Loading...
ST0501-CS080917(9/1/2009) DiWanna Baskins - RE: Bidding Deforest From: DiWanna Baskins To: Dan DeGroot Date: 9/17/20081:43 PM Subject: RE. Bidding Deforest I will give you a call regarding the bid date, etc. Also, usually we have a meeting to go over the comments. The comments we have thus far are mine and Larry's. The others have not reviewed the plans yet. »> "Dan DeGroot" <ddegrootCalgswwengineers.com> 9/17/200812:51 PM »> This is what I have put together in past projects with other clients for contract amendments. If you have another format you would like for me to use then just let me know. Also, I'm not sure who would sign the contract amendment at the City. Sometimes it is the City Engineer, Sometime the DPW and sometimes the City manager. Let me know and I can make the mods then get our VP to sign. Thanks. Please give me a call about the bid date below. I don't think that bid date is close to being approachable. To set a bid date in November the plans would have to be finished by the end of September. The sub for the signal probably couldn't even come close to having design complete by mid November and we also need to give the City ample time for review. Also, I need to receive comments for the 35% plans if you have them. If there are no comments I will commence getting 65% plans out to you as soon as I can. 65% will not have the signal in them because of the time constraint. -----Original Message----- From: DiWanna Baskins f mailto:dbaskinsClci.co~pell.tx.us1 Sent: Wednesday, September 17, 200811:29 AM To: Dan DeGroot Subject: Bidding Deforest Dan, What do you think might be a respectable time length for putting Deforest out to bid, November 2008? How long would it take to put the bid documents together? Page 1 -DiWanna September 17, 2008 Ms. DiWanna Baskins, E.LT. City of Coppell P.O. Box 95104 Grapevine, TX 76099 Predecessor Firms: Gutierrez, Smouse, Wilmut & Assoc., Inc. Washington & Associates, Inc. Re: DeForest Road (MacArthur Blvd. to Windsor Estates) ST05-O1 Contract Amendment #1 Dear Ms. Baskins: This Amendment No. 1 is for additional design survey and engineering services for project scope modifications to the above referenced project. The additional scope for this project includes the design of a traffic signal at the intersection of MacArthur and Deforest. GSWW proposes to accomplish the extra work as outlined below: Survey for Design $1,255.00 Basic Engineering Services: $13,345.00 Invoices will show the Amendment No. 1 in detail. If you have any questions regarding this letter or work performed to date, please call. GSWW, INC. Bv: Dr. Steven D. Sanders, P.E. Executive Vice President GSWW, Inc. Civil/Environmental Engineers ,Planners Dallas-Fort Worth-Midland-Austin-San Antonio-Houston CITY OF COPPELL Bv: Ken Griffin, P.E. Director of Public Works 1 1 1 17 Shady Trail • Dallas, Texas 75229 • 972.620.1255 • 972.620.8028 Fax • www.gswwengineers.com