Loading...
ST0701-CS070831 (2) (8/26/2009) Keith Marvin - Fwd: Southwestern Boulevard PlansPage 1 From: Ken Griffin To:Keith Marvin Date: 8/31/2007 2:55 PM Subject: Fwd: Southwestern Boulevard Plans Attachments:SW-BLVD.pdf FYI They are trying to come down here sometime in September to meet with us. ken g >>> "Matt Oyen" <MattO@PacTrust.com> 8/31/2007 1:35 PM >>> Ken, Attached please find the paving plans out of the 30% set for Southwestern Boulevard that Halff has prepared for us. I will forward a CD with all of the PDFs to you next week. Thanks, Matt <<SW-BLVD.pdf>> Matthew Oyen, PE Construction Manager PacTrust 15350 SW Sequoia Pkwy, Suite 300 Portland, OR 97224 Office: 503 624-6300 Cell: 503 523-7619 matto@pactrust.com (8/26/2009) Keith Marvin - SW-BLVD.pdfPage 6