From:Keith Marvin
Sent:Monday, November 10, 2008 2:00 PM
To:Michael_Greenia@McAfee.com
Cc:DiWanna Baskins; Jim Witt; Kenneth Griffin
Subject:RE: RE: Sidewalks along DeForest
Mr. Greenia,
The wood fence on the south side of Deforest will remain in place after the project. There are some places where the
grade change due to the construction will require that we build a retaining wall adjacent to the fence. The engineer is
still working on the design of this wall, however our expectation is that it can be built without impacting the fence.
Our original concept was to have sidewalk only on the north side of the road. We had a public meeting last month and
the feedback at that meeting was less than favorable about the sidewalk. We are presently redesigning the project to
allow for sidewalk on both sides of the road.
Feel free to contact me with any other questions.
Keith
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
>>> <Michael_Greenia@McAfee.com> 11/10/2008 11:39 AM >>>
Keith
Thanks for the information. I appreciate it.
Two questions I was hoping you could answer for me:
1) - Can you let me know if the wood fence located on the south side of DeForest will be affected by the new
construction?
2) - Are sidewalks planned for both the north and south side of the new roadway?
Thanks again.
Have a Great Day......
1
(9/2/2009) DiWanna Baskins - RE: RE: Sidewalks along DeForest
From: <Michael_Greenia@McAfee.com>
To: <kmarvin@ci.coppell.tx.us>
CC: <DBASKINS@ci.coppell.tx.us>, <JWITT@ci.coppell.tx.us>, <KGRIFFIN.Town_Ce...
Date: 11110/200811:44 AM
Subject: RE: RE: Sidewalks along DeForest
Keith
Thanks for the information. I appreciate it.
Two questions I was hoping you could answer forme:
1) - Can you let me know if the wood fence located on the south side of
DeForest will be affected by the new construction?
2) -Are sidewalks planned for both the north and south side of the new
roadway?
Thanks again.
Have a Great Day......
Michael
**********************************************************************
Michael J. Greenia
McAfee, Inc.
Senior Financial Analyst, Corporate Accounting Department
5000 Headquarters Drive, Plano, TX 75024
Telephone: 972-987-2052 Il Fax: 972-987-2664
Mail Stop: 2s394
Email: Michael_Greenia@McAfee.com
***************************** wwjd *******************************
-----Original Message-----
From: Keith Marvin [mailto:kmarvin@ci.coppell.tx.us]
Sent: Monday, November 10, 200811:30 AM
To: Greenia, Michael
Cc: DiWanna Baskins; Jim Witt; Ken Griffin
Subject: Fwd: RE: Sidewalks along DeForest
Mr. Greenia,
The City of Coppell is in the design phase for the reconstruction of
Deforest Road. The plan is to remove the asphalt paving, and construct
a 28 foot concrete street. We expect to improve vehicular safety and
improve drainage along the road. We plan to construct sidewalks the
entire length of the project, and install a traffic signal at the
intersection of Deforest Road and MacArthur Blvd.
Page 1
We expect to complete the design in the next few months. We will then
have some right of way acquisition and utility relocations that will
(9/2/2009) DiWanna Baskins - RE: RE: Sidewalks along DeForest
need to take place. The project will begin construction once these are
complete. We anticipate that to be during the second half of 2009.
If you have any specific questions about the project, please feel free
to contact DiWanna Baskins or I at 972-304-3679.
Keith Marvin, P.E.
Project Engineer
(972) 304-3681
»> Ken Griffin 11/10/2008 8:05 AM »>
Keith
Could you handle this today?
Thanks
ken g
»> <Michael_Greenia@McAfee.com> 11/10/2008 7:54 AM »>
Hi Jim
Our next Board meeting is set for Wednesday, is there a way I could get
some info on the DeForest project before the meeting so I can discuss it
with the Board?
Many thanks.
Take care.
Have a Great Day......
Michael
**********************************************************************
Michael J. Greenia
McAfee, Inc.
Senior Financial Analyst, Corporate Accounting Department 5000
Headquarters Drive, Plano, TX 75024
Telephone: 972-987-2052 Il Fax: 972-987-2664
Mail Stop: 2s394
Email: Michael_Greenia@McAfee.com
***************************** wwjd *******************************
-----Original Message-----
From: Jim Witt [mailto:JWITT@ci.coppell.tx.us]
Sent: Tuesday, November 04, 2008 3:31 PM
To: Greenia, Michael
Subject: Re: Sidewalks along DeForest
Page 2
(9/2/2009) DiWanna Baskins - RE: RE: Sidewalks along DeForest
Sorry! I will get on it.
-----Original Message-----
From: <Michael_Greenia@McAfee.com>
To: Jim Witt <JWITT@ci.coppell.tx.us>
Sent: 11 /412008 3:15:16 PM
Subject: RE: Sidewalks along DeForest
Hi Jim
I have not heard from them yet.
Thanks
Have a Great Day......
Michael
**********************************************************************
Michael J. Greenia
McAfee, Inc.
Senior Financial Analyst, Corporate Accounting Department 5000
Headquarters Drive, Plano, TX 75024
Telephone: 972-987-2052 Il Fax: 972-987-2664
Mail Stop: 2s394
Email: Michael_Greenia@McAfee.com
***************************** wwjd *******************************
-----Original Message-----
From: Jim Witt [mailto:jwitt@ci.coppell.tx.us]
Sent: Tuesday, November 04, 2008 2:54 PM
To: Greenia, Michael
Subject: Re: Sidewalks along DeForest
Has engineering responded to you?
»> <Michael_Greenia@McAfee.com> 10/291200810:08 AM »>
Hi Jim
I heard from some homeowners who live in the Lakes of Coppell HOA along
the south side of DeForest that the City is planning some improvements
for DeForest
Can you let me know what the plans are and a timetable if available?
Thanks.
Have a Great Day......
Page 3
Michael
(9/2/2009) DiWanna Baskins - RE: RE: Sidewalks along DeForest
**********************************************************************
Michael J. Greenia
McAfee, Inc.
Senior Financial Analyst, Corporate Accounting Department 5000
Headquarters Drive, Plano, TX 75024
Telephone: 972-987-2052 Il Fax: 972-987-2664
Mail Stop: 2s394
Email: Michael_Greenia@McAfee.com
***************************** ~~ d *******************************
Page 4