ST0701-BD090707Page 1 of 1
Keith Marvin -Contractor Bid Tabs South Western Blvd.
From: "Rodriguez, Jorge" <jrodriguez(c~halff.com>
To: "Matt Oyen" <MattO@PacTrust.com>, "Keith Marvin" <kmarvin(c~ci.coppell.tx.us>
Date: 7/7/200910:13 AM
Subject: Contractor Bid Tabs South Western Blvd.
CC: "Littleton, Dave" <dlittleton(c~halff.com>
Attachments: 2009-07-02 contractorbid-AV024732 .xls; 2009-07-02 CONTRACTORBID-
AV025816.x1s
H i g uys
I have attached the Bid Tabs for the above referenced project. We adjusted a few items that have been reflected
at the end of each tabs. They were modified as part of previous Addendums or founded mistakes. Please call
Dave or me if any question.
Thanks
Jorge Rodriguez, P.E. ~=
Pro ect Mana er ~~~
J g ~~
HALFF ASSOCIATES, INC.
1201 N. Bowser Road
Richardson, Texas 75081
Phone 214-346-6203
Fax 214-739-0095
www.halff.com
file://C:1Documents and SettingslradloolLocal SettingslTemplXPgrpwise14A531FC5City_... 8/28/2009
(8/2812009) Keith Marvin - 2009-07-02 contractorbid-AV024732 .xls
Page 1
ROJ: SOUTHWESTERN BLVD. FROM GRAPEVINE CREEK TO BELT LINE ROAD 41' B-B STA 15+13- 38
.VO: 24732
.,
ITEM N0. .,~
Jackson Construction
Rodman
ITEM DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL
1 B Mobilization 1 LS $0.00 $30,000.00 $30,01
2B raffic Control 1 LS $0.00 $17,765.00 $17,7E
3B Street Stri in 1 LS $0.00 $18,060.00 $18,OE
4B Clearin and Grubbin 1 LS $0.00 $84,288.00 $84,2
5B Remove Existin As halt Pavement 8,120 SY $0.00 $2.10 $17,0!
6B Remove Existin Concrete Pavement 410 SY $0.00 $7.00 $2,8~~
7B Remove Existin RCP Pie 245 LF $0.00 $22.00 $5,3!
8B Remove Brick Pavers 10 SY $0.00 $20.00 $21
9B Install As halt Pavement 135 SY $0.00 $56.50 $7,6;
10B "Thick Concrete Sidewalk 820 SY $0.00 $28.00 $22,9E
11B 6" Inte ral Curb 4,980 LF $0.00 $1.00 $4,9~
12B 5"Think Reinforced Concrete Drive 1,070 SY $0.00 $38.75 $41,4E
13B 8"Thick Reinforced Concrete Pavement 11,070 SY $0.00 $30.15 $333,7E
14B Limed and Com acted Sub rade 11,915 SY $0.00 $2.80 $33,3E
15B H drated Lime 30 Ibs/SY 180 TN $0.00 $136.00 $24,4
16B Grass Seedin b H dromulch 1 LS $0.00 $17,500.00 $17,51
17B Salva a Fire H Brant 1 EA $0.00 $935.00 $9;
18B Re lace Mail Box 8 EA $0.00 $320.00 $2,5E
19B Remove and Relocate Traffic Si n 19 EA $0.00 $107.00 $2 0;
ITEM N0.
ITEM DESCRIPTION
QUANTITY TOTAL
UNIT $0.00
Jackson Construction $667 28
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAL
20B 1" Co er Pi e 630 LF $0.00 $13.00 $8,1!
21B 1 1/2" Co er Pie 85 LF $0.00 $17.00 $1,4~
22B 3" PVC Water Pi e 75 LF $0.00 $18.00 $1,3!
23B "PVC Water Pi e 10 LF $0.00 $18.00 $1 ~
24B 6" PVC Water Pi e 110 LF $0.00 $19.00 $2,0!
25B 8" PVC Water Pi e 620 LF $0.00 $27.00 $16,7
26B 12" PVC Water Pie 2,005 LF $0.00 $28.00 $56,1
27B 24" RCP Water Pie 295 LF $0.00 $140.00 $41,31
28B 1"Air Release Valve 1 EA $0.00 $2,115.00 $2,1
29B "Gate Valve 1 EA $0.00 $585.00 $5~
30B 6"Gate Valve 7 EA $0.00 $725.00 $5,0~~
31B 8"Gate Valve 9 EA $0.00 $1,035.00 $9,3'
32B 12"Gate Valve 6 EA $0.00 $1,890.00 $11,3
33B 1"Water Service Connection 7 EA $0.00 $1,070.00 $7,4!
34B 1 1l2" Water Ta in Sleeve Connection 1 EA $0.00 $2,155.00 $2,1 !
35B 16"x12" Tapping Sleeve and Valve(including connection) 1 EA $0.00 $5,760.00 $5,7E
36B 24"x12" Tapping Sleeve and Valve(including connection) 1 EA $0.00 $8,700.00 $8,71
37B Ductile Iron Fittin s 4 TN $0.00 $4,285.00 $17,1
38B Concrete Thrust Blockin 23 CY $0.00 $120.00 $2,7E
39B Install Fire H Brant 6 EA $0.00 $2,350.00 $14,11
40B Removal of Water Service Line 1" or 1 1l2" 8 EA $0.00 $200.00 $1,61
41 B rench Safet S stems 2,915 LF $0.00 $0.25 $7;
42B estin and Chlorination 1 LS $0.00 $1,375.00 $1,3~~
43B V Inspection * 0 LF $0.00 '
TOTAL $0.00 $217,67
8/2812009) Keith Marvin - 2009-07-02 contractorbid-AV024732 .xls
Page
ITEM N0.
ITEM DESCRIPTION
QUANTITY
UNIT
Jackson Construction
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAL
44B 8" WW PVC 2,290 LF $0.00 $52.00 $119,0
45B ' Diameter WW Manhole 6 EA $0.00 $3,135.00 $18,8'
46B Connect to Existin Wastewater Manhole 4 EA $0.00 $1,285.00 $5,1~
47B rench Safet S stems 2,290 LF $0.00 $0.25 $5~~
48B est Waste Water System and Manholes ** 2 EA $0.00 $2,050.00 $4,11
49B V Ins ection 2,290 LF $0.00 $0.50 $1,1~
50B Connect Existin 4" WW Service to New 8" WW 9 EA $0.00 $450.00 $4,0!
51B Remove Existin WW Manhole 2 EA $0.00 $1,225.00 $2,4!
52B Cut and lu existin 8" ww 5 EA $0.00 $420.00 $211
~-~
ITEM N0.
TEM DESCRIPTION
UANTITY TOTAL
UNIT $0.00
Jackson Construction $157 44
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAL
53B 12"CLASS III RCP 115 LF $0.00 $30.00 $3,4!
54B 18"CLASS III RCP 560 LF $0.00 $45.00 $25,21
55B 24"CLASS III RCP 380 LF $0.00 $59.00 $22,4;
56B 30" CLASS I I I RCP 30 LF $0.00 $72.00 $2,1 F
57B 36"CLASS III RCP 420 LF $0.00 $89.00 $37,3
58B 2"CLASS III RCP 285 LF $0.00 $115.00 $32,7~~
59B 8" CLASS I I I RCP 240 LF $0.00 $134.00 $32,1 F
60B 60"CLASS III RCP 210 LF $0.00 $194.00 $40,7
61 B 66" CLASS I I I RCP 255 LF $0.00 $232.00 $59,1 F
62B 72"CLASS III RCP 160 LF $0.00 $269.00 $43,0
63B 6' STORM DRAIN MANHOLE 1 EA $0.00 $5,680.00 $5,6~
64B Pi e W es 17 EA $0.00 $165.00 $2,81
65B 2'X2' WYE INLET 1 EA $0.00 $2,240.00 $2,2~
66B 5'X5' WYE INLET 6 EA $0.00 $5,160.00 $30,9E
67B 10' Curb Inlet Standard De th 13 EA $0.00 $2,710.00 $35,2;
68B 2:1 Slo ed End Treatment 42" RCP 1 EA $0.00 $2,300.00 $2,31
69B Slo ed Concrete A ron 4 EA $0.00 $1,060.00 $4,2~
70B Concrete Encase Existin Wastewater Main 20 LF $0.00 $40.00 $81
71 B 6"-8" Diameter Rock Ri Ra 10 CY $0.00 $75.00 $7!
72B 2' Thick TxDOT T e "A" Rock Ri Ra 10 CY $0.00 $90.00 $91
73B rench Safet 2,650 LF $0.00 $0.25 $6F
74B Remove Existin W e Inlet 2 EA $0.00 $990.00 $1,9~
75B Remove Existin Manhole 1 EA $0.00 $860.00 $8F
76B Erosion Control and SWPP3 1 LS $0.00 $15 000.00 $15 OI
ITEM N0.
ITEM DESCRIPTION
QUANTITY TOTAL
UNIT $0.00
Jackson Construction $402 89
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAL
77B 2"Electric Conduit 4,075 LF $0.00 $5.40 $22,01
78B Pull Box 4 EA $0.00 $562.00 $2 2~
• TOTAL 0.00
$0.00 24 25
$1469 55
NOTE: HALLFF ESTIMATE DOES NOT INCLUDE 15% CONTINGENCY
(8/2812009) Keith Marvin - 2009-07-02 contractorbid-AV024732 .xls
Page 3
~ ~:
ITEM N0. ~ ~ ,.
ITEM DESCRIPTION
Jackson Construction
Rodman
TOTAL TOTAL
1 B-19B Pavin IGradin $0.00 $667,2
20B-43B ater Service $0.00 $217,6~~
44B-52B astewater $0.00 $157,4
53B-76B Draina a $0.00 $402,8!
77B-78B Electric $0.00 $24,2!
TOTAL 0.00 1469 55
*43B TV Inspection was deleted as part of Addendum 3
**48B Unit is "EA" instead of LS. There are 2 lines to be tested.
72B Lacy Construction shows 85 CY instead of 10 CY. Quantity adjusted.
ITEM N0.
ITEM DESCRIPTION
QUANTITY
UNIT
Jackson Construction
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAL
PAVING & GRADING
10B "Thick Concrete Sidewalk 820 SY $0.00 $28.00 $22,9E
ATERSERVICE
27B 24" RCP Water Pipe 295 LF $0.00 $140.00 $41,31
ASTEWATER
44B 8" WW PVC 1,430 LF $0.00 $52.00 $74,3E
45B ' Diameter WW Manhole 3 EA $0.00 $3,135.00 $9,41
47B rench Safet S stems 1,430 LF $0.00 $0.25 $3!
48B est Waste Water S stem and Manholes 1 LS $0.00 $2,050.00 $2,0!
49B V Ins ection 1,430 LF $0.00 $0.50 $7'
50B Connect Existin 4" WW Service to New 8" WW 9 EA $0.00 $450.00 $4,0!
51B Remove Existin WW Manhole 1 EA $0.00 $1,225.00 $1,2;
52B Cut and lu existin 8" WW 5 EA $0.00 $420.00 $211
TOTAL 0.00 158 52
8/2812009) Keith Marvin - 2009-07-02 CONTRACTORBID-AV025816.x1s
Page
PROJECT: SOUTHWESTERN BLVD. FROM COPPELL RD. TO GRAPEVINE CREEK 41' B-B STA 0+00 -STA 15+13
V0: 25816
.,
ITEM NO. -,~
ITEM DESCRIPTION
QUANTITY
UNIT
Jackson Construction
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAI
1A Mobilization 1 LS $0.00 $53,600.00 $53
2A Traffic Control 1 LS $0.00 $54,450.00 $54
3A Street Stri in 1 LS $0.00 $10,130.00 $10
4A Clearin and Grubbin 1 LS $0.00 $54,364.00 $54
5A Removal of Existin As halt Pavement 3,600 SY $0.00 $2.10 $7
6A shalt avement 95 SY $0.00 $58.80 $5
7A "Thick Reinforced Concrete Sidewalk 4,350 SF $0.00 $3.15 $13
8A 5" Class C Reinforced Concrete Drive 455 SY $0.00 $38.75 $17
9A 6" Inte ral Curb 2,400 LF $0.00 $1.00 $2
10A 8"Thick Reinforced Concrete Pavement 5,505 SY $0.00 $30.15 $165
11A Limed and Com acted Sub rade 6,230 SY $0.00 $2.80 $17
12A H drated Lime 40 IbsISY 120 TN $0.00 $136.00 $16
13A Grass Seedin B H dromulch 1 LS $0.00 $9,000.00 $9
14A Relocation of Mailbox 6 EA $0.00 $320.00 $1
15A Removal of Existin Tree 4 EA $0.00 $300.00 $1
16A Relocation of Traffic Si n 4 EA $0.00 $107.00 9
17A Retainin Wall 90 LF $0.00 $140.00 $12
18A Removal of Existin Concrete Ri Ra 345 SY $0.00 $6.00 $2
ITEM NO.
ITEM DESCRIPTION
QUANTITY TOTAL
UNIT $o.oo
Jackson Construction $446
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAI
19A 1" Co er Pi e 770 LF $0.00 $13.00 $10
20A 6" PVC Water Pie 110 LF $0.00 $19.00 $2
21A 8" PVC Water Pie 45 LF $0.00 $27.00 $1
22A 12" PVC Water Pi e 1,205 LF $0.00 $28.00 $33
23A Trench Safet S stems 1,250 LF $0.00 $0.25 9
24A Install Fire H Brant 4 EA $0.00 $2,350.00 $9
25A 6"Gate Valve 4 EA $0.00 $725.00 $2
26A 8"Gate Valve 3 EA $0.00 $1,035.00 $3
27A 12" Gate Valve 3 EA $0.00 $1,890.00 $5
28A 12"x12" Ta in Sleeve and Valve includin connection 1 EA $0.00 $5,340.00 $5
29A 24"x12" Ta in Sleeve and Valve includin connection 1 EA $0.00 $8,700.00 $8
30A Ductile Iron Fittin s 2 TON $0.00 $4,285.00 $8
31A Concrete Thrust Blockin 4 CY $0.00 $120.00 9
32A Testin and Chlorination 1 LS $0.00 $600.00 9
33A TV Inspection * 0 LF $0.00 $0.00
34A Removal of Water Service Line 1" 9 EA $0.00 $200.00 $1
35A 1"Water Service Connection 9 EA $0.00 $1,070.00 $9
36A Removal and Salva in of Fire H drants 1 EA $0.00 $935.00 9
TOTAL $o.oo $104
8/2812009) Keith Marvin - 2009-07-02 CONTRACTORBID-AV025816.x1s
Page
ITEM NO.
ITEM DESCRIPTION
QUANTITY
UNIT Jackson Construction Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAI
37A 8" WW PVC 1,070 LF $0.00 $66.00 $70
38A ' Diameter WW Manhole 5 EA $0.00 $3,135.00 $15
39A Connect Existin to New Manhole 1 EA $0.00 $410.00 9
40A Test Waste Water S stem and Manholes 1 LS $0.00 $890.00 9
41A TV Ins ection 1,070 LF $0.00 $0.50 9
42A Trench Safet S stems 1,070 LF $0.00 $0.25 9
43A astewater Connection 9 EA $0.00 $580.00 $5
44A bandonment of Existin WW Manholes 4 EA $0.00 $1 225.00 $4
-, ,
ITEM NO.
TEM DESCRIPTION
QUANTITY TOTAL
UNIT $o.oo
Jackson Construction $98
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAI
45A 12" Sch. 40 PVC 100 LF $0.00 $29.00 $2
46A 18"Class III RCP 10 LF $0.00 $45.00 9
47A 24"Class III RCP 730 LF $0.00 $59.00 $43
48A 36"Class III RCP 285 LF $0.00 $89.00 $25
49A Pi e W es 2 EA $0.00 $165.00 9
50A 10' Curb Inlet Standard De th 3 EA $0.00 $2,710.00 $8
51A 36" Slo ed End Section 1 EA $0.00 $1,825.00 $1
52A 6' Storm Drain Manhole 1 EA $0.00 $7,950.00 $7
53A TxDOT T e A Rock Ri Ra 85 CY $0.00 $150.00 $12
54A 8"-12" Diameter Rock Ri Ra 6 CY $0.00 $75.00 9
55A Trench Safet 1,020 LF $0.00 $0.25 9
56A Ditch Excavation 2,910 CY $0.00 $4.00 $11
57A Erosion Control and SWP3 1 LS $0.00 $9 500.00 $9
TOTAL $o.oo $124
.. ~
ITEM NO.
ITEM DESCRIPTION
QUANTITY
UNIT
Jackson Construction
Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAI
58A Drilled Shaft Foundations 24" Diameter 264 LF $0.00 $80.50 $21
59A Drilled Shaft Foundations 30" Diameter 120 LF $0.00 $140.00 $16
60A Class C Concrete Abutment 36 CY $0.00 $845.00 $30
61A Class C Concrete Bent 56 CY $0.00 $735.00 $41
62A Class S Concrete A roach Slab 100 CY $0.00 $428.00 $42
63A Class S Concrete Sidewalk 7 CY $0.00 $456.00 $3
64A Reinforced Concrete Slab 6,800 SF $0.00 $17.70 $120
65A Prestressed Concrete Slab Beams 4SB15 401 LF $0.00 $144.00 $57
66A Prestressed Concrete Slab Beams 5SB15 939 LF $0.00 $144.00 $135
67A Concrete Surface Treatment Class 1 854 SY $0.00 $2.70 $2
68A Railin T411 Rail 150 LF $0.00 $130.00 $19
69A Railin C411 Rail 150 LF $0.00 $140.00 $21
70A Tem ora Railin 176 LF $0.00 $18.20 $3
71A Tem ora crash terminal narrow REACT 350 2 EA $0.00 $11,790.00 $23
72A Joint Sealant 150 LF $0.00 $16.10 $2
73A Remove Str Bride 100-499 Ft Len th 1 EA $0.00 $26,800.00 $26
74A 5"thick concrete ri ra 90 CY $0.00 $402.00 $36
75A Sin le sided crash cushion BEAT-SSCC 1 EA $0.00 $9,220.00 $9
76A Metal beam uard fence TL2 1 EA $0.00 $1,180.00 $1
77A Sin le uardrail terminal SGT 7 or SGT 8 1 EA $0.00 $2,935.00 $2
8/2812009) Keith Marvin - 2009-07-02 CONTRACTORBID-AVO25816.x1s
Page
TOTAL $0.00 $61 ~
(8/2812009) Keith Marvin - 2009-07-02 CONTRACTORBID-AV025816.x1s
Page 4
ITEM N0. Jackson Construction
ITEM DESCRIPTION QUANTITY UNIT Rodman
UNIT PRICE TOTAL UNIT PRICE TOTAI
78A 2"Electric Conduit 2,780 LF $0.00 $5.40 $15
79A Pull Box 4 EA $0.00 $562.00 $2
80A Connect to Bride 2 EA $0.00 $2 410.00 $4
~ TOTAL $o.oo
$0.00 $22
1,413,
HALFF ESTIMATE DOES NOT INCLUDE 15% CONTIGENCY
1 ~:
ITEM N0. ~ ~ ~.
ITEM DESCRIPTION
Jackson Construction
Rodman
TOTAL TOTAI
1A-18A Pavin lGradin $0.00 $446
19A-36A ater Service $0.00 $104
37A-44A astewater $0.00 $98
45A-57A Draina a $0.00 $124
58A-77A Bride $0.00 $617
78A-80A Electric $0.00 $22
TOTAL 0.00 1,413,
*33A TV Inspection deleted as part of Addendum 3.