ST0701-CS080206
Page 1 of 1
Keith Marvin - Southwestern Boulevard - OH Utility relocation
From: "Littleton, Dave" <dlittleton@halff.com>
To: <charles.braggs@oncor.com>
Date: 2/6/2008 12:07 PM
Subject: Southwestern Boulevard - OH Utility relocation
CC:"Smith, Madonna" <msmith@Halff.com>, "Yeager, David" <dYeager@Halff.com>,
"Keith Marvin" <kmarvin@ci.coppell.tx.us>
Attachments:fx oncor 09-12-07.pdf; 4-4 Existing Util.PDF; 1-4 Existing Util.pdf; 2-4 Existing
Util.pdf; 3-4 Existing Util.pdf
Charles, I have attached .pdf drawings showing the needed relocation. I believe that the cost estimate you
provided back in September was for the lines east of the bridge. We would like to have an updated cost estimate
for this work and the section of OH line west of the bridge (bridge to Coppell Road). Please let me know that you
receive this information and when you think we can get the estimate complete. Thanks!
B. David Littleton, P.E.
Vice President
HALFF ASSOCIATES, INC.
1201 N. Bowser Road
Richardson, Texas 75081
Phone 214-346-6200
Fax 214-739-0095
www.halff.com
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\47A9A2EDCity...8/26/2009
(8/26/2009) Keith Marvin - fx oncor 09-12-07.pdfPage 1
(8/26/2009) Keith Marvin - fx oncor 09-12-07.pdfPage 2