Loading...
Bellacere Addn-CS080721(8/3112009) DiWanna Baskins - RE: Bellacere Addition - 300 W Sandy Lake Road From: "fluffy" <michaduffy@charter.net> To: "'DiWanna Baskins"' <dbaskins@ci.coppell.tx.us> Date: 7/21/2008 5:13 PM Subject: RE: Bellacere Addition - 300 W Sandy Lake Road DiWanna i think i might have found it. Finished Floor must be a minimum of 1-ft above paving grade. please verify. yours truly, micha p. fluffy, pe HAMILTON DUFFY, PC 8241 mid cities blvd -suite 100 north richland hills, texas 76180-4759 817.268.0408 -phone 817.284.8408 -fax entail - michaduffy@charter.net -----Original Message----- From: fluffy [mailto:michaduffy@charter.net] Sent: Monday, July 21, 2008 4:36 PM To:'DiWanna Baskins' Subject: RE: Bellacere Addition - 300 W Sandy Lake Road DiWanna, i am trying to revive this project and get it back in your hands. is there any way you can send me a PDF file of the latest engineering comments? one of the specific questions that i have is about a comment referring to the finished floorofthe homes. the comment referred to the minimum height above the top of curb that the house needed to be. 1. i don't rememberwhat the minimum height was 2. i don't remember if it was the finished floor or finished pad of the home. Page 1 thank you for your time. (8/3112009) Divvanna Baskins - RE: Bellacere Addition - 300 W Sandy Lake Road yours truly, micha p. fluffy, pe HAMILTON DUFFY, PC 8241 mid cities blvd -suite 100 north richland hills, texas 76180-4759 817.268.0408 -phone 817.284.8408 -fax entail - michaduffy@charter.net -----Original Message----- From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us] Sent: Thursday, March 27, 200810:34 AM To: fluffy Cc: twhatley@eaglemetal.com; 'Tom Whatley' Subject: RE: Bellacere Addition - 300 W Sandy Lake Road Hello Micha, The next step afterthe engineering reviews is for us to sign and approve the drawings, provided all fees are paid. You would then schedule a preconstruction conference with the city. It is in your best interest to finalize the mentioned items as you move forward with the reviews. Approximately how much time do you need to get the geotechnical report and fire lane finalized? DiWanna City of Coppell Engineering Department (P)972-304-3562 (F)972-304-3570 »> "fluffy" <michaduffy@charter.net> 3/27/2008 9:43 AM »> diwanna, two items to discuss. 1. the thickness of paving - we have not completed the geotechnical work and recommendations yet. can i place a notation on the Paving Plan that either the 6"with the lime or a 7" PCC pavement will be used with the geotechnical recommendations? (In effect, this is what your standard note currently states "MIN. REQUIREMENTS-UNLESS OTHERWISE APPROVED BY CITY ENGINEER") 2. we have not finalized the colorltexture/etc on the pavement edge of the fire lane. again, will a note suffice stating that engineering and fire department shall approve the final design of the pavement edge? Page 2 (8/3112009) Divvanna Baskins - RE: Bellacere Addition - 300 W Sandy Lake Road thanks for your time these are the only two outstanding issues. i would like to get the plans back to you today if possible. yours truly, micha p. fluffy, pe HAMILTON DUFFY, PC 8241 mid cities blvd -suite 100 north richland hills, texas 76180-4759 817.268.0408 -phone 817.284.8408 -fax entail - michaduffy@charter.net -----Original Message----- From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us] Sent: Wednesday, March 05, 2008 2:50 PM To: fluffy Cc: Tim Oates Subject: RE: Bellacere Addition - 300 W Sandy Lake Road Micha, Yes, 7" or greater is a viable option. We would need for you to submit a geotechnical report reflecting the same and a letter requesting a waiver if you prefer not to lime stabilize the base. I also spoke with Tim Oates, Deputy Chief with Fire Dept., regarding the fire lane alternatives. We need for you to submit an example(s) of your alternative option(s). So once you narrow them down, we can go from there. Thanks DiWanna Baskins City of Coppell Engineering Department 972-304-3562 »> "fluffy" <michaduffy@charter.net> 315/200811:30 AM »> diwanna, here are a couple of options that we are looking at for the pavinglfire lane at Bellacere. Page 3 when we narrowall of our options, wewill contactyou to see ifthe City (engineering and fire protection) is OK with the modifications. (8/3112009) DiWanna Baskins - RE: Bellacere Addition - 300 W Sandy Lake Road question - is pavement thickness increase a valid option in lieu of lime treated base? yours truly, micha p. fluffy, pe HAMILTON DUFFY, PC 8241 mid cities blvd -suite 100 north richland hills, texas 76180-4759 817.268.0408 -phone 817.284.8408 -fax entail - michaduffy@charter.net Page 4