ST0003-CS080401
Page 1 of 1
Rhonda Adloo - Coppell Road Construction Project
From: Sharon Logan
To: Brandon Formby; Bud Gillett; Citizens Advocate; Deborah Fleck; Tasha Hayton
Date: 4/1/2008 12:40 PM
Subject: Coppell Road Construction Project
CC: Keith Marvin; Rhonda Adloo; Tamerah Ringo
Attachments: coppell road cooper to sl ltr map.pdf; Coppell Rd construct cooper to s lake 08.doc
Please see attached.
Sharon Logan
Community Information Officer
255 Parkway Blvd.
P.O. Box 9478
City of Coppell, Texas, 75019
Voice: 972-304-7065
Cell: 469-576-7702
Fax: 972-304-3673
slogan@ci.coppell.tx.us
Visit our Web site at www.ci.coppell.tx.us
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\47F22D35City_...8/26/2009
(8/26/2009) Rhonda Adloo - coppell road cooper to sl ltr map.pdfPage 1
Mr ,
ach312008
RCoppeRoadPoec#S0003
E: ll , rjt T -
tifiti f trti, Amt f li Mti
NocaonoConsuconnnounceenoPubceeng
r :
Dea
T ity f ll mlt t i f ll frm y Lk t r L.
heCoCoppehascopeedhedesgnoCoppeRoadoSandaeoCoopeane
W v mlt t ii r, it t wr trti trt t t Aril ,
ehaecopeedhebddngpocessandnendoaadaconsuconconacahep8
ity il Mti. Ti rjt will ivlv t mlt rtrti f ti rti f
2008CCounceenghspoecnoehecopeeeconsuconohspoono
ll .
CoppeRoad
T xiti -ft wi lt rwy will rmv rl wit -ft wi
heesng24oodeasphaoadabeeoedandepacedha34oode
rt trt wit r imrv ri. T “rrw it” l t i f t r
conceeseehcubsandpoeddanagehebaodchesaonghesdeoheoad
will fill i, iwlk will trt t tir lt f t rjt. T iwlk
beednandsdeasbeconsucedheeneenghohepoechesdea
l t t i f t r will fr ft wi, t t wt i will it ft
aongheeassdeoheoadbeoueedeandheoneonheessdebeeghee
wi.
de
Ti rjt will rtly imrv tri , l l rliv t ti
hspoecgeapoepedesanaccessandshoudhepeeehecongeson
it wit mri r-ff ftr ik- trffi r Wil lmtry.
assocaedhonngdopoandaenoonpcupacaoundsonEeena
frttly, i rr t t t ti it w will v t r m ivi ri
Unounaenodeogeohsponehaeoenduesoenconenencesdung
trti. Bii t f r L xti t y Lk, t r will
consuconegnnngsouhoCoopeaneandeendngoSandaeheoadbe
limit t -wy trffi i t rt irti ly fr t rti f t rtrti.
edooneaacnhenohbounddecononoheduaonoheeconsucon
Ti rjt i lt t i , i xt t lt mt.
hspoecssaedobegnonJune92008andsepecedoas12onhs
l i xiit wi t lti f t rjt m vill rt t tk r
Encosedsanehbshongheocaonohepoecandsoeaaabeouesoaeaound
t rtrti. I ffrt t rvi m ifrmti il t t w will
heeconsuconnaneoopodeasuchnoaonaspossbeohosehobe
imt y ti trti, w r l ti li mti t Wil lmtry t
pacedbhsconsuconeaeasohosngapubceengasonEeenaonhe
vi f Ty, Aril , t : m. til l will vill fr rviw t t
eenngouesdap152008a700pDeaedpansbeaaabeoeeahe
th
mti, ity tff will vill t i t rjt t t mti Aril .
eengandcsabeaaabeodscusshepoecaheeengonp15
If y r l t tt t mti wl lik t t l r i t rjt, l
ouaeunabeoaendheeengandoudeoseehepansodscusshepoecpease
fl fr t ll m t --.
eeeeocaea9723043681
irly,
Sncee
Kit . Mrvi, ..
ehRanPE
rjt ir
PoecEngnee
ffi : () -
OcePhone9723043681
x: () -
Fa9723043570
kmrvi@i.ll.tx.
anccoppeus
ùÍÌÌ×ÐÐêÍÛØðÛÎ×ùÐÍÉÇÊ×
ûÐÈ×ÊÎÛÈ×êÍÇÈ×ïÛÌ
ìÊÍÒ×ÙÈéè
ûðè÷êîûè÷êíçè÷
5001000
0
1 INCH = FT.
1000
Created on: 27 March 2008 by Scott Latta
Created in LDDT
S:\CAD\In_Design\MISC EXHIBITS\dwg\EXHIBITS.dwg\ST00-03 DETOUR 1
(8/26/2009) Rhonda Adloo - Coppell Rd construct cooper to s lake 08.docPage 1
NEWS RELEASE
FOR IMMEDIATE RELEASE
April 1, 2008
Contact: City of Coppell Engineering Department972-304-3679
CITY TO HOST PUBLIC MEETING FOR COPPELL ROAD PROJECT
The city of Coppell Engineering Department will host a public meeting on Tuesday, April 15,
2008, to present the reconstruction plans for Coppell Road from Cooper Lane to Sandy Lake.
The meeting will be held at Wilson Elementary, 200 S. Coppell Road, beginning at 7 p.m.
Because of construction, traffic patterns will be altered. Beginning south of Cooper Lane
and extending to Sandy Lake, the road will be limited to one-way traffic in the northbound
direction only for the duration of the reconstruction. Anticipated start date for construction is
June 9, 2008 and is expected to last 12 months.
Plans for reconstruction include the removing the existing 24-foot wide roadway and
replacing it with a 34-foot wide concrete street with curbs and improved drainage. The “barrow
ditches” along the side of the road will be filled in and sidewalks will be constructed the entire
length of the project. The sidewalk along the east side of the road will be four-feet wide while
the sidewalk on the west side of the roadway will be eight-feet in width.
Detour routes will be provided. City staff will be available at the meeting to answer
questions.
255 PARKWAY P.O. BOX 9478 COPPELL TX 75019 TEL 972/462-0022
???