Loading...
ST0003-CS080421 (8/26/2009) Rhonda Adloo - Re: Status of Construction ProjectsPage 1 From: Keith Marvin To:Braden, Anne CC:Adloo, Rhonda Date: 4/21/2008 3:33 PM Subject: Re: Status of Construction Projects Anne, We are forecasting construction to be complete on Sandy Lake Road from Coppell To Denton Tap by the first quarter of 2011. We expect construction to be completed on Coppell Road from Sandy Lake to Cooper by June, 2009. Feel free to contact me with any additional questions. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Anne Braden" <abraden@ucrrealty.com> 4/18/2008 1:03 PM >>> Road Construction at Sandy Lake and Coppell Road - Coppell to Denton Tap and on Coppell Road from Sandy Lake to Cooper. Can you tell me when the construction is projected to finish? We have a national retailer looking in Coppell that needs to know. Thank you. Anne Braden <http://www.ucrrealty.com/> Anne Braden Senior Executive Assistant Tel. 214.252.1138 abraden@ucrrealty.com <mailto:abraden@ucrrealty.com> UCR 7001 Preston Road, Suite 222 Dallas, Texas 75205 Tel. 214.526.6262 Fax. 214.252.1001 www.ucrrealty.com <http://www.ucrrealty.com/>