Coppell Heights 9-CS090902MEMORANDUM
FROM THE
DEPARTMENT OF ENGINEERING
To: Ken Griffin, P.E., Dir. of Engineering /Public Works
Mike Garza, E.I.T.
Glenn Hollowell, Asst. Dir. of Public Works
Lee Stone, Commercial Bldg. Inspector
Tim Oates, Deputy Chief/Prevention
From: Larry Davis, Construction Inspector
Office Phone: (972) 304-3684
Fax: (972) 304-3570
Date: September 2, 2009
RE: WALK-THRU INSPECTION for Coppell Heights, Lot 9 B & C
920 S. Belt Line Rd.
A final walk-thru for paving and utilities on the referenced project has been scheduled
for:
Tuesday, September 8, 2009 at 1:30 p.m.
Please let me know if I can be of further assistance.
cc: Mohammed Kamal, MJR Engineering (fax #972-767-3003)
Calvert Engineering (fax #972-242-9252)
"CITY OF COPPELL ENGINEERING -EXCELLENCE BY DESIGN"