Loading...
ST0701-CS090119Page 1 of 1 Keith Marvin -southwestern boulevard From: "Rodriguez, Jorge" <jrodriguez(c~halff.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> Date: 1/19/2009 5:14 PM Subject: southwestern boulevard CC: "Littleton, Dave" <dlittleton(c~halff.com> Attachments: Proposed Utility Layout.pdf; Bridge Cross Section-2.pdf; Bridge Cross Section.pdf; Bridge Layout.pdf; Construction Phasing.pdf; Proposed Road Layout.pdf Keith- I have attached some pdf files for your review. We have adjusted the proposed pavement to a 41' Back to Back road alignment. We held the south line of the previously designed road and came down 4 feet from the north. We also shifted the bridge south to allow for enough clearance to build the proposed bridge in 2 phases. Phase 1 of the bridge will be 30' wide, and phase 2 will be 20' wide. The utilities have also been adjusted to keep the new utilities out of the existing road way. I have included pdf copies of our road layout, construction phasing, proposed utilities, bridge plan and bridge cross sections. Please review and let us know if you have any comments. We would like to finalize the road alignment before we move forward with the rest of the construction plans. Also, we have not heard back from Pac trust regarding making the change from a 45' B-B road to a 41' B-B road. Thanks Jorge Rodriguez, P.E. ~= Pro ect Mana er ~~~ J g ~~ HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com file://C:1Documents and SettingslradloolLocal SettingslTemplXPgrpwise14974B4D8City_... 8/27/2009