Loading...
ST0701-CS090122(8/2712009) Keith Marvin - RE: southwestern boulevard From: "Rodriguez, Jorge" <jodriguez@halff.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> CC: "Littleton, Dave" <dlittleton@halff.com> Date: 1122/200910:20 AM Subject: RE: southwestern boulevard Hi Keith We are ready to finalize the road alignment if you have any comment or recommendation and move forward with the rest of the construction plans. Please let us know. Thanks Jorge Rodriguez, P.E. Project Manager -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Tuesday, January 20, 2009 8:37 AM To: Rodriguez, Jorge Cc: Littleton, Dave Subject: Re: southwestern boulevard Sorry guys we were off for the holiday yesterday. I'll print these out and look them over this morning. Keith Marvin, P.E. Project Engineer (972) 304-3681 »> "Rodriguez, Jorge" <jodriguez@halff.com> 1/19/2009 5:13 PM »> Keith- I have attached some pdf files for your review. We have adjusted the proposed pavement to a 41' Back to Back road alignment. We held the south line of the previously designed road and came down 4 feet from the north. We also shifted the bridge south to allow for enough clearance to build the proposed bridge in 2 phases. Phase 1 of the bridge will be 30' wide, and phase 2 will be 20' wide. The utilities have also been adjusted to keep the new utilities out of the existing road way. I have included pdf copies of our road layout, construction phasing, proposed utilities, bridge plan and bridge cross sections. Please review and let us know if you have any comments. We would like to finalize the road alignment before we move forward with the rest of the construction plans. Page Also, we have not heard back from Pac trust regarding making the change from a 45' B-B road to a 41' B-B road. (8/2712009) Keith Marvin - RE: southwestern boulevard Thanks Jorge Rodriguez, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www. halff.com Page 2