Denton Creek/Sandy Lake-CS090707(9/3/2009) DiWanna Baskins - Re: Residential Grading Only Sets
From: Mike Boyd <mboyd@ndmce.com>
To: ROBERT SCHNEEBERG <robert.schneeberg@gs-engineers.com>
CC: Kevin Kendrick <Kevin@ApertureDevelopment.com>, Raj Akula <rajakula_99@y...
Date: 717/200910:45 AM
Subject: Re: Residential Grading Only Sets
Robert,
Can you send me a copy of the grading plan (pdf works)?
Thanks,
Mike Boyd, P.E.
Nathan D. Maier Consulting Engineers, Inc.
214-739-4741 214-739-5961 (fax)
-----Original Message -----
From: "ROBERT SCHNEEBERG" <robert.schneeberg@gs-engineers.com>
To: "DiWanna Baskins" <dbaskins@ci.coppell.tx.us>, "Daniel St. Claire" <ghomes@att.net>, "P.E.
Michael H. Boyd" <mboyd@ndmce.com>
Cc: "Kevin Kendrick" <Kevin@ApertureDevelopment.com>, "Raj Akula" <rajakula_99@yahoo.com>
Sent: Tuesday, July 7, 200910:31:10 AM GMT -06:00 US/Canada Central
Subject: RE: Residential Grading Only Sets
Mike,
We now have a significant problem due to the change in water surface elevation and need some advice
as to how we proceed.
Please advise.
Robert schneeberg
Gonzalez &schneeberg, Engineers & Surveyors. Inc.
660 North Central Expressway, Suite 250
Plano ,Texas 75074
Phone: 972-516-8855 Fax: 972-516-8901
-----Original Message-----
From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us]
Sent: Tuesday, July 07, 200910:22 AM
Page 1
(9/3/2009) DiWanna Baskins - Re: Residential Grading Only Sets
To: 'Daniel St. Claire'; ROBERT SCHNEEBERG; P.E. Michael H. Boyd
Cc: 'Kevin Kendrick'; 'Raj Akula'
Subject: Re: Residential Grading Only Sets
Hello Robert,
We cannot allow fill/structures in the floodplain without a CLOMR that defines the scope, regardless of the
amount. If you do not want to carryoutthe scope of the CLOMR currently in existence, you will need new
documentation defining the new scope, which is the retaining wall, etc.
Otherwise, you can fulfill the requirements of the CLOMR we currently have on file.
You may want to look into requirements of a LOMA (Letter of Map Revision)
Sincerely,
DiWanna
»> "ROBERT SCHNEEBERG" <robert.schneeberg@gs-engineers.com> 7/7/2009 9:18 AM »>
DiWanna,
Per the contractor's response below, the owners would like to defer any work
on relating to the CLOMR until a later date. Please note that our grading
plan does show some minimal work below the base flood elevation (BFE) which
was recently adjusted upward to 447.0. At the original BFE of 445.1, all of
the work shown on the grading plan for the residence would be above the BFE.
The total amount of fill below the elevation of 447 should be less than 100
Page 2
cubic yards.
(9/3/2009) DiWanna Baskins - Re: Residential Grading Only Sets
Please let me know if we can submit final plan sets for issuing a "Grading
Only" permit.
Robert Schneeberg
Gonzalez &Schneeberg, Engineers & Surveyors. Inc.
660 North Central Expressway, Suite 250
Plano ,Texas 75074
Phone: 972-516-8855 Fax: 972-516-8901
From: Daniel St. Claire [mailto:ghomes@att.net]
Sent: Monday, July 06, 2009 3:56 PM
To: ROBERT SCHNEEBERG
Cc: Raj Akula; DiWanna Baskins; Kevin Kendrick
Page 3
Subject: Re: grading sets
(9/3/2009) DiWanna Baskins - Re: Residential Grading Only Sets
Robert,
You are correct. We do not wantto do the CLOMR atthis time. We
understand about the time limit of 2 years after City approval.
It is fully the intention of the Akula's to start the Commercial project in
mid to late 2010, so the 2 year time limit should not come into play.
Thanks,
Dan
From: ROBERT SCHNEEBERG <robert.schneeberg@gs-engineers.com>
To: Daniel St. Claire <ghomes@att.net>; Raj <rajakula_99@yahoo.com>
Cc: Kevin Kendrick <Kevin@ApertureDevelopment.com>; DiWanna Baskins
<dbaskins@ci.coppell.tx.us>; "Michael H. Boyd, P.E." <mboyd@ndmce.com>
Sent: Monday, July 6, 2009 3:42:59 PM
Subject: FW: grading sets
Page 4
(9/3/2009) DiWanna Baskins - Re: Residential Grading Only Sets
Dan and Raj, I know that you told me you did not want to do any work related
to the CLOMR at this time. DiWanna called me and asked me to be sure that
this was the case. She wanted me to emphasize that the CLOMR is only good
for 2 years and that if it expires all necessary data will have to be
resubmitted to the Corps of Engineers. There is the possibility that the
rules could be changed and that the CLOMR might not be granted in the
future. Ifyou wish to complete the work forthe CLOMR, several large trees
along the bank of Denton Creek will have to be removed. Apparently the City
feels that it makes sense to do all of the dirt work now. Please let me know
how you would like for us to proceed. Robert Schneeberg Gonzalez &
Schneeberg, Engineers & Surveyors. Inc. 660 North Central Expressway, Suite
250 Plano, Texas 75074 Phone: 972-516-8855 Fax: 972-516-8901 -----Original
Message-----From: DiWanna Baskins [mailto:dbaskins@ci.coppell.tx.us] Sent:
Monday, July 06, 2009 2:15 PM To: ROBERT SCHNEEBERG Cc: 'Daniel St. Claire'
Subject: Re: grading sets Robert, I have a couple of questions foryou. Are
you following the CLOMR? It most likely will be easier for you to follow the
CLOMR regarding the grading, etc. -DiWanna DiWanna Baskins Graduate Engineer
Engineering Department (P)972-304-3562 (F)972-304-3570 »> "ROBERT
SCHNEEBERG" 7/61200911:15 AM »> Are you ready for us to submit the sets
for grading only? We will include the plat with this submittal. Robert
Schneeberg Gonzalez &Schneeberg, Engineers & Surveyors. Inc. 660 North
Central Expressway, Suite 250 Plano, Texas 75074 Phone: 972-516-8855 Fax:
972-516-8901