnt, complete in place, the su~ of Elam DOLLARS AND ~ CENTS per 11near foot. Fm, re. va1 and replacemnt of 6' reinforced concrete Rip-Rap, cmaplete tn place, the su~ of ~ DOLLARS AND m CENTS per square yard. For furnishing and plactng landscaping, cemplete tn place, the sub of SE~ ~,US~ DOLLARS AND ND CENTS per lump su~. · m --~tptton Page 00100-11 , Section 13.2.1~- 7tMLN 38 7346 LF 39(A) I LS For Trench Excavation Safety and Support, colplete in place, the su~ of ~ DOLLARS AND ~FI~-CENTS per ltne&r foot. For furnishing and maintaining Traffic Control stgnage, barricading, etc. during and through completion of construction, complete tn place, the sum of AND m CENTS per lump sum. 17,6M.M REVISED 00301-15 39(8) ] LS For furnishing and maintaining Traffic Control signage, barricading, etc. during and through completion of construction, complete in place, the sum of ~_rv~lm~SmDSlX~ DOLLARS AND m CENTS per lump sum. *See Description Pag41~-1Z, Section 13.2.18 40 18 EA For furnishing and placing 3~.. 6,3~.# 4" PVC sever services, complete tn place, the sum of ~mE~)F~FT~ DOLLARS ~ m CENTS per each. 41 N/A N/A NOT USED SECTION III - BETHEL ROAD TOTAL BID FOR ALL UNIT PRICES: (use words) I wheel.. FIVE ~ FI)RTY SIX IH~ SIX ~ EIGHTY (]NE {)ollars and FIFTY Cents ($ (use ftgures) Bidder agrees that ell ~rk described in SECTION III - BETHEL ROAD wtll be completed within I~ calendar days. I 00301-19 BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated by Bidder.) STATE OF ~i-~)~ COUNTY OF BEFORE ME, the undersigned authority, a Notary Public in and for the State of on this day personally appeared C~/~.r~.-p. ~o:~4~ who after being by me Name duly sworn, did depose and say: "I, r~ -p. ~4- am a duly authorized office/agent for Name ~ q..qa..~q6 ~t~3i~ and have ~n duly au~o~ to ex.ute ~ N~ of Fi~ forgoing on ~if of ~ ~id ~-~V~ ~~ N~ of Fi~ [ hereby certify that the fOregoin~ bid has fibt ~g~n pre~ In'~.ollusion.~i~?~y~ .~r Bidder or individual(s) engaged in.the same line o' business prior to the~offi~.'.~. ~ning.of this bid. Further, I certify that the Bidder is not now, nor has been for the pas~'~ (6)~months, or indirectly concerned in any pool, agreement or combination the~o conuoi th~ori~e of services/commodities bid on, or to influence any individual(s) to bid ~t t~ bidr Name and Address of Bidder: ~ ~'~ (.~frl~/~ Co.I Telephone: (V~)~"l~ ~ 0~ __ by: ~7~i Z'~ ~' on this the ~2~11~ day of ~4c 199~-~' Nota~, Public in and for the State of '~X~'~ __ __ REVISED 00301-3 any other BIDDER to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other BIOOER or over OWNER. 4. Bid Prices. BIDOER will co~olete the Work in accordance with the Contract Documents for the following price(s): All specific cash allomances are included in the price(s) set forth above and have been computed in accordance with paragraph 11.8. of the General Conditions. UNIT PRICE BID FOR CITY OF COPPELL SEgER IMPROVEMENTS SECTION I - GRAPEVINE III ITEN ESTIMATED DESCRIPTION AND UNIT TOTAL ....... 1-4 N/A N/A NOT USED ' ' ' 5 166 LF For furnishing and placing "d~, ~ 8' PVC sewer (15'-20' depth), -- c~map~ete J~ place, the'sum of OOL ARS AgDX ~ x~,.~' 'CENTS per 11nearfoot. 6-13 NOT USED N/A N/A 14 200 LF For furnishing and plactng 16' ~.~ ~ SDR-35 PVC sever (O'-lO' depth), complpte tn place, the sum of DOLLARS AND · CENTS per~ ]5 2670 LF For furnishing and plactng ~.~.o~ .L~tc~a~,ec~ 15' SDR-36 PVC sewer (]0'-15' depth), complete tn place, the sum of ~, ~-~ ~Cj~e DOLLARS AND I ~ CENTS per linear foot. I 00301-4 REVZSCD 16 1094 LF 17 230 LF 18 N/A ]9 5 2O D 21 I 2~ WA 23 I 24-26 N/A For furnishing and placing 15' SDR-35 PVC sewer (15'-20' depth), complete in place, the sue of ~:v~ OOLLARS AND CENTS per 11near foot. For furnishing and placing 15" SDR-35 PVC sewer (20'-25' depth), complete in place, the sue of ~z,~E,r~F~ ~---tv~ DOLLARS AND 1~. ' CENTS per linear foot. N/A NOT USED EA For furnishing and plactng 4 FT dtueeter standard .anhole, complete tn place, the sue of .JOOLLARS CENTS per each. EA For furnishing end plactng 5 ~~ ~ FT dtmeter standard mnhole, complete tn place, the sue of CENTS per each. EA For furnishing and pl&ctng 6 ~ ~ FT dtmeter standard manhole, complete tn place, the sum of CENTS per N/A NOT USeD EA For furnishing end placing 5 ~ ~ FT dtaeeter drop tnlet manhole, complete tn place, the sum of ba~4:l.a~A~-..~ h=~:L~/ 0OLLARS AND '- ~ CENTS per each. N/A NOT USED REVISED 00301-5 Z7 718 LF For furnishing and placing 2~ diameter dry bore, complete sum qf place, the ~ Wu~vLF~d i~y~ DOLLARS AND ~.. -- CENTS per linear fobt. 28 718 LF For furnishing and placing 20' diameter casing pipe, complete in place, the sum of AND ' ~ CENTS per linear foot. 29 9 EA For abandonment of standard sewer manhole, complete in p~ace, the su,, of ANO f~ CENTS per each. 30-31 N/A N/A NOT USEO 32 12 SY For removal and replacement of 8' reinforced concrete pavement, complete in place, I the sum of ,l~P4:~ DOLLARS AND ' ' ')~ CENTS I per square yard. 33 188 SY For removal and replacement ~.~m~_~_. of reinforced concrete - drtvewmy, complete in place, the sum of 34 835 LF ~cOOLLARS ENTS per square yard. For removal and replacement of reinforced concrete 4 FT wide sidewalk, complete in place, the sum of ~ DOLLARS AND ~o CENTS per linear foot. 35-36 N/A N/A NOT USED 00301-6 REVISED 37 I 38 3555 39(A) 40 8 41 102 LS For furnishing and plactng landscaping, complete in -- place, the sum of ~c~ t'~,~,~,~A DOLLARS AND ~ - CENTS per lump sum. LF For Trench Excavation Safety and Support, complete in place, the sum of AND ~ CENTS per Ti-~Foot. -- LS For furnishing and maintaining Trafftc Control signage, barricading, etc. durtng and through completion of construction, complete in place, the sum of DOLLARS ~Q~L--~~~~~ CENTS per lump sum. EA For fu~tahtng and plactng ~ ~ 4" PVC sMr services, complete tn place, the sum of NTS per each. LF For furnishing and plactng 24" ASTM F-497 PVC se~er (25'-30' depth), complete tn place, the sum of /~. ku.vJ~n// ~ DOLLARS · ' ~ CENTS per each.' SECTION I - GRAPEVINE III ~ TOTAL BID FOR ALL UNIT PRICES: Bidder agrees that all ~ork described in SECTION I - GRAPEVINE III wtll be completed wtthtn 120 calendar days, Note: The Ctty has set the time for this sectton at 120 calendar days. Should the Contractor be the successful low btdder on Sectton! and Section II and/or Sectton Iii, the Contractor shall be requtred to complete Section I within the first 120 calendar days of the total time allotted for completion of the work. SECTION II - GILAPEVINE IV REVISED 00301-7 j ITEM ESTIMATED DESCRIPTION AND UNIT TOTAL NO. QUANTITY UNiT PRICE IN WORDS PRICE AMOUNT 215 LF For furnishing and placing -~,a~ 6' Cl. 50 Ductile Iron Pipe, complete i.n p~,ace, the sum of ~u~J-~ J-~ DOLLARS ~ ~ CENTS per linear foot. 215 LF For furnishing and plactng 8" Cl. 50 Oucttle Zron Ptpe, c~lete Jn place, the sum of ' '~L~RS ~/a ~/~ 13 LF For furnishing and placing 8" ~0~~ ~.~ SDR-35, PVC se~r (10'-15' depth), c~lete tn place, ~~L~ ~0 v, ~ ~ CENTS per llnear foot. a/A N/A ~T USEO 557 LF For furnishing and placing ~,~ 12' S~-35, PVC sewer (0'-10' depth), co~lete in place, t begum o~. ~~L~S ~ ~ - ~ t CENTS per llnear foot. I 11 1565 LF For furnishing and placing 12' SDR-35, PVC sewer (10'-15' depth), complete in place, the sum DJ' AN " DOLLARS  CENTS 0030~-8 RE¥~SED ~ $80 13-18 19 8 20-23 #/A 24 3 26 I 27 316 ! LF For furnishing and placing ~...~,,,.~ .~7).F~.~o I 12' SOR-35, PVC sewer (15'-20' depth), complete in place, m the sum of~ ~,x~. ~ DOLORS C[.TS per linear foot, N/A ~T USED m ~ For furnishing and placing 4 FT dieter standard manhole~ c~lete in place, the sum ot ~ For fumishtng and placing 4 · · hole ~ dieter Type S man c~lete tn place, the s~ of ~r each. c~ete tn p~ace, the sm o~ pe~ each. . For fu~tshtng ,11 la~r, ~ ~ J Mtertals a~ Incidentals requtr~ to c~lete Stphon st~cture per contract requtrMnts, c~lete tn place, the ~M of LS CEOS m per each. LF For furnishing and plactng 20' ~ ~.~.i~'''~ m dieter dry ~re, complete in place, the sub of CE TS per~ I REVTSED 00301-9 28 316 LF For furnishin, g and placing 20" __~ (~).~?.~.ao diameter casing pipe, complete in place, the sum of 4~xc~a:~ DOLLARS AND ~ ~ CENTS per l~near foot. 29 6 FcA, For abandonment of standard ~-J~.~ ~ sewer manhole, complete in place, the sum of ~:~u#. hu~ OOLLARS AND ~ CENTS per each. 30-31 N/A N/A NOT USED I For reflmval and replacement 32 832 LF of 8' reinforced concrete parent, complete in place, I the sum of ~CENTS per square yar~. I 33-35 N/A N/A NOT USED I 36 9 SY For removal and replacement of 6' reinforced concrete Rip-Rap, complete in place, the sum of. I ~ ~:~~OOLLARS ~CENTS 4~.~ 40~.~° per square yard. I 37 1 LS For furnishing and placing landscaping, complete in I place, the sum of ~ OOLLARS CENTS per lump sum. m 38 2601 LF For Trench Excavation Safety and Support, complete in I place, the sum of ~r~ DOLLARS AND ~o CENTS per linear foot. 00301-10 R£VISEn 3g(A) 1 LS 40 8 ~ For furnishing and maintaining~ ~ Traffic Control signage, barricading, etc. during and through completion of construction, complete in place, the sum of ~DOLLARS ~CENTS per lump sum. For furnishing and placing 4" PVC sewer services, c?~~om~)ete in pl ace, the sum of DOLLARS CENTS 41 N/A N/A NOT USED SECTION II - GRAPEVINE IV TOTAL BID FOR ALL UNIT PRICES: (use wor~s;I m Bidder*agrees that all work described in SECTION II - GRAPEVINE IV wtll t be completed within ~ calender dmys. I REVISED 00301-11 I SECTION III - BETHEL ROAD I ITEN ESTIMATED DESCRIPTION AND UNIT TOTAL NO. QUANTITY UNIT PRICE IN ~ORDS . ~!~ _A~..~! I 1 110 LF F~r furnishing and placing --~, ~)Z~, 6 C1. 50 Ductile Iron Pipe, complete in IL13ce, the sue of I ~_..~.j~DOLLARS CENTS pep tlinear foot. I 2 110 LF For furnishing placing and 8" C1. $0 Ductile Iron Pipe, complete in place, the sum of '~L_~~DOLLARS I 3 13 LF For furnishing and plactng 8' SDR-3$, PVC se~er (0'-10' depth), complete in place, i the of~ CENTS I per ltneer foot. 4 $ LF For furnishing end placing 8' SOR-3S, PVC se~er (10715' I depth), coeplete tn place, the sum of ~ DOLLARS I AND a'~ 4 ~ CENTS per linear foot. N/A N/A NOT USED 2314 LF For furnishing and plactng 10' SOR-35, PVC se~er (0'-10' depth), complete in place, the~l DOLLARS ~CENTS per lTnear foot. 8 1648 LF I I I For furnishing and plactng 10" SDR-35, PVC sewer (10'-15' depth), complete tn place, the~-q~°f~v~ DOLLARS AND' ' : ~ k~ CENTS per linear foot. 00301-12 REVISED 9 15 LF 10 892 LF 11 2477 LF 12-18 19 13 For furnishing and placing 12' SDR-26, PVC sewer (0'-5' depth), complete in place, the sum of ~ DOLLARS AND ~'~.~ CENTS per linear foot. For furnishing and placing 12' SDR-35, PVC sewer (5'-10' depth), complete in place,  DOLLARS CENTS For furnishing and plactng 12' SDR-3~, PVC sewer (10'-15' depth), complete tn place, the sum ~ DOLLARS CENIS per ~ N/A NOT USED u For f. tsht ,nd p .tng 4 t FT diameter standard manhole, ' complete tn place, the sum of ~ U'~,d. ~,e_ In,u.,,,~L~d DOLLARS · ~,~ CENTS 20 2 EA 21 N/A ~A 22 4 EA per each. For furnishing and plactng S FT dtamter standard manhole, complete tn place, the sum of ' - DOLLARS ~ CENTS per r ach. NOT USED For furnishing and plactng 4 FT dtamter drop tnlet manhole,-- .complete tn place, the som of DOLLARS ~ ~,~ CENTS per each. ! REVXSED 00301-13 I 23 I EA For furnishing and placing 5 FT diameter drop inlet manhole,-- I complete in place, the sum of Jo~m~sa~ ~. ~Lred DOLLARS AND ~.~ CENTS I per each. 24 N/A N/A NOT USED I 25 I EA For and 5 furnishing placing FT diameter Type'S' manhole, complete in place, the sum of i 6~' ' DOLLARS AND t~' CENTS per each. I 26 I EA For furr:ishing all labor, materials and incidentals required to complete Siphon I structure per contract requirements, complete in place, the sum of I ~LLARS AND ~o CENTS per each. I Z7 15 LF For furnishing and placing 20' diameter dry bore, complete in - ' place~ the sum of I LLARS AND ' ~ CENTS per linear foot. I ~8 15 LF For furnishing and plactng 20" ~ ~ dt~eter casing ptpe, complete in place, the sum of I AND '(;;~J~(~r~l CENTS DOLLARS per ltnear foot. ! 29 6 EA For abandonment of standard sewer manhole, complete in I pl~c~e~ the sum of ~,1 cL/~z~L DOLLARS ~ ~ CENTS ~ pe~ each. 30 4 EA For abandonment of sanitary sewer clean out, complete in place, the sum of ~)ux~,~J h"Pcu DOLLARS AND 1~.~ '' ~ CENTS per eac h: 00301-14 REVISED 31 48 3Z-34 N/A 35 6998 36 7 37 38 7346 LF 39(A) ] LS II II LF For placement of 6" Class "B" [~.~o concrete embedment across I entire trench width, complete in place, the sum of ~l,~v ,:, 0OLLARS AND ~CENTS I per each. N/A NOT USED mm LF For removal and replacement ~,~ ~.~O.~ of asphaltic concrete *~e Description pavument~fcumplete tn place, SecttonPage 00100-1113.2.1~.  DOLLARS CENTS SY For removal and replacement of 6" reinforced concrete Rip-Rap, complete tn place, the sum of per square yard. LS For furnishing and plactng q.~f).,e ~ landscaping, cmaplete tn place, t~he sum of ' ' ~Ao · DOLLARS ~CENTS per lump sum. For Trench Excavation Safety and Support, complete in place, the sum of ~ IX)LIARS AND y~ CENTS per ltnear foot. For furnishing and matntatntng~:/~_~e° _~ Traffic Control stgnage, barricading, etc. during and through completion of construction, complete in of DOLLARS CENTS per lump sum. REVXSED 00301-15 I I 39(B) 1 LS For furnishing and maintaining Traffic Control signage, barricading, etc. during and through completion of construction, complete in place,.the sum qf ~u,~l DOLLARS CENTS per lump sue. *See Oescrtptton Page 00100-12, Sectton 13.2.18 I ! I I I 40 18 EA For furnishing and placing ~D. ~r+_'~:~L_~ 4" PVC sewer services, complete tn place, the sum of ~L.~ ~,,,~c~-ed DOLLARS AND/ ~ CENTS per each. 41 N/A N/A NOT USED I SECTXON III - BETHEL ROAD TOTAL BXD FOR ALL UNZT PRXCES:~X~-~e~ ~(use vords) ~ ' Bidder agrees that all ~ork described in SECTION ]1! - BETHEL ROAO be completed within ~_ calendar days. i II I II I I I II II II II II II Ii II ii ! I 00301-19 BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be t~O calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated by Bidder.) STATE OF "/-e./Y /l ,5 COUNTY OF 'Td/t-r/J-a45~-- BEFORE ME, the undersigned authority, a Notary~ ~P?lic in and for the State of To. Artt ~: , on this day personally appeared "~.~ · ti ]Ct 5: ~;~ t Sba [ { c. who after being by me - J Name duly sworn, did depose and say: - J Nam,,e Name o( Fire J foregoing on ~half of ~e said am a duly authorized office/agent for and have been duly authorized to execute the Name of Fi~m I hereby certify that the foregoing bid has not been prepared in collusion wi.th any other Bidder or individual(s) engaged in the same line oc business prior to the official opening of this bid. Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/commodities bid on, or4o influence any individl3al(s) to bid or not to bid thereon." Name and Address of Bidder: F~[~'~ T'~) S ~'~"[' ~ ~ Telephone: (~7) SUBSCRIBED AND SWORN to before me by the above named on this the ~ _J~ day of ~.--~ /4 ,~ '~- Notary Public in and for the State of "[-P~_. d~5'~- 199~' If BIDDER IS: An Individual By 00301-20 I I ! (Seal) ! doing business as (Individual's Name) Business address Phone No. A Partnership. By (Seal) (Firm Name) (General Partner) Business address Phone No. A Corporation By (Corporation Name) (S_.mte of Incorporation) ~~ ame of person authorized to signed (Corporate Seal) Attest Business address A Joint Venture By (Title) ~'s;cre-ry) i-- - (Name) (Address) By (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a partner to the joint venture should be in the manner indicated above.) ~ OF SECTION 95H08 SECTION 00301 BID FORM REVISED 00301-1 PROJECT IDENTIFICATION:Sanitary Sewer Imerovements for Grapevine III, )V and Bethel Road. CONTR~ACT IDENTIFICATION: S$ ~4-09 THIS BID IS SUBMII'rED TO: Purchasino Aqent. City of Coooell. Texas 255 Parkway Boulevard. Coooell. Texas 75019. herein after referred to as OWNER. · City of Coppell Bid No: Q-0895-~ 1. Enter Into Agreement. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. BIDDER Accepts. BIDDER accepts all of the terms and conditions of the Advertisement or Invitation to Bid and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for ninety (90) days after the day of Bid opening. BIDDER will sign and deliver the required numberof counterparts of the Agreement with the Bonds'.and other documents required by the Bidding Requirements within fifteen (15) days after the date of OWNER's Notice of Award. The OWNER considers the work described by the Contract Documents three separate and distinct projects. Bidder hereby agrees to accept an award of contract based on any individual section. 3. BIDDER's Representations. In submitting this Bid, BIDDER represents, as more fully set forth in the Agreement, that: BIDDER has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged: (List Addenda by Number and Date) ADDENDA NO. DATE 00301-2 REVISED bo BIDDER has visited the site and become familiar with and is satisfied as to the general, local and site conditions that may affect cost, progress, performance and furnishing of the Work. BIDDER i~ familiar with and is satisfied as to all federal, state and local Laws and Regulations that may affect cost, progress, performance and furnishing of the Work. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studies and data concerning conditions (surface, subsurface and Underground Facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price and other terms and conditions of the Contract Documents. BIDDER has correlated the information known to BIDDER, information and observations obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies and data with the Contract Documents. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. Where conflicts, errors, ambiguities or discrepancies have been discovered in or between Contract Documents and/or other related documents, and where said conflicts, etc., have not been resolved through the interpretations or clarifications by ENGINEER as described in the Instructions to Bidders, because of insufficient time or otherwise, BIDDER has included in the Bid the greater quantity or better quality of Work, or compliance with the more stringent requirement resulting in a greater cost. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization or corporation; BIDDER has not directly or indirectly induced or solicited REVISED 00301-3 any other BIDDER to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other BIDDER or over OWNER. 4. Bid Prices. BIDDER will-complete the Work in accordance with the Contract Documents for the following price(s): All specific cash allowances are included in the price(s) set forth above and have been computed in accordance with paragraph 11.8. of the General Conditions. UNIT PRICE BID FOR CITY OF COPPELL SEWER IMPROVEMENTS SECTION I - GILAPEVINE III ITEM ESTIMATED DESCRIPTION AND NO. QUANTITY UNIT PRICE IN WORDS UNIT TOTAL PRICE ANOUNT 1-4 5 N/A N/A NOT USED 166 LF For furnishing and placing ~,, 7~ 8' PVC sewer (15'-20' depth), cqmplete in place, the sum of T~L~T~$~m.~q DOLLARS AND ~;~.U~'~T~ ~ CENTS per linearfoot. 6-13 N/A N/A 14 200 LF 15 2570 LF NOT USED For furnishing and placing 15" J~.i~ SDR-35 PVC sewer (0'-10' depth), complete in place, the sum of ~"(.,ue~ ~,.~ DOLLARS AND ~egq ~tue CENTS per linear foot. For furnishing and placing 15' SDR-35 PVC sewer (10'-15' depth), complete in place, t~ sum o¢~ DOLLARS AND ~ CENTS per linear foot. 00301-4 REVISED 16 1094 LF 17 230 LF 18 N/A lg $ 20 8 21 1 22 23 For furnishing and placing 15" SDR-35 PVC sewer depth), complete in place, t~e sumlt~ tO~Ttl DOLLARS AND ~Iq~qL(T', CENTS per linear'fo~. For furnishing and placing 15" SDR-35 PVC sewer (20'-25' depth), complete in place, the sum of ~h~?~ ~F~ DOLLARS AND ~o~l~'~k CENTS per linear foot. N/A NOT USED EA For furnishing and placing 4 FT diameter standard manhole, complete in place, the sum of TU~ 1)~4~ C)~G ~eA ~q~, ~4qh~ DOLLARS ~O T~ ~ CENTS per each. EA For furnishing and placing $ FT diameter standard manhole, ~lete in placer the sum of ~R~l~i(xarl~ f~4~ DOLLARS AND ~TY' CENTS per each. EA For furnishing and placing 6 FT diameter standard manhole, comDlet.,e in place, the sum of u~' l'~S,~J'ilJt~ ~.,rl~ ~, ~'~,.~ DOLLARS AND ~ CENTS per each. N/A N/A NOT USED EA For furnishing and placing 5 ~'~j~ FT diameter drop inlet manhole,' , compl%te in place, the sum of pL~I'~'~SMp,~.~,,,~AJk,~I~q~iY,~,,~.~ DOLLARS AND FL[~e~R CENTS per each. 24-26 N/A N/A NOT USED REVISED 00301-5 27 28 * 30-31 32~lac 33r~ 35-36 718 718 9 N/A 12 188 835 N/A LF LF For furnishing and placing 20" diameter dry bore, complete in place, the sum of C~ ~ G~b~t~ DOLLARS' ANDS~ ~l CENTS per linear foot. For furnishing and placing 20' diameter casing pipe, complete in place, the sum of ~bO~lqLuo ~ DOLLARS AND Kt~h ~dl~ CENTS per linear foot. For abandonment of standard sewer manhole, complete in ~pl~ce, the spm of t~,/~c~.q~iLc~l~a~A DOLLARS AND l~,~, CENTS per each. N/A NOT USED SY SY · LF N/A For removal and replacement of 8" reinforced concrete pavement, complete in place, the sum of ~v~1 ~ull~r' DOLLARS AND ~qcl~*o,'tg CENTS per square'yard. For removal and replacement of reinforced concrete· driveway, complete in place, the sum of ~Tt~ qt06 DOLLARS ANO~ 'A~ · CENTS per square yard. For removal and replacement of reinforced concrete 4 FT wide si,dewalk, i complete in place, 'the sum of -TbOeld~ DOLLARS AND ~ta l~ O~e CENTS per linear fbot. NOT USED 00301-6 REVISED 37 1 LS For furnishing and placing /~J?4.e~ 11,~7~,~ landscaping, complete in · __ place,, the sum of ~J~4a~ll~oq~ld 74)o~l~ua4~S~ DOLLARS AND ~l~r ~t~ ' CENTS per lump'sum. 38 3555 LF For Trench Excavation Safety and Support, complete in place, the sum of SL~ DOLLARS ANO q%b~t~4~ ~ ~ CENTS per linear'foot.' 3g(A) 1 LS For furnishing and maintaining ~I~.~$ ~V~.~f~ Traffic Control signage, barricading, etc. during and through completion of construction, comp]ete in · nlace, the sum of Ta~e 177~(al~&~ltt(el~ &~ DOLLARS AND ~ ~q/~qt~ CENTS per lump s~m. 4O 8 EA For furnishing and placing 4' PVC sewer services, ~l~cqmplete iR place, the sum of ' DOLLARS AND ~)~U~X~l~ea~.. CENTS per each.' 41 102 LF For furnishing and placing /q6t~.~ J~?7~.~o g4' ASTH F-497 PVC sewer (25'-30' depth), complete )n place~ the sum of ~R~klbj~ ~-. DOLLARS ~D ~u~ ' CENTS pet each. I SECTION I - GRAPEVINE III ~ ~ . TO~AL BID FOR ALL UNIT PRICES: ~O~b~ (u e words) -- ' (use figures) Bidder agrees that all work described in SECTION I - GRAPEVINE III will be completed within 1gO calendar days. Note: The City has set the time for this section at 120 calendar days. Should the Contractor be the successful low bidder on Section I and Section II and/or Section III, the Contractor shall be required to complete Section I within the first 1~0 calendar days of the total time allotted for completion of the work. REVISED 00301-7 SECTION II - GP~APEVINE IV ITEM ESTIMATED DESCRIPTION AND NO. QUANTITY UNIT PRICE IN WORDS UNIT TOTAL PRICE AMOUNT I 215 LF 2 215 LF 3 N/A N/A For furnishing and placing 6" Cl. 50 Ductile Iron Pipe, complete in place, the sum of ~LUG~tqII'F DOLLARS AND ' ~e.~,~--'~, CENTS per linear foot. For furnishing and p)acing 8" Cl. 50 Ductile Iron Pipe, ~plete in place, the sum of t~'hllr'~,o DOLLARS AND F~g~ %~L~ CENTS per lifiear'foot. 5>.v7 ¢,9er. oS 4 13 LF For furnishing and placing 8" SDR-35, PVC sewer (10'-15' depth), complete in place, ~the sum of ~A~ia~.~I~.OR~ OOLLARS AND F~I~ a~n~ CENTS per ltnea¢ foot. 5-9 10 11 N/A 557 1565 N/A LF LF NOT USED For furnishing and placing 12" SDR-35, PVC sewer (0'-10' depth), complete in place, the sum~f ~(4,aM~ ~,F-,' , DOLLARS AND ~Fl~l ~ ~r4L CENTS per lineaV foot. For furnishing and placing $/.~ 1Z' SOR-35, PVC sewer (10~-15' depth), complete in place, ~sum of ~.ltl ~ DOLLARS ANO~:t~qa ~uo CENTS per linear foot. 00301-8 REVISED 12 58O LF 13-18 19 20-23 24 25 26 27 For furnishing and placing 12' SDR-35, PVC sewer (15'-20' depth), complete in place, th~sum of ~¢itl DOLLARS AND ~/~q~q CENTS per linelr root. N/A N/A NOT USED 8 EA For furnishing and placing 4 FT diameter standard manhole, _c~mnlete in place, the sum of ~lO0 ~/4~blJ ~,~~/~.J~ n IA~'Jt~ ~ DOLLARS AND '01~ ' CENTS per each. N/A N/A NOT USED 3 EA For furnishing and placing 4 FT diameter Type'S' manhole, , ¢ojapl~te in place, the sum of ANO ~e~r~I Fb~4~ CENTS per each. I EA For furnishing and .placing 5 FT diameter. Type "S' manhole, __ ~ompl~te in place, the sum of ~ ll. bqs~d-~ ~J/l~l~w~ ~,~ DOLLARS AND S~Ttl '11~i~(~ CENTS per each.' I EA For furnishing all labor, materials and incidentals required to complete Siphon structure per contract. requirements, complete in .~ _ pla~e, the sum of . ~O ~ CENTS per each. ' 316 LF For furnishing and placing 20" diameter dry bore, complete in .~place, t~e su~of 6~:~1~,~/:~ fL.~.l~ DOLLARS AND ~tq ~'~ CENTS per linear ~oot. REVISED 00301-9 28 316 LF 29 6 For furnishing and placing 20' diameter casing pipe, complete in place, the sum of ~Ld~'V)lt~ ~cU~ DOLLARS AND q(F~1 ~ CENTS per linear foot. EA For abandonment of standard sewer manhole, complete in Rlace, the sum of ~-~b~5~q~h~a: DOLLARS ANO ~ lq~h~a'~ CENTS per each. 30-31 N/A N/A 32 832 LF 33-35 36 37 NOT USED For removal and replacement of 8' reinforced concrete pavement, complete in place, the sum of Fl. Pm4 ~&K . , DOLLARS ANO ~Ft~l~l THi~ CENTS per square yard. N/A N/A NOT USED 9 SY For removal and replacement of 6" reinforced concrete Rip-Rap, complete in place, ANDS~b~q-A1 CENTS per square yard. 1 LS For furnishing and placing landscaping, complete in plaRe, the su~ of ~ AN & per ~ 38 2601 LF For Trench Excavation Safety and Support, complete in place, the sum of ~A DOLLARS AND ~F~ ~ CENTS per linear' foot. /LYf 00301-10 REVISED 39(A) I LS For furnishing and maintainingJjgY~,/~ Traffic Control signage, barricading, etc. during and through completion of construction, complete in , pla~e, the Sum of ~c~O~S,tn~6l~h~l'l~n~,~J~l~'~ DOLLARS AND ~T~q~ CENTS per lump sum. 40 8 EA For furnishing and placing /,/~I.~7 4' PVC sewer services, coqpleteln place, ~he sum of (~F/l~ 7~F~ ~)(g ~b((d~lc( ~DOLLARS AND~ CENTS per 41 N/A N/A NOT USED SECTION II- GRAPEVINE IV ~ ~6~4/~ TOTAL BID FOR ALL UNIT PRICES: · (~ ~~) (use words) (useJ figures) Bidder agrees that all work described in SECTION ZZ - GRAPEVINE IV will be completed within/~:) calendar days. REVISED 00301-11 SECTION III - BETHEL ROAD ITEM ESTIMATED NO. QUANTITY UNIT DESCRIPTION AND PRICE IN WORDS 1 110 LF 2 110 LF For furnishing and placing 6" Cl. 50 Ductile Iron Pipe, ~tlete in place, the sum of P~ff~. DOLLARS AND T~.~ CENTS per linear foot. For furnishing and placing 8' Cl. SO'Ductile Iron Pipe, comolete, in place, the sum of DOLIJ~RS AND ~R~l~vt~ CENTS per linear ?Dot. 3 13 LF 4 5 LF For furnishing and placing 8' SDR-35, PVC sewer (0'-10' depth), complete in place, the sum of ~o~it~ ~ L ~' OOLLARS AND ~t~Jh'l,I CENTS per linear foot. For furnishing and placing 8' SDR-35, PVC sewer (10'-15' depth), complete in,place, AND '~[4RF~ CENTS per lindar Toot. 5-6 N/A N/A 7 2314 LF 8 1648 LF NOT USED For furnishing 'and placing 10" SDR-35, PVC se~r (0'-10' depth), complete in place, th~sum of '((~l~l/)l~l ~ DOLLARS AND~04 ~c~ CENTS per lidear~foot. For furnishing, and piacing 10" SOR-35, PVC sewer (10'-15' depth), complete in place, the sum of ~F'b(/~lh ~t~, DOLLARS AND ~t~l~ ~L~4~ CENTS per linear 'foot. UNIT TOTAL PRICE AHOUNT 00301-12 REVISED 9 15 LF 10 892 LF 11 2477 LF 12-18 N/A 19 13 2O 21 22 For furnishing and placing 12" SOR-26, PVC sewer (0'-5' depth), complete in place, the sum of ~q.~-~ CENTS per linear' foot. For furnishing and placing 12' SDR-35, PVC sewer (5'-10' depth), complete in place, the sum of 13J,/~ *"~ DOLLARS AND 'Fq~ CENTS per lfnear foot. For furnishing and placing 12' SDR-3S, PVC sewer (10'-15' depth), complete in place, ~o~ DOLLARS AND ~t2~ ~ CENTS per linea~ foot. N/A NOT USED EA For furnishing and placing 4 FT diameter standard manhole, . compltte in place-~(~khe sum of per eacn. ' 2 EA For furnishing and placing 5 FT diameter standard manhole, comple&e in place, &he sum of AND ~ $~ CENTS per each. ' N/A N/A NOT USED 4 EA For furnishing and placing 4 ,3;~¢.~ FT diameter drop inlet manhole, · comple[e in plact, the sum of per each.~ c/ / I . leo REVISED 00301-13 23 I EA For furnishing and placing $ ~i~.~ FT diameter drop inlet manhole, ~ . co~letain ~lace, the.~tum of ~O' ~ ~ CENTS per eachL' 24 N/A N/A NOT USED 25 1 EA For furnishing and placing 5 FT diameter Type'S' manhole, ~ F7yo..t' ,rcom~ete to place, the sum of per each.' 26 I EA For furnishing all.labor, materials and incidentals required to complete Siphon structure per contract requirements, complete in p)acq, the sum of ~ ~l~ l~ ~-a~~' ~F~ ~f~'. CENTsOOLLARS 27 15 28 15 per e LF For furnishing and placing diameter dry bore, complete in place, the sum of --'AND ~(i~La:~ .CENTS per linear foot. LF For furnishing and placing dieter casing pipe, complete in place, the sum of ~ ~ . ~LLARS ~O ~l~ F~e CENTS per 11nea~ foot. 29 6 EA For abandonment of standard sewer manhole, complete in place, the sum of ~x~.~k,~,,.xdn~ G~ DOLLARS AND d~ S~ CENTS per aach.~ 30 4 EA For abandonment .Qfsanttary sewer clean out, complete in place, the sum of ~l_.~ ~.AJ~el) ~r~ DOLLARS AND ~-r~. 61~ CENTS per each. 0030~-14 REVISED 31 48 32-34 N/A 35 6998 LF 36 7 SY 37 38 N/A LF For placement of 6" Class concrete embedment across entire trench width, complete ~place, the sum of /~l~)'/ DOLLARS AND ~ CENTS per NOT USED For removal and replacement of asphaltic concrete pavement, complete in place, L lum of ty~ DOLLARS AND ~IJE'/~ ///H~ CENTS per Tin6aV foot. For removal and replacement of 6' reinforced concrete Rip-Rap, complete in place, the.~um Qf~ ,~'-I~/.'/f'b /'at4~F-~. DOLLARS ANO-~~_c~CENTS per square yara. 1 LS For furnishing and placing landscaping, complete in p)ace, t~he )um of ~u j>/y~.~ CENTS per lump sum. 7346 LF For Trench Excavation Safety and Support, complete (n place, the sum o~ ' ~ ~.~ ,~ DOLLARS AND ~! F-~ hu ~ CENTS per linear foot. 39(A) 1 LS For furnishing and maintaining Traffic Control signage, barricading, etc. during and through completion of construction, complete in place, the~sum of AND Fo~iq~ ne per lump ~um. DOLLARS CENTS scription Page 00100-11 Section 13.2.1--*,- REVISED 00301-15 3g(B) 1 LS For furnishing and maintaining ~Y~.~G ~, ~?~.~ Traffic Control signage, barricading, etc. during and through completion of construction, complete in _/ nlace, the sum of DOLLARS AND ~,~Tt~ ~ CENTS per lump sue. *See Description Page 00100-1~, Section 13.2.18 40 18 EA For furnishing and placing 4' PVC sewer services, cpmplete in place, the sum of ~4~ ~n~')td~ DOLLARS AND F~FI~'Tc~O CENTS per each. 41 N/A N/A NOT USED SECTION III - BETHEL ROAO TOTAL BIO FOR ALL UNIT PRICES: ~L~I~ ~19~i) ~Jl~, ~' ~ (use words) (use ~igures) Bidder agrees that all work described in SECTION III - BETHEL ROAO will be completed within/J~__ calendar days. mi II 00301-16 REVISED Unit Prices have been computed in accordance with paragraph 11.9.2. of the General Conditions. BIDDER acknowledges that quantities are not guaranteed and final payment Will .be based on actual quantities determined as provided in the Contract Documents. 5. Completion. BIDDER agrees that the Work will be substantially completed and ready for final payment in accordance with paragraph 14.13. of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. 6. Attached Documents. The following documents are attached to and made a condition of this Bid: a. Required Bid Security'in the form of 8. Other Requirements. Address for Communications. Communications concerning this Bid shall be addressed to Purchasing Office 255 Parkway Boulevard Coppell, Texas 75019 BIDDER agrees that all Work awarded will be completed within the Calendar Days listed for each section. Contract time will commence to run as provided in the Contract Documents. c. Communications concerning this Bid shall be to the address of BIODER indicated on the applicable signature page. BIDDER understands that the Owner is exempt from State Limited Sales and Use Tax on tangible personal property to be incorporated into the project. Said taxes are not included in Contract Price (See Instructions to Bidders). The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Oocuments have the meanings assigned to them in the General Conditions. f. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in REVISED 00301-17 the General Conditions or Instructions. The City of Coppell reserves the right to delete any portion of this project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. SUB.~TTED o. /'~,~ ;~I¢ , ~g~-~. 00301-18 PREVAILING WAGE RATE FOR PUBLIC WORKS PROJECTS: The City shall ascertain the general prevailing rate of wages for each craft of type of workman, or mechanic needed to execute this contract and shall specify in the call for bids of this contract what the general prevailing rate of wage§ is sin the City of Coppell. The City shall also specify the prevailing rate for legal holiday and overtime work. The contractor must pay the said specified rate to all laborers, workmen, and mechanics employed by him or any subcontractor under him in the execution of this contract. The City of Coppell resolution regarding prevailing wages follows this section. PENALTY FOR VIOLATION: The contractor or subcontractor in violation of these rules is liable to the City for a penalty of Sixty Dollars ($60.00) for each laborer, workman, or mechanic employed for each calendar day or portion thereof, that such laborer, workman, or mechanic is paid less than the stipulated rates for any work done under this contract. The money collected shall be used to offset the costs of administering these requirements. If the City receives a complaint by a laborer, workman, or mechanic it shall determine within thirty (30) days after receipt whether good cause exists to believe that the contractor or any subcontractor has committed a violation of these specifications. The City shall provide written notice of its determination to the contractor or subcontractor andy any affected laborer, workman, or mechanic, the City shall retain any amounts due under the contract pending a Final determination. If the contractor or subcontractor and any affected laborer, worlcman, or mechanic fail to resolve the alleged violation by agreement within fourteen (14) days of the determination by the City, the issues of the alleged violation, any penalties owed to the public body, and any amounts owed to any affected laborer, workman, or mechanic shall be submitted to binding arbitration in accordance with the provisions of the Texas General Arbitration Act. If the parties fail to agree upon an arbitrator within ten (10) days, the arbitrator shall be designated by the District Court upon petition of any party. The decision and award of the arbitrator is final and binding upon all parties and may be enforced in any court of competent jurisdiction. The City shall not be a party in the arbitration. ARBITRATION: The arbitrator shall assess and award all reasonable costs, including the arbitrator's fee, against the party or parties who fail to prevail in the proceeding. Costs may be assessed against the laborer, workman, or mechanic only if the arbitrator finds that the claim was frivolous. If the arbitrator does not find that the claim is frivolous and does not make an award to the laborer, workman, or mechanic, costs will be shared equally by the parties. If the arbitrator determines that a violation of the specification has occurred, the arbitrator shall assess and award penalties as provided in the Act and all amounts awed to the affected laborer, workman, or mechanic against the contractor or subcontractor. The City shall use any amounts retained under this provision to reimburse the laborer, workman, or mechanic for the amount owed to that person because of the failure to pay the person the general prevailing rate of wages as provided in the arbitrator's award. If the amounts withheld by the City are insufficient to fully reimburse the laborer, workman, or mechanic for amounts owed, the person has a right of action against the contractor or subcontractor and the surety of that person to recover any amounts owed. ? ;~IDDE~R IS: Individual 00301-19 (Seal) (Individual's Name) t doing business as Business address A Partnership PhoneNo. (Seal) By (Firm Name) (General Partner) Business address Phone No. I ! I I ! ! A Corporation (Corporauon Name) ,,, (State of Incorporatio,,n) , By ~.,I. A cd a~ ~ 1/61,_~ t~n !lq (Najn~: of person authorized- (Title) (Corporate Seal) Attest (Secretary) Business address 7¢0 b~_A~tCc~.S,C;e~b{ A Joint Venture By By (Name) (Address) II Il ! (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a partner to the joint venture should be in the manner indicated above.) END OF SECTION - ~?/12/95 09:06 CITY OF CDPPELL ~ 817 483 0899 H0.274 REVISED 00301-1 $$CGl1 S£CTION 0030] BID FORR PRCL1ECT IDENTIFICATION: anlt er e t a · IV R CONTRACT IDENTIFICATION: S$ g4-O? THIS BID IS SUBHITTED TO: Purchastno Aeent..Ctty of CooDe11. Texas 2SS Parkway Boulevard. Co~°011. Texa~ 75019. herein after referred to as OWNER. City of Coppe11 Bid No: _ ..~ ~U--~"~ - 1. Enter trite Ageeluent. The undersigned B[DDER proposes and agrees, if thts Bid is accepted, to enter into an Agreaaent wtth OWNER in the fane included in the Contract Oocuaents to perfom and furnish all Work as specified or indicated in the Contract Documents for the Btd Price and within the Bid Ttmes indicated tn this Bid and in accordance with the other rems and conditions of the Contract Oocu~ents. BIDDER Accepts. BIDDER accepts all of the topes and conditions of the Advertlselaent or Invitation to Bid and Instructions to Btdders, including without limitation those dealing with the disposition of Bid security. Th~s Bid ~tll remain ~b~ect to acceptance for ninety (90) days after the d~y of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Agra?ant ~h the Bonds ~nd ~ther documents required by the Bidding Requirements ~tth~n f~fteen (lS) days ~fter the date of OWNER's Notice of A~ard. B~DOER's Representations. In submttJng tht$ Bid, BIDDER represents, forth in the Agree~nt~ that: as ~ore fully set BIDOER baa examined and carefully studied the Bidding Oocuments mhd the following Addenda receipt of ell ~hich hereby acknowledged: (List Addenda by Number and Oate) - 07/12/95 09:06 CITY OF ~ELL * 817 483 0~ ~,274 D06 00501-2 REVISEO BIODER has vSslted the site ind becolae familiar with end is satisfied es to the general, local and site conditions that may e~fect cost, progress, performance and furnlshtng of the Work. BIDDER is famtltar with and is satisfied as to all federal, ktate and local Laws and Regulations that may affect cost, progress, perfo~nce and furnishing of the Work. BIDDER has obtatnad and carefully studied (or assumes responsibility for having done so) all such additional or supplementary examinations, investigations, explorations, tests, studtes and dsta concerning conditions (surface, subsurface ~nd Underground Facilities) at or contiguous to the site or otherwise ~htch may affect cost progress, performance or furnishing of tho Work or which relate to any aspect of the means, methods, techniques, Sequences and procedures of construction to be.employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any addtttonsl examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance end furnishing of the Work in accordance with the times, price and other te~ms and conditions of the Contract Documents. BIDDER has correlated the information )mown to BIODER, information and observations obtained from vlslts to the site, reports and drawings identified in the Contract Oocuments and all additional examinations, tnvestigetlons, explorations, tests, studies and dais with the Contract Oecuments. BIDDER has given ENGINEER w~ttten notice of all conflicts, errors, ambiguities or discrepancies in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate &nd convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted. Where conFIi'cts, errors, ambiguities or discrepancies have been discovered in or between Contract Documents and/or other related documents, and where said conflicts, otc., have not been resolved through the interpretations or clarifications by ENGINEER as described in the Instructions to Bidders, because of insufficient time or otherwise, BIDDER has included in the Bid the grea~er quantity or better quality of Work, or compliance w~th the more stringent requirement resulting in a greater cost. 87×12x95 09:0? CITY OF COPPELL ~ 817 483 8899 N0.274 ~ REVISED 0o301.3 This Bid ts glnutno end not lade tn the interest of or on behalf of eny undisclosed person, firm or corporettofl and is not submitted tn conformity with any agreement or MUles of anY 9roup, association, organization o~ corpoP,tion; BIDDER nas not directly or indirectly induced or solicited any other BIDOER to subltt a fa]se or sham Btd; BIDDER has Dot solicited or induced soy person, firm or corporation to refrain from biddtng; and BIDDER hes not sought by collusion to obtain for itself any advantega over any other BIDDER or over OWNER. 4, Bid Prices, will cor~lste the Work in accordance with the Contract Docmaents for the following price(s): All specific cash allowances mre included in the price(s) set forth above and have bmmn computed in accordmnce with paragraph 11,B. of the General Conditions, UNIT PRICE BID FOR CITY OF COPPELL SEWER IMPROVENENTS SECTION ! - GRAPEVINE III ITEl( ESTIMATED No. qUAt4TITY DESCRXPTION AND UNIT PRICE IN MOROS UNIT TOTAL PRICE A~UNI N/A N/A NOT USED 166 LF For furnishing and placing J~/,~ 8' PVC sewer (15'-~0' depth), complete in place, the sum of ~ev~ ~EHTS pe~ 11nea~ fHt. 6-13 N/A 1~ ~OO LF * NOT USED For furnishing and plmclng 15" ~ Si)R-aS PVC sewe~ (0'~10' depth), complete in place, the sum of AND~CENTS per 07/12/95 09:07 CITY OF COPRELL * Bi7 483 0899 N0.274 D08 00301-4 REYZSED 15 ;570 LF For furnishing and placing IS' SDR-3S PVC se~.r depth), complete iff place, the sum of , ~ ~,~ DOLLARS per II~e~r rO0~, 16 1094 LF For furnishing and placing IS' SDR-35 PVC se~er (15'-20' depth), complete in place, the sum of . mD ~,~1~-'~ ~ CENTS per ltne&r fdot, l? Z30 LF For furnishing and placing ~,, 15' SDR-35 PVC swer depth), complete in place, the sum of A~D~CENTS pe~ 18 N/A ./A NOT USED 19 5 EA For furnishSng and placing 4 FT dtameter standard manhole, co~ete ~n place, thu sum of ~~ ~ : ~ - ' DOLLARS ~CE~S 20 8 EA For furnishing and placing 5 FT diameter standard manholes _ complete i~ place, the sum of 7'~i~t.~,-'f~. h~4r¢o( ~ ,~x~/~:~... DOLLARS ~~CENTS pep elcO. ~ 21 1 EA For furnishing and plactng 6 . FT dt~net~r standard manhole, · complete ~n pltce, the sum of -- ~D , ~;~ ' CENTS pep each. ZI N/A N/A NOT USEO 09:08 CITY OF CORPELL * 817 483 ~899 NO. 274 D09 REVISED ~7 29 30-31 33 34 ! EA For furnishing and p]actng 5 Fl diameter drop inlet manhole, . complete ill p.lmce, the sum of AHD ~]~ ~ CEOS N/A ~A ~T ~ED 718 LF For furntshtngand placing 20" dta~eter dry bore, complete in place, the.s.ue of 0 ~ ~d,+~-~o DOLLA~ ~D ~CENTS per ilaear T~C. ' 718 LF F~r furnishing and placing ~0" ~ )L.Iqo.iO diameter casing pipe, complete in place, the sum of -[l~b~---~uo DOLLARS AND ~-~-~(~ CENTS per llne~r EA For abandonment of standard sewer manhole, complete in place, ~he sum of ScVta~J~b~v~(~ s; ~+z~-~t~rce-OOLLARS RNO ..~F~Ke~CENTS per each. ~ N/A 12 835 N/A SY SY LF NOT USED For removal and replacement of 8" reinforced concrete pavement, complete tn place, the sum of ~t~/~.~qCuao OOLLAR$ D~CENT$ per square y~re. For r~oval and replaceMnt of reinforced concrete driveway, complete in place, thq su~ of /(J: ~Lf~ ~Co~ p DOLLARS I~D~CENTS per square yaro, , For removal and replacement of ratnforced concreta 4 FT wide sidewalk, complete in place, the sum of ~ ~--~e e~ DOLLARS AND ~'~6~-~F¢~-~ CENTS per linear 07/12/95 09:~ CiTY OF' COPRELL -~ ~? 483 0B99 N0.274 00301-6 REVISED 36-36 H/A N/A NOT USED 37 ] LS For furaishing and placing landscaping, complete tn · place, the sum of 38 3656 LF For Trench Excavation Safety ~.1/. ~:g31.6f and Support, complete in placa,~the sqmof - .~caX~i~i.i-~OOLLARS ~CEN~ per linear TOOt. 39 ! LS For furnishing end maintaining Traffic ~ontrol stgnage, barricading, etc. during and through completion of construction, complete in place, the sum of per~cENTS 40 8 EA For furnishing a~d placing ~G~.qq ~ 4' PVC sewer services, complete ~n plscn~ the sum of RND~CENTS Der e~c~, - 41 102 LF For furnishing and placing /~.~? S4" ASTI4 F-497 RVC se~er (25'40' depth)t co~lete tn phce_,.the sum of per eacB~ · SECTION I - GRAPEVINE III ,,j.~ TOTAL BID FOR ALL UNIT PRICES:-~/~I~r~y~J.~/ U[,--~,~ -/~ar'c~L~,7 ~use ~s) ' ' ~T?12xS5 09:08 CITY OF COPPELL ~ 817 483 0899 I40.274 Dll REVISED 00301-7 SECTION II - GRAPEVINE ITE# ESTIMATED NO. QUANTITY UNIT 1 Zl$ LF Z Z15 LF IV DESCRIPTION AND PRICE IN MOROS For furntlhlng and placing 6" C1. 50 Oucttle Iron Ptpe,_ copplete tn place, the sma of 'lqqi ~-~. ~ ~ ,DOLL.S ~ ~C~ pm~ I1fliir TOO~, For furnishing and placing 8" Cl. $0 Ductile I~on P~pe, complete In place, the sum of "i~[~.~-~ i~c-. DOLLARS ARo~CENTS per ii~eir Too~, UNIT TOTAL PRICE NqOUNT 3 N/A N/A 4 13 CF For furnishing and placing SDR-3$, PVC seNer (10'-15' depth), complete tn p]ace, the sue_ of AND ~CENTS per 5-g N/A 10 557 11 1565 N/A NOT USED LF For furnishing and plactng 1~" $DR-3S, PVC sewer (0'-10' depth), complete tn place, the sum of ~+?~_¢,¢~ CENTS per 11near ~oot. LF For furnishing and placing 1~' SOR-35, PVC se~er depth), complete in place, the sum of "~i r-~,_~b(a~ DOLLARS ~ g~x~' ~ENTS ~er 1~lir f~, 07/12/95 09:08 CITY 0~ COPPE]_L ~ 817 483 0B99 N0.294 00301-8 REVISED lZ 13-18 19 LF For furnishing and placing 12" SDR-3$, PVC sewer depth), ceepIete tn place, the sum of "grh ~-~,, - ~. IXILLNis AND ' ~L~ CENTS per linear' foot. N/A N/A NOT USED 8 EA For furnishing and plactng 4 FT diameter standard manhole, c. omplete In ~ace, the su~ of per each. 20-z3 #/~ WA ~4 3 EA 27 NOT USED complete in ~lace, the sum of AND -r ~ ' CENTS per each. For furnishing and plscing $ FT dla~eter Type'S" mnhele, complete In plece, the sum of per each. · For fu~Jshtng all labor, materials and Incidentals re~d to c~plete Siphon structu~ per contract eequtr~nts, co~ete In place, the s~ of ~O'%~~ee CENTS per each. ' For furnishing and placing FT dia~tar Type'S' manhole~ 316 LF For furnishing and plactng 20" diameter dry bore, co. leto in place, the .sum of. ~O ~ ~'~. ~ ~ C~TS per ltnea~' foot. 09:09 CITY OF COPPELL ~ 817 483 ~899 N0.274 Q13 REVISED 00301-9 28 315 LF 30-3 ! N/A 32 832 36 9 37 38 EA For famishing ami placlng 20' dia~ter castng plpe, complete tn place, the sum of A~-~o DOLLARS -:~-~_C~ ¢~- CENTS per l~ear foot. For abandonment of standard se~er manhole) complete tn place, the sum of O ~ c..~--,'t~c CENTS per ~ch. ~ N/A NOT USED LF For removal and replace;ant of 8' reinforced concrete pavement, complete in place, the sum of O)te~( .~+~o DOLLARS AND~CENT$ per N/A NOT USED SY For removml and replacement of 6" reinforced concrete Rip-Rap, complete in place, the ~um of A),~- ~u~ DOLLARS A~O ~cENTS per square y~ro. ' 2 LS For furnishing and placing landscaping, complete in place, the sum of -~,.~_,i,t(. h4,~,~,+-.~nr-.h.,-&~¥ ~LLARS per mu~ ~ LF · For Trench Excavation Safety and Support, complete in place, the sum of AND~~Lm~ per ]1near ?oot. 87/12/95 89:89 CITY OF COPPELL ~ 817 48~ 8899 N0.274 D14 00301~10 REVISED 3g ! LS For furnishing and ~atntatntng ~_~/_~ Traffic Co.tro! stgnage, ~ ber~tcad~ng, etc. during through cgkpletton of coflst~uct~on) c~mplete place, the sum o~ ~r~-~-~l(C ~.~ ~ DOLLARS AND '5~ ~-I-~ ~,~l~ CENTS per lU~ ~. 41 N/A WA NOT USED SECTION 1[ -GRAPEV]NE ]V TOTAL BED FOR ALL UNIT PRZCE$:..-T~4~eC (use ~or~s) I ~ ~ ~. (use SECTZON ~Z! - BETHEL ROAD ITEJq ESTU~ATED DESCRZPTZON AND UNZT TOTAL NO. qUANTZTY UNZT PRZCE ZN WORDS PRICE AJqOUNT 110 LF For furnishing and pllclng 6' C1. 50 Ductile [~on P~pe, e~_~ete ~n place, the sum of i r~?~ - ~ i ~ , DOLLARS ANO~CENTS per 11flear foOt. Z 110 LF For furnishing and placing ' 8' C1. 50 Ducttle Z~on Hpe, complete in place) Lht sum of AND -~r~-~F~(_ CENTS par 1 tne~oot. 3 13 LF For furnishing and placing $" $DR-35,' PVC sewer depth), complete in place, the su~ of 07/12/95 09:09 CITY OF COPPELL * 817 483 E~99 N0.274 D15 REVISED 00301-1! ~ $ LF s-6 N/A N/A 7 Z314 LF 8 ~648 LF g 15 LF 892 LF 11 Z¢77 LF For furnishing end plactng 8" $OR-3S, PVC sewer (10'-15' depth), coffq:~lete in place, the sum of FIOT USED For furnishing and plectng 10' SOR-35, PVC se~et (o'-lO' depth), complete tn place, the sum of J _ '¢~CENTS AND~ pe~ For furnishing and plactng 10" $DR-35, PVC sewer (10'-]5' depth), complete in place, the sum of .. OLLARS AND . ':~'~'4~:~,~_ CENTS per ltnear'fodt. For furnishing &nd placing lZ" SDR-~G, PVC sewer (0'-$' depth), complete ~n place, the sum of C~ELLARS NT$ For furnishing and placing IZ" SDR-3S, PVC sewer (5'-10' depth), complete tn place, the sum of Ai~DD~ ~ -'~..0o DOLLARS per I~near For furnlshJng and plactng ~ _c;~.~ ~ ~- lZ" SDR-$5, PVC sewer (lO'-lS' depth}, complete Jn pl~ce~ the sum 'l-~-~lre~ DOLLARS ~ND '"J-,'.~.f--,-~¢c.' CENTS per 11~e~r 1~-18 N/A N/A NOT USED ~/12/95 09:10 CITY OF COPPELL ~ Bi? 483 0899 N0.274 Ql$ 00301-12 REVISED 10 13 2O EA For furnishing and placing 4 FT dt~eter standard manhole, co~p~ete,~n place~ the s~ Of ~ ~'_ ~ v~. CENTS par ~ach, ~ EA Fo~ ~urntshtng and placing S FT diameter standard manhole, ?~plete tn place, the sum of AND -~'-.e...,~J CENTS per.ch. z] N/A N/A NOT USED 4 EA For furnishing and placing 4 ~ FT dta~eter drop tnlet aanhole, coaalete tn place, the sum of per each. ' J 23 I EA For furatshing and placing 5 3,b~Lr _~_~5- FT dtameter drop inlet manhole,~ complete tn place, the sum of -T~ir.~.s~xh.~.~,,-~.f-~-.i.~uo DOLLARS ~10 '-:~--~vc., CENTS per each. N/A N/A NOT USED EA For furnishing and placing S FT diameter Type "S" manhole, complete tn place, the ~ua of per 1 EA Far furnishing ~11 labor, mterials and Incidentals requtred to complete Stphon structure per contract requlreeents, complete place, the sum of RNO -~-p_~,__~-~CENTS per ~ach: ~' 07/12795 09:18 CITY Of COPPELL ~ 817 483 8899 N0.274 REVISED 0030]-13 27 28 2g 3O 31 3Z-34 36 1S 15 6 48 N/A 6998 7 LF For furnlshln9and plncing dtameter dry bore, complete placer the sum of LF For fUr~ishing and pl&clng 20' 3~.S-S-- diameter castng ptpe, complete in place, the sum of AND "~-l'lc-f~.-~-(Vc.- CENTS per 11rider Yoot. EA For abandonment of standard ~_,_,_,_,_,_,_,_~, sewer manhole, complete in E~ace, the sum of r~.~r~'VC OOLLARS ~O ~,~,]~-~,~ 'CENTS per i~ch, v For abandonment of sanitary [nl.V9 se~r clean out, complete in place, the sun of ~p b~d ~ ~ DOLLARS per mich. / LF For placement of 6" Class "B" /~.o/ concrete ambedment across entire trench width, co,plate in place, the sum of ~'~ ~-eer~-~ DOLLARS AND D~-~ CENTS per each. N/A LF SY NOT USED For remeval and replacement i~,~? I~_~__~. Of asphaltic concrete ~e Oescrtption pavement, coeplete in place, Page Sect$on 13.2.1 the su~ o~ AND . <~,~-~.~1~- CENTS per linea~ fdot,/ For r~vil end replacement of 6" reinforced concrete Rtp-Rap, complete tn place,. the s? of /~/,~-~r DOLLARS per squa~ yard, ~ 07/12/95 09:10 CITY OF COPPELL ~ Bi? 483 0899 N0.274 D18 003QI-14 R£VISED 37 LS 'For furnishing and placing landscaping, co~lete tn place, the sum of 5 i X'~ -'~ ~',~ ~' ~ ~ n DOLLARS AND J'i ~te~_ CENTS per ~mp s~. 38 7346 LF 39 1 LS For Trench Excavation Safmty and Support, complete in place, the sum of ~¢ ¢~,~,.~ DOLLAR~ AND =~-h~-t~nUL~CEgTS pmr linem~ For furnishing tnd maintaining I1: ~?~.G~-. /~ JT~.~d- Traffic Control stgnage, barricading, arc. during and through completion of construction) complete in place, the sum of per Tump'su~. ' 40 18 EA For furnishing and plactng 4" PVC sewer services, complete in place, the su~ of -~r h~ ~ ~h.+~r~OOLLARS A~D ~i;~~ CENTS per each; ' 41 N/A N/A NOT USED SECTION III - BETHEL TOTAL BID FOR ALL UNIT PRICES: (use words) - - ~ ~sm ~igures) 07/12/95 89:11 CITY OF COPPELL ~ 817 483 8899 N0.274 REVISED 00301-15 COHBIW~TION OF SECTIONS The undersigned Bidder hereby agrees to accept an award of contrect based on eny individual section. Ho~ever, if awarded t~o or more sections, the undersigned Bidder agrees to deduct from all prtces na~d in those secttons the following a~ounts: Combination of Sections I and II, deduct ~ 0.oo dollars. TOTAL BID FOR ALL UNIT PRICES (AFTER DEDUCT) ~'~J~ _ . .... · _ . '(use'wo~s) Co~tnmtton of Sacttons II and III, deduct ~.00 dollars. lOl~ BID FOR ALL UNIT PRICES {A~ER DE.C)) ~ ~.~ . (use~rd~) ' ~ ' - [use figures) Combination ~f Sections I and IXI, deduct ~ ~,0o TOTAL BIO FOR ~L UNIT PEICES [AFTER DEEUCT)~~-~et~ , . ~' (use words) Co~inmtion of Smctions I, II, ~nd III, deduct ~,oQ__ dollars. TOTAL BID FOR ~LL UNIT PRICES (AF?ER ~rcJ 4~r~$~~t~ {USe words) ~ ~. (U'Se figures) Unit Prices have been c~ut~ in accordance with 1~.9.2, of the General Conditions. BIDOER acknowledges that quantities are not guaranteed and final paymnt will be based on actual quantities determined as.provided in the Contract Documents. Completion. BIDDER agrees that the Work will be substantially completed and completed and ready for final payment in accordance with paragraph ~4,!3, of the General Conditions on or before the dates or w~th~n the number of calendar days indicated in the Agreement. ~?x12/95 09:11 CITY OF COPPELL ~ 817 483 0899 N0.274 P20 00501-16 REVISED BIDDER eccepts the provisions of the Agreement as to liquidated damages in the event of failure tn complete the Work wtthtn the times specified in the Agreement. Attached Oocuments. The following documents are attached to and made a condition of this Btd: a. Required Bid Security in the form of 8. Other Requirements. Address for Co~ntcattons. a. Communications concerning this Bid shall be addressed to Purchasing Office Z55 Parkway Boulevard Coppe11, Texas 75019 b. BIDDER agrees that ell Work awarded wtll be completed within ~SO Calendar Days. Contractor wime will commence to run as provided in the Contract Oocumants. c. C~unicattons concerning this Bid shall be to the address of BIOOER indicated on the applicable atgnature page. d. BIOOER understands that the Owner is exempt from State Limited Sales and USe Tax on tangible personal property to be incorporated into the project. Said taxes are not included in Contract Price (See Instructions to Bidders). e. The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. f. Terms used in this Bid which are defined in the General Conditions or Iflatructtons will have the meanings indicated in the General Conditions or Instructions, The City of Coppe11 reserves the right to delete may portion of thi~ project as it may deem necessary to stay within the City's available funds. Should the City elect to delete any portion, the contract quantities will be adjusted accordingly. 00301-17 PREVAILING WAGE RATE FOR PUBLIC WORKS PROJECTS: The City shall ascertain the general prevailing rate of wages for each craft of type of workman, or mechanic needed to execute this contract and shall specify in the call for bids of this contract what the general prevailing rate of wages is sin the City of Coppell. The City shall also specify the prevailing rate for legal holiday and overtime work. The contractor must pay the said specified rate to all laborers, workmen, and mechanics employed by him or any subcontractor under him in the execution of this contract. The City of Coppell resolution regarding prevailing wages follows this section. PENALTY FOR VIOLATION: The contractor or subcontractor in violation of these rules is liable to the City for a penalty of Sixty Dollars ($60.00) for each laborer, workman, or mechanic employed for each calendar day or portion thereof, that such laborer, workman, or mechanic is paid less than the stipulated rates for any work done under this contract. The money collected shall be used to offset the costs of administering these requirements. If the City receives a complaint by a laborer, workman, or mechanic it shall determine within thirty (30) days after receipt whether good cause exists to believe that the contractor or any subcontractor has committed a violation of these specifications. The City shall provide written notice of its determination to the contractor or subcontractor andy any affected laborer, workman, or mechanic, the City shall retain any mounts due under the contract pending a final determination. If the contractor or subcontractor and any affected laborer, workman, or mechanic fail to resolve the alleged violation by agreement within fourteen (14) days of the determination by the City, the issues of the alleged violation, any penalties owed to the public body, and any amounts owed to any affected laborer, workman, or mechanic shall be submitted to binding arbitration in accordance with the provisions of the Texas General Arbitration Act. If the parties fail to agree upon an arbitrator within ten (10) days, the arbitrator shall be designated by the District Court upon petition of any party. The decision and award of the arbitrator is tm,al and binding upon all parties and may be enforced in any court of competent jurisdiction. The City shall not be a party in the arbitration. ARBITRATION: The arbitrator shall assess and award all reasonable costs, including the arbitrator's fee, against the party or parties who fail to prevail in the proceeding. Costs may be assessed against the laborer, workman, or mechanic only if the arbitrator finds that the claim was frivolous. If the arbitrator does not find that the claim is frivolous and does not make an award to the laborer, workman, or mechanic, costs will be shared equally by the parties. If the arbitrator determines that a violation of the specification has occurred, the arbitrator shall assess and award penalties as provided in the Act and all amounts awed to the affected laborer, workman, or mechanic against the contractor or subcontractor. The City shall use any amounts retained under this provision to retmburse the laborer, workman, or mechanic for the amount owed to that person because of the failure to pay the person the general prevailing rate of wages as provided in the arbitrator's award. If the amounts withheld by the City are insufficient to fully reimburse the laborer, workman, or mechanic for amounts owed, the person has a right of action against the contractor or subcontractor and the surety of that person to recover any amounts owed. 00301-18 BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated by Bidder.) STATE OF '-'~Y.J~(A.~ COUNTY OF '-[-a r lr'fl~b~''- BEFORE ME. the undersigned authority, a Notary Public in and for the State of-{-~,ggt fi' . on this day personally appeared "~Lckr, Irt5 ~ ~ba_ !Iff- who after being by me '- - ] Name duly sworn, did depose and say: [3 ' JNaro~ Name of Firm foregoing on behalf of the said am a duly authorized office/agent for and have been duly authorized to execute the Name of Firm t I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same line oc business prior to the official opening of tiffs bid. Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon." Name and Address of Bidder: 9/J,.~x--~ ~(]~r0"~.gV5 (~_£/M-g4'~¢-c~"'~ Telephone:(~[*)Uc6~ Dqq~ by: Oal&S ~))iS~tl Title: V[~ ce ~f'~' G[d~ Signamr SUBSCRIBED AND SWORN to before me by the above named '~ f~aala* / on this the [ ~dr'o'' day of ~ [\/ 199~ Notary Public in and for the State of "~ I I I ! I I I I I I I I I I ! ! 00301-19 If BIDDER IS: An Individual By (Seal) doing business as (Individual's Name) Business address Phone No. A Partnership By_ (Seal) (Firm Name) (General Partner) Business address Phone No. A Corporation (Co¢oration Name) (State of Incomoration) By (Name (Title) (Co.orate Seal) (Secremu) Business add.ss ,?gO IxS, ~s~iu~ A Joint Venture By By (Name) (Address) (Name) (Address) (Each joint venture must sign, The manner of signing for each individual, partnership and corporation that is a partner to the joint venture should be in the manner indicated above.) END OF SECTION 4 4 1 4 35 1 ~r Sz ~0~' ~ ~+ ~(s~ oss~) ~---- ~ s~ ~ ................... ~o~s ~ 43q 518 I ! I If BIDDER IS: An Individual By. 00301-19 (Seal) doing business as Business address A Partnership By Business address (Individual's Name) PhoneNo. (Sea~) (Finn Name) (General Partner) Phone No. A C o._A_.~__t~.~ation (Corporate Seal) AtLest (Title) sign) By corporation (Address) (Address) The manner of signing for .each individual, partnership and venture should be in the manner indicated above.) EilD OF SEL-tlOI~ COMBINATION OF SECTIONS 00301-15 The undersigned Bidder hereby agrees to accept an award of contract based on any individual section. However, if awarded two or more sections, the undersigned Bidder agrees to deduct from all prices named in those sections the following amounts: If Awarded: Combination of Sections I and II, deduct ~:~66- dollars. Combination of Sections II and III, deduct ~ "),50- .dollars. Combination of Sections I and III, deduct~m"' -- Combination of Sections I, II, and III, deduct ~ dollars. Unit Prices have been computed in accordance with paragraph 11.9.2. of the General Conditions. BIDDER acknowledges that quantities are not guaranteed and final payment will be based on actual quantities determined as provided in the Contract Documents. ~ Completion. BIDDER agrees that the Work will be substantially completed and completed and ready for final payment in accordance with paragraph 14.13. of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement. BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement. 6. Attached Documents. The following documents are attached to and made a condition of this Bid: a. Required Bid Security in the form of X;J ~Y J'~ 8. Other Requirements. Address for Communications. 00301-16 a. Communications concerning this Bid shall be addressed to Purchasing Office 255 Parkway Boulevard Coppell, Texas BIDDER agrees that all Work awarded will within ~ Calendar Oays. to run as provided in the Contract Documents. c. Communications concerning this Bid shall of BIDDER indicated on the applicable signature page. d. BIDDER understands that the Owner is exempt from State Limited Sales~:and Use Tax on tangtb!epersonal pr0Pgrty to be incorporated into the project. S~idtaxes are not included in Contract Price (See Instructions to Bidders). The terms used in this Bid which are defined in the General Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to them in the General Conditions. ' ~ Terms used in this Bid which are defined in the General Conditions or Instructions will have,the meanings indicated in the General Conditions or InstruCtions. The City of Coppell reserves the rightto delete any portion:of this project as it may deem necessary to stay within theCtty's available funds. Should the City elect to delete any Portion, the contract quantities will be adjusted accordingly. SUBMITTED on 75019 m ll (o) be completed m r ~y~ Contractor wime will commence n ~e nt . be to the address onrn Ch,lg 'e pag~e. · m ha ti '& 's~ate · e ax ) r~op~e~rty to m t )1 a~e'not' P ic~ o Bidders). is )t~ n the m f ~e .t included a CoO ~t':um ~g: assigned m td,h JGenera' ~ m ct 3n: n, s tndt~ ns th r r' ion of ec ss~ e CttY~s m ci ~ , otton, be m m i I I i m m not lubittted tn conrgritWwl~h in~ igremInt or l~Ilit Bl~O hu not dl~otl~ or t~tr~tl~ J~d or Ioltet~K no~ ~14c1~d or 1~ I~, ~1~ ~r~ratd~tO ~e~iln ~bt~t~; a~ B[DD~ htl.nut. I~ ~y . Bid Dc~Ien~l for the ¢0110~Ing prlceCs): Ali spectft~ cub .al.i?tgIS I~ln~lMId tn the prtcI(S) let fOY~h above ind h&YIblIn computed In 'iO00~da~I~tth p~rlgraph UNIT PRZCE CITY Or COFPELL SEIl[R ]HPROVKfl~NTS SECTION [ - G~PEVZ#E l~l ITEH ESTIHATED DESCRIPTION AND., HO. QU~ITITV UNET PRICE IN ~ UNIT ~OT~ PRICE AJ~N1 1-4 6-LS H/A 14 For fui~tshtng ondplm-ing .~ 7~. the sum ~S N/A NOT USED, IDR-II PVC ItII~ per,~l~~cENT5 2570 ]~ 10~4 lB tO 21 LF Fo~ fU~nllhlP9 BPd plictn9 , ,~/. ~ ~ 18' ~ol~-~s lYc s~ ~lo'-2S ' ~ For ~fnishtng u~ placing ~. ~ ~' ~ / d~th), c~letm tn place, t ' or , ~  C~ ~A ~T ug~ ~ N/A $ I~A For furfl4lhlma lnd c~litl~plEc~ t~s~ or ~- - ~ each, 8 ~ Fo~ furnishing AM ptBIng S ~ ~~' FT dt~r ttudl~ m~ule, ~2 N/A N/A NOT USEO 23 26 29 3o-$L 33 34 R~ISED 0O301-5 EA For Furnishing arid plKtng FT dtLMtar drop Inlet ~o. d~/~' 718 LF For fu~ntsh~,glnd plKtng p~cev th& s~ 0 ~ 'c~s 718 LF FO~ Yu~tshlng ~ pllctng_t0' d'la~ir cu~l~ P!~, /d~,~, g N/A 635 N/A NOT USI[O SY For rmnov,l er~.repl~c .eMflt ~ --~ / p~V~t,~lo~l tn place; pe~ squa~ ~ ~ ~--~~¢EKT$ ,/ OITY OF 60PPELL ~ 9?718498 N0.275 0030~-$ REVZSED 36-36 WA IVA HOT U~ED 37 ] LS FoP h~llhiRI and pl ici~a~ Of thrown e~structlon, A~ l~ II,' 4~ ~ II~ II~JelI~ . ~ ~]etelInl ~ the ~4" (25~-30; ~th)~ c~lete 1 pl e OT TOTAL BZD FOR ALL UNIT PRICE$:,~-~ (III 10:54 CITY OF ¢OPPELL REVIS~) 0030l-7 N0.275 $~crzu. Il - GIGF~¥IHE IV ITEH ESTIRATET) DESCRIPTION AND NO. QUANTITY UNIT PRICE I#NORD$ ~ 21S UNiT PRICE 3 4 5-9 10 11 SS7 N/X LF For fumlshtng ond pli~tng SOn-35, P~ IMf depth)', cmOlot~ ti plato, o po~ 11~a~ fQo~ ~A X~ depth), ~lete Jfl pilot, A~ ,~ pe~ linear foot'; *LF For fur~lshlngW placln~.lS' l~· ~ 36, P~ d~th), c~letl ~ ~th~.pf ~ ~CENTS ./ 003014 REVISED l~ 880 13~la WA 19 Z0-23 24 3 EA For ~rntshtng and plKtng 4 ~ ~r each. ~ dieter T~e S ~,~ ~ ~~L~S furnishing'and plaaing SO." dry bol'm, complete tn :CENTS 33.31 36 O ~n '-See, ..... ~ FO~ I~~nt Of ~ttnd~d Se~ ~hole, cO~i~fl~ pl~o, tht ~ O~ · kt' For removal, and .~pltc_e~._nt o1' t" reinforced ~CENTS pet' squibb .yaru, REVISED ~C£11T$ . ~ ./ ^'. o.._O ,/ LS For pflrnlshit~g lalMeGaptng, ~0ml~le to per ,up ,--. for Trench Excavation 5&fO~Y · ~C£NTS OQqlO[*~O RE¥1SB) 40 ~ 41 M/A N/A NOT ~ED. REVISED 00301-11 ,.* 4 Il LF For furnl*htng ~nd pli¢tn_g ~': /(/~' Ii# SDR-3S, dipth), c~lo~e J~ plm~ ~A ~ USED o 7 ~314 LF For fu~tlhtng aM plBct~g , ~ , ~,~ 10N ~-36, pVC s~r.(O -10 i 114I L~ For f~IIhtnl t~ .... ~L~ 11 '~477 LF For ~tsh4ng IZ' ~CENTS per 11hilt fooI~ 12-18 N/A H/A HOT USED REVISED ZO ~ 23 f4 25 N/A 4 N/A PlOT USED For fu~etaht~ per elch, N/A II/A HOT USg) I ~ For fu~ntlhtflg and plsctng S ~/~ o~.~ FT diameter 1~;p$ RS" ~nho1% I ~ FoP furnishing ill Itertals and tncld~tals st~cture ~r contract ~qulremnts, ~lete /~ ~D .... ~ CI~ DOP eaoh, 27 $1 4B 3Z-a4 ~CE~S ~F For plac~flt.Of tu.,p'l, AA., .the. s,fl o~ . ';/,UL~_ ' ~'.,.~.,..~ ~LI.A~ ~er each. N/A NOT USED .~ ~ CF For re/ovil lad Fepllcimonk ~L~? /~'~ ~5-~, ~ Of asphaltic colgate P&gl OOlOO-tJ piwtt.~lete ~n plice, s~tl~ 13,2.T c[ms ~er ~i~ font. o o ~ 07/12/95 10:37 CITY OF COPPELL ~ 9~?18498 00301-14 REV:$~O t7 ! 'For fu~n]ahtng i.~ plKtng per ]Ul,~ sum. $8 7~46 LF 4O For Trench [xeav&?,ton IIId Sgl)port, couplets in pl#~ the sum of' ~TAL BiO ~R ALL UNIT PRXCES~ ~ . ~ ~ ~ (use 10:4Z CITY OF COPPELL - W1W bw2 Uwiu Atkins Bros· Equip. Co.. Inc 918 W. Marshall Grand Prairie, Tx 75051 SECTION 00301 BID FORM N0.275 R~V15ED 00301-1 PXOdC~T IUFNTIFICATION,~an~tarv .ij~m~ lmnrevemel,ls for Gvanevtne II2L_IV and B,~lihel Rg~, CONTRACT [OENTIF[CATJU~: ~_$_.9~-02 IHI5 8ID [$SU~[TTED TO: Purchasinn Auen~. City ~P ¢,~poell. T~xa~ Parkway Boulevard,' CoIp~Jl, T~x~"-:7~OIg, h~retn aftarreFerred to as OWNER. City of Coppell Bid No: ~ _ 1, Enter Into Agraamant. The undersigned BIDDER pr,,po~es and agrees~ if thl~ Bid 1~ ~cceptad, to e~te~ into an'Agrcement with OWNER in'the form mnc)udad in the Contr4¢t Documents to pe~form~d f~P~i~h all WQrk ~ =pccif)ed ~Y lndi:a[~d in tho Contract Documents for tile 8tdPrice and wttMn t~a Bid llmos indicated in %hi~ Bid ~nd in accordance w(th th~ other ter~ and cend't'o,s ur th~ Cum)tract 2, BIDDER Accepts, BIDDER accepts all of the te~n~ and conditions of time -Advertisement e~ Inv~[ation ~o Bid and In{tYuctien~ to,Bidders, including without limitation ti)o~'daalin0 with the'dl~po~ltion of §td security. This Bid will ~emain ~ubJa¢[ to acceptbnce Far ninety (90) da~s arte~ tbs day Of ~td opening, rBIDDERwIll sign anddeliv~ tho required number of counterpar~ of tho Agrem,,ent with the Bonos ~nd other documents required by thm ~iddin9 Requirement~withln Fifteen (1~] da~ after th~ d.te uf OWNER's Noti~m of AivBrd. In ~ubmitting this B{d, BIDDER represents, az more f(,lly set forth tn'theAgreemunt, that: ~, BIDDER h~= ~X~mlnQd ~RU o~roful]y ~tudied the Bidding D~cuments and the followin~ Addenda receipt O~ all which is h~robY acknowledged: (Li~t Adde~d~ by Number and Date) ADDENDA N~. DATE :~ ~-/)_,-9_4F~ L0:44 CIT' OF SEIF'F'ELL - 214 ~132 U'dlu REVISED bIDDER has v {~ted tie sit~ and bocom~ fa~ liar with and Ix sati~fled'-aA ~o the ~encr~l. local and;xike conditions tllat Work,affect cost, program{, ~,rfer~:nce and furnishin{ of BIDDER. Is familiar with ~nd Is sati~ftoda~ to all f~'U~rM, and local La~s mndReoulmtions that maya(Fsct progreaa. ~crfomance and ~urnishino of the Work. UIDD~R has obtained ,nd carefully studtmd (or assumes ~.~on{ibtlt:y for havio~ done so) all such additiona] or supplement~wy examinat~ons i~ve~ttga%lons, explorations, Ze{l{, ~tudic{ and datu concerning conditions sub~urr~ce and Underground Facilities) at or contiguous 'to Zhe ~ite or otherwise which may ~ffec~ co~t progress, p~rfon~ance ~ furnishing of tho Work or which re]~'~e to ~ny ~pcct Of ~he ~lean~ m~Lh~ds, technlquB~, ~equence$ and pr~]cedure~ of ?nStrucMon to DO em~loye~ by BIDDE~ and ~afotY prec~uMons a)~d pr.gram~ incident thereto. BIDdeR d~es nec cu.sider th&t ~n~ additional examinations, investigations, oxpiorattona, '~m~. studies ~r d~t~ ~r~ nmces~a)~ ?~r U~ d~termin~tion of this Bid f~r~porformamce and Furnishing of the Work in accord4nce with tim time~, pr(ce a~d e~her te~ms ano conditlon~ of the Contract BIDDE~ has correlated the Infomatlon known So. BIDDEI(. information and ob~awvationa 'obtMned ~rom vt~i~ ~o t)m site, reports ~nd drawings identified in,She 6on%tact Oecumen~ and M1 addttlo~al e~aminations, tnw~tig~tlons, explorations, te~ts. ~tudios and d~B With ~[)e Contract 8IDDE~ ha~ given EN6IN£ER written nDtlco of all · Pro~. ,amblgui%ie~ or discrepancies in tim Contract Documents a~)d th~ written resolution thereof by EHGINEER is ~c¢optable to.~lDO[~, ~nd th~ Contract ~ecument~ are generally sufficient to indicate and :onvey understandin~ of all, Sorm~ and condltio.~ for performing and furoiAhing th. Work for which thi~ Bid l~ aubmlDtod, Wh~r~ coofliot$~ Q~VOrs, ambiguities or dJ~cr~pa[~cies have been discovered ~n o~.hatweertContract Documont~ and/or other , rmlited document., an~ where ~Mdconflicts, otc',. ))ave not been rosolwd through the lnterpret~MO~ ap cl:Pifications by ~H~IHC~R as de~cribed~:ln ~he~Ins~ructions t~ Bidd~rs~ because oB insufficient ttm~ or oSh~rwi~e~~ BIDDER. ha~.included tn the Bid th~ greater quant(ty'~r better quMtty of Work, o~ complt~ic~ with the moro'otrtng~n~ requirement resultt))g in a HO. 2?5 95 28:44 CIT/ OF CFJPPELL - Zi4 bL12 0910 I-ICI, 2'7'5 REVISED o0301-3 ~. Th'Is'Bid ls genuine and ~ot ~ade in %to {nt~e~C of any group, ~o¢t~t~on~ org~nlza~lOll or corporat~oat , BIDDER ~ notd~rect]y or indirectly tnduce~ oF ~olIc~c~d A~y ~Lher BIDDE~ to ~ubm')~ a ~a]~e Qr sham Bid; BIDDER collu~lonre~atn f)~ bidding; and BIDDER hasn.t sought ~y etlon BIDDER or ov~r OWNER. Bid Prtce~. 8IDD£Rwill completq .'[h~ Work)n acco~d,nfe Wlth th~ Document~ for the following All ~peclfiq ca~ a)l~w~nce~ a,e included hi t~e pPic~{s} see forth abmve a~!d have be~n compu[ed in 11,8. of the ~en~ral Condi~ion~, with P~ragraph U~IT PRZCEBID FOR CXI¥ OF COPPELL SEWER IN?ROV[NENTS - GRAPEVINE III -ESTIMATED DESCRIPTION AND NO.:'QUANTIT¥ UNIT PRICE IN ~-4 N/A N/A NOT USED 5 168 CF For ru~qtshing ~nd Pl~cin c"-'/...~comp,e~e 1~ plato; ~he sum of N/A ~/A NOT USED 2o0 LF UNIT TOTAL PRICE ~4OUNT For furnishin~ and'placing ]~,, ~DR-3~ PVC s~we~ · {O'-]O°;depth)~'' -~ co~plQte (n Place, tho' sun of per ~'~-0-~.. HD .C~Nl'S 61.8~ 50. ~O 18,126, 88 10.8~0.0 lO:4E CITY OF 00~01-4 16 ~0~4 18 N/A 19 ~; 20 8 Zl I ]OF?ELL - 214 u, u2 U'dlc LF FoP fur~t~hing and placing l~"$Dg~35,PVc,sewer.(lO,-lB, dePth),'complete in:Place, the sum of AND per lln~ LF For furnl~fl~og and placing 15' SDR-35P~C se~ov (~5'-~0~ d.~M)~ complete ~n place, thc ~unl DOLLARS per ?0r fur~i~hino and plactn~ doP%hJ, complete in place, the sum of NZNETY FOUR DOLLArs NO CENTS N/A NOT USED For furnl;lin~ aaO p!aclng 4 FT dtampter'~±andard manhole, complete in place, ~he ~um of ~unlc~N~ FOUR HUNDRED TEN DOLLARS per FA For f:Urnlshlng and Placing 5 PI dl~letcr slandard manhole, FOUR ~WO HUqDRED ~IXTY ~LLARS ?~ CENTS EA For furni~hing and placing 6 FT diameter ~tandard ~anhole, complete in ~l~ce, thm sum of FIV~_TH~t~D EIGHT NUNORED TEk[X] ~-=NDA =" ' Lt. ARS . __~CENTs 2Z N/A N/A NOT USED 60. ~0 75. ~8 5~810.0D HO. B2, 8.58. B6 12, ~50.0~ 5,810.00 23 24-26 ~7 CITY OF ZOFF'ELL - 214 ~0,= C310 718 28 718 LF 29 9 [A 33 34 REVISED N/A N/A 12 SY EA FO~ furnishing and placing S [1 dtameter, dr~p Inlet manhole,-- completein p)aGe~ %he'sum:of T[.JELVE THDUSAHD DNE HUNDRED !J!)~FT'¢ DOLLARS ~1~i ~jCENTS ~r each, N/A NOT USED IF SY LF For furntshtn9 andplacin9 20" dlamoteY dPy bere~ complete in Rlace tho o ONE HU)qDRED N)~ tEVEN DOLLARS AND FIFTY CENTS pOP lih~'a~ foo~. For furnlsh(ng and plat(ns 20" ~lem~ter ca,lng pipo, comp)Btm ~n place, the~um of IWELVEDDLLARS ~l~l~'~--' ~ CENTS per")'tnear foo~', For abandonment of sewe~ manhole, complete in plmcm, thesum TWO HUNDRED DULLA~S NO CENTS pop NOl USED For Pemoval aM replacement of 8" reinforced ¢~ncrete the sum of SIXTY EIGHT DQLLARS ~ND ND ~ENTS p~ ~qu~r~ yard. of r. inf~rced concrete driveway, complete ~n place, th~ ~um of ..... FDRTY~OLLARS ~5 m'CENTS ~m' rpmowl ~nd of ~lnfor¢od concrete 4 FI wide sidewalk, complute in place, the su~ oF FIFTEE~ DOLLARS ~ ......................... -~ENTS po~ line~ foot, lz, 190, ~0 197.58 141, 12.88 Bi 288.88 6B.8~ 40.00 [5.80 7i 12,525; 10:46 CIT'~ OF CQPFELL - 214 bd~ 0910 ,10.~'m=~,w ~10, ~ 36-36 ~/A N/A ~9 I LS NOT U~ED For fUPnishing ~lld plBcino landscapin9~ cnmplete in place, :h~ sum of ~iTNE TH~JSO~n DOLLARS ANU N0 C~lS per lump sum. For T~¢ncb EXCaVation 5aFc~ aJld Suppa~L~ complete in place, Lhe gum of NO DOLLARS ~ TWENTY FIVE -CENTS For furni~hing ~nd maintaining Traffic Con%rol barricading, through completion construction, complete in "lace~W~q~s~Ob~NO DOLLARS AND NO~-_~CENTS PO~ lump For furnishing.and placing 4" PVC sewer.servlce~, com~]9_te~4.~_,]~C~. ~he sum of THREE HUNL)J~ h 171 Y DOLLARS ~j,~'; NO , CENTS pep 4] lOZ LF FoP furnishing and p acing 24" ASTMF-497 PVCsewer (25'-~D~ d~pth), complete in DNE HUNDRED..~I~.TY FDUR DOLLA~S AND N~ CENTS SECT[ON I - GRAPEVINE .iglAL BID FOE ALL UNIT PRICES: THOUSAND SIX HUNDRE: FOUR Dollars ann SEVENTY FIVE Cents 8.25 154.80 563, 604.75 9~ 860.00 ' 888.75 2, B00,08 ~ 15~708.00 95 10:4~3 CiTY OF ]OPPELL - W14 C,~2 8'310 N0,275 ,SEC'rION,: , II - Q~PEVINE lV ~ITEH,, ESTIHAT£Q OE~CRIPTIO~ A~O NO. qU.~TITY UNIT PRIUE IN WORDS uNiI PRTCE 1 ~I5 LF 2 2]5 LF ~0 1] 3 N/A N/A 4 13 LF 55Z 15~5 For furnishing and pla¢'lng 6" C1, SO Ouc~tle Iron PI~, comolctc In plane; the sum of SIXTY THR~ .....DOLLARS ~ tENTS ~or ?qrni~hlng and placing DOLLAES AND NU~CENT$ SIXTY THREE Fur furnishing and pt~c~ng 8" '~DR-35, PVC'sew~r [10 -15~ dopth}, complete in place, the sum of ~D- ...... ~;~TV ~n,;~ DOLLARS ........... CENTS pot 1 ~a)' floor, "~ N/A NOT USED L~ ~or furnishing and placing 1Z" SDR-35, PV¢ ~cwor (O~-iO~ depth), complete in pl~c~, FORTY TWO DOLLARS ANU ~o' tENTS per ~~ LF For furnishing amd placing 1~" SDR-35, PVC s@war depZh), cumul~l;j in plato, the sum o~ FIFTY THeE DOLORS pot ~o~-T REVISED 00301-7 TOTAL AMOUNT 63. ~ 13, 545.00 ~/~:~ 67.88 14,485.00 54.88 782.~ 42. ~ 23, 53.88 82, 9~5.0~ ~95 1Fl:a? CIT' 3F 20PF'ELL - 214 682 U'~lU N0.295 LF g4 3 316 L~ ~" ~OR-3~, PVC sew~ (lS~.2o, ~n~ ~um o~ SIXTY F~VE ~^- -- ~u~LARS ~0T USED Fer f~PntAh}n9 and PlAcihg 4 FT di~n]eCer ~tandArd comp]ete In place, Che ~um of TWD THin, Nb pe~ ~ ~/A NOT USED YPO S munholQ, TWO THOUS~D FOUR HUNDRED $~ENiY ~,, EA For fuPnl~hin~ and placing THREE TH~ FOUR HUNDRED~Ir~, per ~' £A For furni~hln~ all.libor. ~eria]~'~flU~lDcid~nt~ls ~tructur; Po~ contract requirements~ complete place, the ~um Df __ .NINETE~ THOUSAND DOLLA~ AN~-------- _' 2,410.(~0 2,470.00 ., 4u0. 19, 00~. 00 For furnishing and placing ~o" ~i~oter dr~ bore, comp)~te in .... pF~O~ONg~F~ENTY FIV~oIIARt r IlA~ar foot. 37,708.)0 19, 280.00 7,410.00 55, 07/12 10:47 28 29 30-31 ~7 38 ,SIT OF SC{PF'ELL - 214 E. OS ~{91CI N/A 832 R/A 2601 G LF For furnishin~ amd plactn9 diameter ca~ln~ pipe complete" in place, ti,. sumef TW~.VE DOLLARS uer lin~ap tOot,No .'CENTS EA For abanuonm~nt of standard place, the aum'of AND TWO HUNDRE)~DOLLARS N/A N/A SV LS LF NOT USED Fop Yemovnl and replace~:~t oF 8" rolnforoed concrete pavement, canlplele in place, ~ha sum of ~D~' ~IXTY TWD . DDLLARS .... No CCNTS per squar~ ~OTUsED For removal a~d replacement of 6" reinforced concrete RIp-R~p~ CO~pIoto in place, the sum of FOR~ OOL~R$ Aqq~" ~0' CENTS Pot ~quaro For furnishing a~d placing landscaping, compl.l.e in place, th~rsqm Of ONEYRDUSAND DOLLARS ~P rCENTS pop lump ~um. For Trench Excavation ~afaty and SuPport, complete in place, the ~um of NO DOLLARS ~D . '~NTY FIVE~CENTS per linear foot. '-- : REVISED 00301-9 ~, ' 12:00 3,792, ~ 62, 80 51,584. ~0, 80 360.80 1,000.00 1,~00.~ 0.25 10: 4,Z .JFFELL -Z14 EU20Di~ ;[T L-iF CF - NU. ,-_, ~, D~4 3g 1 l$ For furnishing ~nd m~lntainlng Tr~fflCrCOn~rol ~ barricading, ~t¢, during and through~c~mpletion construction, comp)Bte in place, ~he sum of DOLLARS SIXTEEN ~'~ N~ CENTS p~r lump sum, 40 8 E~ Far ~u~n~shin~ and placing ~ll~PO~, the sum or DOLLAR~ ~(D NO CENTS 16, 29 4] N/A N/A NDI' USED SECTION Il - ~gAPEVINE IV TOTAL BID FOR ALL Un~[ PRICES: (uso words) FIVE THOLJSRN2 TWO HL;NDRE~ 5E-UENTEE~C-1)~tI~r~' 'a~ TWEmTf F~w uenrs 355,217,25 ,,~ figure~) SECTION III - BETN£L ROAD ITEM ESTIMATED NO, QUANTITY DESCRIPTIONANo UNIT P~ICE IN WORDS ] llO LF 2 lid LF For furnishing and placing 6" Cl. ;0 Ductile I~on Pipe, complete in place, the sum of ~EVENTYDNE DOLLARS AND Nfl CENTS [,o,r furnishing and placing 8 C1, 50 Ductile IY'On Pipe~ complet~ in pl~c~ Lhn sum of ~EVENTY FDUR DOLLARS par ~.~CENTS 3 13 LF For furnishing,and placing 8" SDR-3~, PVC ~ew~ ~0'-10? depth), completein place. the sumof. THtRT~ FpUR DOLLARS CENTS p~r linear foot. UNIT TOTAL PRICE ~40UNT 71.00 74.80 34, O0 7,818, 8? lC, 4~. lIT CF CCPPELL -- }14 2,0~ OqiO NO. 2?5 ~ P15 LF N/A N/A 2214 .F 10 ]1 8 1640 LF 2477 N/A LF LF LF REVISED 00301-11 For fu~nish{n~ and placing , 8" SDR-3$, PVC ~ewer 110'-15 the ~um ~f FORTY SEVEN DOLLARS NO __CENTS ~ limber foot, NOT U~ED For furnishin~ and pl~ciflg 10~ SDR-3$, PVC sewer (O.'-]O' depth), complete t~ place, the sum of THIRTY EIGHT DOLLARS CENTS per linear foot. For furnishing and placing , 10' SDR-35, PVC,scwer (lO'2]H oepth),.complete in place, the sum of FIFTY DOLLARS AN~ NO_ CENTS Fo~ furnishing and pl:¢ing , 1Z SDN-26, PVC sewer (0/-5 depth), complet, in place, the ~um _THIRTY TNRFF DOLLARS AND ~ NO CENTS per l;near ~uut. For furnishing and placing IR" SDR-3S, PVC ~ewor (5'-10' depth),'complete in place, th~ sum of F~TY DME DOLLARS AND 'CENTS pe~ ~O For furnishing and plat-lng ]2" SDR-35, PV¢ sewe~ depth), complete tn tho ~um ~iFTY FOUR · DOLLARS CENTS pe~ ~~ NOT USED 47.08 38.88 33.08 41, 80 54.08 235.88 87,932.~ 36, 1L,4: 3ITY.UF CLFFELL - 214 ~O2 8910 h10,275 ,'. r 00301-12 REVISED 1~ ~3 EA 2] N/A 72 4 23 24 For furnishing and Placing 4 FT diameter standard m~nhole. TWO THOUSAND SIX_TY DOLLARS ~ -- CENTS par ~c,~o EA For furnishing and placing 5 FTdl~meter ~tandard manhole, eom leto in'R ~ THREE THOUSAND ~E HUNDRED ¢0~ the ~um of DOLLARs ~' NO ..... _CENTS per each. N/A NOT USED EA FoP furnish(ns and placing 4 FT diameter ~top inle~ manhole, complete tnplac~ th~ ~q~ of THREE THDUSA~FI~HtIND;TED TEN DOLLARS /~D NO CENTS per e~.-- 1 For furn)$hing'a~? placih§ 5 FT diameter drop mlet manhole, complete t~ place, the sum of FDURTHDUSAN~NT~FK ~)INnREn ~IXTy DOLLARS pere--~E-h, bio CENTS N/A NOT USED EA For furnishing arid placing 5 FT diameter i~p~ "S" manhole THREE THOUS~l~tl~b~4~E~)~t))h the sum or AND .... NO DOLLARS CENTS p~F each. For fuPniShtn~ all Tabor, mat#rials.end Incidentals required:to complete'Siphon requirements, complete hl place, the ~m of SEVENTEEN THOUSnND FIVE ~RED DOLLARS ~I)----~' CENTS per ~acl. ..... _NO 2, 068.~0 31140. 00 3, 510. 360.00 3, 160.88 17, 26 27 29 3O 3G ClT' dF .JFFELL - 214 FO2 O'}lO J6 48 N/^ 15 2?5 REVZSED 00201~13 LF For furnishing and placing 20" dtmmeter dry bode, complet~ in place, the ~um.or S~]NDOnKDTH-IR_TYFIVE OOLLARS · NO per lineaP~ .diameter casing pipe~ complete In Place, the stem ~ TWELVE OOl LARS EA _F LF S¥ For' abandonment oflat~nd~rd ~ewar manhole~ complete in place, Lira $t1~1 Of ~., ~n HUN~EE~ DOLLAR~ per ~" N~ _CENTS t. or ~bandonmen: of ~aMlta~ sewer clo~n out, complele ~n alice, the sum of SIXTY DOLLARS For placeme,t of 6" Class concPete embedmeat antt~e [ranch width, complete in ~lace. the su~ of ~ ~_DOLLARS per ea~j ~JENTS NOT USED For re,ova) and replacement oF asphaltic concrat~ Pavement, complete in Place, the sum of EIGHT DOLl. ARs AND _. _ _ No-CENTS per linear Fnr rumoVll a~d replacement of 6'~ rninforced concrete Rip-Rap, co,plate in place, the snm of FORTY.DOLkARS ~ NO~ENTB Per~rd~ 60.00 15.80 72Q. ffi 'i '~c~iptidmjx Section '13,2. B. 08. ~ 01 10:49 :ITY -IF 30F'PELL - 214 602 Er_-qlO 37 I LS For f~n~shtng ~nd placing pl~c~, ~ho sum of SEVEN THOUSflND DOLLARS pe~ u~u~p ~U~. 7,0~0[g0 ~8 7~46 LF For Trench ExcavatioflSafety and Support, ¢ompletu in place, the ~um of ND DOLLARS A~b._.___IWENTY FIW.~GENTS per linear foot, - LS For Furnishing ~nd maln%)lning Traffi: Cofltrol Stgnage, barricading, ~tc. during and throqgh completion ~.nstructlofl~ complete SEVENTEE~ll~Rb~h ~ I ~ ~N~D DOLLARS ~ND NO CENTS per ]umo 40 lfl EA For furni~hing ~nd ~l~ciny 4" PVC ~w~r DOLLARS AND '--' NO CENTS p~r' e6ch. '"' 41 N/A N/A NOT USED SFCTIDN III - ~ETHEL ROAD TOfAL BID FOR ALL UNIT PRICES: THOUSAND SEVEN HUNDRED SIXTY NINE Dollars and FIFTY Cents 0.25 608. 88 358.88 538,769.58 N0.275 PlO :' 1,836.58 10:50 CITY DF ]OPPELL - 214 602 ~910 COMBINATION OF SECTIONS The u~Q~r~l~ed Bidder-hQroby agree~,to.occeps~am ~ward of c.n~r~cL based on any ~ed~vidu~l s~cLinn. However, if ¢r~m all prices named in.thes~isections the folloWf~g .mounts: Combination of, Sections I and Ii, deduct dollars. TOTAL BID FOR ALL UNIT PRIGB$ {AFTER DEDUCT) NINE HUNDRED EIGH~T~oUS~ND EIBH) HUNUR~Ni'¢'~D Dollars .,,d NG (U~ figUr~) Co~bin~tiO~ 6f S~CtiO~ IIan~) 111 deduct ~ do'I)~Ys .~ . IOTAC BID FOR ALL UNIT PRICES (AFTER DEDUCT) (u~e -..'._? [us~ figures) Combination of S~tions ) ~nd III. d~duct ~ dolla~. TOTAC BID FOR ALL UNIT PRICES (AFTER DEDUCT) ONE ~]LL~ON N~NET~ F~R TH~ND~SEVENTY FOUR DoHars .and ~TY FIVE C~n~ Combination of Socttons I. II, and III, deduct _~ dolla~a, ZO?AL BIO FOR ALL UNIT PRICES (AFTEn FOUR ~NDRED FORTY N~ ~'.~NEIY_~E.,.D~ar~ ann FIFTY Cents Unit Pric~ h~v~ been compu~d In ao~ord~no~ With BIDDER acknowledge~ that quantitie~ are not guaranteed.and final p~yment Will ~e based on ~ctual quantities determined as provided i~ thm Contract Docum~nt~. S:. Complmtten. BIDD~R.~ea~ th&% the Work will be substonDially completed and paragraph 14,13 Of the General Condit'ion~ o? o~ b~fore th~ dat~ or within the number nf c~l~ndar days ,ridicuLed In the Atk/ns Bros· Equip. Co., Inc 918 W. Marshall Grand Prairie· Tx 75051 7/1~- _J ~0~50 CITf OF CI]F'PELL - 214 6,02 8910 NO. 295 OO~Ol.16 R£VISEL) BIDDER accepts the provisions of %he Agreement ss to liquidated damage~tntheeVenc of failure to complete ~he Work within the Lime~ ~p~tfied in the Agreement. ~ Attached ~ocuments. ... The following documents are aL~ached :o and made a condition of this Bidl a. Required Bid Security in t~e for~ of Other gequtramants. Address ?or Communications. Con~untcotinn~ cnncmrntng this Bid ~hall ~e addressed [o ~urchasing Office 255 Parkway Boulewrd Ceppell, Texas 75019 b, BIDDER agree~ that all Work awarded will be completed within' Calendar Days. Con~)'ac~or wime'will commence to run as provided in ~he £entract Documents. c. Communic~tton~ c:ncerning Lids Bid shall be to the address of BIDDE~ indicated on the applicable ~Ignature p~ge. d. BIDDER understands that tho Owner is exemp: fPo~ Limited S~les and Use Tax on fungible personal preper~y to be incorporated into the project. Said taxes are not included in Contract Price (See Instructions to Bidders). e, The terms u~ed in this )id which are d~finod in the General Conditions eF the Construction ~nntrect included part of the Con~ract Documents have %he ~c:B~gs a~signed thom in the General Conditions. f. lerm~ u~eo )n this Bid Which ~re defined in the General Conditions or Instructien~ will have the meanings indicated in the General Conditions Gm Instructions. The City of Coppell re~arvo~ the right ~o delete any portion of this project as it M~Y dee~ necessary to ~tay within th~ avatl~bl~ fund~. Should the Ottytelect to delete any portion~ :he ¢ontr~:% quantities willbe ~dJu~%ed accordingly. 00301-18 BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated by Bidder.) STATE OF COUNTY OF BEFORE ME, the undersigned authority, a Notary Public in and for the State of on this day personally appeared who after being by me Name duly sworn, did depose and say: Name Name of Firm foregoing on behalf of the said am a duly authorized office/agent for and have been duly authorized to execute the Name of Firm I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same Iine of business prior to the official opening of this bid. Fun. her, I certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, :agreement o~(~.m~',~, tion thereof, to control the price of services/commodities bid 'on, or to influence any ~ividual(s) to bid or not to bid thereon." Name and Address of Bidder: ~ : ~'~_~-~Tt~- % Telephone: ( .) :. ~ : Title: ~/t~g_.~. ~ll:~77 , SUBSCMBED AND SWO~ t0 ~fore me by on this ~e ~ day of ......... ~)m~ ~blic in and for ~e State of 95C~11 sECTION 00301 BID FORH PRO~ECT IDENTIFICATION: a~t _ r e I lethe1 CONTRACT IDENTIFICATION: _SS 94-o2 . THIS BID IS SUBIqITTED TO: e It ell 255 parkway Boulevard. C~~ -- " ~eretn after referred t5 as O~NER. ' Ctty of Coppell Bid No: 1. Enter Into Agreement. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter tnto an Agreement with O~NER tn the form Included Jn the Contract Documents to perform and furntsh gork as specified or t~dicated in the Contract Documents for the Bid i~tce and vithtn tho Bid Times Indicated Jn this Bid and in accordance wtth the other terms and conditions of the Contract DocuISentl, 2. BIDDER Accepts. BIDDER accepts all of the terms and conditions of the tflCludtng .$t~OUt ilmicatlofl ~nose aea, m~.-.~.,..-- -- ~ ~eimmnt ,ith the Bonds ~nd other d~.meqts re~]?~y,~ ddt~g Requirements ~tthln fifteeo ~l~J gays aT, er ~nu u~w Of OM4ER's Nottce of AwaY. BIDDER's Representations. Zn sublattting thts Bid. BIDDER represents, as more fully set forth in the Agreement, that: e. BIDDER has examined and carefully stud~e~ Documents and the following Addenda rece~pT of hereby acknmeledged: (List A~denda by Humber and Date) ADDF./~3A NO. DATE 00301~2 R£VISEO BIDDER has vistt~ad the st%e ar~l becoa~ famt]tar with and ts satisfied eS to the genera], local and site conditions that m~y affect cost, progress, parfo~nc, ~ furnishing of the Work. c. BXODER is fmmtllar with m~d is satisfied ms to all fader)l, ~tete mhd local Laws mhd Regulations that ~ty affmct cost, progress, performmnce end furnishing of the Work. d. BXDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional or supple~ntary ~amtnattons, tnvesttgmttons, explorations, tests, stUdies end data concerning conditions (surface, mubsurfmce ~nd Underground Facilltlea) at or contiguous to the site orothe~tse.which m~y affect cost progress, performance or furnishing of the Work or which relate to ~ aspect of the meana, methods, techniques, sequences a~d procedures of construction to be employed by BIDDEN and safety precautions and p~ogr&ms incident thereto. BIDDER does not consider that any additional examtnattons~ investigations, explorations, tests, stu~!~s.or dat~ are necessa~ f? the determination of this BlS rot performance and furntshmg of the Work in accordance with the items, and other te~ms and condlttons of the Contract ~tce arm i cuments. BZDD£R has co.elated the information known to BXDDER, Information and observations obtained from visits to the siti, reports ~nd drawings identified in the Contract Oocun~nts and all additional examinations, Snvosttgattons. explorations, telts, studies and data with the Contract Docents. BZDDER ha5 given EJ4GI~EER written notice of all conflicts, errors, ambiguities or discrepancies tn the Contract Docu~nts and the written resolution thereof by ENGZ#EER ts acceptable to BIDD£R, and the Contract Documents are . generally sufficient ~o.indicete and convey understanding of e11 terms and conditions for performing and furnishing the Work for which thts Bid ts submitted. Where conflicts, errors, ambtguttles or discrepancies have been discovered in or between Contract Documents and/or other ~elated documents, and where said confl~ct$~ otc,, have not been resolved through the interprstattons or clarifications by EHGZNEER as described in the Znstructlons to Bidders, because of Insufficient tJme oc othe~tse, 8ZDD£R has included in the Bid the grea~er quantl~y or better quality of Work~ or compliance w~th the more stringent requirement resulting in a graater cost. RE'VISED 00301-3 This Bid is genuine and not made in the interest of or off behalf of any undisclosed person, ftc. or corporation and ts not submitted tn confo~tty wtth any agreement or rules of any ~reup, assottetton, organization or corporation; BIDDER nas not dtrectly or indirectly induced Or solicited a~V other 81DOER to subltt a false or sham Btdl BIDD~ has not solicited or induced any person, ftrm or corporation to ref~atn from btddSng; and BIDDER has not sought bY co]]usion to obtain for ttself an~ advantage over any other BIDDER or over OWNER. Btd Prices. BIDDER wtl] complete the Work t, accordance with the Contract Documents for the following price(s): All spectftc cash allowances are included tn the prtco(s) set forth above and have bain computed in accordance with paragraph 1Z,8. of the General Conditions. CITY OF UNIT PRICE BID FOR COPPELL SEHER IHPROVENENT$ SECTION I - GRAPEVINE III ITOI ho, ESTINATED DESCRIPTION AND UNIT QUANTITY UNIT PRICE IN ~ORD$ PRICE TOTAL ANOUNT' N/A 166 LF NOT USED For furnishing and placing 8" PVC sewer (I$'-ZO' depth), complete in )lace, the sum of per linear foot. 6-13 N/A 14 ZOO N/A NOT USED LF For furnishing and plactng 15" /-~ ~<~ / SOR-3$ PVC sewer (O'-10' depth)~"-'- complet~.t~ p~aco, the sum of /'~TT/ 0OLLARS AND ~ CENTS per nT~ ~ ' ,00301-4 18 2570 LF 16 1094 17 23O For furnishing and plactng IS" $DR-35 PVC sewer (lo'-15' depth), complete tn place, the sum of _ COLlArs ~ND ' ' CENTS par 1In--foot. ~5' $D~-38 PVG sewer depth), complete in place, ~DOLLAR$ LF For furnishing and placing , IS" $DR-36 PVC se#er ~20'-25 dote tn pl~ce, depth), comi: AND~CENT$ per linear foot, ]8 N/A 2O N/A NOT USED EA For ~urnJshlng and placing 4 irT diameter stlnd&rd manhole, ~ ~omp]~e J.n, pla¢% the sum of ' ~ CEOS per each. 8 EA For furnishing and placing S FT dtameter standard manhole, __ complpte in place, the sum of "/mg~'l/.ee~V/~DOLLARS pep each. Z1 1 EA For furnishing and placing 6 FT dta~ter standard manhole, complete_, in place, the sue of per e~h. 22 N/A N/A NOT USEO RE¥ISED 00301-6 23 24-26 26 2g 30-31 32 33 34 H/A 718 718 g N/A 12 188 835 £A For furnishing end plactng 5 ~2~~,d) FT diameter drop Inlet manhole, complete in.place, the sum of ..~ ' ~ DOLLARS ~ CENTS per each. NOT USED LF For furnishing and plactng 20" dtameter dry bore, complete in ~4~-/f,~ ~ OOLLARS cr TS par Iln61r LF For furnishing and plactng 20" ~,a~ . dtametor castmJ pSpe, complete ENTS EA For abandonment of standard place, th~ sum of ~ ..~OOLLARS ~ CENTS per each. fl/A NOT USED SY For removn~ and replacement of 8" reinforced concrete pavement, comp1 ere tn pl ace the s~DOLLARS ~CENT$ per square ~ S¥ For remova~ and replacement /p/~:~) '7~,~'Z'/~,e~d'~, ,, of re~nfo~ed concrete drJve~, co.leto ~n place, the sum CEHTS per square yaed. LF For removal and replacement of reinfo~ed concrete 4 FT wide sJde~alk, coeplate in per ~ .00201-6 REVISED 37 N/A NOT USED ~ LS For *'u,-.~.~.~ ,n~ p~c~n, /~/.~-~ _ /~ / landscaping, ce~la~e tn _ ~ce, the~u~f 38 3S55 LF 39 40 8 per ~u~p su~:- For Trench Excavation Safety and Support, complete in plsc~e sum of DOLLARS 41 102 CENTS tS For furnishing and maintaining ~)~ ~,~r~ ~ Traffic Control stgnage) b&rrlc~dtng, etc. during and through co~letton of construction, co~letm in ~..placl, the sum of AND ~ / CENTS per 1-ump sum. EA For furnishing and placing .._~o~.pJete tn p~Ge).the stea of AND ~_ / C~TS per'ch. LF For furnishing and placing 24" ASTH F-497 PVC sewer (25'-30' depth), complete .... Jo p. lace,.~he sum of D)~NF-~~ CENTS per~ SECTION I - GRAPEVINE III TOTAL BID FOR ALL UNIT PRICES: ~se words) (use figures) SECTION II - GRAPEVINE ITEH ESTIHATED NO. QUANTITY UNIT ! 215 LF 2 2Z5 LF IV DESCRIPTION AND PRICE IN WORDS For furnishing and plactng 6" C1, 60 Oucttle Iron Ptpe, comp_)ete tn nlace, the sum of pet" ilfleat' TOOT, UNIT TOTAL PRICE AJ4OUNT For furnishing and plactng ~p,dO 8" Cl. 50 Ducttle Iron Ptpe, the sum of ~CENTS 3 N/A N/A 4 13 LF For furnishing and plscJng 8' 7~0 SDR-36, PVC smee~" (10'-15' depth), complete tn place, 5-9 WA IO 567 1565 N/A NOT USED LF For furnishSng end pl4c~n9 ~ 12" $DR-35, PVC sewer (0'-10~ depth), complete tn place, _LLA S '~N~~CENT$ pe~ 11near ~oo~, LF Eo~ ~ur~t~htn9 ~d p~actn9 ~/~ 12" S0R-35, PVC se~e~ (lO'-lS' depth), c~plete Jn place~ 00301-8 REVZSEO 580 LF For furnishing and plactl~l 12' $OR-3S, PVC setm~ (IS -20' depth), complete tn place, N/A N/A NOT USED 20-23 24 2S 26 27 N/A 316 N/A NOT USED $ EA For furnishing and placing 4 FT dtm~etar Type'S" manhole, _~-_.,,tfC.~te J_~p]~ce...t~. sum of ~D~CENTS pep For furnishing and pllctng $ ~77~',0c> ~.~,~b ~' FT dimetor Typo 'S' man~le, ~lp~e In place, the s~ of CLARS per each. EA For fu. rnJshtng 111 labor, mter~als and tncldontels required to complete Stphon structure per contract requirements, complete In LF For furnishing and plactng 20" /~ dieter dry bo~. co~lete Jn OLdS ENTS 28 2g 30-31 32 33-35 36 37 38 N/A 9 6 REVISED 00301-9 LF For furnishing and pltctng diameter castng pipe, complete t_,n. pta~e, the sum of .. ~ DOLLARS per lJndir For abandonment of st&ndard setmr manhole, complete tn OLLARS ENTS per each, - N/A ~OT USED LF For~.~ovil and replacement of 8" ~elnforced concrete pavement, complete tn place, th,~,~// DOLLARS AND ~;~ ,ard'. GENTS per square ,~ N/A NOT USED SY Foe t~aoval and replacement of G" reinforced concrete RIp-R~, c~plete tn place, ~u ~CE~S per square ~ard. L$ landscaping, complete tn CENTS per lump sum, LF For furnishing and placing ~__,~¢~ ~p,,~c~ ~/~ For Trench Excavation Safety ~d Support, complete tn ace,.~sum of (-/)~-/ DOLLARS AND ~:~, --CENTS per ltrmar foet~ ' 00301-10 REVISED 39 I L$ 40 8 ~ For furnishing and mJntalntngg~/-~~ TraCfl¢ Control Mgnage, barricading, erG, durlng and through cf~Pletton o~ construction, complete in c DOLLARE ENT$ For furnishing .nd plactng ~'~ ~.a~ 4' PVC ;e~er services, , the sum of DOLLARS CENTS per each, ' 4] N/A N/A NOT USED SECTION ZT - GRAPEVINE IV TOTAL BID FOR ALL UNIT PRICES: SECTION ZZ! - BETHEL ROAD ITEH EST]NATED DESCRIPTION AND UNIT TOTAL NO. QUANTITY UNIT PRICE IN NORDS PRICE AMOUNT I 1]0 LF For furnishing and plactng 6' C1. 50 OuctJ]e l~on Pipe, eomplet, e ink,lice, the sum of ~ ~OL~RS ~D ~CEMS pep II~P ~GOT, 2 IlO LF For furnishing,and plact~g 8" Cl. 50 Ductile Iron Pipe, complete/in place, the sum of ~r~_.z~?~__DOLLARS -AND CENTS pep 11near fo~t. 3 ]3 LF For furnishing and placing 8" SDR-35, PVC sewer depth), complete in place, y' DO u RS AND ~ _ ' CENTS per 11near foot. fi- REVISED 00301-11 5-6 4 5 LF 8 10 11 23]4 1648 15 892 2477 For furnishing and plactng 6' $DR-~S, PVC se~er (lOS-lS depth), complete in place, ~~LI.AI~ ~D ----~ CENTS per 11nea~' foot. N/A LF LF LF NOT USED For furnishing and placing 10" SDR-35, PVC sewer (iO'-]S' depth), coe~lete in place, t h~sam of /ff I DOLLARS ~¢EHTS For fumtshlng and placing 1~" SDR-26, PVC sewer (0~-5/ depth), complete tn place, ~~DOLLARS ~(;ENTS LF For furnishing and plactng 12' SDR-35, PVC sewer (5'-10' depth), cmaPlete tn place, ~ --"CENTS per T~nilar fOOt. LF For furnishing and pl&cJng~7~'~ 12" $DR-35~ PVC sewer (I0'-15' depth), coaplete tn pl&ce,  DOLLARS CENTS t2-18 N/A N/A NOT USEO *00301-12 REV[SED 19 13 EA For furnishing and plactng 4 FT dlameter standard manhole, ~ d~a~ter standard manhole, ~7~ ~oq)ete In place, the sum of 21 22 ~/A ~/A ~OT USED u For ~u~i.h~n~ a,,d p~.~.g 4 ~'~ //~'~' FT dieter drop inlmt ~hole, ~ ._q~]~.~ (p ~]ac~, th~ sum of ~~~_~~LL~ ' / ~C~TS 23 EA For furnishing and placing 5 FT dl~eter drop inlet manhole, cowlete tn ~l~ce, ~be s~ of ~C~T$ 24 26 1 N/A NOT USED EA For furnishing and p. lacing 5 FT diameter Type's" manhole, ~ co~lJ~t~n place, the s,,~ of per h~c~ For furnishing all labor, materials and incidentals required to complete Siphon structure per contract requirements, complete in /~/~ DO~LA~S · ~CE~S per each. 28 29 6 3O 4 32 46 32-34 N/A 35 6gg8 REVISED LF For furnishing and placing diameter dry bore, complete place~ the/su~ of ~OOLLARS ANU / - CENTS per 11neEt LF For Cumishing and p]actng 20' diameter castng ptpe, complete ~um of DOLLARS CENTS per linear foot. sewer manhole, complete tn plqcp, .the sumAf OOtCAaS / CENTS per ~ EA For abandonment of santtar~ sewer c]ean out, complete tn DOLLARS LF For placement of 6' Class "B" ~7'~a ,,//~-~/~'~ / concrete embedment across enttre trench width, complete OOLLARS CENTS per each; N/A NOT USED LF For removal and replacement of asphaltic concrete pavement, complete tn place, the ~um of  DOLLARS 'CENTS 36 7 SY For removal and replacement of 6" reinforced concrete Rtp-Rap, complete tn place, the sum of AND~DOLLA~ per~CENTS sqUe~ $ ~-~See~ecrtptten Page OOlO0-11 Section 15.2.1 .00301-14 REVISED 37 ] LS 'For furntshtng landac&ptng, complete tn ~DOLLAP~ per lump 38 7346 39 ] 40 18 LF For Trench Excavation Safety and Support, complete ~fl place,~)Td~lum of DOLLARS LS For furnishing and mJntatnlng/~'~'~,~. Traffic ~ontrol stgnage, b~r~tc~dtng, etc. durJng and through completion of constructton, comlete ~n ~O'~~CE~$ pep 1~ fa, EA For furnishing aAd plactng 4' PVC se.er services, LIARS NTS 41 N/A N/A NOT USED SECTION II! - BETHEL ROAO TOTAL BID FOR ALL UNIT PRXCE$: _/~/-//~. /~/~5/~//_~e~C)~~~ (use words) /V~/v/~;~;'~/7/~ ~_~;~/~ (Use flgures) REViSeD 00301-15 COHB]NATZON OF SECTIONS Tho uode~stgned Bidder hereby agrees to accept an ewerd of contrect based on any Individual soction. However) tf aw&rded two or more secttons~ the undersigned Bidder agrees to deduct from all prtces hanoi in those secttons the following ~unts= Combination of Sections ! and I~, deduct __ TOTAL BED FOR ALL UNIT PRICES (A~TER DEDUCT) Combination of Secttons I! and ~[~, deduct TOTAL B~D FOR ALL UN;T PR{C£S (AFTER DEDUCT) Combination of Secttons I and Z~l, deduct TOTAL BIO FOR ALL UNIT PRICES (AFTER D£OUCT)_ (use uo~is) -C~ ,. dollars. (use (S ~ _ dollars, (use WOrds) (S Combination of Sections I, II, and IIl~ deduct ~O Foe ALL UNiT PRICES (AF?~R DEDUCT) TOTAL B - / // 11.9.~, of the ~ene~i conditions. B[OOER acknowledges that quantities are not guaranteed and p y ent will be based on actual quantities determneo as prowaea in the Contract Documents. Completion. 810DER agrees that the ~ork will be substantially completed and co~p~etea and ready for final payeen~ ~n accordance utt~ paragraph 14.13. of the Gene?l ~on~lti~fls o~ ~ b~f~re t~ dates or within the number Or calenaar Rays ~n~catea tn :ne Agree~nt. BIDDER accepts the provisions of the Agreement es tn liquidated damages in the event of fatlure to complete the gert within the times specified in the Agreement. Attached Documents, The follow~ng documents are attached to and msde t condition of this B~d: a, Requtred Bid Security in the form of ~/~ ~#]P 8. Other Requirements, Address for Com~nications. a. CommUnications concerning this Bid shall be addressed to Purchasing Office 256 Parkway Boulevard Coppe11) Texas 75019 b, BIDOER agrees that all Hork awarded wtll be completed withtn ~ C~lendar Days, Contractor wime will commence to run as p~owdad tn the Contract Documents. c. Cmmmunicat~ons concerning this Did shall be to the address of BIOOER indicated on the applicable signature page. d. BIDOER understands that the Owner is exempt from State Ltwited sales and Use Tax on tangtble personal property to be Incorporated ~nto the project. Said taxes are not tncluded tn Contract Price (See Znstructtons to Bidders). e, The terms used tn this Bid ~htch are deftned in the Gemeral Conditions of the Construction Contract included as part of the Contract Documents have the meanings assigned to thee ~n the Gener~l Conditions. f, Terals used in this Bid which are defined in the General Coadittens er Instructions will have the meinings indicated in the General Conditions or Instructions, serves the right to delete any portion of The City of Coppe11 re 's this project as it .~_deem .~c)ssa~y To.st~y.v~Th!~.t~_~ evailible funds. Should the city elect To aele~e any pur~v-, the contract quantities will be adjusted accordingly, _, 19_~. SUBMITTED on ~'./~ REVISED 00301-1 S£CTIO~J 00301 811) FO~ NWJF. CT IDENTIFICATIOI(: COIITR~T IDENTIFIUTIOII: ss 94-o~ ,, , TH~S 8ID I$ SUBHITTED TO: here~n e , C11~y of eol~e11 eld No: .... X. IE.1~r Into Agreemmt. e accepted, to enter tnt. an Agre,.mt vlth?N~ll ~m tho.~.om.. tmclidnd tn the Contract Bec.rants to perroru and furmsn III York a~ spectP~od or Indicated In the Cor~ac~ Documents for the 8td I~ce tnd vtth~n the 8id Ttmes ~fldtcotnd tn thts Bid lad 1. accordance vtth the other tem~ e~d condKtons of the Contract Documents. BII]D£R Accepts. BIDDER accepts &l] of the tl~mS and coMitJons of the Advertisement or lnvltetton to B~d mad Instructions to Bidders, Including .tthout limitation thole doellflg ~tth the disposition of Btd security. This Bid vtll rumtn subject to eccoptmnce for nl~ety (90) days after ~hs ds~ O~ 8.1d o~.ning. 81~ Wt11 sign end dmltver the requt~ number, or counterparts or ~ne Ag~amNnt with the Bonds end other oocuaeflts requJred by the g~ddtng ItequJrmmnt$ vlthtn fifteen (15) days after Ohm date OWIE.q's Notice of Aklaw:l. 3. mIDI)ER' s Aep~ese~tattons, In submitting th1! Bid, BIDOEA represents, is more f~11y set loath tn tim Agreemflt, that: 8II~EP, ha~ exmtnod &M ce~efully studl~ ~ko 81ddlng Oocumnts and the followJng Addenda receipt of oll uhtch ts hereby &Ckllowledged: (List Addenda by flUBlmr arKI D~te) 0030]-2 REYtSED B[0OER has vJIJtid the IiSI end btcoa fItlier satisfied as &o the gone~al, 1~1 end site c~Jtlenl ~rk. BIDOEIt is fmtltar utah usa ts satisfied es to el! federal, kaita end local LMdS and ReguTatlons that may afi~ct cost, progress, perForuonce and furnishing of abe Ibrk. d. BXDOER has obtained and carefully studtad (eT esaqualu respmmlbtltty for havteg done so} all such additional or aupPllmlntat-y w~jlnatlons, Investigations. explor`attons, alisa, studios and data comcerntug condtttons (surface, lUbeerfice N UielurgrOUIKI FKI]ttlas) at or conttgueus to perfurllnce or fUrBishing of the llork or uhtch relsta to a~y eSl)OCt of tho lelma, methods, techniques, sequences and procedures of construction to be eeFlo~edi)y BIDOER end safety prnceuttona and p~ogreas Incident there~o B[DOER does not consider that any additional examinations, Investigations, e~lorettons, tests, studios or, date ere necessary f~r the detoretnetton uP this Btd for pir~o~e a~ Fu~tshlng of the Murk tn a~o~ance vt~ the taws, prt~ ~ ot~r ~ ~ c~itt~s oF the Contr~ e. BZDOER his correlated the Infonmtion known to BlOt)ER, iflFoMattoa and ebaervetJons obtained ~ vJsf¢~ to the sit], reports and drmslngl 1dentil'tod tn ~m Contract Documents and alt addltlonal examinations, Investigations, explor,attons, tests, studies and data vlth the Contract Decants. f. BIDDER haa g~v.~.,EAIG]NEER ffrttte~ notice o~ all ce~flicts. errors, ambiguities or dlac~panCtos tn tho C~trac~ ~c~ts a~ t~ ~ttt~ rasolutine therlof by ~INEER ts Kc~ble to BI~, a~ t~ Contract ~ts ITu g~erally sufftcl~t ~ Jodtcate ~ conve~ ~ratl~l~ of all ~ nd co~tttons for perfomln9 and ~iskt~ tam Nm-k for uhJch thts Bid ts submitted. Vhe~ conflicts, error`s, ambtg,*Jtles or dtscrepasctes have bain discovered in oF b.twem Cofltract Documeuti a~/o~ other ~leted docunmnts, and ~bere satd conflicts, eec., hive not been PeIOIvEd threug~ ~e tfft_e~p~mtettons er clar'tflcattons by ENGINEER es described In the Instructions to Bidders, becuuae of tnsu~recteut ttm or otherwlle, BIDDER has Jnclu~red tn the tim greater quauti~y e~ better qualtty of ~rk, or cnepltaKe ~Jth the more stringent requtr`eMnt resulting tn a greater cost, REVISED g. Th{s Bid ts goeu{nl iud not uafe in tho interest of ~ on Mail of eux ~lsclosM ~rsofl, tim or ~or~tton a~d of ~ ~, is~It~l o~lntzi~tan or B~ h~ not d~otly ~ o~br B~ ~o subJ~ a false o~ sba etd; BZ~ has ~f~aJn f~ biddf~, a~ BEOOER h~ not ~ght by collus~ to ~4u ~or 4tself ~ idvn~age ov~ ~ o~he~ 4. $1d P~Jces. eIOOEI ~11 complete the l/ork tn accordance with the Contract Documents fertlm folloutng p~tce(a): All spncJftc cash ellouances are t~cluded in the forth above and have been cmnputed Jn accordance 11,8. of the GlUm'aT Coodtklons. uttb paragraph CITY OF IAIT PRICE BIO FOR COPFELL SEWER IHPROV~EJI~S SI~CTION I - GRAPEVINE Ill ITEM ESTINAT~D DESCRIPTION AND UNIT TOTAL NO. QUMITITY UNIT PRICE IN ~QI~S PRICE ANOU~ !-4 N/A WA NOT USED S 166 LF For fur~tshtng and placing ~,~ 8' PVC sWer (16'-20' depth), cau~let.e tn pTace, the sum of ~~DOLLARS AH ~ C~S ~-1~ ~A ~A 14 200 LF HOT USED For' ~urnJshJng and placing 15." __~ I~?oC~3. SDK-3S MC s.?e~ (O'-lO' d~th), c~!~ tn place, t~ s~ of per liMa"foot, '" 00301-4 IIEVISB) 15 ~70 16 IQ94 17 230 LF LF For t~tshlng and plictng 15' ~ 35 Pvc sever (10'-IS' depth), c~mplete tn place, the sub oJ~ .~ 6.~[~. MD' '~ LF For fu~Jshtflg and plactflg '~°~-° IS' SDR-IB PVC IOW)' (15'-~0' depth), cauplete tn pike, the si of AND ~.~-- C~tT$ per 'llnea~' foot,. For ~urntshing end 15' SDR-IS PVC sever ~epth), complete fn plat_e, the si 18 19 2O Z! N/A ~A NOT USE]O 5 EA For fu~tshtng and placing 4 ~ 1~/~. ~le~ tn pla~, ~ s~ of cEm poF FOr furmishtng and plKlng S FT dJw~e~er standard inhule, c .o~ple~e in place, the sa of For fuFetshing a~l placing standard IrT dt Iter InhoIe, coiple~.u tfl place, th s~ 22 ii/A N/A NOT USE1) ~4 -~6 ~7 Z8 718 20-3! #/A 32 ]2 33 188 For furntshtng~ pluctngSOw dtamete~ drX ~, ~aplit~ In p)l~ the sum qf REVISED 00301-5 LF Far ~val a~ r~lecemnt af ~tnFo~ed concF~e 4 FT uide stdMlk, ~lete tfl place, the sm ~ ~, CENTS ~F~c~ I~LLAP~ D ~ CENTS per ~qu~m y.ra, sv ~o...m.1 mi rep~ac~nt of reinforced ¢onc~t~ pavemflt).c~lete In plac*, the sum o? drtve~y, ceopleta in p]ace, the ~tlm of per tqu&~l 38 3555 3g I 40 8 N/A It01' USIEO LS For furfltshing and p~actng landsciptng, campleto in ' - plece, the suu per ]~p sum, For Trench Excavation $1ht,,y and Support, coaple~e pliCl, the Sul of ]Qa~~~E LLARS NTS per LS For furnishing and maintaining Trifftc Cont~l SJllnage, barricading, acc. during &nd through C_mlplettm.o.l' . const~ucklon, COIl)leTO In peF 1~ sum. For furnishing and pllctng 4w ~ SMr services, complete tn pltce; the sum of per each. 41 102 LF For furnishing and plactng 150. )~:~. 24" ASTI4 F-497 PVC sever per eaCh~ SECTION [ - ~E1/ZItIr Ill TOTAL BiO FI)Il ALL ~IT PRICES~ ~1~ %ur~(~l (use uo~is) , } i {use ftgu~s) REViSEO 00301-I SECTION Il - ~H~APEVZNE ZTL'N ESTIHATED I ZI$ LF IV 0E~CRIPTION AND PRICE IN ¥ORD$ For Purutshtrg and placing 6' (;1. 50 Oucttle l~on Pipe, coa~let~ In j~llce, the sun of For Nrnlsht~g and plactng 8" Cl. SO I)ucttle Iron PIpe, complete l~n place) ~ke sum of ? 'CENTS P UNTT TOTAL oo 3 N/A 4 I`1 $-0 N/A lO ,567 11 1565 I~A HOT USED LF For furmtsht~g afld placing ~.~ ~,|;~.~ ~pth), c~l~e t~ pl~, ~e sm of per 11ne&r fo~. ~.~ . LF For fumt~lng 12' ~-35, ~ sweF (10'-15* 00301-8 REVISED 1! MO LF For furn~sMng nd pllclng 1~' SDR-3S, PVC sever depth), _c~ple~4 In place, ~be sug of AND ~--~ CEN[5 per linear foot, 13-18 N/A N/A HOT USED ~0-23 2~ 27 WA H/A gOT US[D 3 EA For furntshtng lad placing 4 FT dtOmt~r T~o 'S' mnhole, complete tn plac.e, th.e sum of £A For fur, tshtng and plactng $ FT dlimter Tjq)e 'S' -lnhole, c~pleto In place, the sum of per e~ch. 316 ~equtred to complete S4p~oli structure per contract place, tim sm of · ' DOLLARS -AND-- ' t per llhO~F foot~ i~qiftremeJits, colplitl In place, the sum of' . ' - a~d WI. ARS AND- *L~ .... CENTS LF For Furnishing and placing 20' ~...~,~:~?_~.oo dtameter dry bore, cemplete In 2g 37 632 9 REVISED O0301-O For aba~onmnk of sta~a~ se~eY manhole, e~lete tn LF For removal and ~epJ~cm~ of 8' relnfa~ co~crete ~hymnt, cm~lete tn place, N/A #OT USED SY For ~uo~l! iai replacment Of 6~ ~ln~o~ cO~c~ltn RIp-Rap~ c~lete in pllce, tim sm of DOLL.S ~¢ENTS LF For Trench Excavation Safety end Support, camplete tn place, the sum of ~.~ DOLLARS MD CENTS pit ~ 00301-1D R~-VISED i LS For fu~sts#lng iud Tr~fl'ic Co.tro! ~tg#nge, bartlett, Etc. c~st~tlon, c~l~ For furollhlng lad plKtng 4' PVC se~r sewlces, complete Jn place, the sum of ~ r%~ CENTS p~P each. 41 N/A N/A riOT USED 5~CTION II - 6RA~[~INE IV TOTAL BIO FOR ALL UNTT PRICES:,. ~or (,se vordf) I SECTION 1II = 9~q14EL HOA0 ITEH ESTIMATED OF~AIFTION kJiO HO. QUANTITY WIT PRIC£ IN ~ORDS I IlO LF For furnishing afld placing 6' Cl, 50 Ductile lPo, Pipe, eempllteJw place, the sum of cms UNIT TOTAL PRICE ~lNrr z 3 13 LF E? fu~ishtng and placing 8 C1. 50Ductile Iron Pipe, cogplete in place, the sum of LF For furnishing and plKing 6" 5DR-35~ PVC Im~r (0'-10' deptH, complete iii plicap ~e sm of ~ REVISED 00~01-II 4 5 5-6 2~14 1648 9 15 10 692 l I 2477 LF For furnishing an~ plact~ , depth), COl~l~e tit place, tim sm of N/A NOT USED LF LF ~.,0.~° %%0.~° For fmmishtng and plKln, g , 10' S01t-3S. P~C smmr (0 -10 d~pth)~ cgmplete tn plKe, tim sm of AND ~ ~. ' ,, CBIT$ ixkr llmeir ~oOt. For farnlshlnga~d plactng -~%,~ J.?,~.J~ lO' SDR-3~, PVC smmr (10~-~5' -- ' de~th), cMaplete tn place, tim sm of ~ ~ CENTS LF For furnishing and pllctng IZ' ~)R-3S, PVC se~er (5'-!0' depth), cmaplete tn plice, tim sm of'. AND ~ C~S pe~ 11ne~r foot. F~r f.rntsking and pl&ctng ~O.~ Il" $0R-35, PW; se~er (Ig'-15' deptk)) ~1~1 tn pl&cm~ ~he sum of A~ ' ' ' ~S 12-]8 N/A #/A KOT USED 00301-12 REVISED lg 2~ 13 EA For fu~ishtnf and plactn9 4 FT dtem~er atnnda~ mnbole, cmeplet, e In place, the sue of 2 ll/A 4 For furntshteg Ind llctng 4 ~:~,* ~ F~ dtamter drop tfl~et aumkole~ c~pleta in pls~, ~e s~ ~ ~r each. 23 24 26 N/A For furnishing and placing 6 ~ .~-~ · FT dtameter drop inter mm~e, ' ~l,~Jn pl.e, ~o ~ ot N/A NOT USED 1 EA For fuPnishtng all labor, materials and tactdemta~a ~equtred ~o oomplete Siphon structure per contract place, ~he sma ar . par each; ~" ! ~I$~ 00301-13 27 IS LF 28 lS LF 3O 31 32-34 35 36 69~ 7 For fur~hlng In4 per ~lJ~alr Foot, Fog' abandonment o~ standard Sekler mnhola~ complete tn pl~, the III of. For abandoiien% of flnttar.y seder c~ean out, ~lete tn I)IICI, ~;Itl ag of pal' ~ch. LF Far pl~t of 6" C~ass cenc~e ~nt ~c~ss tn plea; ~ sum oF ~'A NOT USED Of as~altJc ~te Page ~vlt, c~JetI ~n pl~, S~tion 13.2.1 t~ si of SY For rmmvul ami riplace~ent of 6' r~tpfor~d concrete fltp-Rap~ couplete tn place~ the SI of ~,~$~ IX)LLARS O0-t0)-~4 RL'VTSED 38 734~ LF 30 1 LS For T~nch and Sui)pon, cmple~u In place, ~he SUB O~ o~ BOLLHLS 40 lB EA For furntlhlng and placing ~(~.. ~ 4' I~ r~mF services, complete tn place, the sm of ~ CmTS 41 N/A N/A mw UsED SECTION ZII - ~L'TH[L ROAD TOTAL BiD FOR ALL IMIT ~lCES: ~J,(-~ (use vords} 1~I4BINATiON OF SECTIONS COati'aCt bued off I~y tndtvlaaa! sec~lon, mvuvar, .. two Or Bore snctlens, the ulld~tgl~l Bf.d.~er_a~.r~. tO fr~ all prtces nmod In t~se ~t~ t~ roll.lng ~un~s, Citnillon of SKIJonl J and lis deduct ~_-~ro ._ _ dollars. BID FOR ALL UfllT PRICES (AFTER DEDUCT) ~_Q_~oo TOTAL ~uam rl~UrUl Canb4nEtton of Secttoas !I and III, deduct ~o~cO , dollars. TOIAK BID FOR ALL tl4lT PRIC~S (AFTFJI. DEDUCT)~rlc/~ [,use tm~g) ~AL BZD F~ ~ UNiT ~C~ [AF~ ~O~T)~ , ' (ark ftgu~si ~TAL BIO FOR A~L~TT ~lC~ (~[g O~1)~ U~tt ~l~s have ~n ~ tn ~co~c~ ~tth parqr~b ]l,g,S, of ~e bMrtl ~tttens, BIDDER acknovledges that q,i~t.itte~ .a.?.not.g.uara.nte~d. and ft.n~?, pa~flii_ nt vtll be based o.n Ktual qtJaht;1tlaa dare,linen is.pro¥1aea tn the CoflWact I)oc~almlts. Cmt~l arian. BiODER agrees th&t the Uork .v111 be subStanttal, ly coeq~.l~pt~d nnd Calpl~ ~ld Flad~_ for final pqment in accora~nca paragraph 14.13, of the liener&l Conditions on or f~re the climes or wltkln the nmlbe~* of oAlendnr days 1edit&ted In the Agreeiant, 0D301-16 REVISEO BTM accepts the provtslms of the Age#met ss te 11991.da..l~d dmaiges 4a the event of failure te template khe Work wit#tn tt/S spwclfted tn Actic~ ~nts. ~e fo11~tng ~ts a~ att~ to and mdc a co~ttion of ~is Bid: a. ~ut~ Bid S~r4ty ~ss ~or C~ntcattens. f~ Pl~ Bouleva~ b. BZ~ER q~es ~tu ~ Ca~r c, C~tcaLt oas of BI~ t~S~tK on the ~14CeDle SI~iT~ pig d. 8I~R ~e~t~d8 thlt tko ~er.)~ exit f~g Stit~__ L~mttK Sales ~ t,~ed e. The terms used tn this Btd vhl.ch ~.~. de.rtn?d ~..n ,the,_j_j es G~naril Conditions of the COflSTJ'UCT,1On contract lfl¢l.UUgu. _ ~-~f the Co~trKt Documents have the tmantngs Ililgf~a To Lhem In the brdril Conditions. Terms used tn t~hi$ 8td which a~e defined tn the Gener&l Conditions or the 6e~erll 07×12/95 14:21 CITY OF COPPELL REVISED 00501-1 StrCTION 00301 BID FORN MWd£CT IDENTIFICATION.* CONTRACT IODITIFICATION: SS 04,02 THIS BID IS S~8NITJ~O TO: Dell .Texas ~SS ParJadalf loulfJval~fI 1~ooo0 , herein after referred to as ONNER. CJ~y of Coppe11 Bid No: ~-05q~'-o~ t. ~nter Into Agreeaent. The u_ndq, rstgnud BIDI~ proposes and agrees, if thf$ Bfd is .accepted, to enter into an Agreement with ONNER in the foe included In the Contract.Documnts to Ilarfom end furnish all York as spKlfind or inchcatmd tit the Contract Oocunmntsfor the Bid Price and vlthtn the Bid Ttmos Jndtcatod fn thts Btd and tn accordance Mth the other terms and cond~tlans of tim Contract Documents. 2, BIDO[R Accepts. BIDOER aCCOpt! all of the terns end conditions oF the Adve~tt~emant or lnvttotton to Bid and Instructions to Btdder$, lflcl.dtng utthout limitation those dealtng ~tth tho dtaposltiou of Btd se~u~fty. This Bid #tll rmmatn subject th ~ceptance for nSnety (90) days after tim day si~ Bid opofltng. BIDOER wtl1 .atgh and de31ver tim re(IUtrnd number of counterparts of the Agreement wtth the Bonds end other docuamntl required by the 61riding Requirements wtthtn flftann (15) days after tim date of O~NER's Nottce of A~ard. BIDOER's Pap~aentsttens. In sIdmttting thts Bid, BIDDER represents, as mor~ fully set forth tn the Agrmmamnt, that: a. BIDOER hu ~xamtnnd and carefully studted tim Bidding poc.mmnts and the following Addenda r~catpt of &11 ~hich is MrODy acknowledged; (List Addenda by Number and Oate) Er//12.×95 14:21 CITY DF COPPELL R[VI$~ BZOIXl hal Vtl~tid tho lite and becola fimt]taf with end is satisfied is to tho gunoral, local and sate conditions that ~ee a~ect cost, progress, performnce and furnishing of c. BIOOER ts fmtltar wtth and ts setlsftnd as to all fnderil, State and ]nco1 Lays and Regulations that ~ affect cost, progress, performance and furnishing of the York. BIDDER has obtained and carefully studted (or assumes responslblltt~ for havtng done so) all such &cldttteool or evpplelnontery exuatnatton$, Investigations, explorettona~ tests, studtes and data concerning condttJofla (aurfiCO~ subsurface and Underground Facilities) at or contiguous to the site or otherwise vhtch ma~ affect cost ptrogt'~as~ per,america o~ furnishing of the York or vhtCh relate to any aspect of abe manl, mthoda, techniques, sequences and procedural of conatrectton to be en~l~yed by BIDOEJt and safot~ precautions and progren$ tnctdant thereto. 9IOOER does not constdor that a~y additional examinations, Investigations, ex~.lorettons, testl,, studte~ or data are n~oelaa~ ~r the aete~inatt~ OF thts 8td for pe~o~nce and fu~tsh~ of the Nork in accedence with the tl~l, and other toms and conditions of the Contract camaro. BIDOER has correlated the tn~nm&tton knovn to BIODER, In,emotion and observations obtetnnd from vtstts to the atto, repo~ts end drawings Identified tn tho Contract Documents and e11 nddttton~l examinations, Investigations, ~lorattons, tests, studtes and data #lth tho Contract ocuamnts. f. BIDOER has given ENGINEER w~ttten nottce of all conflicts, errors, ambiguities m' discrepancies tn tho Contract Documents and the vrlttAn resolution the~of b~ ENGINEER t3 acceptable to BIDOER, and tho Contract Documents ere generally sutYlctent to lndtcate And convoy understanding of all toms and conditions for perfomtng and furetshtng tho York for vhtch thts Btd ts suhnt~tod. Vhere con'Flicts, errors, ambiguities or discrepancies have bain discovered tn or between Contract Documents and/or o~er related documnts, and vbere sntd conflicts, etc., hl¥t riot been resolved through the lnterpretattonl or cle~tflcat$ons by ENGINEER es descrtbnd tn the lnstruct4on8 to Bidders, because of insufficient ttau or othervlse, BIDDER has included tn the Btd the greater ~anttl~y or bettor queltt~ of York, or compliance vtth the more stringent requtr~laorrt resuJtlng In a greater cost. 07/12/95 14:22 CITY OF COPPELL ~ 922?9043 N0.275 QO? RE¥ISEDO0301-3 This B~d 1s 9enutne and not made tn the interest of or on babe]f of any undisclosed person, ftmor co~por~t~on a~d ~s not auim~tthd tn confom~t~ ~th any agreement o~ ruIii of any g~oup, ISSQC~ltiOfl, Orglfl(zlt?on or COlrpOritlOnl BIDDER his not dtrectly or Indirectly tnduced or so]tctted amy other BIDDI~ ~o submit a f&lse or shm Bid; BIDDER his not solicited or induced any person, ¢lrm oe co,potation to refYaln frmablddtng; and BIDDER has not sought by collustno to obtain for itself any advantage over any other BIDD~ or over 4. Bid Prices. BIDDER will complete the ~rk tn accordance wtth the Contract DOcuBe~ts for the ¢o110~tug price(s): All spectftc cash allowances are included tn the p~tce(s) set forth above and have been cmq)uthd tn acco~clance v4th parlgraph 11.8. of the General Condtttofls. UNIT PRICE BID FOR CITY OF COPPELL SEVER INPROVENENTS SECTI~ I - GRAPEVINE Ill ITEN £~i'IHAT~ NO. QUANTITY DESCRIPTION AND UNIT TOTAL UNIT MICE IN NORO$ PRICE AJqOUffT I-4 S N/A N/A NOT USED 166 LF For fu~tshtng end plictng 8' PVC sever (15'-20' depth), coTuplgte_tn place, the sum of - DOLLARS G-13 14 N/A N/A NOT USED ZOO LF For furnishing and plactug IS' ~/ /(~_~(~;oo SDR-3S PVC sever (O'-ZO' d~th)~ ' coqplete In place, the sum of DOLLARS ~CENTS 07/12/95 14:22 CITY OF COPPELL ~ 922?9043 N0.275 Q08 0030]-4 R[¥ZSED ]5 tS70 ]O94 For furnishing and plactng (v5°° I~lc~lC'°o lS' SOR-3S PVC sever ~10'-1S' depth), complete tn piece, the SUB Of . _" ~ ~L~ LF For furnlshlflg End plictng IS' SDR-3S PVC sewr depth), complete tn place, the IUB of , ~CU~~DOLLARS ~CENTS 230 LF 18 N/A K/A 19 S EA ZO 8 £& al I EA IS" SDR-3S PVC sever depth), co~p]ete tn piece, ghe s~o~ NOT USED For Furnishing and placing 4 /~oo C)~ ~T d~am~e? standard mublo, C~tu tn B~G~ sub of FO~ furnishing ~ placing S _S~'O°° ,~G~?° FT dt~ter standa~ ~hole, c~le~ l~olace, tho sm o~ ~ C~S For furnishing and plactng S .~z~/DC~°° '-~00~ FT dieter stndi~ manhole, c9~Te~ ~, tht s~ of per toch, 22 IVA N/A NOT USED 07×12×95 14:25 CITY OF COPPELL ~ 92299045 N0.275 009 718 28 718 REYISED 00301-5 EA For .furnishing and placing S /~ ~ I~ d~amter d~p tnlot ~hole, c~1~ In. slack, t~ s~ o~ ~r each, N/A mT ~ LF For furntshtJtg end plactng 20" dl~ne~er dr~ bore, coll)~qte In . LF Fei' furnishing and placing ZO' /~)o~_~_ /_~/~o~ diameter cajtng piped complete in Of place, the sum 29 9 EA 30-3! N/A N/A 32 lZ SY 33 18~ SY 34 835 LF For abandonment of standard sm~er manhole, complete In place, the sue .of m . ~ OOLLAR~ ~ CENTS per each. NOT USED For rlmovll and replacemnt of 8' reinforced concrete pavement, complete tn place, the sum of CENTS per square yard. FOr ~umovl! K replacement of reinforced concrete drtveviX, celpllte tn plies, the sum of per square For removal and replicement of reinforced concrlt, a 4 FT #1de stdeualk, complete tn place, the. sum of ENTS 14:25 CITY OF C~PELL ~ 9~45 N0.275 00301-6 Rk*VISED 37 ~ 38 3SSS 3g I 40 8 41 10~ BI/A ~ USF, O LS For fU~ishtng and plict~g /~000~, /.~0~ land~c~Jng, complete ta " ' p]o,~ the. sum of , LF For T~t~ch Excavation plac~tbe s~ of For ful~lshtflg and placing 4' ~ IIl#~' services, For furnishing and rain. thing /~--~'~': /0~'~-~® TraFfic C~t~l Slgnlgl, conltr~I~, ~lete IK, . ..°° cOOENTS s.m of LLAFLS LF For furnishingimf plactng S4" Abflq F-#7 PV£ smmr 75':30' depth), cmplete fl piicet the sum of : - - OOLLARS AND' ' per eich. 07/12/95 14:23 CITY OF COPPELL ~ 922?9045 ~u.~¢'~ uu.~. REVISED 00301-? SECTION I1 - GRAPEVINE IV IT[N [STZ/'IA~rO DrSCKIPTIOfl AND NO. QUANTITY UNIT PRICE IN VORDS 215 LF 215 LF UNIT TOTAL PRICE N40UKr For fur. tsh~ng and placing S' C1. $00ucttle Iron Ptpe, the sue of Fo~ furnishing and placing 8" CI. SO Ductile leon Pipe, C~ete~t.n p. lice, .t~he sue of r~ ~ ~ ~L~ o~OG? ° ~0°° 3 N/A N/A 4 13 LF I0 11 N/A SS7 1565 For furntsiljflg lied plictng 8" 77~oo 5DR-38, PVC leuer depth), complete in place, ~he sum of ANO ~ CEHT$ per linear foot. N/A NOT USED LF For furnishing and plict~ , 12" SOR-3S, PVC s~der (0 -10 depth), coglplete tn pl&cl, th~ ;ua of . pe~ l llea~ tog. LF For furnishing and plectng 12" SOR-35, PVC sever (10'-]S' depti~s~ ~faa~l.t. in place, ~DOLLAqS 07×12795 1~:24 CITY OF COPPELL * 92279~43 N0.275 Q12 REVISED For f~tshtag ~nd plactng 1Z' SOR-35, PVC depth), complete tn place, 12-18 N/A N/A NOT USED 19 8 EA SO-Z3 N/A K/A NOT USED 24 3 Z6 I 26 EA For fuymtshtng and placing 4 FT diameter Type'S' nunhole, S:oeqlleTe. tn pl~, ~e s~ oF ~ For fu~t~l~ ~ plact~.S ~ dliter Ty~ uSS ~hOle, c~leto lq plKq, th~ll of ~ For fu~Jsht~ 811 l~or, Mtertals ~ t~tdentals 27 316 LF required to col~llte Siphon structure p~r contract requtremnts, complete tn ,.~ ~C~S For furnishing a~ plict~ ~0" /~ dtmtlr dr~ ~, c~lete In, 14:24 CITY g~ COF~ELL ~ 9227~43 N0.275 ~13 Z8 3~$ LF 30-31 N/A N/A 32 832 LF 36 9 37 I REVISED 00301-9 For furwlshtng and plicing ZO' c~O~ ~,-~ diameter oist~ pl~, c~lete NOT USrn For rea oval ind'replacelent Of 8' reinforced concrete pivemflt, complete In placer tM sim of ~C:ENT$ N/A NOT SY For riflOVl! lid replacement of 6" reinforced coucTete RIp-RIp, cogolete tn place, the. sm of LS For furllshtng aM placing I andscaptlJg, COl~lnte LF For Trench Excavation Safety and Support, complete tn placid, the sub of 07×12×95 14:24 CITY OF COPPELL ~ 922?9043 H0.275 D14 REVISED 39 ] LS 4O 6 For furnishing and mtntatntng Trat'ffc Control slgnage, h~t~i~, etc. durt~ and th~ ~letton of cmst~t~, c~le~ tn pll~, t~ s~ Of ~r ~ ~. 41 N/A N/A HOT USED SECTION lZ - GRAPEYINE IV TOTAL BID FOR ALL U. IT PRICES: ~(_~/~ .~~ (use .ordf)/~C~ SECTZ~ iii - ~EL ~ 11'01ESTII~TED OESCRIPTION ANO UNIT TOTAL NO. QUANTITY UNIT PRICE IH ~ PRICE A#OU#T I IlO LF For furfltlhtllcj and placing ,;~/~ ~/C 6' C1. SO Ouctile IPon PIPe, c~j~,~lete~ ~ suni of' I 110 LF For furnishing and plictng ~0o° ~/~OO 6' C1. 50 I~tle Iron Pipe, 3 13 LF For furnishing and placing %%~ r soR-3s. ~C lever (0'-10' ~lo~e la pllce, depth), coq the sum of eOLLARS ~CENT$ 07/12/95 14:25 CITY OF COP~ELL - 92279~43 N0.275 Q15 4 S-6 N/A N/A NOT USED 7 2314 8 1648 LF For furnishing a/KI plictng , 5~-°° ~'~7~~ 10u SOR-3S, PVC sever (0'-10 -- depth), calPlete tn place, tlm~_sWn ,of . LF FOr fllrnishtng and plictng ~?~o 10" SDR-3S, PVC IJ4r (lO'-lS' depth), COelplltl tn p1Ka, g IS LF For furnishing and placing TI' S~-Z6, PVC sever (O'-S' depth}, coapllte tn plact, lO 692 2477 11 LF For furnishing &nd plecl,ng 12' SOR-3S, PYC sever [S -lO' depth), camplo~ In pl&ce, per lSnear foot, LF For ~urotshtngind p~ac1~ depth), complete tn place, tl~s#moF ' CENTS I~r linear foot, 12-1n WA ff/A ~ USED 07×1~95 1~:~5 CITY OF COPPELL ~ 9~79~4] NU.~Y~ ~lb 00301-12 RL'~ ISED 19 13 FT dtsm~er s~undurd R.ho~e, EA For furnishing and plictng S ~ ,,~/J~'- FT dtmeter standard manhole, .cwp~e~_e In ~e, the sum of z] N/A N/A NOT USE~ zZ ( 1 EA For fur~tsht_ng &nd plictng S __~ FT dlamt4~ di~p Inlet muhole, CPal)lete~tn place, t~ sun of 24 N/A ./A .OT USED 26 I ~A For furutshtng a11 libor, mtertals and Incidentals requtred to ce~lete Stphon structure .r contract roqutrmnent$, complete tn __ p)mce, ~h. sm, o( CITY OF COPPELL ~ 922?9043 NO. 275 28 IS LF 30 4 EA 3] 48 LF 3Z-34 I(/A N/A 3S 6998 LF 36 7 SY REVISED 00~01-13 Fo~ furnishtngiM p]ictng 20' :0~., -~-C dtimtor dry bo~, coapletl tn p~uco, the bum. of , For abandonment of standard segtr mphole, complet, e tn pl.~ace, tht~ II o,f _~ .~, . ~C£NTS For abandonment of santtarX sewer clean out, complete tn place, tho sun Qf. For placemnt of 6' Cl&ss 'B' concFete edmdmnt across enttre trench width, cmplete per each. NOT US~ For remval Ind replacement of Isphaltic concrete pivem~, complete In place, the suB of  DQLLAR~ CENTS For remvll and repJacemnt of 6' reinforced concrete Rtp-Rap, complete tn place, c l]OEEFLLARS S oO ~scr~ptton Plge 00100-11 Sect*on ~3.2.1 ~/0°° 14:25 CITY OF COPPELL ~ 922?9043 N0.275 Q18 00301-14 REVISED 37 I LS ~For furnishing and plactng ~ -~ landscaping, cmplete tn place, ~he ~ua of ~ · LLAR5 38 7346 LF For Trench Excavation Sufsty 40 18 ~57//°° end SupPOrt, couplete placenta of 39 ] L$ For f..rntshtng alxl TrafY~c Coatrol stgnage, ba~lcadtng, etc. duetng and through ceeq)l teton constructton, coaplete tn place, the sum~o¢ EAFor t'urntshtng ll~d plactng '_ 4' PVC seuor #evlce$, c~a~lete~in.p;J~q,.~e sum of DOLLARS ~CENT$ ~570°° 41 N/A N/A NOT USED TOTAL BZD FOR ALL UNIT PRZC~S: ~se 07/12/95 14:26 CITY OF COPPELL ~ 9227°~43 blO.~7~ ~19 REVIS~ 00301-1S CI~8INATIOfl OF SECTIOflS T~e undoFsig~d_ Bidder hereby Igrees to accept on sword of co, tract hued off i~y Jndtvlduil sKtton. Mr, tfM~d ~ or ~ sKt~ous, ~e ~t~ Btddor ~s to de~ f~ all prtcos n~ iff those s~i~ t~ fo11~i~ ~unts~ Ceabtnitton of Sections ! and II, deduct '~0~ ~TAL 8ID F~ ALL WIT PRICES (~ D~T) ~ ~~~~ ~ BID F~ ~L ~IT ~IC~S (A~ER O~) ~use ~Jna~ion ~ SecU~a ] ~ Ill, ~K~ ~ ~ 8ZO F~ ~L (use TOT~ B~ ~R ~tt Prtcos hove BZDD~R acknowledges that quaflttttes are not guaranteed and ftnal pa)lent vt11 be minion ictu&l quonUties dete~utned is provtded tn the ContrKt Documuts. Coq)leSSon. BIDDER agrees th&t the YOrk will bo substantia11~ completed and completed end ~oa~y for ftnal po)lent in accordance #1th plrigrliph )4,13. Of the General Conditions on of befome ~he da~es oJ' vtthtfl ~e number of cl~e~dar d~s indic&ted tn the 07x12/95 14:26 CITY OF' COPPELL ~ 922?9043 N0.275 Q20 00301-16 REVI$[O BIDOER accepts tim p~ovls~ons of the Agreement as to liquidated diages tn tim event of fetlu~e to complete the Horkvith~n the alms specified t, tho Agremumnt. 6. Attached DoCUlllant~. The follofftn~ do~illlllts are attached to and m~do a condition of thts Btd: a. DoqeJred etd Sh'~rtty tn the fore oF ~ ~ ~ 8. Othmr Requirmmn~s. Address for Communications. i. Cmimtcat~ons conc~rel~g this Btd shell be addressed to' Purchutng Offtce 255 Parbay Doulevo~l Coplm11, Texas 76019 c. Communications co,corning thts Bid $ha11 be to the address of BlflOER tndicltdd on tho applicable signature page. d, BIDOER understands that the Odner ts exempt Prat State Ltmtted Sales and Use Tax on tong4ble personal prepev~y to be Incorporated 1flee the project, htd ams are not tncluded tn Contract Prtce (~ Instr~ttons to Bidders). The terms used In thtl Btd ~htch are defined tn the Gmara1 Conditions of tim Construction Contract tncludod as part ~f the Contract Documents have the Imantngs &lstgned to them tn the General Condtttofls. Tone used tn tht$ Btd t~tch ire defined in tho General Conditions er Instructions v111 have the men, trigs Indicated tn tim Gennrel Conditions or lnstructtons. The Ctty of Coppell reserves the rtght to delot~ any portton of this pro~le~t as tt m~y dom necessa~ to stay ¥1thln khn Ctty's available funds. Slmuld the Ctty elect to delete any portton, the contract qoantJtfes vi11 be adjusted aconrdtngly. 00301-18 BID AFFIDAVIT The undersigned certifies that the bid prices contained in this bid have been carefully reviewed and are submitted as correct and final. Bidder further certifies and agrees to furnish any and/or all commodities upon which prices are extended at the price offered, and upon the conditions contained in the Specifications of the Invitation to Bid. The period of acceptance of this bid will be calendar days from the date of the bid opening. (Period of acceptance will be ninety (90) calendar days unless otherwise indicated by Bidder.) STAT - OF COUNTY Or BEFORE ME, the undersigned authority, a Notary Public in and for the State of -~xo-co , on this day personally appeared '~cJic'q> /~-~ci.-$r.~;c~¢,~r: who after being by me Name duly sworn, did depose and say: Name Name of Firm foregoing on behalf of the said am a duly authorized office/agent for and have been duly authorized to execute the Name of Firm I hereby certify that the foregoing bid has not been prepared in collusion with any other Bidder or individual(s) engaged in the same line oc business prior to the official opening of this bid. Further, I certify that the Bidder is not now, nor has been for the past six (6) months, directly or indirectly concerned in any pool, agreement or combination thereof, to control the price of services/commodities bid on, or to influence any individual(s) to bid or not to bid thereon. Name and Address of Bidder: ~/~ ~-- O-----°c~b~C~5°'S ~ SUBSCRIBED AND SWORN to before me by the above named __~ on this the [ c~ r~ day of ,~o, / ~,~ 1992~. Notary Public in and for the State of Charlotte A. Humphrios NOTARY PUBLIC ST~A,,~ OF TEXAS Comm~Jon Expires 7-29.g5 T~XC~ 00301-19 If BIDDER IS: An Individual By ( Seal ) (Individual's Name) doing business as Business address PhoneNo. A Partnershiu By (Seal) (Firm Name) (General Parmer) Bus/ness address Phone No. A Corporation By ('~3~ ~-~ T~c,s (Corporation Name) By (State of lncorporati~on) (Name of person authorized to sign) (Title) · (Corporat~ ~e..ai~ /'~ ' ~ ~(Secre~) A Joint Venture By By (Name) (Address) (Name) (Address) (Each joint venture must sign. The manner of signing for each individual, partnership and corporation that is a partner to the joint venture should be in the manner indicated above.) ~ OF SE~'riON 1. Secgoa 00(Il0 - INVITATION TO BID, ~ (II(D0-1, BIOTICB TO BIDDBP.3: Change '2:00 p.m. o~ Thursday, JuIy 6, 199S,' to '2:00 p.m. o~ Tucshy, luly 18, 1995,'. 2~ So0iion 00100, Pago 8-* Fol~ lm~r~h 13,2, add lbo fnlLowlflg p~, A minimum of 12 1~ ~ushaf 8to~ embMment shell bo phood over Mp of piPO. Materiel tbr Water end hnitiry Sower'Maim.' Section 00100, P~e 12: Followini Pwg~l~h 13. I2.19, add the foUowi~,. '13,2.20. P~y llgm N'O. u~xiaf~d with pipe Jfuudisii~. JnoMen~s neom~ m oomplm ~e work.' 4. ,~ 00301: Replac~ aeotkm with ~vised Seotion 00501 aUacl~ to this addendum. Secdon 00~o0, P~ :~: pollowt~ ~ ~0, add ~ho fo~owtns i~m, 10~ LF ASTM F-'7~ Pvc sew~r (2S'.30' depth), oomplete in place, the sum of sec,~on 0O5OO, 1. Sheet No. 29, Mbcelhnoom Dettlls: Add "Typlolt Rmbedmmt Detgl'* to ~s sheet, Rmbedment deudl Is ef~____,'~od in this addendum. Ail it.ms in ~ with this nddmdurn ~rs hereby deleted, ~ ADDIINDUM I~ MADI~ PART OF TI~ DRAWINGS, SPBCIFICATION-8, AND CON'r~CT DOCUMEN~ AND ~ Bli NOTi~ ON TI~ PR~. TYPICAL NATIVE MATERIAL COMPACTED TO' 9§% OPTIMUM MOISTURE ! 3% UNDER PAVEMENT 90% OPTIMUM MOISTURE £3% OUTSIDE CURB LINES JETTING IS NOT ALLOWED BACKFILL TO BE COMPACTED IN 6"± L~I~TS CRUSHE STONE (SEE SPECS) EMBi[DMENT REVISED 00301-1 9SCGI1 SECTION 00301 BID FORM PKO~gCT IDENTIFICATION: CONTRACT IDENTIFICATION: ss 94-02 .... THIS BID IS SUBlqITTED TO: ~ here · City of Coppell Btd No: ...... 1. Efltor Into Aeru~mant, The undersigned BIDDER proposes and agrees. If this Btd ts accepted) to enter tote in Agreement trlth O~NI~ In the rom Included tn the Contract.Documents to perfom and furnish all ~ork as specified or tnd~cstod tn the ContraOt Docu,mnts for the Btd Price and vtthtn the Btd Ttms indicated tn thts Btd and tn accordance wtth the other term and conditions of the Contract Documents. 2. BIDDER Accepts. BIDDER accepts al~ of the rems ~nd conditions of the Advertisement o~ Invitation to Btd and Instructions to Biddtrs, InCluding vithout ~lmltatlon tho~l dlalln9 wtth the disposition of 8td security. This Btd wtll ~mmtn subject to acciptance for ntnety (90) days after the day of Bid opening. BIDDER ~11 stgn and de]tver the requl~ed number of ~ounterpart~ of the A§reemlnt #1th the Bonds and other documentl required by the Bidding Requtwments within ft~teen (15) days after the date of OMNER's Nottce of A~a~. '- BIDDER's RepreSentations, In submlttln9 thts Bid, BIDD£R represents, as more fu?~y set forth in the Agreimnt, that: a. 8IDDER has ~xmtnnd and carefully studted the Btddlng Bocumente end the following Addenda recetpt of all which hereby acknovlodged: (Ltst Addenda by Number and Date} ADO£NDA No. OATE one ( 1 ) 6-30-95 Two ( 2 ) -30-95 Three ~3) /-1z-9~ 00301-2 ~EVI$~D BIDD[R has vSsttnd tho stte and becom famtlta~ wtth end ts aatisflnd as to the generll, 1ocll and atto conditions that mW affect coat, progress, perfoIm~nce and furnishing of Work. BIDDER is famlltar with and ts satisfied as to all federal, irate and local Lens and Regulations that amy affect cost, progress, perfomance and furnlshlng of the kbrk. d. BIDDER has ebtatnad and carefully studtod (or assumes ~sponstbtlit~y for havtng done so) all such nddtttonaT or supp, le~entary ~examtnatlons~ tnveatigittons, ~loritl~s, testa, at.tel aM data co~ce~tng CO~tttonl (su~ice~ subsurface ~ U~e~o~ Fictlltlis} at ? ~nttguous to per~o~e Or ~ntshtng of the York or~t~ relate to ~ upec~ o~ t~, mth~s, technt~es, s~nces a~ proc~ures of c~structton to ~ e~l~edbx BI~R and s&~et~ p~ca~tons &nd p~TIws tnctdent ~e~ito. BIDDER does not consider that any additional exl~atnatlons~ Investigations, explorations, tests, studtas or data are necaasa~ for the deteminstlon of thts Bid for perfomance and ~urnishtng of the iork tn accordance Mth the ttmes, price and other tones and conditions of the Contract Docmients. o. BIDDER his coTl'elated the Information known to BIDDER, tnfomatlon ~Ad absa~vattona obtltned I~om vtstts to the site, ~epor~s iud dravtflga Identified tn the ~ntrlct ~nts and a)l additional ixmtnittons, Investigations. explorations, tests, studies and data vith the Contrlct Documents. BIDDER has g~ven ENGINEER w~ttten notice of ali conflicts, errors, ambiguities or diSCrepanCies tn the Contract Documents &nd the vrltte~ resolution thereof by ENGINEER acceptable to BIDDER, and the Contract Documents a.~e generally sufficient to indtcate lad conv~y unoersthndtng of all tams and conditions for performing end fu~tshtng · the Work for whtch this Bid ts suhnttted. Where contrltcts, errors, ~Jnbtgutttas or dlscrepanctes have b~en discovered tn or burmese Contract Documents and/or other ~elated documents, and vho~ satd conflicts, etc,, have not been resolved th~ongh the Inta~pretattons or clartflcatlons by ~#GZNEER as described In the instructions to Btddera, because of Insufficient time or othe~tse~ 8[DDFA has tnclnded tn the Btd the greater quanttty or better qualtt~ of Hor~, or compliance ~tth tho more stringent requirement resulting tn a greater cost. REVISED 00301-3 g. Thts Btd ts OenUtno and ~o~ Bade tn tho interest ?~ or oR behelf of any undt$¢]oseo person, ftm or corporation eno ts not submitted tn confomt~ wtth any agreement or rules of any group, assoc~u~ton~ organization or corporotton; RIDOER has not dtreotly or Indirectly ~nduced or solicited any other BIOOER to submtt a false or sham Btdi BIDDER has not solicited or 1educed any person, firm or corporation to refrain from b~ddtng; and BtDD£R has not soughtby co13uslon to-obtain for ttsetf any advantage over any other 8IDO£R ~ over OtOIER. 4. Btd P~tCO$. -BIDDERwill complete the Hork tn IccoPdlnce wtth the Contract Documents for the following prlceCs): All spectftc c~sh a11ouonces are Included tn the pFtce(s) set forth above and have been computed tn accordance wtth p~ragraph ~1,8. o~ the General Conditions. UNIT PRICE BIO FOR CITY OF COPPEL~ SEYER IIIPROVEHEHTS SECTION Z - GRAPEVIHE ESTI~4ATED DESCRIPTION AHO UNIT TOTAL QUANTITY UNIT PRICE IN t~ORDS PRICE ANOUIfT I-4 N/A N/A NOT USED 5 t66 LF For fu~'ntahtng ind placing ~ -'1~'~/~""~ 8' PVC se~er (15'-ZO' depth), '" c_ompl~t~ In place, tho sum of 6-13 .N/A N/A NOT USED ~4 200 LF For fur~tshtng and plictng SDR-3S PVC sewe~* (O'-lO' depth), complete tn 4)]ace, the sum of ~CENT$ 00301-4 REVISED ]5 Z570 1094 17 230 15' $0R-35 PVC smdr ~10'-15' c~plete tn place, depth}, _ ~CENTS i5' $DR-3S PVC sent (1S'-20' d~'~th), comlete tn place, ~CENTS For furnl shJng depth}, go~lete the s~ ~f ~CE~S ]8 N/A #/A NOT USED EA For furntshtng and plicing 4 FT dtmeter standard manhole, . complete.tn plaep, the sum of per e&cn, 20 8 EA For furnishing and plKing S ~ ~.~v~-.' FT d~l~eter stenderd manhole, .compl~t~i.lpp~ace, UPe sum of DOLLARS ~CENT$ per each. ' For Furnishing and plactng 6 FT dtameter stand&~(I manhole, complete $~ plac~ tho sum of AND ~ CENTS pe~ ea'~h. 22 N/A N/A NOT USED 23 ~? 28 2g ~0-31 33 34 ./A 718 N/A 188 635 REVISED 00301-$ EA For Rlrnishlng and plnctng 5 f~a:~.~ FT dtlmte~ 'drop Inter miflhole, colale~ tn.pTace, the sum of '~ - DOLLARS NOT USED dt~eter dry bore, complete In ~OOLLARS LF '-For furnishing and pl,ctng 20" ~ _~_~:~.~ dlamtor cestng pipe. complete ~CENTS EA For abandonment of smmrmnhole, complete ~CENTS N/A NOT USED of 6" reinforced concrete pavement, couplete tn place, the ,s~ o~ / per square yard, SY For rmoval and replacemnt of reinforced concrete drtvewly, COIq)]ete tn pl&co, -CENTS per~ LF For removal and replacemnt of re~nforced concrete 4 ~ '' utde sidewalk, c~lete place, the%s~ of ~ DOLORS 37 38 3555 3g ! NOT USED ! L$ For furnishing and plactng landscaping, complete ~L~ and ~po~t~ c~lete Pl~R, ~he_sm of FO~ fu~tshtng I~d mltn~alntng~ LS Trafftc Cont~ atgnage, ba~tc~J~, e~, du~l~ and through c~lett~ of c~structlon, c~lete 40 8 4~ P~C ~IM~P ~rvJc~sl ~_ ,, complete In p~a_c.~ the s~ of ' ~r each. 4] ]02 LF For furnishing ,~ plictng~'~ ~,~,~ 24" ~H F-497 PVC s~r ' (25'-30' dmpth), c~le~e ~~~LLARS per each, SECTION I - G~PEVINE III IOTAL BZD FOR~L UNIT PRICES: I~¥I$E0 0030~-7 SECTION Il ° GRAPE¥INE ITEM ESTIMAT£D NO. QUNfTITY UNIT 1 215 LF con~te, ta ,lace, the sum of ' ~gXTOfj~__~eOLtARS ~CENTS LF Fo~ fu~lsht~ a~ placing 8" C1. 50 D~tle Irp~ Pipe,. ~CE~S IV DESCRIPTION AND UNIT TOTAL PRICE ]N~ORDS PRICE NdOUNT For ~urnt~htng and pllctng G" ¢1. SO Oucttle Iron Ptlm, 3 4 10 11 H/A 13 #/A 567 ~1565 N/A LF N/A NOT USED LF For furnishing ind plactng ~ 12' SM-35, FVC se~er (0'-10' depth), complete te place, ~CENTS LF For furntshlllg 12" S~-35, PVC s~er (lO~-lSt depth), co.lore In place, the s~ ~CENIS 00~01-8 REVISED 12 Ii' S~-35, PVC sowtr depth), c.ou~lete ~ place, 13-18 N/A H/A IIOT US~'I) 20-23 N,/A N/A NOT USED 24 26 3 £A For fu~ntsb4ng and placing FT dtemeterT~pe "S" EA For fu~n4shlng I~ pluctng ~ dl~tor T~po "S" mnhole,~ 1 ~ FOr fu~lshtng Ill labor, ~rtals and Incidentals re~t~ to c~l~te Stroh 28 29 30-31 32 33-3q 37 316 REVISED 00301*g S EA FOP ibandomNnt of standard se~eP manholo, coaq)lete tn p.] ace, t o per each. N/A N/A NOT USED .. 83Z LF For removal and replncemnt of 8' reinforced concrete plvement.~complete tn place, tho sum~of_. / ~>%~z__OOLLARS ~WTS per ~. N/A N/A NOT USED , sY For ..o.,~ .d ,.,~..,t ~ 1 ~' ~ of 6N rotlJfoi'cod coiTcrgl;8 RJp*~, co. lore tn place, the sum Of. per squaro yam. ' 38 260] LF For Trench £xcavatton Safety a~ Support, complete in c OOLLARS ENT$ 00~01~10 REVISED 40 pl ca the s f pe~ lump sum. g F.A For furnishing 4" PVC s~r sl~lces~ 41 N/A N/A NOT USED SECTION Il - GP~PEVZNE IV ~ TOTAL BID FOR ALL UNIT PRICE$z~ SECTION III - BETHEL ROAD ITEIq' ESTIMATED DESCRIPTION ANO UNIT TOTAL NO. QUANTITY UNIT PRICE IN NOP, DS PRICE NqOUNT I lid LF For furnishing and pTac~ng ~:~ ~::~c~. 6' C1. 50 Ductllm l~on Pipe, eomplet, tn plat_e,/the sum of ~LLARS 8' Cl, 50 Oucttle Iron Pipe, ' complet~ ~.n, p]qc_,,, ~he sum of DOLLARS per ! 1near toot, 6" $DR-35,' PVC ~e~r ~0~-10* depth), complete in place, LLARS NT$ z 3 13 REVISED 00301-11 4 S-6 8 ]0 11 1648 1S 892 2477 LF For furntehtng and plactng ~ ~-~,.-~ 8' SDR-3S, PVC sewer (iO'*lS' depth), co~01ete tfl plafl, NOT USED 10' ~R-3S, ~VC s~r (O'-lO' dupth)~ ~lete tn plice~ ~~L~ depth), c~]ete tp place, 1Z' SDR-26, PVC Sower (0 -S depth), complete tn places .~~~DOL~S LF FO~. furnishing and placing ~ ~_.~.9 12 Si)R-iS, P~C s~er (6'-I0' depth), c~le~ In place, 12-]8 N/A N/A NOT USEO 00301-Z2 RLrVZSEO 19 Z0 Z EA FOr furntihtng and placing 5 ~___~-~ FT dtlmetlr standiY~J manhole, ~, .' c~le~t tRpl~e. ~he s~of ' ~~ CENTS 2] N/A N/A HOT USEO 22 4 EA For furntsh$~9 and plactng 4 ~__~.o .o FT dtamter atop inlet manhole, par 5 ~ EA For t'urrdshlng ~nd pl~ctng ~.d ~.* FT diameter drop inlet manhol, e, .c~leTe ~n plice, the sw or 23 24 N/A N/A NOT USED 26 Z 26 Z EA For ~urntshJng and placing 6 ~,~ ~.e FT dtameter Type "5" manhole, _, c_o~.lete 1. p~ce, the sm of ~terlals and Incidentals re.trod to c~plete Stphon requirements, c~lete tn laca~ s m of ANO - ' ~.l~ ~anta per each. 27 ]5 ZB ~5 LF 2g 3O 31 32-34 35 REVZSLq) 0030Z-~3 LF For furnishtn9 and pl&ctng dtameter dry bore, complete ~lsce,.the su~f £EN~S For fu~ishtng and plactng 20' diameter casingpipe, complete in plebe, the, sum of ~CE#TS 36 ~6 EA For abandonment of standard sever manhole, complete in nl~:e, the s~,~ of '~CENTS per e~cn. 4 7 48 6998 FA For abandonment of santtsry se~er clean out, complete i] ace, the LF For plaemaent o~ $' Class "B" .~-'~ ~:~'~(-~" concrete ~nbtdnmnt ICrOS$ enttre t~ench wtdth, complete t~p. lace, ~he sum of ~CENTS per each, LF NOT USE0 of asphaltic concrete pavement, complete tn place, Page 00100-II the sum o~ Sectto~ 13.2.1 DOLLARS ~CENT$ Sy For re.)vi1 el~d replacement of G" reinforced concrete Palp-Rap, comp3eta;tn place, __,~esmof_ , / ~ ~ ~:\~;rT~ ~ DOL~RScE~S pep squire yard. 00101-~4 37 I l~ndeciptng, complete tn place the s of ,- - ·, "~cE~s per 1map sum. 38 7346 LS *For furnishing and plictng ~-}(~:~;~0'~C~'~ LF For Trench Excav&tton Safety Tr&fflc Control stgnlge, b~r~tcidtngt etc. durtng an~ th~ough'cogq~letton oF construction, comp~Ke tn  OLLARS Lift'S 40 ]e EA F? fUlrntshtng and plictng 4 P'~ semt services, , coapl.e~e ~n place, the sum of 41 ~A N/A ~T BETHEL ~ TOTA~ BID FOR ~use REVISED 0030~-15 COHaINATION OF SECTIONS The undersigned Btdder hereby agrees to accept an award of contract based on a~y individual section. However) if awarded two or more sections, the undersigned Btdder agrees to deduct from all prices named tn those secttons the following amounts: Combination of Sections I and I[, deduct ~dollere, TOTAL BID FOR ALL UNIT PRICES (AFTER DEDUCT)~ .... ~use figures) Combination of Sections I! end III) deduct ~ol~-.~.~ dollars. TOTAL etd FOR ALL UNIT PRICES (AFTER DEDUGT)~ ~ Combination of Se(atone I and III, deduct \~;c~_\?~.~ ~011ars, TOTAL BZD FOR ALL UNIT PRICES (AFTER DEDUCT)~~U~D~/ Combination of Sections l, II, and III, deduct~..~dollars. TOTAL BID FOR ALL UNIT PRIC~$ (AFTER DEDUCT)~ (use ftgu~es} Unit Prlces have been computed tn accordance wtth paragraph 11,9.2. of the ~neral Conditions, BIDDER acknowledges that quantities a~ not guaranteed and ftnal payment wtll be baaed on actual quantities detemln.d ts provided In the Contract Documents. 6. Completion. BIDDER agrlla that the )lork will be substantially completed and completed end pead~ for ftnal payment in accordance with paragraph 14.13.of the GeneraT Conditions on or before the dates or withtn the number of calendar di~s lndJcitld Iff the Agreement. REVISED BIDDER accepts the provisions of the Agreement as to liquidated dslige~ tn the event of fa$1u~e to complete the #ork wt~htn the ttms speclfltd tn ~he Agremnlnt, Attached Documents, The following documents are attached to and Bade a condition of thls Bid: a. RequtT~d Btd Sec~rtty tn the foTmof 5%Bid Bond Other Requtrlmnts, Address for Communications, Communications concerning thts Btd shall be addressed to Purchasing Offtce 255 Par]May Boulevard Coppe11, Texas 760]9 b, BIDDER agrees that all gork awaked w111 be completed withtn 270 Calendar Days. Contractor vtle wtll coamence to run ~s provtded tn the Contract Documents. c. Cm~untcattona concerning thta Bid shell be ko the address of BIDDER Indicated on the applicable Ltmtted Sales and Usa Tax on tangtblo personal property to Satd be Incorporated tote the pro~ect, taxes are not tncluded tn Contract Price (See lnskrocttons to Bidders). The tams used tn this Bid which are defined tn the Ge~nral Conditions of the Construction Contract tncludnd as part of the Contract Documnts have the ~eantngs isltgned to them in the General Conditions. Terms used In this 8td ~hlch are deflnnd tn tho General Conditions or Instructions will have the meantngs Indicated in tho 6innral Conditions or Instructions, The C1~ of Coppe11 reserves the right to delete an~ portton of this pro, ecL aS Jt m~Y deeflt necessary to stay ~ithtn the CtW'I available funds. Should the Ctty elect to delete any portton) tho contract quantities #t11 be adjusted accordingly. SUB#~TTED on July 18 , 195 . 14:15 CiTY ~ COPPELI- '* 9817481~97 AImENDUM TO DRAWINGS, CONTRACT ~, AND SPECIFIC&TIONS lq)U SAMTAIY SEWER IMI~O~ FOR GRAFEViI~ ~I, IV AND BE'A'itEL RO~, aS CFFY OF COIVEI,L, TEXAS NO.~O~ 1. Sec~ 0~0-1N3~TA~ TO BE), Pog~ G(X~0-1, NoT~r~ TO BE)DERS: Clunge *2.'G0 p.m. oa TlnnM~ Jul7 6, 1995,' to ~2:00 p.m, oa Tues., Zul~ 18, 199~,*. 2..~i~m0G301: RepbceFage00301-3wi~h~lmgsG0301'3. 3. Sec6oa00301: Repbmpqo00301-Tw~hREVl~EDpogo(X)301-7. ~ ADDBlqDUM IS MADE PART OF THR DRAWINGS, SPEc~t~,ATIONS, AIqD COtrD~CT ~ AND SHALL B~ NO~-~-., ON Tm~ PROPOSAL. 07/17/~5 1~:1~ CITY ~ C~ELL ~ ~17~1~5~? St/. 85 '95 GM~4~F~ HI~ EMGR DF. PT 37 (214)9G~-4471 NO. ~4~3 P.~/4 REVISED Q0301-3 g. This BId Is genuine a~d not Bade tn the ~ntlrest of or on behalf of any undtsclosnd ~reon, fie or co~oritJon ts not su~lttnd tn confoml~ of m4zatt~ or co~rition; ~ ~ g~, association, o~ 8I~ER bis no% dJ~tly or J~re~l~ lnd~ed or sollct%~ not ~ollcited o~ tnduced ~frain f~ bt~tng; ~nd ~11uston ~o ~ltn for ILsolf 8~[R or ever ¢. 814 Prtces. BZDOERV111 COmplete the Work tn mccordmnce vtth the Contract Documntl for the follovlng price(s): All specific cash allowances ire Included tn the price(s) set forth above and have been comuted In accordance vlth paragraph 11,8, oF the General Conditions. ~IT P~ICE CITY OF COPPEU. SEVER ll4PRQYOENTS SECTION I - GRAPEVINE III ITBq £5TIHATED DESCRIPTION Alll) ilO. QUANTITY UNIT PRICE IN #ONDS UNIT TOTAL .1 I0~ LF For furnishing ~nd placing 24' PVC sever (25'-30' depth), cmoplete tn place, the sum of OOLLA~ per 11near foot. 2-4 6 171 N/A NOT USE]) LF For furnishing ind placing 8" PVC siwr (t$'-20' depth), complete In place, the mm of E~TS per ~ 6-x$ N/A N/A 14 S06 CF NOT USED For fmlishtng aim plactng 15' __ SDK-3S PVC se~er (O'-lO'depth), comlete In place, tho smlof DOLLARS AND COnS per linear foot, 87/17/95 14:16 CITY OF' COPPELL "* 9817481259? H0.303 P.4/4 R~VISED 00301-7 SECTION II - ~d~PEVINE ITEN ESTIHATED ZV D£SCRZPTION ANO PRICE IN MOND$ UNIT LF For furnishing m~d placing 6' C1. 50 Ductile Iron Pipe, complete tn place, the sma of OOLU~S JUg) CENTS pot linear foot. 2 215 LF For fu~lshtng and pllctng 6' Cl. 50 Ductile Iron Pipe, complete in place, tho sum of DOLLARS All0 CENTS par linear foot. 3 4 N/A N/A LF For furnishing and placing 8' SDR-3$, PVC aeimr (10'-16' depth), cumplete in plice, the sum of . DOLLAKS AND CENTS per llHlr foot. S-I N/A N/A 10 557 LF 11 1665 NOT USED For furnishing and plmcl,ng , 12' ST~-3S, PVC sewer (0 -10 depth), c_~letm in place, the sum of ~D CENTS I~r linear foot. LF For furnishing and placing 12' SDR-35, PVC sever (10'o15f the sum Of DOLLARS AgO CENTS i~r Hnear foot. TOTAL Sa:~nGGG~0-1NVITA73(~TOB~D, PI~I, NO17(33TOBIDDBRS: Chinp '2:00 p.m. m Thund~, Zul~ 6, 199~,' ~o '2:00 p.m. ~ 'l'ugod~y, ,July 18, 199~,'. 2, Se~m 001G0, Pq~ 8: ~ imupuph X3.2. add Ihe f,~,d~ Imqmph, 'Pipo embedmm b all umiUry #wet lines dudl be u hllows: A mb~nmn of 12 llq crushed stmu embMmmt dudl bo plural over mp of pipe. Crudmd m d~l be us specif~ in Smdurd ~ 8pooifl~jonO 2.1.8.L, Pipe Stolon 001~0, Pqe 12: Ponowing ~ X3. X2.19. uddtbo folloMnL -13.2.20. hybml~ro.~x: Tbb~dunomifo~rumhmngndplaoins24' ASTM 4, ~ 01~01: i~pla~ minim wilh x~vlml Stolon 00301 affaclml to _~i_. addmdum. NOT U~BD" e Se~ion 00600, l~p 13: Following 12m 40, Md th, followi~ i2m, '4! I~/A N/A NOT _~ON~l~rIoN PLA~TS. THIS ADDBNDUM I~ MAD]~ PA~,T OF THE DRAWINGS, SI~C]]~.AT~ AND CONTaACT ~ AND ~F, ALL B,~ NOII~ 2 TYPICAL NATIVE MATERIAL COMPACTED TO 95% OPTIMUM MOISTURE _~ 3% UNDER PAVEMENT 90% OPTIMUM MOISTUI~E ~% OUTSIDE CUR8 LINES JETTING IS NOT ALLOWED BACKFILL TO BE COMPACTED IN 6"~ UFT$ CRUSH ( SEE SPECS) EMSEDM£NT Atm~:~t~vM I~. 5 REVISED 00301-1 9SCGII SECTION 00301 BID FOI~ PRGJECT I[k~ITIFICATION: CONTRACT IOENTIFICATION: ss 94-Q~ THIS BID IS SUaHITTED TO:~Agent. Cttv of Cannel1. T*x~I 255 Parbfiy Bouleva~. Cnnnm . OXes lg. herein after referred to iS MER. ' ' Cit~ of Coppo11 etd No: 1. Enter Into Agrummnt. The undersigned BIDDER proposes end agrees, if thts Btd is fccepted, to enter into an Agreement ~lth OtMER In the rom ]ncludnd in the Contract Doconnts to perforu ~nd fu~lsh ell York is specified or Indicated in the Contract Documentsfor the Btd J~tce and vtthtn tho Bid Ttmes indicated in thts Bid and In accordance utth the other terms end coedtttons of the Contract Documents. 2. BIDD[RAccepto, BIDDER accepts ell of the toms and conditions of the Advertllali~t or Invitation to Bid and Instructions to Bidders, lncleding without limitation those dealtng uJth the disposltlofl of 8id security, This Bid vtll rmutn suGJ . oct to acceptance for ninety (gO} daxs after the d~yof B,d opening, lIDO[R viii sign Ind deliver the required number of counterparts of the 6A~c~.mNn~VITh the. Bonds ind_o~her docualents required by the oolncj KeqUlr~nTs #1thin fifteen (15) d~ys after the date of MER's Notlca gfAvarcl,- 3. BIDDER's Representations. In submitting this Bid, BIOO~R represents, as mo~e fully set forth in the Agremaent, that: a. BIDDER has oxmtnnd and carefully studied the 8tddtng Oocumnts end tho relieving Addenda receipt of ell vhtch is hereby acknowledged: (List Addenda by Number and OBoe) 0Alt O0301-Z P~ISED BH)DE]I has visited the site and become fami]tor with and ts satisfied as to the general, loca] and site conditions that ~ a~fact cost, progress, performance and furnishing of BZDOER ls famtltar utth and ts satisfied as to all fedora1, trite and local Lays and Regulations that ~ay affect cost, progress, performance and furnishing of tho York. d. BIDDER has obtatnnd and carefully studied (er assumes responsibility for havtng doH I0) all such additional or supplementary examtonttons, Investigations, explorattofls, tests, studies and data . COaCernlng conditions (surface, subsurface and Underground Facilities) at or contiguous to tho sttm or othmratse~htch may affect cost p~ogress, perfomance or forntshtng of the York or ~htch relate to any aspect of the moans, methods, techniques, sequences and procedures of constroctton to be employed by 8]DOEK and safety pracauttons and programs tactdont thereto, BXDDER do~$ not conslder that any additional examinations, Jnvestlgattofls, explorations, tests, studto$ or data are necessary for the determination of thts Btd for performance and furnishing of the York tn accordance vrlth the Items, ~t~o and other terms and conditions of the Contract clanonts. BIDDER has correlated the Information known to BIDDER, information and observations obtaJnml from vtstts to the site, reports and drawtngm Identified in the Contract Documents end ill additional examinations, Investigations, explorations, tests, studtes and data vtth the Contract Oocumants. BIDDER has given ENGIN[ER ~ttton notice of all convicts, errorS, iad~tgutties or discrepancies In the Contract Documents and the ~lttefl resolution thereof by ENGINEER ts acceptable to BIDDER, and thu Contract Documents are g?oral~y sufficient to indtcate ~ convey understanding et all ~ornm ina conditions for pur~ormlng and furnishing the tlork for ~hich this Btd ts sutmttted. k~ro confTJcts, errors, ambiguities or discrepancies have been discovered tn or between Contract Oocunmntl and/or other related documents, and vhere said conflicts, etc., have not been resolved through the Interpretations or clarifications by ENGZNEER as described tn the Znstr~ctton$ to Bidders, because of tnsufficte.t time or otherwise, BIODER has included tn the Btd the greate~ quantity or bettor qualtty of Uork, or comp~lanco vith the more stringent requirement resulting in a greator cost. P/VISED 00301-3 9. Thtl 8td ts 9enutne and sot Ildl tn the tntere~t of or on behalf of i~ ~tsclos~ ~rl~, ftm or co.option ~ ts n~ su~ttt~ tn c~fo~t~ vl~ ~y ag~T or f~leS of ~ g~, us~tltt~, oqlntzatton or co~ofltt~; BZ~ has not dlNctly or t~t~tly t~ o~ soltctt~ a~ o~r Bl~ to su~tt a falH o~ she Old; 8I~ has ~t ~11ctbd or tnd~ a~ parson, ftm or ~ration to ~fratn f~ btddt~; a~ BI~ER has not ~ght by collusion to ob~tn for ttselF a~ adverse wet any other 8I~ or over ~ER. 4. Bid Prtces. BIDOER wt11 complete the Work ta accordanca ~lth the Contract Oocmnents for the roller, tn9 price(s): All spactftc cash allo~ancms arm tncluded tn the prtcm(s) sst forth above and have boon computed tn acco~lance vtth paragraph 11.8. of the Ganaral Conditions. UNIT PRICE BIO FOR CITY OF COPPELL SEVER II~ROVENEHTS SECTION I - GRAPEVINE I11 ITEN ESTIMATED DESCRIPTION MD NO. QUANTITY UNIT PRICE IN fJORDS UNIT TOTAL PRICE MOUNT ]-4 N/A N/A ~ 6 166 LF NOT USED For furnishing and placing 8' PVC smmr (15'-20' depth). com~lmta tn place, the sum of C~S per 11near foot, 6-13 N/A ~/ 14 200 WA NOT USED LF For fulmtshing and placing IS' SDIt-3S PVC smm~ (0'-10' depth), com~p~lste in ,lace, the Still of AND ~CENT5 per 0030~-4 REYZSL'D 16 1094 17 230 IS' SDR-3S PVC seve~' (IS'-20' IS' SOR-3S PVC sever dep~), catp~ete In p~uce, t~s~of dep b p ace, the s LF For furnishing and pl&ctng 15' SDR-35 PVC sever (20'-~5' depth), complet, e tn place, the sum ot~e~,~ S N/A ~/A 19 S 2O 8 [A z1 I NOT USED For furnishing and placing 4 FT altimeter standard manhole couplete tn p}ace, the sun ~ ~o DOLLARS per Foe furn4shtng and placing S IrT diameter standard mflhole, complete tn pl&ce, the sum of RqO---~r~--CENTS pereich, EA For furntshing and plactng 6 IrT dtameter standard manhole, complete tn place, the sm of ~e~c~e~ DOLLARS 0 CENTS per each. 22 N/A N/A NOT USEO 23 Z4-26 28 29 33 34 N/A 718 g K/A lZ 835 For furnishing end plactng S .~..~.- 5~o. FT dtemter drop Inlet uan#ole, cmaplete in pl.ace, tho sum of per each. NOT USED LF For furntshtnge~J plactng 20' ~--90~ ~.0(~, Z~.~ dtamter dry ~re, c~lete tn place, tho ~ of LF FO1' furnishing and pl&ctng 20' ~--~ L'T°~:).°~- dlamter casing pipe, complete in place, the sum of EA For abandonmflt of standard seuer manhole, cmoplete tn lace, the S~lal of AND ~ (% CENTS per each. qt 3? f~A NOT USED SY For ~movul and replacewflt ~ (.~.o~_ of 8' ~etflforcod concrete SY LF pavement, coeplete tn place, the sum ~ DOLLARS per square yard. For removal and topi&cement of re~nforced concrete driveway, complete in place, the lure of ~cDOLLARS per squmre ymr~. ~c~.e-° ~.337_. ~ FoP removal and replacemnt of reinforced concrete 4 FT wtde sidewalk, complete 'in pl~c,e, the s~um of per 11near foot. oo3o1-$ REVISED 37 1 38 3SSS 3D I N~A NOT USED L$ FoP furnishing and I)~igJncj landKiping, c~lote pla~, ~ s~ o~ per ~ s~. through complettofl of cpnstructJon, complete tn place, the swop For furnishing end plKtng 4' PVC $et41' services, complete .IR place) the sum of AAD ,, ~ CENTS per ach. 40 8 EA 102 LF For furnishing and plictng 24' ASTII F-497 PVC se~er (25'-30' depth), cumplete _in place, the sum of per eacn. SECTION I - GRAPEVINE III ~ ,& TOTAL BIO FOR ALL UNIT PRICES.'~ IA,:~,~e~w~ ~T~ ~ ~ (usu ~s) / REVISED 00301-7 SECTION II - GRAPEVINE IV ITE# ESTJNATE1) NO. QUANTITY DESCRIPTION AND UtlIT UNIT PRICE IN ~ORDS PRICE TOTAL MIOUNT 1 215 LF For f.urntshtng and plictng 6' CT. 50 Oucttle Iroe Pipe, coapJete fn ~lice, the sum of' ~ ~ o DOLLARS LF For furnishing and placteg 8' C1, SO Oucttle Iron Ptpe, coe~ete tn place, the sum of NTS 3 N/A 4 13 N/A 5-9 10 11 567 N/A LF NOT USED For furfltshtnglnd placing lZ" SOR-36, PVC smmr (0'-10' depth), con~lete tn place, the sum of - ~._~OOLLARS Am) i CENTS per linear foot;-- 12' SOR-3S, PVC slier (lO'-]S' depth), complete in place, the sm of cDOLLARS ENTS per linear foot, 00301-8 REVTSED 13-18 N/A ~o-~3 ZS 1 26 I Z7 316 LF For fu~nlsMng and plactng ~ ~t~.~ ]2' SDR-3$, PVC saner depth),~hs sum ~foaplete in p]ace, $ HOT USED EA Fo~ fur~lshtng ~nd plactng 4 FT diameter af, eodard manhole, complete In place, the sum of CENTS per each. N/A NOT U~ED EA For J~rntshtng and plactng 4 ~.~-- c~(c~).ec~- ~ dieter T~e 'S' mnhole, ' ' ~r each. For furnishing a11 labor, MtortaTs and Incidentals EA FO~ furnishing and pl&ctng 5 ~ ~,~.~ FT dtamter Type sS' mmhole, complete In pl.~.e, tho sub of AND~ l -~ --CENTS per each. ~equJred to complete Stphon ItFUCtUru per collt, ract reqetremento, complete In Place, the sum of ~.. 00LL/~S AH~ - CEHTS per elch~ LF For furnishing and placing diameter dry bore, co~le%a __~ace, the sum of pe~A~ene~cENTs 28 30-31 32 33-36 37 38 336 6 IyA 83t 9 ~60~ REVISED 00301-9 LF ~or furnishing and placing SO' ~.~:~-- ~(~C~.~'~ dlmeter cutng pipe, cogpltto tn plico, tho sub of per t iMar foot. EA For abandonment of st~nd&rd sluer manhole, complete tn p1KO, the, sum of ~ ~c~ - CENTS per ~ch. N/A LF NOT USED For removal and ~eplactlent of 8' reinforced concrete pavement, c~lute ~n place, the sum of per squira ~?~d~. WA SY LS LF NOT USEO For ~enoval and repiocemnt ~ ~_~c~ of 6" ~o~nforced concrete Rtp-RIp, cemlete tn place, the sum Of I~r oquore yaM. For furnishing and plactng landscaping, complete le place, the sum of per Jump sum. For Trench Excavation Safety ~nd Support, co. leto tn ~ '~ CEOS per li~ar foot. 00301-10 REVISED 3g 4O LS For ~urntshlng and maintaining ~:~, ~,~% Tr&fftc Control slgnige, ba~.tc~ltng, etc. durTng and through coaoletton of constrocttoh coo~plete tn pl~ace, the sum .. ~ DOLLARS ~.~ CENTS per 1~ $ ~/ EA For fur~tshlng and plectn9 4' P~ I~r s8~Jcos~ cogq)lete :Jp place, th sum of L~ OOLLARS CnTS per otC#, 41 N/A N/A HOT USED SECTIUN 1I - GRAPEVINE ]Y TOTAL BXD FOR ALL UNIT PBICES:~)E (use uords) SECTION llI - BETHEL ROAO ZTFJ4 ESTIIMTED DESCRIPTION AND UNIT TOTAL NO. QUANTITY UNIT PRICE IN #ORDS PRICE AHOUNT ! 110 LF For furnishing and placing 6" C1. 50 Ductile lima Pipe, Z 110 LF 3 13 coe~plete tn place, the sum of AND~CENT$ ~P Ilfleer TOOT. For furnishing.and plectng 6" C1. ~ OUctlle lr~ Pipe, complete in p_lace, the sum of --~, ~ OOLLAAS ~CENTS LF F? furnishing &nd plmc?g 6 $DR-35, PVC se~e.r (0 -lO depth), complete in place, the sum of NT LLAR$ S ? 8 9 lO 11 4 $ LF N/A 23]4 1648 15 892 2477 NOT USFJ) LF For furnishing and plactng ~--~.°cb--~?-(o.~°- ~ 1o' S0~-35, FVC smmr (0'-10' dept,h), cemplet,e tn place, the sum of c DOLLARS ENTS LF For furnishing end plactng ~.~ l(~-T,(~.~3.C~ 10' SDR-3S; PVC lower (10'-15' depth), camplet, e Jn place, the sum oF pe~ ~ tnear foot. LF For fur~*sMng and p]a¢ing 12" ~-~, P~ sMr (0'-5' depth)~ c~lete tn place, the s~ o~ S,~ ~L~ ~ ~or per ~ LF For f~tsht~ ~d placi~ 12' ~R-3S, ~ sMr {5'-10' dep~), c~leto tn place, ~s~ oF ~~L~ LF 12-18 N/A N/A NOT USEO 00501-12 REVISED 19 22 4 EA 23 I 24 FoP furnishing and plactng 4 FT dtamter standard Ikmhole, c~p_/eT, e~lete ~nln ~place, the sum of CENTS per each, For furntshtn9 a~d pl~cln9 5 FT diameter atindlrdmnhole, comp~lgte tn ~ce, the sum of CENTS per each. For fu~tshln9 and piactng 4 ~ FT dlamter d~op Snlet manhole, co_mplete In pllco, the s~ of #/A NOT USED FT dlamter Type'S" manhole, .~lete Jn pla .ce, the sma of For furnishing all lahor, materials and Incidentals mqutred to complete Siphon structur~per contract requfrement$, cmaplete place, thl sub of per each, 27 28 29 3O 31 3~-34 35 36 6 15 IS 4 6998 J~EV3$EO 0030~-13 c~letl tn dlw~r d~ pla~, t~ I~ of per ltMar foot. LF For ablfldoflent of stafldard SMP nanholo~ complete In plKe, the sm of ~ ~ CENTS per eaCh. EA For ahdonment of sanitary ~::::~ se.r clean out, complete tn l~ce~ the sum of per dich. For plaCemnt of G" Class concrete elbedmant ic~ss entf~ t~nch wtdth, c~lete in place, the s~ d ~ ~L~ per each. LF LF SY NOT USED Fo~ raov&i and rep1 of aspkaltIc concrete ' *S~ hscr~ptton Pl~ OO]O0-ll Section 11.2,1 pavement,, co. leto tn place, the sum el~ OOLLaS ANO CENTS per ~ For r~ovll afld rep)acemnt of 6" r~toforced concrete Rip-Rap, cou~lete tn place, ~ ~¢ENT$ 00301-14 REVISED 37 ! L$ · For furnishing and plactng landscaping, complete tn place, the sug of ' ~ CENTS per lump sum. 38 7346 LF 39 ! LS 4O and $~pport, complete tn pla~, s~ of per t~near T~T. For fuY~lShlng and nmtntatntng ~,~-- Trafftc Control $tgnage, barrtcadlug, Itc, durtug and through completion of construction, complete In place, tho SOl of per l U~ sum. ]6 J EA FOr furnishing and pl&ctug (~.~ 4" PVC swot services) complete.tn place, the sum of ~ ' DOLLARS r~ CENTS per each. 4] H/A N/A HOT USED SECTXON 11I - BETHEL ROAO .~ ,I ~ TOTAL BID FOR ALL UNIT PRZCES. 'use tm s O REVISED O0$Ol-lS COI~6INATIOR OF SECTIONS The undersigned Bidder hereby agrees to accept In award of contract based on iny tedividua] section. However, Jf awarded too or mre sections, tho undersigned Bidder agrees to deduct f~om all prices named tn those sectton, the folloutng anounts: Combination of' Sections ! end IX. deduct ~ dollars. TOTAL BID FOR ALL UNIT PRICES (AETER DEOUCT~ Combination of Sections II and III, deduct ~ dolllrs. , ~_~ (~) Combination of Sections ! and !11. deduct ~) dollar$o TOTAL BID FOR ALL UNIT PRICES (AFTER DEOUCT~ TOTAL BiO FOB ALL UNIT PRICES (AFTEn (use words) Untt Prtces bawl mn ~puted tn accordance wtth par~h 11.9.2. of the bneri] Co~ltlons. 8IDI)ER acknowledges that quantities are not guaranteed and ftnal pennant will be based on actual quantities detergined as provtded in the Contract Docu~nts. 5. Completion. BIDO£Rigroes that the t/o~k will be substantially completed end completed and ready for ftnal p~nt in accordance with paragraph 14.13. of the General Condltton~ on or befor~ ~e di~ Or wtthtn the n~r of cile~ar days indicat~ ~fl tho Agreement. BIOOER accepts the provisions of the Agremaent es to liquidated damgns in the event oF Cailure to complnto the #ork wtthln the times spectftmd tn the Agreement, 6. Attached Documents. The following documents are attached to and Bide a condition of this Bid: a. Required Bid Security in the form of ~o ~,~ ~o~/~ . Other Requiremnt$. Address for Cmmuntcatton$. a, Cmmamtcations concerning this Bld shell be addrusaed to Purch&atng Offtce 255 Parlmay Dou]evard Coppel], Texas 75019 b. BIDOER~ees that all #ork awar~ndwtll ~ completed withtn~4o Caleud~r Days: Contractor v~ will cMnce to run as provid~ m the cont~ac~ ~c~n~s. c. Cmmuntcet~ons concer~tnO this Btd shall he to the address of BIOOER ~nd~cated on the applicable signature page. d, BIOOER u~derstonds that the O~er is exempt fto~ State Limited Sales ~d Use Tax on taeglblo pnrsonal property to he Incorporated tote the pro~ect. Satd taxes are net included tn Contract Price (See Instructions to Bidders). The terms used in this Btd ~hich are defined In the General Conditions of the Constrnctton Contract included es partof the Contract Documents have the meantegs assigned to thmn tn the General Conditions. Tems used in this Bid ~htch are defined tn the General Coudtttons or Instructions wtll have the meantngs Indicated tn the Ge~nral CondJtlons or Instructions. The Ctty of Coppe11 reserves the right to delete any portton of thte project as it may die ~cessary to stay wtthtn the City's avatllble funds. ~h?uld ~he Ctty elect to delete any portion, thl contract quantities w~ll be adjusted accordingly, ~0 /OU NO?IC~ TO IDD]~S: Chop 1. 9nctimIG0(120-{HVII'&TERqTOB{D'Pfig~iW~20'I' 18, 199~,'. 2. Secek~0O30l: ltq~l, qe(XB01.3wbhiB~poP00MI-3. 3. Sec~cu 0O{01: ~ po{~ (~B01-7 ~ RBVlSI3D p~ 00301-?, p~r ~noar foo'r,. 1. hi~tm~i~0.DIVITATIC~TOBID, PIg~00Ii20-1, HOTICBTORmD~,3: Change '2:00 p.m. -- Thunday, July 6, 199~,' ~o '2:00 p.m. oa Tumhy, JMy 18, 199'J,'. smbn OOla). Po~ 8: Fonowh[ prqnph 13.2, add th. fonowin; lx,rqraph, · l, ipo emlx~mmt for ail nnlftr~ m b shdl bO u J~)ws: A nddmm of 6 m cnubed ,mo ,u,bed,nm ,ban be pl=~ below nd on each ,,ak, . A..~,m,.- ~E 12 IN crulbM U mal~lmmt ~ b ~ ~ ~ ~ Cnulml ,,,--- ~hallb a, qmd~d ia Suudml Cuuma:tkm ~ 2. l.tL, l~e 4. Section (XJ301: itepll~ .l:~hxl wilh :~viued Souliml 00301 Il:ladled to {his adduadum. NOT U~HD~ HOT us~)' THiS ADDIINDUM 13 MA,DB PART OF THB DRAWINGS, SPHCIFICATIOIq$, AND CO~t~s. CT ~ AND SHALL BI{ NOTBD ONTHB PBf:B'OSAL. HDi B)TOIiq~.lNO, INC. TYPICAL NATIVE MATERIAL COMPACTED TO 9§% OPTIMUM MOISTURE · ~,% UNDER PAVEMENT 90% OPTIMUM MOISTURE .f. 5% OUTSIDE CURB LINES ,,lETTiNG IS NOT ALLOWED BACKFILL TO BE COMPACTED IN 6"::1: LIFTS CRUSHED S~ - { SEE SPECS) EM~IEDMENT REVISED 00301-1 95CGll SECTION 00301 BID PItO~£CT IOENTIFICATI0~: CONTRACT IOF~I'IFICATION: ss g4-0~ ~HI$ BID I$ SUBRITTEI~. !0'. _ City of Coppell Bid Iio: I. Enter Into The unde~tgn~ BI~ p~posol and ~rHs, tf thts B~d ~s acc~, to ente~ tnton ~mnt wl~ tn the.fp~. ~ncl~ tn tho ~fltract ~rk is o~ift~ or t~tcat~ tn the COntFKt ~cmnts for the 8td ~tce ~ utthtn ack.axe ~ the ot~r te~J and ~ttJ~s ~ the ContrKt S. BI~ER 8Z~R ~s at1 of the tams and ~ltt~ of the ~l~tmt ~ luvttlttOn tO Bid ~ ]fllt~tons to Btd~rs, 1flc1~4~ ~ ]tut~t~ t~e ~alt~ ~th th d~s~ositlon of Bid ~tt~. For nl~ty (M) d~ after t~ ~ oF Bid o~t~. 8Z~ ~11 st~ ~ ~lvlr t~ ~t~ n~ of ~ynte~a~s.o~ t~ ~t vtth ~ ~s ~d ether d~T, ~r~. Dy.C~e . 61ddt~ ~ntS vtth~n MER's ~tt~ of 3. Bl~R's ~s~tatJ~s. In s~ltting thts Btd, BI~ER represents, is m~ fuTly set forth ~n the ~t, that: BIDDER has exmtnnd and carefully studlnd the 81riding Oocuments and the following Addenda race?pt of all ~htch ts hereb~ icknoulodged: (List Addenda by R.ldmr end 0ate) 00301-2 REVISED b. BIDDER has vtslted the atto and becon fatllar utah ~d ts sa~tsft~ u ~ t~ ~nerel, 1~al and slte c~lons ~at a~ aff~t cost~ p~sl~ ~Ffo~ce and ~s~t~ of c. 8I~ ts fmt11~ utah ~ h sattsfl~ ~tite i~ 1~il L~s a~ Regulittons that my Iff~t cost, pre.ss, ~o~ce ~ ~tsht~ of the York. d. BZ~R has obtitnK and c.efu11~ ~stbtllt~ for havt~ d~e s~]~tiry ~tM~tons, lnvest~gR1ons, ~lor~t~s, tease, st~Se3 ~ ~te con~Jng ~ttJons Ig~urfKe ~ U~e~ro~ Factlifl#) the sib or ~ ~t~ ~rfo~ce or fu~tshtng oF tho ~rk or ~tch ~lu~ to . W as~t of t~ ~ns~ mth~l~ pr~s of c~lt~lon to ~ ~l~ed b~ BJ~ aM safeW p~i~lons ~d p~r~ tnctdeut thereto. BIDDER dona not consider that a~y additional exutnatlofls, 1nv.algerians. exp]orettons, tests, studio or data are for the htem~nlt~on of th~s etd faf perforce ~hhl~ of ~e hrk tn IKo~ance ~th the alms, ~er te~ ~ cantatas of the Contra e. BZDOER has correlated the tnfomRJofl knmm to BIIOOER. Infatuation and ob. wetlons obtained from visits to the atto, reports and dra#,tnga Identified tn the Contract Ooculmte led all ~dd~tIoral eximtoattoM, Investigations, explorattoM, teats, studies and date with the Contract Oocumnt$. BIDDER has gtven ENGINEER wttten Mttca of ill cant'Itch, errors, ambiguities or dtscrep_ncles tn the Contract Once.nil end the wrttten resolution thereof by ENGZNEER ts acceptable to StIX)ER, and the CofltractDocumnts ire generally sufficient to indicate ~ convey understanding oF all terms and conditions for performing and furnishing the York for vhtch this etd ts suhnttted. bra coal]Joel, el~'ors, ulbtglii~JlS or discroponc~ea have been d~scovered tn or bntmn Contract O~cunieflts and/or other related documents, and ~hera said coflfilctl, etc., have not been resolved through ~he tnhrpratatlOM or clarifications by ENGIK~R as described tn tho lnstructtofls to gtdders, because of ~nsuffIctent tim or nthervhe, BIDDER has included tn the Bid the greater quantity or ~etter qullty of York, or c--pltance with tho ~ora stringent raqutramnt r-suiting tfl a greater cost. R[VlSED 00301 Th~l B~d ts 9enulne and not Bade tn the Interest of or on. boh&lf of iny undisclosed person, .tim or co~povTtton a.M t$ not sulaattted tn confomt~ vtthLif~y Igl~glllel~t o1' ~UlBS Of &RY group, association, o~gentzatton or cerporatJon; BIOOFJ has not dtrectly o1' Indirectly tnduced or solicited a~y other BIOOER t~ sub~tt · filse or shin Bid; BIDOER has not solicited or tlKIuced a~y person, ftl~ o1' corporation to refrain frme btddlng; nd BIDDER has not sogghtby collusion to obtlJn for ttself a~y idvantagu over ~ other BIOOER or over ON#ER. 4. 6td P~tces. BIDOF~vIll cmnpletetheVork in icce~dancevith the Coat1'&ct Documents For the relieving price(s): Al! spectftc cash ·11.o~tncns are Included t~ the prtce(s) set Forth above and h&veoeen computed tn ~ccoroancewtth pi1'ag1'aph 11.8. of the General Conditions, UNIT PRICE BID FOR CITY OF COPI~LL SEV[~ IIL°ROVE~ENTS $~TION I - GRAKVlNE III DESCRIPTION AND UNIT TOTAL UNIT PRICE IN ItOIIOS PRIC[ AfIOUNT 1-4 5 166 8/A HOT USED LF For fumtshlng tnd placing //~1'~ ~ 8' PYC sever (lB'-20' depth), coaplgte tp p]ice,.the suni of 6-13 N/A 14 200 LF For fumtshJng and placing IS' ~ SOR-3SI~;C seuer (0'-10' depth), 00301-4 REVISED 16 1094 17 230 LF For ~nishtng and plactng IS' ~)R-35 PVC smmr (10'-15' complete tn place, ~P~), _ ~e s~B uT , --CEN S per i]near T~, LF For ~rntsht~ and plactng 1S' S~-35 ~ s~r (IS'-~' "' dep~), c~lete ~n place, LF For ~rfl~shi~ ~ placi~ .~/~ 15' ~-35 P~ s~r depth}, c~lete ~. p/ice, 18 2O 8 z] WA N/A NOT USeD ,~ ~ S EA For fUlfltJlhJmj arid pl&cing 4 ~ ~ ~ dt~br standa~ mu~le, complete .~n pJice, .th sug of AND ,,~ CENTS I~r ~ach. For ~tshtM ~ placl~ S FT dt~ter standu~ ~nhole, / CDO e.te .u of LLAKS per e~,cit, "~'~ ,PO gsO EA For fu~tshtng ~nd plictng 6 ~ ~ FT dtlMter standard amnhole, the sum of cpmple~! in placg, The ~~00LLARS /~ CEI~S per ench. 22 WA N/A NOT USED P,~VlSEI) 00301-5 23 24-Z6 27 26 Zg 30-31 33 34 fl/A 718 718 9 Imf each, N/A NOT USED ~ LF For furotshtng ~nd plactng 2Q" ,,,~/.~ ~ dJ~er dr~ ~, c~lete tn LF F~ ~tsbtng ~ plact~ 20' ~ ~ dlmter casl~ pJ~, ~lete tn pl~,, t~ O~ of . -~~L~ s~r mnhole, ~lete In f~ OOLLAqS CENTS per each. Ii/A N/A NOT USED 12 SY For remvll and roplacemnt ~,- of 8' reinforced concrete 188 635 SY LF pavement, co~le~ tn place, the sm of OOLLARS ~ OOLLARS For remvul aud replacemmt of ~e~nforoed concrete 4 FT wide sidewalk, comlete in place, th.e,;sum of ~LL~S OO3O1-6 REVISED 36-36 37 39 I 40 8 41 102 WA H/A NOT USED LS FOr furnishing and pl&ctng landlclptng, complef~ tn pla4e, th~ sum of j ]UlD~CEXT$ per 'lump sum, 3655 LF For T~ench ~xcavatlon Safety and Suppo~, comlete In plice,-~ of per lump sum. ?~cp~ ~_ EA For furnishing and plactng , ~ ~ 4' PVC smear services, completedn p~ac, p,, .the sun of (25'-30' dlp~), complete ~n p~ce,,thg. SUIli of OLLARS 0O301-7 SECTION II - GI~P~INE IV ITEN ESTINMEO 1 2 DESCRIPTION AND UNIT TOTAL UNIT PRICE IN JIORDS PRICE ANOUNT (;1. SO hcttll Iron Pipe, complete tp .place, the sma of ' .~,,/~._~__DO L L~S coeOlete tn pTace~ the sum of · ~ DOLLAqs ~CEflTS 5-9 10 3 N/A 4 13 11 N/A S67 1565 LF For furnSshi~g lid plictng 8" S~-3S, ~ s~r (10'-15' ~th), c~lete tn place, the sm o~ , . LF For fu~tshS~ ~d pl~J~ ~Z~ G-36, PVC sMr (0'-10' depth), ~lete tn ~ CEOS LF For furnishing &~l placing _~ ~ 1~' SOP.-3S, PVC sever (lO'-lS' dept~), coa~letu in place, the ;ulN Of ' , 00301-8 R[VI$~D lZ iF For furntsh~ng ~nd pll~tng ,,/~' , ~2' SDR-3S, PVC sevin' (1i'-~O' de~th), c ~]ete the sm ~r~ ~OOLLAnS 13 - 18 K/A K/A 19 8 EA For Furnishing end placing 4 ~1~ /~Y~- FT dtiletJT' $~lndard aiflimle, -- ceapl.el~ to~place, r~m sum of ~~DOtLARS CEHT$ per each. 20-23 24 27 3X6 WA NOT USED _.o ~o EA For furnishing and p~ac~n~ 4 ~.~c1~ ~ FT diameter T~po 'S" mnlmle, - cogplel:9 1T)pl~Jce,.th~ sum oF EA For furnishing and plactng S FT diameter T~pE 'S" mnhole, cap91etq~tn place# tho sub of per each. ~ ~.~ EA For fur~Johtng all labor, mterill$ el~l incidentals required to complete Stphon requtrOlmntl, con,lute In pTace,, t~ sua,f)f /~ LF Fog' furnlshtnglnd' placing dtamtef dry ~, ~lete In pac,t , f . ~~L~S 28 29 30-$! 22 36 37 38 316 H/A N/A 2601 LF REVISED 00301-9 For fu~tshleg and pltc*ng dlmeter casing pipe, cmp~ete lu pl,~um of ~LLARS NID ~ CENTS per For ~l)lhdonmnt of st~da~ sever manbolo, couplete tn par LF For removal and replaceaent ~/-~ of 8' reinforced concrete pavement, coeplete tn place, the sun per square ~ara. SY For renoval and replacmmnt of 6" reinforced concret~ Rip-Rap, Cliplite tn pl&cm, the sm,orr. ~rsqunre yin. ~r ~lsht~ a~ placing )late landscapt~, coal pJ~e, th~,em of~ LS per 1map sum. LF For Trench Excavation Safety and Support, coaplete ~n place, t, ho suni of per 1T~ar foot. 00301-10 REVZSED 39 4O 8 ] LS For furnishing Traffic Cmt~l slgnage, I ~i~t~, etc. durt~ and thigh ~letton of . ~st~tl~ c~lqte in pla~ EA Fo1' i g and plact~g ~ ~ 4" PVC sever services, complete lB It1Ke, the sum ot' 41 N/A N/A NOT USO) TOTAL BTD FOR ALL UNiT PR]CES:~~ SECTZOtl Z][Z - BETHEL [TDI £STZHATED D[SCRIPTZON AND NO. Q~...~NTITY UNIT PRICE IN I 110 LF For furnishing and pllclng 6' £1. S0 Ductile Iron P$1m, complete ,fo ;1Ke, ~the sum of UNIT TOTAL PRICE N40UNT z ~io $ 13 I~r 11nei~ foot. LF For furnishing end plictng 8" C1. 50 I)ucttle I~on P~pe, ' ' complete ~n 91acgq,the sim of per linear foot. ~ ao LF For furnishing and ploctng . ~/ ~-~- 8" S0fl-3S, ~ sever (0'-10' depth), cmq;lete in place, the f ~00LLARS REVISED 00301-11 4 5-6 8 ]0 11 5 IS 8g~ 2¢77 LF For ~rotshtng and pli¢tng 10' SDR-3B, PVC sever depth), coiN)leto tn placl, the sum I~r Ttnoer foot. LF For furnishing end placing ~/~-- IS' 50R-26, PVC sMr (O'-S' depth), complete tn place, per ~ foot, LF For furnishing and plact~ , 12' SDR-3S, I~C sever {5 -10 depth), cmaplete tn place, $ per linear foot. . LF For furnishing end placm9 ~x'~~ ~_~.~ Ir SOR-35, PVC sever (tO'.]S' depth), COalp~ete in place~ the sum .~ DOLLARS - CENTS p~t ~l~ir foot. 12-18 WA ~/A NOT USE]) 00301-12 REVISED 19 t% EA For furnishing and pllctng 4 ~ ~ FT dtIitlr stindard mmhele, complete tno~lice, ~e ~um of For furnishing and placing $ Fr dtii~er sLandird manhole, c.oaqilet.e ]~ p,lice, t~e sum of ~CENTS per ertl1, 2~ 22 4 23 I FA For furnlsht~g and plactng 4 ~ FT diameter drop Snlet aanhole, cojq)le~e ~in pl~ce~tlT~ Sum of per each. For furnishing and pllctllg S EA FT dtMmter d~p tnlet; Koaple~,e tn I)1&~, the sm per 25 I EA 26 I HOT USED ~ ~ For furnishing ~nd plict~g 5 _~ - ~ dtlter T~e "S" i~le, c~le~e.~n pl~ce,~t~ si of For furnishing all labor, Itertals and incidentals requtred to complete Stphon structure per contract rlquireimnts, complete in ptr iIch. 27 28 lB REVISED 00~01-13 LF For furnishing and plactng dtametor dr~ bore, c~late tn place~the LF For ~tshl~ dtmtor c~tng pt~, c~le~e ~~~t~ ~ ~ C~S 29 6 EA 30 4 3] 48 For abandonment of stsnd.~d ~ -~ saver mnhole, comple~ In UTS per each. tA For abandonment of santtir~ sMr c]eu ou~, pll~ the~m ~ ~ ~~L~ ~~S per LF For pli~t of 6' Class co.fete ~t ac~ss · n~t~ t~ch wtdth, c~lete in placp, ~hq sun at' _ DOLLARS ~CENT$ 35 6998 LF For ramoval and replacmont //~7/ ~fc of as~mlttc c~nte rtptim 36 7 $¥ ~avement, cout)lete tn pllce, P&ge OOlO0-11 ~I su,~ o1' ~- Soctton 13.2.1 ~LU~S ~ CEOS pIr limit foot. ~ ~ For ~v.1 a~ replace~nt ~ _ ~ of 6~ ~nfo~ C~te Rip-Rap, complete tn place, the sun o1' per square yard '~ aa301-14 RL'VIS~O 37 ! 38 7346 3~ ] LS 40 18 EA LS For furnishing and placing ~ landscaping, coaplete In placq~.%hl~spn of ,,~ per lump sum. LF For T~ench Excavation Safaty ofld Suppol't, cmnp_lete per'T'~'~2~'~~, For fuF~ishtng and mtntilntng Tr&~tcControl stgnage, barr~cadlng~ etc. durtng a~d con$~ructJon~ coiN)lite In plicb the ~gu of - ,~,~.,_,~,~oo L LARS ~ CmTS per lump sim. For furnishing mid plactng ?_~'~ 4' PVC sever 41 N/A N/A NOT USEO SECT]OW Z]~ - Kr.~. P.O~ . *" ' TOTAL BID FOR ALL UNXT ~' ~' REVZSED ¢Of~IW~TION OF SECTZONS Tho undersigned Btddor her~b.~. ~lrees.~o accept in contract based on any indtvlaua] set,loft, IJOWover~ 1T tee or cora SKtlons, the Underslgnnd Btdder agrees to deduc~ from Ili prtces named tn those sec!tons the relieving Combtfl&tton oF Sections ! and ]I, deduct /~ dollars. TOTAL B!D FOR ALL UNIT PRZCE$ (AFTER O£D~CT)~~ Combtn&tton of Sections Il and III, deduct ~ do]lets, TOTAL eTD FOR ALL UNIT PRICES {AFTER DEDUCT)~ Cmnbtnitton of Sec!tons ! and HI, deduct ~ dollars. TOTAL BZD FOP, N.L UNZT PRZCES (AFTER I)~OUCT)~ o ' ' -t-,~ ~ (use *lgu~$J Combination of Sections I, II, arid Ill, deduct ~ doltarl. TOTAL BTD FOR ALL UNZT PRZCES (AFTER Unit Prices hive b~en ~n~uted tn acco~ince with paragraph ll,9.Z, of th~ G~llertl Conditions, B!DDER ac..l~.lndges that quint!ties a~e not guaranto~ end pe~nent w~11 I~ bisod on actull quantities detomined as prowaeQ the Contract Documents. 5. Completion. BXDOER ig~s !hit the I~ork ~11 be substantially completed and COml)letndand ready for final payment in accordance wtth paragraph ~4.~3, of the Denote1 Condlttons on or before the dit~s or w~thm the number of c&lendi~ days Indic&ted in the Ag~*~Ji~nt. 00301-10 REViSEO B~DOER ac, ce;ti the p~Qvts~ons of tho Agraemnt as to 11qutditnd SiMS specified in the ~reeMnt. 6. Attach~ ~c~. ~e fOll~ing dOCents a~ at~ached to and m~e of th,, B,d: ~ a, ~qu~ Btd ~1ty t~ the fo~ of . 9- ~r Re~tr~nts, ~d~es~ for a. C~cattons C~ce~i~ this Btd s~11 ~ a~ss~ to ~h~ing ~fJce 255 P&r~ Bouleva~ C~IT, T~as b. BIOOER agrees that all ~rk ava .r~led ,vtll .be coed. leted within ~ C&.I.u .~.r O.lYS: C. ont,~_cTo_.r, wi_?. wi Il commence to run il provid~O in th~ conTraCT uocumeni~. c. CmmUniCations concerfltng this Old shell be to the address of BlOO~t tndtcat~l on the applicable stgnatum page. d. 8lOOER understands that_ the O~er..t.s exert f.ro?~tatr~- to timttnd Sales end Use TIX on tlnglUle ~e' Incorporated 1nSc _the. project: .Satd_t. axes?_~t~rs,. tnclnded in Contract Price f, Soe InsTruCT, lOSS To D U~ I e. l~e terns used In this Bid_~hl.ch a~ do.fin.ed t.n t. he .... . _ G~eral cufldtttons of the co.as?ucl;1.o.n o, th. ,n, th(iai tn the G~ne a Toms used in this IHd ~htch are defined in the General Conditions or InstFuctlons wtll have the ueaAtngs Indicated in the g~neral Conditions or Instructions. 11 reserves the right to delete any portton of The City of Coppe's - it may deem necessary to stay ~thtn the .Ct. ty the tho contrsct quantities wt~1 be adjusted accordingly,