ST0701-CS090623Page 1 of 2 Keith Marvin - FVV: Southwestern Blvd. improvements From: "Rodriguez, Jorge" <jrodriguez(c~halff.com> To: "Keith Marvin" <kmarvin(c~ci.coppell.tx.us> Date: 6/23/2009 9:31 AM Subject: FW: Southwestern Blvd. improvements Keith Could you please clarify the below comment from one of the invited contractor. Please let me know Thanks Jorge From: Ron McAvoy [mailto:RMcAvoy@mariosinacola.com] Sent: Tuesday, June 23, 2009 9:22 AM To: Rodriguez, Jorge Subject: RE: Southwestern Blvd. improvements Jorge, question the response to one of Austin's questions concerning the tax status of this project. Isn't this road going to be dedicated to the City of Coppell for future maintenance? If that is the case, is should benon-taxable. Ron McAvoy, P.E. Mario Sinacola and Sons Excavating, Inc. 10950 Research Road Frisco, Tx 75034 214-387-3900 214-387-3940 Fax From: Rodriguez, Jorge [mailto:jrodriguez~halff.com] Sent: Tuesday, June 23, 2009 9:05 AM To: Keith Marvin; Matt Oyen; Ron McAvoy; CBBurchfield~rodmancompanies.com; dmacafee~lhlacy.com; carmen~jacksonconstruction.net; jshaw~Austin-Ind.com Subject: Southwestern Blvd. improvements Gentlemen Please see the attached Addendum No.2. for Southwestern Blvd. Improvements Please call or email me if any questions. Thanks Jorge Rodriguez, P.E. ~= Pro ect Mana er ~~~ J g ~~ HALFF ASSOCIATES, INC. 1201 N. Bowser Road file://C:1Documents and SettingslradloolLocal SettingslTemplXPgrpwise14A40A0E4City_... 8/27/2009 Page 2 of 2 Richardson, Texas 75081 Phone 214-346-6203 Fax 214-739-0095 www.halff.com file://C:1Documents and SettingslradloolLocal SettingslTemplXPgrpwise14A40A0E4City_... 8/27/2009 (8/2712009) Keith Marvin -Addendum No.2.doc ~~~ HALFF~ ... 1201 North Bowser Road Richardson, Texas 75081 (214) 346-6200 Fax (214) 739-0095 ADDENDUM NO. 2 To: Bidders From: Jorge L. Rodriguez, P.E. Email: jodriguez@halff.com Subject: Addendum No. 2 Date: June 23, 2009 Avo: 24732 & 25816 Project: Southwestern Boulevard Improvements The attached documents are the answers to the entire received questions from the invited contractors regarding the above reference project. All the contractors shall submit any additional questions on or before 3:00 pm June 29, 2009. Please not that the bid date is July 2, 2009 at 4:00 p.m. Attachments: Sheets with answers. Page 1 Copies: File (8/2712009) Keith Marvin -Questions -Southwestern Blvd Austin-Response 2.doc Halff Associates, Inc. 1201 North Bowser Road Richardson, Texas 75081 Attn: B. David Littleton, PE Re: Southwestern Boulevard Coppell, Texas ^ ~I~IIO~d Sir, Austin Bridge & Road has the following questions regardingthe above referenced project: 1J Has all franchise utilities been cleared? Should be completed prior to the award of contract. 2) Will this project be taxable? Yes. 3) Have the funds for this project been placed in escrow for the city? Not to our knowledge. 4) On Page B-1, "General Instructions to Bidders", Paragraph #2, it is stated that this is a lump sum bid. Is the Schedule of Bid Items required with the bid just to establish units and prices for monthly estimates? Yes 5) Will the successful contractor be able to work on both sections at the same time? Yes. 6J Is the owner requiring an onsite field office for the inspection staff? The City required an on-site field office for the contractor. 7) Bridge plans show RR8 Concrete Riprap, but roadway plans sheets show rock riprap atthe Grapevine Creek Bridge. Also, the only bid item is for rock riprap. Please clarify if there will be rock riprap or concrete riprap at this location. See Addendum No.1 for corrections (for both). 8) Bridge plans on sheet SC1.02 show a 3" gas line to be installed by others. Will we be required to place inserts into the bridge? "Gas" label corrected on plan need electrical conduits on both sides of the bridge (2"electrical conduits). 9) Quantity for approach slabs in the proposal is 200 CY, but the summary sheets show 100 CY which is closer to our takeoff. Which is correct? See Addendum No.1 for corrections. 10) Quantities for most of your items on the bid sheet do not match the summary sheet on sheet SC1.04. See Addendum No.1 for corrections. 11) Will the bridge need to be painted? Yes. Color to be determined. 12) Will we have to groove the bridge deck per TxDOT 2004 specifications, or can we tine the bridge deck? Groove per TxDOT 2004 Specifications. 13) Is the school zones flasher signs included in the quantity for Pay Item #19b? Yes. 14) The school zone flashers are powered by electricity. How is the relocation of the electrical service for those signs paid? Items to be included in lump sum (no separate items). 15) How will the temporary roadway pavement for two way traffic be paid? Items to be included in lump sum. 16) There is no detail for a temporary driving surface shown in the plans. What will the owner require? Asphalt pavement suitable to withstand construction and local traffic. 17) Pay Item #8A is for 6" Class C concrete. The notes on Sheet #C2.01-2.03 show driveways to be 5" 3600 PSI concrete. Is this pay item for the driveways? If so, what is the correct thickness? See Addendum No.1 for corrections. Page 1 (8/2712009) Keith Marvin -Questions -Southwestern Blvd Austin-Response 2.doc 18) Does the developer have property adjacent to the roadway to set up a temporary portable concrete batch plant? Yes. Contractor will be require to obtain all permits necessary for the operation of the batch plant, carry appropriate insurance coverage for the facility and will be required to clean and restore the site. Thank you for your time and assistance. Troy Childers Senior Estimator Austin Bridge and Road, L.P. 6330 Commerce Drive Irving, TX 75063 (214) 596-7301 (office) (214) 952-0185 (mobile) (214) 596-7395 (fax) Page 2 (8/2712009) Keith Marvin -Questions-Southwestern Blvd Sinacoloa Response2.doc FROM: Mario Sinacola and Sons Excavating, Inc. QUeSt10n:On your unit price schedule you have an item for relocation of mailboxes. The plans indicate that the mailboxes are to be replaced. Can you clarify? Answer: All the mail boxes shall be replaced and relocated. QUeSt10n:I have another question. I don't see any details for the retaining walls around the trees on Section A. Tnlill they be provided? Answer: They are ornamental walls from o ft to 3 ft. height. Contractor shall determine type of stone veneer or modular wall to be built. Selection shall be approved by the City of Coppell and the Engineer. FROM: Austin Bridge and Road, L.P. Question: On the temporary railing, will there need to be some sort of crash cushion at each end sincetherewill betwowaytrafficadjacent? Will there need to be some sort of anchorage of the traffic barrier to the bridge in order to laterally stabilize the barrier. Answer: See addendum No.l for modifications. Page 1