ST0701-CS090625Page 1 of 1
Keith Marvin -TAS Review letters and report for Southwestern Blvd. Improvements
From: "Rodriguez, Jorge" <jrodriguez(c~halff.com>
To: "Keith Marvin" <kmarvin@ci.coppell.tx.us>
Date: 6/25/2009 4:09 PM
Subject: TAS Review letters and report for Southwestern Blvd. Improvements
CC: "Littleton, Dave" <dlittleton(c~halff.com>
Attachments: Southwestern Boulevard Improvements_report.pdf
Keith
The attached TAS review letter is for your records.
Please call me if any question
Thanks
Jorge Rodriguez, P.E. ~=
Pro ect Mana er ~~~
J g ~~
HALFF ASSOCIATES, INC.
1201 N. Bowser Road
Richardson, Texas 75081
Phone 214-346-6203
Fax 214-739-0095
www.halff.com
file://C:1Documents and SettingslradloolLocal SettingslTemplXPgrpwise14A43A157City_... 8/27/2009
e~~~ c~essb~t~ e~e~~
2537 Pilgrim Rest Drive
Dallas, Texas 75237
Phone: 214-597-3429
Fax: 972-296-Q237
txadareview~bc. rr. com
Matt Dyen
Pac Trust
15350 Sequoia Parkway
Portland, RJR 97224
Re: Southwestern Boulevard improvements
R.D.v1l.
Coppell Rd to Beltline Rd
Coppell, TX 75019
PLAN I~E1ilEw~ G~~PL~ETEQ
Dear: ~11r. 4yen
Enclosed are the results of the plan review completed on the referenced
facility. Identified on the report are areas of nonconformance with
accessibility standards adopted by the Texas Department of Licensing and
Regulation for purposes of ensuring compliance with Texas ~overnnent
Code, Chapter 469.
Although deficiencies may have been Hated, the referenced project may
be eligible for inspection approval if constructed in accordance with the
Texas Accessibility Standards. Items which are the responsibility of the
owner should be referred to the appropriate person for action.
The building or facility owner must request an inspection from our office
no later than thirty (30) days after the completion of construction. If the
completion date provided on the Project Registration Form is no longer
correct, notify this office (in writing) of the revised completion date as
soon as possible.
This determination does not address applicability of the Americans with
Disabilities Act ~ADA~, P.L. 1Q1-336}, or any other local, state, or federal
requirement. For information on the ADA, call the ADA Hotline, ~84a} 949
4232 or the United States Department of Justice at ~2Q2~ 514-0341.
Please reference the Department assigned project number in ail future
correspondence pertaining to this project.
,dune ~:~, 2499
EABPRJA9814411
Thanks,
~~.
~~ .~. _ .
~~
ferry Arri~gtan RAS ~~52
Texas Accessibility Specialist
Texas Department of Licensing and Regulations
~e~~s .~c~~s~i~r'l~ty Re~i~~vs ?S,~Pi~~~°irl~estlJ~i~re ~ll~.~, T'exas r`'SZ3~ ~: ~1~-.~i-~~9 ~ ~~~~~G-~3;'
Plans and Specifications l~evie~ deport
Article 9I0~, T>~.~.
Texas Accessibility Standards
Project: South~etern Boulevard Irnprovernents
R,C~,v~.
Coppell Rd to Betline Rd
Coppell, T~ X5019
D~vner: Pac Trust
15350 Sequoia Parku~~ay
Portland, ~R 9~22~
Architect: Halff Associates
Project Name: Southwestern Boulevard Improvements
l~.evie~er: cukatu, ras # 013
Tate: Od,22.09
f~~
Teas A.~~essb~v ~e~ie~vs
Project Sco e: TAS ~.1 4.3 ~,5 ~.7 4.8 and x.29
Project Descri tion: Build a concrete road X3800 linear ft,}; Draina~,e, paving, and utility improvements.
Status: ~- Incompliance ~ ~-Deficiency NI -Not Indicated NA ~.... Not Applicable
Standards Wage Status 11~ates
4, l Minimum Requirements 00.02 All areas of newly designed ar newly constructed
buildings and facilities required to be accessible by
4.1.2 and 4.1.3 and altered portions of existing
buildings and facilities required to be accessible by
4..1.6 shall comply with these standards, 4.1 through
4.35 unless otherwise provided in this section or as
mad~ed in a s ecial a licatian section.
4.3 Accessible Route NA All walks, halls, corridors, aisles, skywalks, tunnels,
4.3.1 ~ General general circulation routes, and other spaces that are
4.3.. .£ocation part of an accessible route shall comply with 4.3.
4.3..2(1 exterior At least one accessible route within the boundary of the
Routes site shall be provided from public transportation stops,
4.3.Z~~~ ~'onnecting accessible parking and accessible passenger loading
Routes pones, a public streets ar sidewalks to the accessible
building entrance they serve. ~'he accessible route
shall, to the ~naxiaraum extent feasible, coincide with the
route for the general public.
At least one accessible route shall connect accessible
buildings, facilities, elegyrents, and spaces that are on
the same site,
4.3.3 Width X201- ~` 'lie r~ainirnurn clear width of an accessible route shall
C20~ be 3~ in. except at doors. 1f a person in a wrheelchair
must rrrake a turn around an obstruction, the ar?rnrmuna
clear ~~tidth of the accessible route shall be 4~ in.
minimum.
4.3.41'assing Space 0201- ~ 1f an accessible route lass less than ~Q in. clear wrath,
C20G then the passing spaces at least ~~ in. by 6~ in. shall be
located at reasonable intervals not to exceed 1 oD t,
4.3. ~ Slope 0201 ~ y An accessible route with a running slope greater than
~20~ 1: 2~ is a ramp and shall comply° with 4. ~' ~~~owhere
shall the cross slope of an accessible route exceed 1: ~ ~.
'exas ~cces~ib~l~t~, ~evie~a;s ?~3?Pil~rta ~~~t ~r~ve T~~ll~~, ~'exr~s iS~3f ~: ?~~-5-329 f ~i?-?gb_(~?3?
TDLR. Praect No. I~ABPRAg81~0011
Pale 1 of 2
~
~
-
a~ge~ i'/Y ~V~~~ ~V'.Cg 4',wi/a
l.3vW Vh
~•3 T ChYOn
gM/ ~. P
Ce~f et'
~
W
ting WY'. i acct/
s~b~w' rV
Y 4~ s/YWi~L
}
~
/
/~
C~.V Ll
Accessible L •W ~btiv y
~
a
~
}
y
p
co~npL~ wwYti s ~. ~.iW, tf W~f ~ aVVe~13 N4J ~ roLbLe i 4f.Ss W ha. Fge~ ~i 4
l
e b`e
~ gr~atYr tan ~ ~n~ Y:Yeii i/€' c~b r4LttftJ, rah/~p,
1
l
~~vLdLCl1 , ~S LfGaoB Sn L t i7haL~ tie pr~v~L4
€rLE.
.~ Ground Surfaces C0.0~ ~ Ground surfaces along accessible routes and its
~.5. l General accessible rooms and spaces incla~ding~l`oors, ~~ralks,
ra~tps, stairs, and curb ramps, shall be jirn~, stable,
and sli -resistant.
~. 5.2 Changes in rev°el C~.O~ - ~~ C'hanges in le~%el ~~p to ~~ in. ~nay~ be v*ertr`cal and
C~.O~ without edge treatr~rent. Changes in level bet~~~een ~ in.
and ~~~ in. shall be beveled with a slope no greater than
1: 2. Changes in level greater than ~~ in. shall be
accnm lisped by means o a ram .
~. 5. ~ Gratings ~~ .lf gratings are located' in ~v~alking surfaces or along
accessible routes they shall ha~Ye spaces na greater
than ~g in. wide in one direction. if gratings have
elongated openrngs, then they shall be placed sa that
the long dimension is perpendicular to the dominant
direction of travel.
~, ~ Curb .amps C~.04 - Curb ramps shall be provided wherever an accessible
4. ~.1- ~. ~. ~ C2.OG route crosses a curb.
tl~axin~u~n slopes of ad~ joining g~ctters, road' surface
adjacent to ramp or accessible route shall not exceed
1':2Q, minimum width of ram s 3~ in.
~.~ Damps C.O~ - Any part of an accessible route with a slope greater
x.8.2 Slope and Rise C2.06 than 1:20 (5f~ shall be considered a ramp and shall
comply with 4.8
The least passible slope shall be used for any ramp.
The maximum slope of a ramp in new construction
shall be 1: ~2, The maximum rise far any run shall be
30 in ~76Q mm~.
~.~9 Detectable Warnings N~ Detectable warnings shall consist of raised truncated
4.29.2 Detectable Warnings domes with a diameter of nominal Q.9 in X23 mm}, as
nn Walking Surfaces height of nominal Q.2~5 mn~~ in and acenter-to-center
spacing of nominal 2.35 in ~6amm~ and shall contrast
visually with adjoining surfaces, either light-on-dark,
ar dark~on-li ht.
~"~'~Comn~ents: ill of tl~e shove conditions are indicated as net per the drawing, however please comply with
floe general note on page CD. ~2 referring to the ADA compliance. ~'nsure compliance during the construction
and prior to requesting an inspection.
~`e~~rs ~4ccessrbility ~e~r~~~-s ~53?T~ilgri~~ hest Dave l~~llas, ~'exas i.~3 ~' ~: X14-5~j-342 f: 9~2-Z~~-~23i
~~g~ 2 0