ST0501-CS080917(9/1/2009) DiWanna Baskins - RE: Bidding Deforest
From: DiWanna Baskins
To: Dan DeGroot
Date: 9/17/20081:43 PM
Subject: RE. Bidding Deforest
I will give you a call regarding the bid date, etc.
Also, usually we have a meeting to go over the comments. The comments we have thus far are mine and Larry's. The
others have not reviewed the plans yet.
»> "Dan DeGroot" <ddegrootCalgswwengineers.com> 9/17/200812:51 PM »>
This is what I have put together in past projects with other clients for
contract amendments. If you have another format you would like for me
to use then just let me know. Also, I'm not sure who would sign the
contract amendment at the City. Sometimes it is the City Engineer,
Sometime the DPW and sometimes the City manager. Let me know and I can
make the mods then get our VP to sign. Thanks. Please give me a call
about the bid date below. I don't think that bid date is close to being
approachable. To set a bid date in November the plans would have to be
finished by the end of September. The sub for the signal probably
couldn't even come close to having design complete by mid November and
we also need to give the City ample time for review. Also, I need to
receive comments for the 35% plans if you have them. If there are no
comments I will commence getting 65% plans out to you as soon as I can.
65% will not have the signal in them because of the time constraint.
-----Original Message-----
From: DiWanna Baskins f mailto:dbaskinsClci.co~pell.tx.us1
Sent: Wednesday, September 17, 200811:29 AM
To: Dan DeGroot
Subject: Bidding Deforest
Dan,
What do you think might be a respectable time length for putting
Deforest out to bid, November 2008? How long would it take to put the
bid documents together?
Page 1
-DiWanna
September 17, 2008
Ms. DiWanna Baskins, E.LT.
City of Coppell
P.O. Box 95104
Grapevine, TX 76099
Predecessor Firms: Gutierrez, Smouse, Wilmut & Assoc., Inc.
Washington & Associates, Inc.
Re: DeForest Road (MacArthur Blvd. to Windsor Estates) ST05-O1
Contract Amendment #1
Dear Ms. Baskins:
This Amendment No. 1 is for additional design survey and engineering services for project scope
modifications to the above referenced project. The additional scope for this project includes the design of
a traffic signal at the intersection of MacArthur and Deforest.
GSWW proposes to accomplish the extra work as outlined below:
Survey for Design $1,255.00
Basic Engineering Services: $13,345.00
Invoices will show the Amendment No. 1 in detail. If you have any questions regarding this
letter or work performed to date, please call.
GSWW, INC.
Bv:
Dr. Steven D. Sanders, P.E.
Executive Vice President
GSWW, Inc.
Civil/Environmental Engineers ,Planners
Dallas-Fort Worth-Midland-Austin-San Antonio-Houston
CITY OF COPPELL
Bv:
Ken Griffin, P.E.
Director of Public Works