Loading...
ST0501-CS080327 Page 1 of 1 Keith Marvin - Deforest Road From:    "Quinn Spann" <qspann@gswwengineers.com> To:    <kmarvin@ci.coppell.tx.us> Date:    3/27/2008 7:55 AM Subject:    Deforest Road CC:    "Dan DeGroot" <ddegroot@gswwengineers.com>   Good Morning Keith,   Just checking in.  We have the Drainage area drawn up.  We have also tried to draw in the existing Storm Sewer profile at the east end. (it is a little “iffy” because the elevations from the record drawings and our survey do not line up as close as we would have hoped).   When we left our meeting the other day, it was my understanding that you and Ken where going to take a closer look at the Windsor Estates and Deforest Court plans at the drainage and possible reasoning for the Hydraulic Grade difference.  It was also my understanding that you guys were going to look at the “sketched-in” alignment and cross section that we left there.   I was just checking to see what you wanted to do for the next meeting and when you would like to have the next meeting.  We can come over there with our laptop and projector.  I figured that it would be easier on you guys if we did it there.   Quinn G. Spann, Jr., P.E. Associate / Sr. Project Manager GSWW, Inc. 11117 Shady Trail Dallas, Texas 75229 972-620-1255 Ext 225 972-620-8028 Fax   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\47EB52D7City_o...3/4/2010 (8/3112009) DiWanna Baskins - RE: Deforest Road From: "Quinn Spann" <gspann@gswwengineers.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> CC: <DBASKINS@ci.coppell.tx.us> Date: 3/27/2008 9:45 AM Subject: RE: Deforest Road What is DiWanna's phone number? We will be adjusting the curve slighty. Quinn G. Spann, Jr., P.E. Associate I Sr. Project Manager GSWW, Inc. 11117 Shady Trail Dallas, Texas 75229 972-620-1255 Ext 225 972-620-8028 Fax -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Thursday, March 27, 2008 9:39 AM To: Quinn Spann Cc: DiWanna Baskins; Dan DeGroot Subject: Re: Deforest Road Quinn, Please make sure you include DiWanna on all of your requests and correspondence. She will be transitioning into the Project Manager role on this project. I will get with her and discuss the drainage and the alignment. Have you had a chance to review the items we talked about at the meeting with respect to the vertical alignment? We'll get back to you with a date for a future meeting Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 »> "Quinn Spann" <gspann@gswwengineers.com> 3/27/2008 7:52 AM »> Good Morning Keith, Just checking in. We have the Drainage area drawn up. We have also tried to draw in the existing Storm Sewer profile at the east end. (it is a little "iffy" because the elevations from the record drawings and our survey do not line up as close as we would have hoped). Page (8/3112009) DiWanna Baskins - RE: Deforest Road When we left our meeting the other day, it was my understanding that you and Ken where going to take a closer look at the Windsor Estates and Deforest Court plans at the drainage and possible reasoning for the Hydraulic Grade difference. Itwas also my understanding thatyouguys were going to look at the "sketched-in"alignment and cross section that we left there. I was just checking to see what you wanted to do for the next meeting and when you would like to have the next meeting. We can come over there with our laptop and projector. I figured that it would be easier on you guys if we did it there. Quinn G. Spann, Jr., P.E. Associate I Sr. Project Manager GSWW, Inc. 11117 Shady Trail Dallas, Texas 75229 972-620-1255 Ext 225 Page 2 972-620-8028 Fax