ST0701-CS090122(8/2712009) Keith Marvin - RE: southwestern boulevard
From: "Rodriguez, Jorge" <jodriguez@halff.com>
To: "Keith Marvin" <kmarvin@ci.coppell.tx.us>
CC: "Littleton, Dave" <dlittleton@halff.com>
Date: 1122/200910:20 AM
Subject: RE: southwestern boulevard
Hi Keith
We are ready to finalize the road alignment if you have any comment or
recommendation and move forward with the rest of the construction plans.
Please let us know.
Thanks
Jorge Rodriguez, P.E.
Project Manager
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us]
Sent: Tuesday, January 20, 2009 8:37 AM
To: Rodriguez, Jorge
Cc: Littleton, Dave
Subject: Re: southwestern boulevard
Sorry guys we were off for the holiday yesterday. I'll print these out
and look them over this morning.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
»> "Rodriguez, Jorge" <jodriguez@halff.com> 1/19/2009 5:13 PM »>
Keith-
I have attached some pdf files for your review.
We have adjusted the proposed pavement to a 41' Back to Back road
alignment. We held the south line of the previously designed road and
came down 4 feet from the north. We also shifted the bridge south to
allow for enough clearance to build the proposed bridge in 2 phases.
Phase 1 of the bridge will be 30' wide, and phase 2 will be 20' wide.
The utilities have also been adjusted to keep the new utilities out of
the existing road way.
I have included pdf copies of our road layout, construction phasing,
proposed utilities, bridge plan and bridge cross sections. Please
review and let us know if you have any comments. We would like to
finalize the road alignment before we move forward with the rest of the
construction plans.
Page
Also, we have not heard back from Pac trust regarding making the change
from a 45' B-B road to a 41' B-B road.
(8/2712009) Keith Marvin - RE: southwestern boulevard
Thanks
Jorge Rodriguez, P.E.
Project Manager