Loading...
ST0501-CS090605Page 1 of 2 DiWanna Baskins -Deforest Road Improvements From: Helen-Eve Liebman <Hliebman(c~cityofallen.org> To: "dbaskins(c~ci.coppell.tx.us" <dbaskins(c~ci.coppell.tx.us> Date: 6/5/2009 8:24 AM Subject: Deforest Road Improvements DiWanna, Thank you. I'm very interested in the plant material since we are losing trees and will definitely attend the next neighborhood meeting. Can you tell me who will be heading up the landscape portion on the city's behalf? Will it be Brad? Thanks again. Helen-Eve Liebman Senior Planner CITY OF ALLEN 305 Century Parkway Allen, Texas 76013 214-509-4172 hliebman~cityofallen.org -----Original Message----- From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us] Sent: Thursday, dune 04, 2009 9:23 AM To: Helen-Eve Liebman Subject: Re: Deforest Road improvements Hi Helen, No, the final construction plans have not been submitted. We currently have 65% submittal in the office. We have a couple of engineering issues, such as the drainage design, that we are working to improve. Some changes from the last neighborhood meeting include putting sidewalk on both sides of Deforest. The trees that will need to be removed were marked on the initial plans shown during the neighborhood meeting. We plan on having another neighborhood meeting so that everyone can have the opportunity to see the plans. You are more than welcome to come in to see the 65% submittal. The plans do not contain the landscape portion at this time. Or, once we get a 90% submittal, I can let you know or check back in periodically. Whichever you prefer. I will be out of the office most of today and during the morning on tomorrow. Let me know what day and time is good for you if you want see what we file://C:1Documents and SettingslradloolLocal Settings)TemplXPgrpwise14A28D625City_o... 9/3/2009 Page 2 of 2 currently have at 65%. Sincerely, DiWanna Baskins Graduate Engineer Engineering Department (P)972-304-3562 (F)972-304-3570 »> "Helen-Eve Liebman" <heleneve@verizon.net> 6/3/2009 7:33 PM »> Hello DiWanna, Last fall we were able to view preliminary plans for the road improvements along Deforest Road. I would like to know if final construction plans have been prepared. I would also like to take a look at the landscape plans/materials proposed. Please let me know how I can take a look at the plans. Thank you. Helen-Eve Liebman Helen-Eve Liebman Senior Planner CITY OF ALLEN 305 Century Parkway Allen, Texas 76013 214-509-4172 hliebman~cityofallen.org file://C:1Documents and SettingslradloolLocal Settings)TemplXPgrpwise14A28D625City_o... 9/3/2009