Loading...
ST0003-CS090624 (2) (8/26/2009) Rhonda Adloo - Re: Kaye St.Page 1 From: Michael Corder To:Rhonda Adloo Date: 6/24/2009 10:01 AM Subject: Re: Kaye St. Thanks. >>> Rhonda Adloo 6/24/2009 9:09 AM >>> I wanted to make sure you had an update in case the lady calls again (I don't think she will)...what she wanted was stamped concrete bands like they have on Halifax and Plantation. Keith told her that would not happen because the contract was to only replace what was already there. No new bands were put down anywhere along Coppell Rd, nor would there be. >>> Rhonda Adloo 5/29/2009 4:18 PM >>> Mike went out to look at the area & said there was no "pothole" anywhere on Kaye St, but there had been a drop-off from the Coppell Rd concrete to the Kaye St asphalt that was fixed very recently (like today) so maybe that's what she meant. >>> Michael Corder 5/29/2009 2:14 PM >>> I'm sorry. She just said the "end of Kay". >>> Rhonda Adloo 5/29/2009 12:58 PM >>> Did she say which end? If it is the end by Coppell Rd, I can have Albert check on it. >>> Michael Corder 5/29/2009 11:39 AM >>> Is a contractor doing work on Kay St.? I had a call from Ms. Nigo at 300 Kay that says they have left a big pothole at the end of Kay. If an outside contractor is doing the work, can the construction inspector over it take a look. If not, let me know & we'll go out & see what we can do. Thanks. M