Loading...
ST0701-CS090128 (8/30/2011) Keith Marvin - Re: southwestern BlvdPage 1 From: Keith Marvin To:Rodriguez, Jorge CC:Littleton, Dave; Shipman, Cory Date: 1/28/2009 3:48 PM Subject: Re: southwestern Blvd We have talked this over and we are ok with the change as shown in the sketch. Thank you for explaining it to me. Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 >>> "Rodriguez, Jorge" <jrodriguez@halff.com> 1/28/2009 11:29 AM >>> Keith Our structural engineer said that to match the new lane widths they have to narrow the temporary lane widths at the bridge to 10.25' as shown on the enclosed sketch. Please let me know if it is acceptable. He would like to go forward on the bridge design, so your promptly answer would be appreciated. thanks Jorge Rodriguez, P.E. Project Manager HALFF ASSOCIATES, INC. 1201 N. Bowser Road Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com (8/2712009) Keith Marvin -Lane Locations.pdf SoU~~~~ w~ lo,~~ ,~,~y ~ J 1' 1' '11x3' 11~ 1' 2' 2.5 `' 12' 1' 6' 1' ~~ TEMP. LANE TEMP. LANE FUTURE LANE WALK a i 1 ii n. ~ ~ -------~ I ~ _ _-_-~~-__---- _--_ ------------ r-f--------I-{. L1-------J-~ PHASE 1 PHASE 2 >~, ',~ ¢ I f jC,~G~ ~ i~ f t ~ ~ ~ la 1' 1' z TRAFFIC LANE MEDIAN ~I ~I W~ o f PHASE 1 ~~Q~i~ ~~ ~ ( ~ g E I, ~ I ti ~~~ ~~ '; i ~ ~ ~~ ~~~~ RPMr 1~ '----- ~~ B 1, 6, 1, v~~z~ TRAFFIC LANE WALK ~~ ~ ~z' PHASE 2 Page 1