Loading...
ST0701-CS080115 (8/26/2009) Keith Marvin - Southwestern Blvd. - hourly rate schedulePage 1 From: "Littleton, Dave" <dlittleton@halff.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date: 1/15/2008 5:24 PM Subject: Southwestern Blvd. - hourly rate schedule Attachments: Newhrlyrate-civil_svy(rev 01-10-08).doc Keith, I have attached the hourly rate schedule. Sorry I forgot this the first time. Please let me know that you receive this document. Thanks! B. David Littleton, P.E. Vice President HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6200 Fax 214-739-0095 www.halff.com (8/26/2009) Keith Marvin - Newhrlyrate-civil_svy(rev 01-10-08).docPage 1 AVERAGE HOURLY RATES FOR ENGINEERING AND SURVEYING PERSONNEL AND DIRECT COSTS Personnel Services: Principal$165.00 Project Manager$135.00 10.00 Professional Engineer$1 95.00 Registered Professional Land Surveyor$ 92.00 Project Engineer$ r/Surveyor in Training (EIT/SIT)$ 84.00 Enginee 75.00 CADD Technician$ Clerical$ 65.00 Direct Costsx 1.10 Surveying Services: 3-Man Survey Crew$125.00 2-Man Survey Crew$105.00 95.00 Field Party Coordinator/RPLS$