Loading...
SS9402-CN 950119January 19, 1995 Mr. Kenneth M. Griffin, P.E. Assistant City Manager/City Engineer City of Coppell 255 Parkway Boulevard Coppell, Texas, 75019 I-DR Re: City of Coppell, Texas Sanitary Sewer Improvements Project No. SS9402 Grapevine Creek 1II, IV, and Bethel Road Amendment to Contract No. 2 Dear Mr. Griffin: In accordance with the referenced contract between HDR Engineering and the City of Coppell, dated October 25, 1994, we are submitting this request for modification to the contract fee amount. The fee modification is requested due to a change in scope, as provided in Exhibit A - Engineering Design and Surveying Services. The change in scope is necessary to provide engineering and survey services south and east of the Denton Tap/Railroad Crossing beginning at the existing manhole approximately 210 feet east of Denton Tap, to approximately twenty feet west of Denton Tap. We request approval of an increase in the fee amount in paragraph 5.22 of two thousand, six hundred dollars and no cents ($2,600.00). Please signify your approval of this contract change by signing below and returning one copy. Very truly yours, HDR ENGINEERING, INC. CITY OF COPPELL William R. Hindman, P.E. Senior Vice President LGR/pkw Title: HDR Engineering, Inc. Suite 125 12700 Hillcrest Road Dallas, Texas 75230-2096 Telephone 214 960-4O00