Loading...
ST0003-CS080801 (3) Page 1 of 1 Rhonda Adloo - Coppell Road From:Ken Griffin     To:Cesar Moncada     Date:8/1/2008 4:28 PM     Subject:Coppell Road     CC:Clay Phillips;  Keith Marvin;  Rhonda Adloo     Attachments:Verizon timeline.doc       Mr. Moncada   Thank you for taking the time to speak with Clay Phillips, Deputy City Manager, concerning some issues the city has had on Coppell Road.  I've attached a time line that goes into greater detail.  We fully understand that there is little that can happen on Coppell Road at this time that will impact the current relocations.  However, the city is very appreciative of the recent efforts by Verizon to expedite some of the critical conduit placements and splicing.   Our goal is to try to determine how best to work with Verizon so that some of the issues we have experienced on Coppell Road do not resurface on future projects.  We have several projects in the late stages of design (Southwestern Blvd, Bethel Road and South Coppell Road) that should go to construction later this year.  If there is anything we can do or provide that would help expedite Verizon relocations on those projects, please let us know.   Again, thank you for your time and any help or insight you can provide.     Ken Griffin, P. E. Director of Engineering & Public Works 972-304-3686 kgriffin@ci.coppell.tx.us file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\489339AACity_...8/26/2009