ST0701-CS070831 (2)
(8/26/2009) Keith Marvin - Fwd: Southwestern Boulevard PlansPage 1
From: Ken Griffin
To:Keith Marvin
Date: 8/31/2007 2:55 PM
Subject: Fwd: Southwestern Boulevard Plans
Attachments:SW-BLVD.pdf
FYI
They are trying to come down here sometime in September to meet with us.
ken g
>>> "Matt Oyen" <MattO@PacTrust.com> 8/31/2007 1:35 PM >>>
Ken,
Attached please find the paving plans out of the 30% set for Southwestern Boulevard that Halff has prepared for us. I will forward
a CD with all of the PDFs to you next week.
Thanks,
Matt
<<SW-BLVD.pdf>>
Matthew Oyen, PE
Construction Manager
PacTrust
15350 SW Sequoia Pkwy, Suite 300
Portland, OR 97224
Office: 503 624-6300
Cell: 503 523-7619
matto@pactrust.com
(8/26/2009) Keith Marvin - SW-BLVD.pdfPage 6