Loading...
ST0702-MP090629(8/25/2009) Keith Marvin -One-page Report 6-29-09.pdf ~ ~ Page 1 CPL07342 Coppell Road South Infrastructure Improvements Keith Marvin, P.E. Caleb Thornhill, P.E.; FNI Project Manager Ken Griffin (Coppell}; Trish Hatley (FNI), Aaron Litteken (FNI}, John Manning (FNI}, File • I will bring the sheets Oncor commented on, full & half size, to the pre-con meeting to be inserted in the plans. I've also attached an illustration of the proposed pole being used. Please verify this is the pole the City is requesting. • Below is a breakdown of the storm drain outfall quantity changes. Adjusted Percentage Items Bid Qty Qt difference difference Unclassified Street Excavation 10,747 SY 16,007 SY $42,080 +49% 6x4 Box Culvert 501 LF 835 LF $90,514 +67% 8' Concrete V-Lined Channel 700 SY 380 SY ($12,500 -46% • Frances Wilson with DART has said {June 26, 2009} our permit looks to be approved, but she has not received the formal paperwork. I hope she will be at the Pre-Con meeting Tuesday June 30, 2009. • 6 full & 6 half size "Issue for Construction" to Pre-Con Meeting. • City to verify Light Pole from attached exhibit. SubmiHal/Meeting DATE • Begin Construction TBD ,. ,; ,.,. Page 1 of 1