ST0501-CS080401(8/3112009) Divvanna Baskins - RE: Deforest CourtlWindsor Estates Drainage From: "Quinn Spann" <gspann@gswwengineers.com> To: "Keith Marvin" <kmarvin@ci.coppell.tx.us> CC: "DiWanna Baskins" <DBASKINS@ci.coppell.tx.us> Date: 411 /2008 8:27 AM Subject: RE: Deforest CourtlUVindsor Estates Drainage Keith, I think that will cover it. There seems like there should also be re-computations for the detention pond after Deforest Court was designed since the flows and time of concentrations changed. I would think that that would change the discharge rates at the different events in the pond. I would also like to know why so much more area was picked up to the west of Deforest Court. Quinn G. Spann, Jr., P.E. Associate I Sr. Project Manager GSWW, Inc. 11117 Shady Trail Dallas, Texas 75229 972-620-1255 Ext 225 972-620-8028 Fax -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Tuesday, April 01, 2008 8:19 AM To: Quinn Spann Cc: DiWanna Baskins Subject: RE: Deforest CourtlWindsor Estates Drainage No problem. Was there anything I missed on our request to Halff? Keith Keith Marvin, P.E. Project Engineer (972) 304-3681 »> "Quinn Spann" <gspann@gswwengineers.com> 4/1/2008 7:58 AM »> Hey Keith, Sorry that I was not here to receive you phone call yesterday afternoon. I had to leave early to attend my daughter's soccer game. Quinn G. Spann, Jr., P.E. Associate I Sr. Project Manager GSWW, Inc. 11117 Shady Trail Dallas, Texas 75229 972-620-1255 Ext 225 972-620-8028 Fax Page (8/3112009) Divvanna Baskins - RE: Deforest CourtlWindsor Estates Drainage -----Original Message----- From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us] Sent: Monday, March 31, 2008 5:15 PM To: Quinn Spann; dchovan@halff.com; wskipwith@halff.com Cc: DiWanna Baskins Subject: Deforest CourtlWindsor Estates Drainage Dennis and Walter, I know this is reaching back a few years, but we need a little help. The City of Coppell has hired Quinn Spann with GSWW to design some improvements to Deforest Road. We will be rebuilding the portion from MacArthur Blvd to the concrete portion constructed with Windsor Estates. We hope to preserve as much of the drainage system within Deforest as possible. We have some specific questions that we are looking for answers to that I am unable to find in city records. We would like either meet with you to talk through these, or see if you can provide any insight on the following: 1. Can you provide us with copies of your computations for the design of the detention pond in Windsor estates? 2. There is a change in the HGL elevation at the downstream end of the pipe at the referenced pond between the Windsor Estates plans and the Deforest Court plans. Was there something that happened that caused this(LOMR, flap gate, etc...)? 3. The Villages of Coppell DA Map shows two DA's that discharge to the Deforest Road ROW within the limits of the drainage system built with Deforest Court. This water is not reflected in the Deforest Court plans. Any insight you can provide in these areas would be helpful. Thank you. Keith Marvin, P.E. Project Engineer (972) 304-3681 Page 2