Loading...
ST0701-CS090102(8/2712009) Keith Marvin - RE: Southwestern Boulevard From: "Ben Chessar" <BenC@PacTrust.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date: 112/20091:10 PM Subject: RE: Southwestern Boulevard Are you available to discuss this today? -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Tuesday, December 23, 2008 2:19 PM To: Dave Littleton Cc: Ken Griffin; Cory Shipman; Jorge Rodriguez; Ben Chessar; Matt Oyen Subject: Re: Southwestern Boulevard Dave, We have discussed the Southwestern Blvd project with the City Manager's office, and we would like to proceed with the redesign of the bridge, and the narrowing of the roadway to 41' B-B. Due to the cost involved in a contract amendment with Halff Associates we will need to go to City Council forapproval. Our next council meeting is January 13th. I will need a contract amendment from you by January 6th in orderto get the packet submitted in time forthe 13th. I'm attaching a copy of the last contract amendment we brought to council as an example. We will handle the exhibit and the memo to council. Thanks. Keith Marvin, P.E. Project Engineer (972) 304-3681 »> "Littleton, Dave" <dlittleton@halff.com> 12/3/2008 4:18 PM »> Keith, we have looked at the possibilities for reworking the project by narrowing the roadway and constructing the bridge in phases allowing maintenance of traffic on the existing roadway and bridge. We have developed construction cost estimates for the revised pavement width (41-foot and 37-foot back to back) and an estimate for staging the bridge construction. In order to accomplish the design changes requested, without modifying the current alignment, we have identified the following design fees: Grapevine Creek to Belt Line Road - Basic Plan Modification - $27,500 Redesign Storm Line B from Approx. Station 5+00 to end (including associated 24-inch Water Line crossings) - $7,500 Page (8/2712009) Keith Marvin - RE: Southwestern Boulevard Coppell Road to Grapevine Creek - Basic Plan Modification - $24,000 Bridge Plan Modification (first structure) - $12,500 Second Bridge Plan (structure after demolition) - $30,000 Sequencing Schematic and description - $5,000 This effortwill take approximately 6 weeks to accomplish. As noted in the estimates, we anticipate saving approximately $160,000 in the roadway costs by reducing the width from 45-feet wide to 37-feet wide. The bridge costs are estimated to increase by approximately 50% due to the sequencing and staging of the construction. Note that the construction time will also increase. I would be happy to come by at your convenience and discuss the various issues associated with the project re-design. Please let me know that you receive this message. Thanks! B. David Littleton, P.E. Vice President HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6200 Fax 214-739-0095 www. halff.com Page 2