Loading...
ST0701-CS070808 (8/26/2009) Keith Marvin - Re: Southwestern BoulevardPage 1 From: Keith Marvin To:Roberts, Ken Date: 8/8/2007 8:09 AM Subject: Re: Southwestern Boulevard Ken, I took a look at what we have out there for water and sewer. The water supply line is an 8" Cast Iron line from 1965. The sanitary is a 8" from 1967. There is also a 24" RCCP water transmission line installed in 1988 through there. The 24" should be fine. We should go ahead and replace the 8" water. I think we should inspect the sewer, and depending on its condition, and where it falls relative to the new road, decide at that point if it needs to be replaced. Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Roberts, Ken" <kar@Huitt-Zollars.com> 8/7/2007 4:45 PM >>> Keith, Are we going to replace any water and sanitary sewer lines on this project? Kenneth Roberts, PE Huitt-Zollars, Inc.